Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ion clock”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

148 records · Page 9

LuSEE-night power distribution system design

The Lunar Surface Electromagnetic Experiment at Night (LuSEE-Night) is a low-frequency, 0.5 to 50 MHz, radio experiment on the radio-quiet far side of the Moon. The instrument will be launched by NASA Commercial Lunar Payload Services in 2026. The LuSEE-Night instrument core is composed of a radio frequency spectrometer (SPT) processing signals from four antennas, the Data Controller Board (DCB), low electromagnetic interference (EMI) Picket Fence Power Supply (PFPS), and Power Distribution Unit (PDU). The battery powers the instrument during the lunar night and stores energy harvested by the solar panel array during the lunar day. The battery charging is controlled by the Power Conditioning and Distribution Unit (PCDU). The unregulated power is supplied either by the SpaceCraft (S/C) or the battery and gets distributed to the PFPS, communication radio, heaters, and deployables through the PDU. The PFPS generates all regulated low-voltage rails using switching regulation synchronized to the LuSEE-Night clock, which ensures self-generated EMI will be confined to well-defined frequency bins. Here, we discussed the unregulated power distribution system architecture and functionality. The PDU engineering and flight modules are developed and characterized to confirm compliance with LuSEE-Night requirements. At the time of writing, all power subsystem components have been integrated into the payload.

47 OTHER INSTRUMENTATION↗

The ETROC2 as the Final Version for CMS Endcap Timing Layer (ETL) Upgrade

The ETROC (Endcap Timing Readout Chip) is being developed for the LGAD-based CMS Endcap Timing Layer (ETL) at HL-LHC. The ETL on each side of the interaction region will be instrumented with a two-disk system of MIP-sensitive LGAD (Low Gain Avalanche Diodes) silicon devices, read out by ETROCs for precision timing measurement with down to ~30 ps timing resolution per track. The ETROC is designed to handle a 16 x 16 pixel cell matrix, with each pixel being 1.3 mm x 1.3 mm to match the LGAD sensor pixel size. The front-end design for preamplifier and discriminator has been specifically optimized for the reduced LGAD signals, with enough flexibilities to meet the ETL specific needs for time resolution, power budget and radiation profile. The ETROC chip is implemented in a commercial 65nm CMOS process. Each channel consists of a preamplifier, a discriminator, a TDC used for TOA (Time Of Arrival) and TOT (Time Over Threshold) measurements, and a memory for data storage and readout. An in-pixel auto threshold calibration is included, along with a self-testing pattern generator. The TOT is used for time-walk correction of the TOA measurement. The detailed hit information (TOA and TOT) from each cell will be read out from a local circular buffer after each Level-1 Accept (about 1 MHz). In addition, a charge injection circuit is implemented to allow for testing and calibration. For more detailed monitoring of the signal pulses, waveform sampling circuits are included for one pixel. The clock distribution is based on a 16x16 H-tree design with a shielding structure to alleviate potential interference. The global peripheral circuits include a PLL, a phase shifter, an I2C slave controller, a fast control block, a global readout, and a data driver along with an efuse and temperature sensor. The ETROC builds event data frames for each L1A selected event and is also capable of providing L1 trigger information for user-defined delayed hits. The main design challenge is how to extract precision timing information from the small LGAD signals in the presence of high irradiation fluence, while keeping the power consumption and digital activity low. The ETL design goal for the time resolution of 50 ps per hit is required to achieve a 35 ps arrival time measurement for a MIP particle, which has its track registered in two ETL disk layers. The LGAD contribution is known to be about 30 ps, this means that the jitter from the ETROC has to be kept below 40 ps. The ETROC2 is the first full size full functionality prototype design fully compatible with the final chip specifications for CMS ETL and now becomes the final version. The ETROC2 chips have been extensively tested. We will present here new testing results including the bump bonding yield improvement study, the time walk correction (TWC) generality study with one pixel TWC applying to all pixels, the final SEU testing using both heavy ion and proton beam, more beam test studies including different sensors, and readiness for the ETROC2 production for CMS ETL upgrade.

Liu, Tiehui [Fermilab] (ORCID:0009000765225605)↗

Combined Global Navigation Satellite Systems in the Space Service Volume

Besides providing position, velocity, and timing (PVT) for terrestrial users, the Global Positioning System (GPS) is also being used to provide PVT information for earth orbiting satellites. In 2006, F. H. Bauer, et. al., defined the Space Service Volume in the paper GPS in the Space Service Volume , presented at ION s 19th international Technical Meeting of the Satellite Division, and looked at GPS coverage for orbiting satellites. With GLONASS already operational, and the first satellites of the Galileo and Beidou/COMPASS constellations already in orbit, it is time to look at the use of the new Global Navigation Satellite Systems (GNSS) coming into service to provide PVT information for earth orbiting satellites. This presentation extends GPS in the Space Service Volume by examining the coverage capability of combinations of the new constellations with GPS GPS was first explored as a system for refining the position, velocity, and timing of other spacecraft equipped with GPS receivers in the early eighties. Because of this, a new GPS utility developed beyond the original purpose of providing position, velocity, and timing services for land, maritime, and aerial applications. GPS signals are now received and processed by spacecraft both above and below the GPS constellation, including signals that spill over the limb of the earth. Support of GPS space applications is now part of the system plan for GPS, and support of the Space Service Volume by other GNSS providers has been proposed to the UN International Committee on GNSS (ICG). GPS has been demonstrated to provide decimeter level position accuracy in real-time for satellites in low Earth orbit (centimeter level in non-real-time applications). GPS has been proven useful for satellites in geosynchronous orbit, and also for satellites in highly elliptical orbits. Depending on how many satellites are in view, one can keep time locked to the GNSS standard, and through that to Universal Time as long as at least one satellite is in view (the longest duration with no satellites in view is important in determining the maximum clock drift from GNSS time). Instantaneous position requires four satellites in view, but because orbital motion is predictable, it is possible to build up knowledge of the orbital position gradually through time without a need for constant four satellite coverage. However, it is desirable to have four satellite coverage when performing satellite maneuvers, since there can be significant changes in velocity, leading to large changes in orbit parameter, causing substantial divergence in position over time. The Space Service Volume has been defined as the volume between three thousand km altitude and geosynchronous altitude, and can be divided into medium orbit services between three thousand km altitude and eight thousand km altitude, and high orbit services above eight thousand km. The Terrestrial Service Volume includes the Earth s surface, the atmosphere, and space below the altitude of three thousand km. The Terrestrial Service Volume is the volume within which the GNSS systems will have very similar performance to the Earth surface, and satellites need only use the signals specified to provide terrestrial performance. Above three thousand km the use of signals passing by the Earth s limb becomes important, so it is desirable to have additional information on signal strength, phase delay, and group delay covering wider beam angles than are needed for terrestrial service (and which can be obtained by monitoring GNSS signals from the Earth s surface). This presentation will look at each of the new GNSS constellations in combination with GPS (GLONASS with GPS, Galileo with GPS, Beidou/COMPASS with GPS), and also at the combination of all four GNSS systems. The presentation will largely follow the format of GPS in the Space Service Volume , presenting data on the availability of one, two, three, or four of the various combinations of GNSS constellation satelles at approximately two thousand grid points evenly spaced and fixed in longitude and latitude, the duration of the longest single-fold outages (intervals when no satellites are available), and the duration of the longest four-fold outages (intervals when fewer than four satellites are available) at several altitudes. Following the original paper, we will use the altitudes of three hundred km (typical LEO satellite, and within the Terrestrial Service Volume), at three thousand km (border between Terrestrial Service Volume and Space Service Volume), at eight thousand km (the border between medium and high orbit service within the Space Service Volume), at fifteen thousand km (just below the GNSS constellations), at twenty five thousand km (just above the GNSS constellations), at thirty six thousand, five hundred km (limit of Space Service Volume definition, geosynchronous altitude), and at seventy thousand km (to show the potential usefulness of GNSS beyond geosynchronous altitude).

Force, Dale A.↗

Solar vs. Fission Surface Power for Mars

A multi-discipline team of experts from the National Aeronautics and Space Administration (NASA) developed Mars surface power system point design solutions for two conceptual missions. The primary goal of this study was to compare the relative merits of solar- versus fission-powered versions of each surface mission. First, the team compared three different solar power options against a fission power system concept for a sub-scale, uncrewed demonstration mission. The 4.5 meter (m) diameter pathfinder lander's primary mission would be to demonstrate Mars entry, descent, and landing techniques. Once on the Martian surface, the lander's In Situ Resource Utilization (ISRU) payload would demonstrate liquid oxygen propellant production using atmospheric resources. For the purpose of this exercise, location was assumed to be at the Martian equator. The three solar concepts considered included a system that only operated during daylight hours (at roughly half the daily propellant production rate of a round-the-clock fission design), a battery-augmented system that operated through the night (matching the fission concept's propellant production rate), and a system that operated only during daylight, but at a higher rate (again, matching the fission concept's propellant production rate). Including 30% mass growth allowance, total payload masses for the three solar concepts ranged from 1,116 to 2,396 kg, versus the 2,686 kg fission power scheme. However, solar power masses are expected to approach or exceed the fission payload mass at landing sites further from the equator, making landing site selection a key driver in the final power system decision. The team also noted that detailed reliability analysis should be performed on daytime-only solar power schemes to assess potential issues with frequent ISRU system on/off cycling. Next, the team developed a solar-powered point design solution for a conceptual four-crew, 500-day surface mission consisting of up to four landers per crewed expedition mission. Unlike the demonstration mission, a lengthy power outage due to the global dust storms that are known to occur on Mars would pose a safety hazard to a crewed mission. A similar fission versus solar power trade study performed by NASA in 2007 concluded that fission power was more reliable-with a much lower mass penalty-than solar power for this application. However, recent advances in solar cell and energy storage technologies and changes in operational assumptions prompted NASA to revisit the analysis. For the purpose of this exercise a particular landing site at Jezero Crater, located at 18o north latitude, was assumed. A fission power system consisting of four each 10 kW Kilopower fission reactors was compared to a distributed network of Orion-derived Ultraflex solar arrays and Lithium ion batteries mounted on every lander. The team found that a solar power system mass of about 9,800 kg would provide the 22 kilowatts (kW) keep-alive power needed to survive a dust storm lasting up to 120-days at average optical depth of 5, and 35 kW peak power for normal operations under clear skies. Although this is less than half the mass estimated during the 2007 work (which assumed latitudes up to 30o) it is still more than the 7,000 kg mass of the fission system which provides full power regardless of dust storm conditions.

Rucker, Michelle A.↗