Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “interconnect”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Perforation patterned electrical interconnects

This disclosure describes systems and methods for increasing the usable surface area of electrical contacts within a device, such as a thin film solid state device, through the implementation of electrically conductive interconnects. Embodiments described herein include the use of a plurality of electrically conductive interconnects that penetrate through a top contact layer, through one or more multiple layers, and into a bottom contact layer. The plurality of conductive interconnects may form horizontal and vertical cross-sectional patterns. The use of lasers to form the plurality of electrically conductive interconnects from reflowed layer material further aids in the manufacturing process of a device.

42 ENGINEERING↗

Electronic interconnects and devices with topological surface states and methods for fabricating same

An interconnect is disclosed with enhanced immunity of electrical conductivity to defects. The interconnect includes a material with charge carriers having topological surface states. Also disclosed is a method for fabricating such interconnects. Also disclosed is an integrated circuit including such interconnects. Also disclosed is a gated electronic device including a material with charge carriers having topological surface states.

36 MATERIALS SCIENCE↗

Toward Interpreting Failure in Sintered-Silver Interconnection Systems

The mechanical strength and subsequent reliability of a sintered-silver interconnection system is a function of numerous independent parameters. That system is still undergoing process development. Most of those parameters (e.g., choice of plating) are arguably and unfortunately taken for granted and are independent of the silver s cohesive strength. To explore such effects, shear strength testing and failure analyses were completed on a simple, mock sintered-silver interconnection system consisting of bonding two DBC ceramic substrates. Silver and gold platings were part of the test matrix, as was pre-drying strategies, and the consideration of stencil-printing vs. screen-printing. Shear strength of sintered-silver interconnect systems was found to be was insensitive to the choice of plating, drying practice, and printing method provided careful and consistent processing of the sintered-silver are practiced. But if the service stress in sintered silver interconnect systems is anticipated to exceed ~ 60 MPa, then the system will likely fail.

Wereszczak, Andrew A↗

Electronic interconnects and devices with topological surface states and methods for fabricating same

An interconnect is disclosed with enhanced immunity of electrical conductivity to defects. The interconnect includes a material with charge carriers having topological surface states. Also disclosed is a method for fabricating such interconnects. Also disclosed is an integrated circuit including such interconnects. Also disclosed is a gated electronic device including a material with charge carriers having topological surface states.

36 MATERIALS SCIENCE↗

Photovoltaic sub-cell interconnects

Photovoltaic sub-cell interconnect systems and methods are provided. In one embodiment, a photovoltaic device comprises a thin film stack of layers deposited upon a substrate, wherein the thin film stack layers are subdivided into a plurality of sub-cells interconnected in series by a plurality of electrical interconnection structures; and wherein the plurality of electrical interconnection structures each comprise no more than two scribes that penetrate into the thin film stack layers.

14 SOLAR ENERGY↗

IC layout adjustment method and tool for improving dielectric reliability at interconnects

Method for adjusting a layout used in making an integrated circuit includes one or more interconnects in the layout that are susceptible to dielectric breakdown are selected. One or more selected interconnects are adjusted to increase via to wire spacing with respect to at least one via and one wire of the one or more selected interconnects. Preferably, the selecting analyzes signal patterns of interconnects, and estimates the stress ratio based on state probability of routed signal nets in the layout. An annotated layout is provided that describes distances by which one or more via or wire segment edges are to be shifted. Adjustments can include thinning and shifting of wire segments, and rotation of vias.

42 ENGINEERING↗

On-package multiprocessor ground-referenced single-ended interconnect

A system of interconnected chips comprising a multi-chip module (MCM) includes a first processor chip, a second processor chip, and an MCM package configured to include the first processor chip, the second processor chip, and an interconnect circuit. The first processor chip is configured to include a first ground-referenced single-ended signaling (GRS) interface circuit. A first set of electrical traces fabricated within the MCM package and configured to couple the first GRS interface circuit to the interconnect circuit. The second processor chip is configured to include a second GRS interface circuit. A second set of electrical traces fabricated within the MCM package and configured to coupled the second GRS interface circuit to the interconnect circuit.

Dally, William J.↗

Encoding of symbols for a computer interconnect based on frequency of symbol values

Data are serially communicated over an interconnect between an encoder and a decoder. The encoder includes a first training unit to count a frequency of symbol values in symbol blocks of a set of N number of symbol blocks in an epoch. A circular shift unit of the encoder stores a set of most-recently-used (MRU) amplitude values. An XOR unit is coupled to the first training unit and the first circular shift unit as inputs and to the interconnect as output. A transmitter is coupled to the encoder XOR unit and the interconnect and thereby contemporaneously sends symbols and trains on the symbols. In a system, a device includes a receiver and decoder that receive, from the encoder, symbols over the interconnect. The decoder includes its own training unit for decoding the transmitted symbols.

SeyedzadehDelcheh, SeyedMohammad↗

Active power control of solar PV generation for large interconnection frequency regulation and oscillation damping

Because of zero greenhouse gas emission and decreased manufacture cost, solar photovoltaic (PV) generation is expected to account for a significant portion of future power grid generation portfolio. Because it is indirectly connected to the power grid via power electronic devices, solar PV generation system is fully decoupled from the power grid, which will influence the interconnected power grid dynamic characteristics as a result. In this study, the impact of solar PV penetration on large interconnected power system frequency response and inter-area oscillation is evaluated, taking the United States Eastern Interconnection (EI) as an example. Furthermore, based on the constructed solar PV electrical control model with additional active power control loops, the potential contributions of solar PV generation to power system frequency regulation and oscillation damping are examined. The advantages of solar PV frequency support over that of wind generator are also discussed. Finally, simulation results demonstrate that solar PV generations can effectively work as ‘actuators’ in alleviating the negative impacts they bring about.

14 SOLAR ENERGY↗

Interconnection-wide hour-ahead scheduling in the presence of intermittent renewables and demand response: A surplus maximizing approach

This study describes a new approach for solving the multi-area electricity resource allocation problem when considering both intermittent renewables and demand response. The method determines the hourly inter-area export/import set that maximizes the interconnection (global) surplus satisfying transmission, generation and load constraints. The optimal inter-area transfer set effectively makes the electricity price uniform over the interconnection apart from constrained areas, which overall increases the consumer surplus more than it decreases the producer surplus. The method is computationally efficient and suitable for use in simulations that depend on optimal scheduling models. The method is demonstrated on a system that represents North America Western Interconnection for the planning year of 2024. Simulation results indicate that effective use of interties reduces the system operation cost substantially. Excluding demand response, both the unconstrained and the constrained scheduling solutions decrease the global production cost (and equivalently increase the global economic surplus) by 12.30B and 10.67B per year, respectively, when compared to the standalone case in which each control area relies only on its local supply resources. This cost saving is equal to 25% and 22% of the annual production cost. Including 5% demand response, the constrained solution decreases the annual production cost by 10.70B, while increases the annual surplus by 9.32B in comparison to the standalone case.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reflow-oven-processing of pressureless sintered-silver interconnects

Here, a method was developed to pressurelessly fabricate strong and consistent sinterable-silver joints or interconnects using reflow oven heating. Circular sinterable-silver interconnects, having nominal diameter of 5 mm and 0.1 mm thickness were stencil printed, contact-dried, and then pressurelessly sinter-bonded to Au-plated direct copper bonded ceramic substrates at 250 °C in ambient air. That sintering was done in either a reflow oven or a convective oven (latter being a conventional heating source for processing sinterable-silver). Consistently strong (>40 MPa) interconnects were produced with reflow oven heating and were as strong as those produced with convective oven heating. This is significant because reflow oven technology affords better potential for continuous mass production and it was shown that strong sintered-silver bonds can indeed be achieved with its use.

36 MATERIALS SCIENCE↗

Foundations for the Future Power System: Inverter-Based Resource Interconnection Standards

As power systems evolve to become reliant on solar, wind, batteries, and other inverter-based resources (IBRs), it is essential that those resources meet certain minimum performance and capability criteria designed to ensure the power system operates stably and reliably. Because those criteria, as enshrined in interconnection standards, take years to develop and are very long lived, they need to account for not only the present state of the power system but also its expected future state over the lifetime of the power plants to which they will apply. In addition, they need to be specific enough to ensure reliability without over specifying and, thereby, impeding innovation. Because power systems are shifting rapidly from a state where IBRs make up a small to medium portion of generation to one where the generation will, at times, come predominantly from IBRs, interconnection standards are especially challenging to develop today. Good interconnection standards can make the power system more reliable and less costly to operate, whereas poorly designed standards can lead to major problems, like the famous German 50.2-Hz problem, which introduced a risk of losing many gigawatts of solar on a frequency excursion and resulted in many IBRs being retrofitted at great cost to mitigate a major system reliability risk. Readying the power system by specifying forward-looking technical minimum functional capabilities for IBRs can be an effective approach to avoid future retrofits.

data models↗

Interconnection of Distributed Energy Resources

This is a presentation on interconnection of distributed energy resources, including the relationships between different aspects of interconnection, best practices and lessons learned from different areas of the U.S., and an update on technical advances and standards for interconnection.

14 SOLAR ENERGY↗

Grid Ready: Strategies for Interconnecting Large-Scale PV in New York City

This Grid Ready Solar project is intended to help create transparency for building owners and developers, so they can better understand and more quickly navigate the interconnection process for large-scale photovoltaic (PV) projects on Con Edison's electrical grid in New York City. Phase 1 of the project provided high-level technical screens of grid interconnection requirements in an attempt to streamline the interconnection of large-scale solar PV systems to the New York City grid. In Phase 2 of the Grid Ready project, the focus of this report, Sustainable CUNY worked with NREL to evaluate a range of solutions for improving the economics of large-scale (over 200 kW) PV within the five boroughs of New York City that are in Con Edison's service territory, as identified on the NY Solar Map.

14 SOLAR ENERGY↗

An Overview of Distributed Energy Resource (DER) Interconnection: Current Practices and Emerging Solutions

This guidebook provides an overview of key issues for utilities and utility regulators to consider as deployments of distributed energy resources (DER) increase, including what has been tried in the field and emerging good practices. Topics covered include: Interconnection Applications and Application Processing; Interconnection Standards; Advanced Inverters; Impact Screening and Evaluation; Estimating Future DER deployments; Distribution System Upgrades and Planning in a DER context; Cybersecurity; Storage and Solar plus Storage Interconnection; and Cost Allocation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Value of Increased HVDC Capacity Between Eastern and Western U.S. Grids: The Interconnections Seam Study

The Interconnections Seam Study examines the potential economic value of increasing electricity transfer between the Eastern and Western Interconnections using high-voltage direct-current (HVDC) transmission and cost-optimizing both generation and transmission resources across the United States. The study conducted a multi-model analysis that used co-optimized generation and transmission expansion planning and production cost modeling. Four transmission designs under eight scenarios were developed and studied to estimate costs and potential benefits. The results show benefit-to-cost ratios that reach as high as 2.9, indicating significant value to increasing the transmission capacity between the interconnections under the cases considered, realized through sharing generation resources and flexibility across regions.

13 HYDRO ENERGY↗

Interconnection of Distributed Energy Resources in the Indian Context: IEEE 1547-2018 Adaptation for Locally-Appropriate Grid Code Development

The rapid growth of distributed energy resources (DERs) in India and ambitious renewable energy goals set forth by the Indian government have created the need for appropriate distribution interconnection standards to ensure continued system stability, reliability, and resilience. Existing DER interconnection codes in India, at the time of publishing this report, lack many of the critical grid support functionalities for DERs which may protect bulk system stability, such as event ride-through provisions, frequency droop control, or appropriate trip thresholds given the increasing importance of distributed generation. The formal adoption of IEEE 1547-2018 by the Bureau of Indian Standards (BIS) marks a significant step towards achieving appropriate interconnection of DERs, though the implementation of such a standard must be accompanied with careful consideration of the current codes, regulations, and operation of the Indian power system. Studies on the performance of the functionalities within 1547-2018, which properly incorporate local operating conditions, can inform decisions related to the adoption and adaptation of the clauses present in the standard. This report outlines several of these key considerations for stakeholders and provides analyses illustrating the performance of grid support functionalities on typical Indian distribution feeders.

1547↗

Evaluating the Curtailment Risk of Non-Firm Utility-Scale Solar Photovoltaic Plants under a Novel Last-In First-Out Principle of Access Interconnection Agreement

With the increasing share of distributed energy resources on the electric grid, utility companies are facing significant decisions about infrastructure upgrades. An alternative to extensive and capital-intensive upgrades is to offer non-firm interconnection opportunities to distributed generators, via a coordinated operation of utility scale resources. This paper introduces a novel flexible interconnection option based on the last-in, first-out principles of access aimed at minimizing the unnecessary non-firm generation energy curtailment by balancing access rights and contribution to thermal overloads. Although we focus on solar photovoltaic (PV) plants in this work, the introduced flexible interconnection option applies to any distributed generation technology. The curtailment risk of individual non-firm PV units is evaluated across a range of PV penetration levels in a yearlong quasi-static time-series simulation on a real-world feeder. The results show the importance of the size of the curtailment zone in the curtailment risk distribution among flexible generation units as well as that of the “access right” defined by the order in which PV units connect to the grid. Case study results reveal that, with a proper selection of curtailment radius, utilities can reduce the total curtailment of flexible PV resources by up to more than 45%. Findings show that non-firm PV generators can effectively avoid all thermal limit-related upgrade costs.

14 SOLAR ENERGY↗