At least 163 records · Page 9

Fiber optic (flight quality) sensors for advanced aircraft propulsion

Development of flight prototype, fiber-optic sensing system components for measuring nine sensed parameters (three temperatures, two speeds, three positions, and one flame) on an F404-400 aircraft engine is described. Details of each sensor's design, functionality, and environmental testing, and the electro-optics architecture for sensor signal conditioning are presented. Eight different optical sensing techniques were utilized. Design, assembly, and environmental testing of an engine-mounted, electro-optics chassis unit (EOU), providing MIL-C-1553 data output, are related. Interconnection cables and connectors between the EOU and the sensors are identified. Results of sensor/cable/circuitry integrated testing, and installation and ground testing of the sensor system on an engine in October 1993 and April 1994 are given, including comparisons with the engine control system's electrical sensors. Lessons learned about the design, fabrication, testing, and integration of the sensor system components are included.

Poppel, Gary L.↗

Favorable Structural–Tectonic Settings and Characteristics of Globally Productive Arcs

There are currently 74 productive geothermal systems associated with volcanic centers (VCs) in arcs globally, including actively producing systems, past producing systems, and systems with successful flow tests. The total installed or tested capacity of these 74 geothermal systems is 7,605 MWe, ranging from 0.7 MWe each at Copahue, Chile and Barkhatnaya Sopka, Kamchatka to 795 MWe, Larderello, Italy, and averaging 90.5 MWe per system. These 74 productive VCs constitute 10% of 732 VCs distributed across more than a dozen major arcs around the world. The intra-arc (within-arc) tectonic setting is highly variable globally, ranging from extension to transtension, transpression, or compression. Furthermore, the shear strain associated with oblique plate convergence can be accommodated by either intra-arc or arc-marginal deformation. The structural-tectonic settings of these 74 productive VCs were characterized to add to a global catalog of parameters to help guide future exploration, development, and regional resource potential.

15 GEOTHERMAL ENERGY↗

NASA’s Exploration and In-Space Services (NExIS) Division OSAM-1 Propellant Transfer Subsystem Progress through FY 2024

The National Aeronautics and Space Administration (NASA) Exploration and In-Space Services (NExIS) Division of Goddard Space Flight Center (GSFC) has been developing technology to robotically refuel both heritage and recently developed satellites on-orbit funded through NASA’s Space Technology Mission Directorate (STMD). The On-orbit Servicing, Assembly, and Manufacturing 1 (OSAM-1) mission, formerly known as Restore-L, developed a system to refuel a satellite in space and assemble a communications antenna. By demonstrating these capabilities, the mission would advance never-before tested technologies for use in future missions (by NASA, other government organizations, and private industries). The purpose of this paper is to capture the lessons learned from the hardware development of the OSAM-1 Propellant Transfer System (PTS) that are highly relevant for the ISAM community. This paper covers a review of in-space servicing extensibility and critical technologies that were being developed within NExIS, focusing on the fluid transfer refueling technology within the framework of the OSAM-1 PTS. An overview of the technology demonstration servicing mission via the OSAM-1 Space Vehicle is provided as an extension of the technology development progress reported in 2018, 2019 and 2020. The general objectives, challenges, and key technologies are presented as an introduction to the context of the OSAM-1 mission, and a precursor to the OSAM-1 PTS specific development status. Final assembly, qualification, and functional tests along with installation and acceptance testing of the Hose Management Assembly (HMA) and Propellant Transfer Assembly (PTA) are discussed. Technology development, challenges, lessons learned, along with installation and testing results are discussed, with particular focus on the OSAM-1 assemblies including the PTA and HMA. In addition, testing utilizing the integrated flight simulator test setups will be summarized. The OSAM-1 PTS made great strides in advancing in-space refueling technology; however, there are unfinished development efforts remaining. This paper concludes with a brief summary of the technology shortfalls (gaps) that remain in the key areas of in-space fluid transfer.

ISAM↗

Multiplexed Optical Fiber Sensors for Coal Fired Advanced Fossil Energy Systems

This report summarizes technical progress on the program Multiplexed Optical Fiber Sensors for Coal Fired Advanced Fossil Energy Systems funded by the National Energy Technology Laboratory of the U.S. Department of Energy, and performed jointly by the Center for Photonics Technology of the Bradley Department of Electrical and Computer Engineering and the Department of Materials Science and Engineering at Virginia Tech. This three-year project started on October 1, 2008. In the project, a fiber optical sensing system based on intrinsic Fabry-Perot Interferometer (IFPI) was developed for strain and temperature measurements for Ultra Supercritical boiler condition assessment. Investigations were focused on sensor design, fabrication, attachment techniques and novel materials for high temperature and strain measurements. At the start of the project, the technical requirements for the sensing technology were determined together with our industrial partner Alstom Power. As is demonstrated in Chapter 4, all the technical requirements are successfully met. The success of the technology extended beyond laboratory test; its capability was further validated through the field test at DOE NETL, in which the sensors yielded distributed temperature mapping of a testing coupon installed in the turbine test rig. The measurement results agreed well with prior results generated with thermocouples. In this project, significant improvements were made to the IFPI sensor technology by splicing condition optimization, transmission loss reduction, sensor signal demodulation and sensor system design.

01 COAL, LIGNITE, AND PEAT↗

A recent Cleanroom success story: The Redwing project

Redwing is the largest completed Cleanroom software engineering project in IBM, both in terms of lines of code and project staffing. The product provides a decision-support facility that utilizes artificial intelligence (AI) technology for predicting and preventing complex operating problems in an MVS environment. The project used the Cleanroom process for development and realized a defect rate of 2.6 errors/KLOC, measured from first execution. This represents the total amount of errors that were found in testing and installation at three field test sites. Development productivity was 486 LOC/PM, which included all development labor expended in design specification through completion of incremental testing. In short, the Redwing team produced a complex systems software product with an extraordinarily low error rate, while maintaining high productivity. All of this was accomplished by a project team using Cleanroom for the first time. An 'introductory implementation' of Cleanroom was defined and used on Redwing. This paper describes the quality and productivity results, the Redwing project, and how Cleanroom was implemented.

Hausler, Philip A.↗

Hydraulic Shuttle Irradiation System (HSIS) Recently Installed in the Advanced Test Reactor (ATR)

2010 International Congress on Advances in Nuclear Power Plants (ICAPP’10) ANS Annual Meeting Imbedded Topical San Diego, CA June 13 – 17, 2010 Hydraulic Shuttle Irradiation System (HSIS) Recently Installed in the Advanced Test Reactor (ATR) Author: A. Joseph Palmer, Mechanical Engineer, Irradiation Test Programs, 208-526-8700, Joe.Palmer@INL.gov Affiliation: Idaho National Laboratory P.O. Box 1625, MS-3840 Idaho Falls, ID 83415 INL/CON-10-17680 ABSTRACT Most test reactors are equipped with shuttle facilities (sometimes called rabbit tubes) whereby small capsules can be inserted into the reactor and retrieved during power operations. With the installation of Hydraulic Shuttle Irradiation System (HSIS) this capability has been restored to the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL). The general design and operating principles of this system were patterned after the hydraulic rabbit at Oak Ridge National Laboratory’s (ORNL) High Flux Isotope Reactor (HFIR), which has operated successfully for many years. Using primary coolant as the motive medium the HSIS system is designed to simultaneously transport fourteen shuttle capsules, each 16 mm OD x 57 mm long, to and from the B-7 position of the reactor. The B-7 position is one of the higher flux positions in the reactor with typical thermal and fast (>1 Mev) fluxes of 2.8E+14 n/cm2/sec and 1.9E+14 n/cm2/sec respectively. The available space inside each shuttle is approximately 14 mm diameter x 50 mm long. The shuttle containers are made from titanium which was selected for its low neutron activation properties and durability. Shuttles can be irradiated for time periods ranging from a few minutes to several months. The Send and Receive Station (SRS) for the HSIS is located 2.5 m deep in the ATR canal which allows irradiated shuttles to be easily moved from the SRS to a wet loaded cask, or transport pig. The HSIS system first irradiated (empty) shuttles in September 2009 and has since completed a Readiness Assessment in November 2009. The HSIS is a key component of the ATR National Scientific User Facility (NSUF) operated by Battelle Energy Alliance, LLC and is available to a wide variety of university researchers for nuclear fuels and materials experiments as well as medical isotope research and production.

07 ISOTOPE AND RADIATION SOURCES↗

Final 2014 Remedial Action Report Project Chariot, Cape Thompson, Alaska

This report was prepared to document remedial action (RA) work performed at the former Project Chariot site located near Cape Thompson, Alaska during 2014. The work was managed by the U.S. Army Corps of Engineers (USACE) Alaska District for the U.S. Department of Energy (DOE) Office of Legacy Management (LM). Due to the short field season and the tight barge schedule, all field work was conducted at the site July 6 through September 12, 2014. Excavation activities occurred between July 16 and August 26, 2014. A temporary field camp was constructed at the site prior to excavation activities to accommodate the workers at the remote, uninhabited location. A total of 785.6 tons of petroleum, oil, and lubricants (POL)-contaminated soil was excavated from four former drill sites associated with test holes installed circa 1960. Diesel was used in the drilling process during test hole installations and resulted in impacts to surface and subsurface soils at four of the five sites (no contamination was identified at Test Hole Able). Historic information is not definitive as to the usage for Test Hole X-1; it may have actually been a dump site and not a drill site. In addition to the contaminated soil, the steel test hole casings were decommissioned and associated debris was removed as part of the remedial effort.

02 PETROLEUM↗

Performance Testing of the CMS Cathode Strip Chambers

The production, installation, and testing of 468 cathode strip chambers for the endcap muon system of the CMS experiment played a critical role in the preparation of the endcap muon system for the final commissioning. Common testing procedures and sets of standard equipment were used at 5 international assembly centers. The chambers were then thoroughly retested after shipment to CERN. Final testing was performed after chamber installation on the steel disks in the CMS detector assembly building. The structure of the detector quality control procedure is presented along with the results of chamber performance validation tests.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

ALFA Discrete Element Method (DEM) Simulations using PFC3D

Contains input scripts, background information, reduced data, and results associated with the discrete element method (DEM) simulations of interface shear tests, plate anchor pullout tests, and torpedo anchor installation and pullout tests, using the software PFC3D (v4.0).

16 TIDAL AND WAVE POWER↗

VERA 3.5 Installation Guide

This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Cost-Effective Reciprocating Engine Emissions Control and Monitoring for E&P Field and Gathering Engines

This final report describes a project intended to identify, develop, test, and commercialize emissions control and monitoring technologies that can be implemented by E&P operators to significantly lower their cost of environmental compliance and expedite project permitting. Technologies were installed and tested in controlled laboratory situations and then installed and tested on field engines based on the recommendations of an industry-based steering committee, analysis of installed horsepower, analysis of available emissions control and monitoring technologies, and review of technology and market gaps.

33 ADVANCED PROPULSION SYSTEMS↗

Component qualification and initial build of the AGT 100 advanced automotive gas turbine

In advance of initial dynamometer testing of the AGT 100 engine, all prime components and subsystems were bench/rig tested. Included were compressor, combustor, turbines, regenerator, ceramic components, and electronic control system. Results are briefly reviewed. Initial engine buildup was completed and rolled-out for test cell installation in July 1982. Shakedown testing included motoring and sequential firing of the combustor's three fuel nozzles.

Johnson, R. A.↗

Design of the Next Generation Nuclear Plant Graphite Creep Experiments for Irradiation in the Advanced Test Reactor

The United States Department of Energy’s Next Generation Nuclear Plant (NGNP) Program will be irradiating six gas reactor graphite creep experiments in the Advanced Test Reactor (ATR) located at the Idaho National Laboratory (INL). The ATR has a long history of irradiation testing in support of reactor development and the INL has been designated as the new United States Department of Energy’s lead laboratory for nuclear energy development. The ATR is one of the world’s premiere test reactors for performing long term, high flux, and/or large volume irradiation test programs. These graphite irradiations are being accomplished to support development of the next generation reactors in the United States. The graphite experiments will be irradiated over the next six to eight years to support development of a graphite irradiation performance data base on the new nuclear grade graphites now available for use in high temperature gas reactors. The goals of the irradiation experiments are to obtain irradiation performance data at different temperatures and loading conditions to support design of the Next Generation Nuclear Plant Very High Temperature Gas Reactor, as well as other future gas reactors. The experiments will each consist of a single capsule that will contain seven separate stacks of graphite specimens. Six of the specimen stacks will have half of their graphite specimens under a compressive load, while the other half of the specimens will not be subjected to a compressive load during irradiation. The six stacks will be organized into pairs with a different compressive load being applied to the top half of each pair of specimen stacks. The seventh stack will not have a compressive load on the graphite specimens during irradiation. The specimens will be irradiated in an inert sweep gas atmosphere with on-line temperature and compressive load monitoring and control. There will also be the capability of sampling the sweep gas effluent to determine if any oxidation or off-gassing of the specimens occurs during initial start-up of the experiment. The final design phase for the first experiment was completed in September 2008, and the fabrication and assembly of the experiment test train as well as installation and testing of the control and support systems that will monitor and control the experiment during irradiation are being completed in early calendar 2009. The first experiment is scheduled to be ready for insertion in the ATR by April 30, 2009. This paper will discuss the design of the experiment including the test train and the temperature and compressive load monitoring, control, and data collection systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Testing Dual Rotary Filters - 12373

The Savannah River National Laboratory (SRNL) installed and tested two hydraulically connected SpinTek{sup R} Rotary Micro-filter units to determine the behavior of a multiple filter system and develop a multi-filter automated control scheme. Developing and testing the control of multiple filters was the next step in the development of the rotary filter for deployment. The test stand was assembled using as much of the hardware planned for use in the field including instrumentation and valving. The control scheme developed will serve as the basis for the scheme used in deployment. The multi filter setup was controlled via an Emerson DeltaV control system running version 10.3 software. Emerson model MD controllers were installed to run the control algorithms developed during this test. Savannah River Remediation (SRR) Process Control Engineering personnel developed the software used to operate the process test model. While a variety of control schemes were tested, two primary algorithms provided extremely stable control as well as significant resistance to process upsets that could lead to equipment interlock conditions. The control system was tuned to provide satisfactory response to changing conditions during the operation of the multi-filter system. Stability was maintained through the startup and shutdown of one of the filter units while the second was still in operation. The equipment selected for deployment, including the concentrate discharge control valve, the pressure transmitters, and flow meters, performed well. Automation of the valve control integrated well with the control scheme and when used in concert with the other control variables, allowed automated control of the dual rotary filter system. Experience acquired on a multi-filter system behavior and with the system layout during this test helped to identify areas where the current deployment rotary filter installation design could be improved. Completion of this testing provides the necessary information on the control and system behavior that will be used in deployment on actual waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technology demonstration for reducing mercury emissions from small-scale gold refining facilities.

Gold that is brought from artisanal and small-scale gold mining areas to gold shops for processing and sale typically contains 5-40% mercury. The uncontrolled removal of the residual mercury in gold shops by using high-temperature evaporation can be a significant source of mercury emissions in urban areas where the shops are located. Emissions from gold shop hoods during a burn can exceed 1,000 mg/m{sup 3}. Because the saturation concentration of mercury vapor at operating temperatures at the hood exhaust is less than 100 mg/m{sup 3}, the dominant component of the exhaust is in the form of aerosol or liquid particles. The U.S. Environmental Protection Agency (EPA), with technical support from Argonne National Laboratory (Argonne), has completed a project to design and test a technology to remove the dominant aerosol component in the emissions from gold shops. The objective was to demonstrate a technology that could be manufactured at low cost and by using locally available materials and manufacturing capabilities. Six prototypes designed by Argonne were locally manufactured, installed, and tested in gold shops in Itaituba and Creporizao, Brazil. The initial prototype design incorporated a pebble bed as the media for collecting the mercury aerosols, and a mercury collection efficiency of over 90% was demonstrated. Though achieving high efficiencies, the initial prototype was determined to have practical disadvantages such as excessive weight, a somewhat complex construction, and high costs (>US$1,000). To further simplify the construction, operation, and associated costs, a second prototype design was developed in which the pebble bed was replaced with slotted steel baffle plates. The system was designed to have flexibility for installation in various hood configurations. The second prototype with the baffle plate design was installed and tested in several different hood/exhaust systems to determine the optimal installation configuration. The significance of coagulation and collection of the mercury aerosols in exhaust ducts, which is dependent on the hood and collector configuration, was also evaluated. Prototype demonstration tests verified the theoretical basis for mercury aerosol capture that can be used to optimize the baffle plate design, flow rates, and hood exhaust ducts and plenum to achieve 80% or higher removal efficiencies. Results indicated that installation configuration significantly influences a system's capture efficiency. Configurations that retained existing inlet ducts resulted in system efficiencies of more than 80%, whereas installation configurations without inlet ducts significantly reduced capture efficiency. As an alternative to increasing the volume of inlet ducts, the number of baffle plates in the system baffle assembly could be doubled to increase efficiency. Recommended installation and operation procedures were developed on the basis of these results. A water-based mercury capture system developed in Indonesia for installation in smaller shops was also tested and shown to be effective for certain applications. The cost of construction and installation of the baffle plate prototype was approximately US$400. These costs were reported as acceptable by local gold shop owners and government regulators, and were significantly lower than the cost of an alternate charcoal/copper mesh mercury filter available in the region, which costs about US$10,000. A sampling procedure that consists of a particle filter combined with a vapor analyzer was demonstrated as an effective procedure for analyzing both the aerosol and vapor components of the mercury concentrations. Two key findings for enhancing higher mercury collection were identified. First, the aerosol/vapor mercury emissions must be given sufficient time for the mercury particles to coagulate to a size that can be readily captured by the baffle plates. An interval of at least 6 seconds of transit time between the point of evaporation and contact with the slotted baffle plates is recommended. Some particles will also deposit in the exhaust ducts between the point of evaporation and the baffle plates. Second, the slots in the baffle plates create jets that force the mercury particles to impinge and adhere on downstream surfaces. The baffle plates should closely follow the designs developed for this system to be most effective.

54 ENVIRONMENTAL SCIENCES↗

VERA Installation Guide

This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in 'Standard VERA Dev Env Directory Structure' and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

97 MATHEMATICS AND COMPUTING↗