Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “infrastructure planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

LUNAR REGOLITH:SMALL SCALE ROBOTIC SITE PREPARATION AND GEOTECHNICAL EXPERIMENTSWITH SCOOPS

NASA’s Moon-To-Mars Planetary Autonomous Construction Technology (MMPACT) project seeks to research, develop, and demonstrate lunar surface construction capabilities. Quantification of lunar regolith’s geotechnical properties allows for effective prediction of forces and displacement during excavation and construction and is critical to facilitating regolith sintering capabilities all of which benefit lunar infrastructure plans. Knowledge of shear strength, Mohr-Coulomb cohesion, angle of internal friction, bearing strength, bulk density, etc. is needed. The use of ground-based testing of various lunar simulants with relevant hardware (e.g., robotic arm tools) enables validation of technology choices, tool paths, and lunar surface construction activities. In addition, the use of Taguchi methods will minimize the number of needed experiments to explore critical input parameters.

R. P. Mueller↗

Experimental Considerations for Ground-Based Testing of Lunar Construction Technologies

NASA’s Moon-To-Mars Planetary Autonomous Construction Technology (MMPACT) project seeks to research, develop, and demonstrate lunar surface construction capabilities - Quantification of lunar regolith’s geotechnical properties allows for effective prediction of forces and displacement during excavation and construction and is critical to facilitating regolith sintering capabilities all of which benefit lunar infrastructure plans - Knowledge of shear strength, Mohr-Coulomb cohesion, angle of internal friction, bearing strength, bulk density, etc. is needed - Ground-based testing of various lunar simulants with relevant hardware (e.g., robotic arm tools) enables validation of technology choices, tool paths, and lunar surface construction activities - Use of Taguchi methods [1] will minimize the number of needed experiments to explore critical input parameter

Moon↗

Lunar Regolith: Small Scale Robotic Site Preparation and Geotechnical Experiments with Scoops

- NASA’s Moon-To-Mars Planetary Autonomous Construction Technology (MMPACT) project seeks to research, develop, and demonstrate lunar surface construction capabilities. - Quantification of lunar regolith’s geotechnical properties allows for effective prediction of forces and displacement during excavation and construction and is critical to facilitating regolith sintering capabilities all of which benefit lunar infrastructure plans. - Knowledge of shear strength, Mohr-Coulomb cohesion, angle of internal friction, bearing strength, bulk density, etc. is needed. - The use of ground-based testing of various lunar simulants with relevant hardware (e.g., robotic arm tools) enables validation of technology choices, tool paths, and lunar surface construction activities. - In addition, the use of Taguchi methods [1] will minimize the number of needed experiments to explore critical input parameters. - The Jet Propulsion Lab is preparing to fly the COLDarm payload on a CLPS lunar mission with a geotechnical measurement scoop

Regolith↗

From Regolith to Living Off the Land: Formulating a Data Model to Catalog Lunar Construction Materials

Artemis Program objectives for sustainable, long-term presence on the Moon and more distant planetary surfaces will require learning to “Live off the Land”, relying on in-situ resource utilization to produce infrastructure and building materials from lunar regolith, icy subsurface deposits, and residual waste materials. Meeting demand for consumables while scaling development with resources found within the landing zone will require detailed data on the geology and environment of the lunar surface. Lunar infrastructure development will generate vast amounts of new engineering data regarding availability of processed feedstocks and their performance in building materials. Lunar engineering data accessible to program partners, research institutions and industry may help situate processes and specifications within the in-situ GIS context. Lunar missions to date have generated geological and ice favorability maps of the lunar surface, and recent technology studies have tested automated construction systems and novel material formulations using regolith simulants and binders. Current discussions focus on identifying key feedstocks, quantities required for nominal mission scenarios and infrastructure plans, and mapping the value chain from regolith to feedstock to consumables and construction materials.

lunar construction↗

From Regolith to Living Off the Land: Formulating a Data Model to Catalog Lunar Construction Materials

Artemis Program objectives for sustainable, long-term presence on the Moon and more distant planetary surfaces will require learning to “Live off the Land”, relying on in-situ resource utilization to produce infrastructure and building materials from lunar regolith, icy subsurface deposits, and residual waste materials. Meeting demand for consumables while scaling development with resources found within the landing zone will require detailed data on the geology and environment of the lunar surface. Lunar infrastructure development will generate vast amounts of new engineering data regarding availability of processed feedstocks and their performance in building materials. Lunar engineering data accessible to program partners, research institutions and industry may help situate processes and specifications within the in-situ GIS context. Lunar missions to date have generated geological and ice favorability maps of the lunar surface, and recent technology studies have tested automated construction systems and novel material formulations using regolith simulants and binders. Current discussions focus on identifying key feedstocks, quantities required for nominal mission scenarios and infrastructure plans, and mapping the value chain from regolith to feedstock to consumables and construction materials.

lunar construction↗

An Optimal Deployment of Wireless Charging Lane for Electric Vehicles on Highway Corridors

We propose an integrated modeling framework to optimally locate wireless charging facilities along a highway corridor to provide sufficient in-motion charging. The integrated model consists of a master, Infrastructure Planning Model that determines best locations with integrated two sub-models that explicitly capture energy consumption and charging and the interactions between electric vehicle and wireless charging technologies, geometrics of highway corridors, speed, and auxiliary system. The model is implemented in an illustrative case study of a highway corridor of Interstate 5 in Oregon. We found that the cost of establishing the charging lane is sensitive and increases with the speed to achieve. Through sensitivity analyses, we gain better understanding on the extent of impacts of geometric characteristics of highways and battery capacity on the charging lane design.

Huang, Yongxi↗

Air Passengers' Joint Decisions about Ground Access and Parking

With increasing air travel demand, it is important for airports to evaluate infrastructure investment and demand management solutions to curb traffic congestion and minimize landside energy consumption. Understanding the decisions and choices air passengers make about their ground access modes is important for both developing infrastructure planning strategies and assessing the impacts of emerging modes on airport revenues, particularly from parking. But parking choice is often overlooked in the modeling of airport ground access choices. To address this gap, NREL's Athena team developed a nested multinomial logit regression model based on a passenger survey conducted at Dallas Fort Worth International Airport in 2015. This fact sheet is an overview of the approach and its impact.

47 OTHER INSTRUMENTATION↗

Simulating Impacts of Extreme Events on Grids with High Penetrations of Wind Power Resources

As extreme weather events become more frequent and intense, the demand for connecting grid operation and infrastructure planning with extreme event models will increase as well. We present a methodology for creating damage contingencies and scenarios for electric transmission grids during a hurricane strike. Included is an example case study: Hurricane Dolly damaging a synthetic 2000 bus test system during its landing in Southern Texas. Using WIND Toolkit meteorological data in conjunction with fragility curves for various electric grid elements, we generate stochastic damage scenarios that can be used for short- and long-term planning problems including emergency asset management. We perform statistical analysis of damages and quantify topological effects on example synthetic grid. Also, we investigate loss-of-load events during two-day economic dispatch experiment. Finally, we point out various shortcomings of our method and suggest how it can be improved.

data-driven forecasting↗

Simulating Impacts of Extreme Events on Grids with High Penetrations of Wind Power Resources: Preprint

As extreme weather events become more frequent and intense, the demand for connecting grid operation and infrastructure planning with extreme event models will increase as well. We present a methodology for creating damage contingencies and scenarios for electric transmission grids during a hurricane strike. Included is an example case study: Hurricane Dolly damaging a synthetic 2000 bus test system during its landing in Southern Texas. Using WIND Toolkit meteorological data in conjunction with fragility curves for various electric grid elements, we generate stochastic damage scenarios that can be used for short- and long-term planning problems including emergency asset management. We perform statistical analysis of damages and quantify topological effects on example synthetic grid. Also, we investigate loss-of-load events during two-day economic dispatch experiment. Finally, we point out various shortcomings of our method and suggest how it can be improved.

contingencies↗

EVs@Scale Next-Gen Profiles - Fleet Utilization 2023

As U.S. fleet operators begin transitioning to electric vehicles (EVs), critical questions arise regarding how to manage this shift without disrupting fleet operations or placing undue stress on the electric grid. A major challenge for fleets is maintaining effective operational schedules while accommodating charging requirements, particularly with high-power charging (HPC) infrastructure, which presents grid stability concerns for utilities. Proposed solutions such as charging substations, megawatt charging systems (MCS), and smart charge management systems (SCMS) offer potential pathways forward, but their effectiveness depends on alignment with real-world fleet behavior and operational constraints. This report investigates the charging and utilization behavior of EV and EVSE fleets actively employing HPC technologies by conducting detailed case study analyses based on telematics data. A suite of predefined metrics—covering charging, routing, and other operational behaviors—is developed to evaluate the impact of fleet activities on grid infrastructure and identify opportunities for optimization. Results highlight variations in charging behavior across fleets, such as weekday versus weekend usage, diurnal charging trends, and the role of operational predictability in enabling SCMS effectiveness. While SCMS can help lower costs and improve energy efficiency for fleets with stable schedules, they may be insufficient for fleets with highly variable or long-haul operations, which may require more robust solutions like MCS. Visualization of aggregated hourly energy metrics reveals that while fleet behaviors are diverse, there are common temporal patterns that could inform infrastructure planning and energy management. These insights emphasize the need for fleet-specific charging strategies that minimize grid impact while supporting reliable fleet operations. Additionally, the report underscores the broader economic stakes of electrification, particularly in high-value markets such as freight, where misaligned transitions could stall EV adoption. By examining current EV and EVSE fleet deployments using predetermined standardized metrics, this study offers a foundation for developing technologies and operational frameworks that support scalable, grid-compatible electrification across a variety of fleet types while establishing a baseline understanding of operational behaviors. In doing so, we aim to ensure that future charging solutions reflect actual fleet needs and grid constraints—an essential step toward maintaining operational continuity and achieving a successful transition to electric fleet operations.

Charging↗

Technical Assistance Opportunities for Tribes

The National Renewable Energy Laboratory (NREL) offers many forms of technical assistance for Tribes to support local clean energy priorities and challenges. With broad support from the U.S. Department of Energy (DOE) and local partners, NREL provides technical expertise to enable data-driven, informed clean energy decision making. Technical assistance may address energy strategy, project financing, policy design and development, data analysis, economic development, infrastructure planning, energy justice, climate change, resilience, or other energy priorities. NREL has a long history of partnering with Tribes and Tribal organizations, including in Alaska Native Villages where the extreme Arctic climate poses unique energy challenges. NREL works directly with Tribes to find solutions that address their self-defined energy priorities, challenges, and goals.

Alaska native village↗

National Ignition Facility. Facility and Infrastructure Systems Maintenance Plan

Ensuring the reliability of the NIF, including its support systems, laser systems, target diagnostic systems, and utilities, is essential to the availability of the NIF in its support of NNSA missions. NIF is a key capability in the DOE Stockpile Stewardship Program and supports high energy physics experiments for nuclear weapons, energy, and astrophysics applications. High system reliability provides opportunities for shots and scientific discoveries with opportunities to enhance and upgrade capabilities. This Maintenance Plan (MP) identifies the policies and procedures used to perform and support asset management of the NIF Facility and Infrastructure Systems (FInS), NIF Lasers & Alignment (LASE), NIF Target Experimental Operations (TOPS), NIF Target Area Science and Engineering (TASE), and NIF&PS Control Systems (NCS). The FInS systems include the facility, HVAC, contamination control, beampath, and Line Replaceable Units (LRUs) as well as utilities which create the beampath environments, such as vacuum, argon, or clean dry air. The LASE systems are Programmatic systems which include laser diagnostics, alignment, power conditioning, pulsed power, and input laser systems. The TOPS and TASE systems are also Programmatic systems which include target and diagnostic delivery systems and positioners, many different insertable and fixed target diagnostics, and cryogenic and target gas fill systems. Finally, the NCS systems include both software and hardware for industrial and shot operation control systems. Policies governing administrative and operational practices related to maintenance of FInS, LASE, TOPS, TASE, and NCS systems are described in this plan. In addition, the plan provides processes and procedures for managing, tracking, and documenting the work. This document, the NIF Operations Management Plan, NIF-5020544 (Ref. 1), and NIF Shot Operations Plan, NIF-5018506 (Ref. 2), together satisfy the requirements of the Conduct of Operations. Duties, responsibilities, and reporting requirements of the various positions associated with FInS, LASE, and TOPS maintenance are detailed in this plan. The FInS systems include both Real Property systems with asset management requirements specified in DOE Order 430.1C (Ref. 3) and Programmatic systems. In addition, for FInS, there is a list of the System Level Maintenance Plans (SLMPs) in NIF-1007419198 (Ref. 4) which provide the system descriptions and maintenance plan and schedule. In addition, the list includes the Reliability Centered Maintenance (RCM) and Experience Centered Maintenance (ECM) evaluations that have been performed for applicable FInS systems as well as reliability criticality per Section 3.5. The -AM version of the NIF Maintenance Plan focuses on the reliability program for FInS, LASE, TOPS, TASE, and NCS within the context of the overall NIF Reliability, Availability, and Maintainability (RAM) program and incorporates changes since the -AL version from August 2011 and has been updated to be fully consistent with the updates to Ref. 1. It also includes asset management considerations, updates to the Work Order (WO) process within the NIF Computerized Maintenance Management System (CMMS) which is EAM infor® System Maintenance and Reliability Tracking (SMaRT) (Ref. 5), and updates to metrics and key performance indicators (KPIs).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advanced Metering Infrastructure for Distribution Planning and Operation: Closing the Loop on Grid-Edge Visibility

In the recent history of electric utilities, the potential to have visibility of the grid edge is gaining significance for the reliable planning and operation of a clean energy smart grid. Before the recent large-scale customer adoption of distributed energy resources (DERs), distribution networks were planned with a simpler fit-and-forget philosophy. The importance of customer-sited DERs to achieve climate change goals marks a major shift for utility operations. Changes to traditional fit-and-forget planning paradigms require better availability of grid-edge data. Smart metering is an enterprise-wide tool that is enabling visibility when and where it has been most needed. As of 2020, the rollout of smart metering, or advanced metering infrastructure (AMI), had reached more than 100 million meters in the United States, and nearly half of all electricity customers are now equipped with a smart meter (Figure 1). Smart meters are quickly becoming a ubiquitous data capture feature of smart grids. AMI enables utilities to record and measure electricity usage and power-flow metrics at a minimum of hourly intervals and at least once a day. At a minimum, AMI enables interval metering, automatic meter reading enabling accurate and time-interval billing, and the ability to provide feedback on customer energy consumption.

advanced metering infrastructure↗

EVI-LOCATE User Manual

One of the longest stages in the deployment of electric vehicle supply equipment (EVSE) is the initial planning of the infrastructure itself. Engineers and fleet experts from the National Renewable Energy Laboratory (NREL) have supported dozens of charging infrastructure site plans over the past couple decades, including the generation of site schematics, determinations of electric capacity, and estimates for likely costs. As the market for electric vehicles (EVs) has matured, this approach should no longer require a time and personnel intensive process. In order to shorten the time taken to develop site plans and cost estimates, NREL developed a tool that fleet managers, facility managers, electricians, EVSE installers, and members of the public can use to develop initial schematics and ballpark pricing for charging station installations. The Electric Vehicle Infrastructure - Locally Optimized Charger Assessment Tool and Estimator (EVI-LOCATE) provides a structured and consistent way for users to enter information about their planned EVSE project in a relatively simple web-based format. EVI-LOCATE then calculates electrical equipment capacity, wiring runs, and project costs. It produces a site diagram optimized around surface characteristics with differential trenching costs for softscape such as grass compared to hardscape such as asphalt that can be adjusted by users in the tool. It also stores the resulting site plans and costs in a dashboard for access at a later date, including plan revisions if necessary. This document guides users through the EVI-LOCATE screens and associated questions. It contains tip text boxes throughout on how best to interface with the tool and find additional information or context. The appendices contain the assumptions and calculations underpinning the tool. Much of the information for EVI-LOCATE was gathered through industry engagements with EVSE installers, invoices from completed EVSE installations, Gordian's RS Means construction data, and the General Services Administration blanket purchase agreement for EVSE. For a visual tutorial of the tool, users can watch EVI-LOCATE Step-by-Step Video. The tool itself is available at https://evi-locate.nrel.gov.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Global nuclear energy partnership fuels transient testing at the Sandia National Laboratories nuclear facilities : planning and facility infrastructure options.

The Global Nuclear Energy Partnership fuels development program is currently developing metallic, oxide, and nitride fuel forms as candidate fuels for an Advanced Burner Reactor. The Advance Burner Reactor is being designed to fission actinides efficiently, thereby reducing the long-term storage requirements for spent fuel repositories. Small fuel samples are being fabricated and evaluated with different transuranic loadings and with extensive burnup using the Advanced Test Reactor. During the next several years, numerous fuel samples will be fabricated, evaluated, and tested, with the eventual goal of developing a transmuter fuel database that supports the down selection to the most suitable fuel type. To provide a comparative database of safety margins for the range of potential transmuter fuels, this report describes a plan to conduct a set of early transient tests in the Annular Core Research Reactor at Sandia National Laboratories. The Annular Core Research Reactor is uniquely qualified to perform these types of tests because of its wide range of operating capabilities and large dry central cavity which extents through the center of the core. The goal of the fuels testing program is to demonstrate that the design and fabrication processes are of sufficient quality that the fuel will not fail at its design limit--up to a specified burnup, power density, and operating temperature. Transient testing is required to determine the fuel pin failure thresholds and to demonstrate that adequate fuel failure margins exist during the postulated design basis accidents.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Harmonized geospatial data to support infrastructure siting feasibility planning for energy system transitions

Climate change, energy system transitions, and socioeconomic change are compounding influences affecting the growth of electricity demand. While energy efficiency initiatives and distributed resources can address a significant amount of this demand, the United States will likely still need new utility-scale generation resources. The energy sector uses capacity expansion planning models to determine the aggregate need for new generation, but these models are typically at the state or regional scale and are not equipped to address the wide range of location- and technology-specific issues that are increasingly a factor in power plant siting. To help address these challenges, we have developed the Geospatial Raster Input Data for Capacity Expansion Regional Feasibility (GRIDCERF) data package, a high-resolution product to evaluate siting suitability for renewable and non-renewable power plants in the conterminous United States. GRIDCERF offers 264 suitability layers for use with 56 power plant technologies in a harmonized format that can be easily ingested by geospatially-enabled modeling software allowing for customization to robustly address science objectives when evaluating varying future conditions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Birth of a Data Center

Since 2005, Research and Education Campus serves as the gateway to INL University Boulevard Consolidates scientific studies, increased interaction and educational opportunities Teams with local commercial developers, the State of Idaho, and Idaho universities Developed University Boulevard 7 major R&D Leased facilities (388,000 sq. ft.) $122M capital value of leased property Some facilities are at and others forecasted to exceed capacity within 2-3 years as mission growth continues DOE awarded the INL contract to BEA, Feb. 2005. Purpose; transform two uniquely different National Laboratories into the newly formed Idaho National Laboratory Become the pre-eminent, internationally recognized nuclear energy research, development and demonstration laboratory within 10 years. Aggressively streamline, upgrade and plan for new infrastructure INL Infrastructure Transformation Plan, Sept 2005, an overall roadmap for transforming INL to meet the new vision. Key goal; procure 400,000 sq ft of new facility space DOE-NE approved Mission Need document for consolidating the INL Research and Education Campus (REC), Dec. 2005; add or replace 200,000 to 500,000 sq ft of professional scientific space, existing facilities were fair to poor condition. Master Campus Plan requirements document and Environmental Assessment approved January and March 2007 respectively. Defined campus location and REC boundaries. INL and DOE-ID decided, in 2007, to suspend quest for third-party financing, because unlikely to succeed. The strategy was; Keep original target of 200,000 to 500,000 sq ft new space Consolidate existing scattered leases Pursue developer-financed facilities in smaller incremental sizes All leased general purpose buildings;No DOE capital investments (except for utility corridor), developed by others (local developers, State, University, private funding), no government land involved INL-funded tenant improvements

99 GENERAL AND MISCELLANEOUS↗