Energy 101: Hydropower
Learn how hydropower captures the kinetic energy of flowing water and turns it into electricity for our homes and businesses.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Learn how hydropower captures the kinetic energy of flowing water and turns it into electricity for our homes and businesses.
Hydroelectric power plants account for 25% of West Africa's total installed capacity. In general, electricity generated by these plants is seasonal and intra-annual fluctuation has a considerable impact on electricity supply and cross-border electricity trade. We soft-linked a global hydrologic model to a multi-region capacity expansion and planning model for the West Africa Power Pool (WAPP) to examine the effects of seasonality in hydropower electricity generation on electricity trade, as well as the economic benefits of unconstrained cross-border electricity trade. We found that transitioning from rainy to dry season decreases hydroelectricity generation by an average of 40% in a normal year across the region. Between 2018 and 2050, satisfying the region's electricity demand will require significant capital investment; nevertheless, extending from current bilateral electricity trade agreements to a fully competitive cross-border electricity trade will result in net annual savings of $3 billion in 2015 USD. To achieve year-round energy security, countries should plan ahead and diversify their energy sources to ensure that supply reliability can be maintained in the case of lower supply during the dry season.
Hydropower is the largest source of renewable energy in the United States. Pumped storage hydropower (PSH) is a hydropower plant that can generate power when it operates as a hydro turbine, and it can absorb power from the electric grid when it is pumping water from the lower reservoir to the upper reservoir. The conventional role of PSH is as an energy arbitrage: it sells power when the price of electricity is high (i.e., during peak hours of energy demand), and it is operated as a pump during times when the price of electricity is low (e.g., midnight to dawn). PSH is an important part in hydropower generation. Currently, the total installed capacity is approximately 22 GW. Recently, a new type of PSH was developed, called ternary PSH (T-PSH). T-PSH is a type of advanced PSH that is different from conventional PSH and adjusted-speed PSH. T-PSH uses a single generator rotating in one direction with two different runners connected to the same shaft (i.e., one is for pumping water, and the other is for generating power as a turbine). This paper presents the development of a dynamic model of T-PSH for power system analysis. T-PSH can be operated in three different modes: generating mode, pumping mode, and hydraulic short-circuit (HSC) mode. The three modes of operation will be presented in this paper. A new combined governor is developed to represent the HSC operation mode, which is a special mode for T-PSH. The power command is divided into two parts, and a distribution coefficient is introduced to regulate the transitions from one mode to the other. Simulation and validation results are presented to verify the performance of the governor model and the characteristics of T-PSH.
Small hydropower, defined in this report as hydropower with a generating capacity of up to 10 MW typically built using existing dams, pipelines, and canals has substantial opportunity for growth. Existing small hydropower comprises about 75% of the current US hydropower fleet in terms of number of plants. The economic feasibility of developing new small hydropower projects has substantially improved recently, making small hydropower the type of new hydropower development most likely to occur. In 2013, Congress unanimously approved changes to simplify federal permitting requirements for small hydropower, lowering costs and reducing the amount of time required to receive federal approvals. In 2014, Congress funded a new federal incentive payment program for hydropower, currently worth approximately 1.5 cents/kWh. Federal and state grant and loan programs for small hydropower are becoming available. Pending changes in federal climate policy could benefit all renewable energy sources, including small hydropower. Notwithstanding remaining barriers, development of new small hydropower is expected to accelerate in response to recent policy changes.
In remote arctic communities, where access to a bulk electrical grid interconnection is not available, the implementation of islanded microgrids has been the most viable way to produce and distribute electricity services to their inhabitants. Historically, these islanded grids have relied primarily on diesel generators or hydropower resources to supply the baseload. However, this practice can result in increased expense due to the high costs associated with fuel transportation and the significant amounts of on-site storage necessary when fuel transportation is unavailable during winter months. In order to mitigate this problem, arctic microgrids have started to transition to a hybrid-source operational mode by incorporating renewable energy sources that are inherently variable in nature, such as wind or solar. Due to their highly stochastic behavior, these hybrid-source islanded microgrids can pose potential issues related to power quality due to introduction of rapid net load fluctuations and inability of diesel generators to respond rapidly. In addition, non-firm stochastic sources can require significant idling diesel generator resources to serve as spinning reserves, which is inefficient and wasteful. This work studies the problems that may arise in the transient dynamics of a real-world hybrid diesel microgrid when subjected to a loss of wind generation. Moreover, this work proposes a transition from a diesel spinning reserve to a battery energy-storage system (BESS) operating reserve scheme. The study of the proposed transition is important in establishing the fundamental implication of transient dynamics and the potential benefits of integrating a BESS as a spinning reserve in terms of stability, frequency nadir, and transient voltage deviation. The methods to investigate and validate the transient dynamics relied on both electromagnetic simulation models of GFMIs and a commercially available GFMI in an experimental power hardware-in-the-loop setup. The simulation results showed that the proposed operating reserve scheme improves the power quality of the system in terms of voltage deviation and frequency nadir when the microgrid is subjected to a loss of wind generation scenario. Depending on the simulation cases, adding a GFMI reduced the frequency nadir between 65.3% and 86.7%. Moreover, the reductions in the voltage deviations improved between 3.6% and 23.0%. From these results it can be concluded that the integration of a GFMI can reduce the frequency nadir in a hybrid diesel microgrid, and in turn, reduce diesel consumption, which improves system reliability while reducing fuel expenses. Furthermore, the novelty of this work relies on the fact that the offline simulation results were validated using a power hardware-in-the-loop platform that incorporated a 100 kVA commercially available GFMI as the device under test.
A growing literature emphasizes the importance of integrating climate change impacts into electricity system planning. Rising average temperatures can increase and shift electricity demand while reducing generator and transmission efficiency. Changes to water availability and quality can reduce the output of thermally cooled generators and hydropower. Electric power grids across the US and globally are undergoing transformational changes that present new opportunities and challenges to reliability assurance. However, electric utilities and system operators have limited internal capabilities to incorporate these effects into planning practices. This work addresses gaps in utility and system planner practices by integrating climate-water-electricity expertise from universities and U.S. Department of Energy National Laboratories with electricity system planners and stakeholders in the Western Electricity Coordinating Council (WECC). Using a highly collaborative approach, global climate model data, high-resolution hydrology models, and long-term electric sector capacity expansion tools are employed to analyze a range of climate outcomes for future electricity scenarios aligned with recent WECC planning studies. Doing so allows WECC to expand its climate-agnostic planning assessments to consider how future temperature and precipitation patterns could influence generation and transmission planning. We explore how changes to climate-water conditions can affect power plant investment and operation, system economics, and environmental impacts, providing an expanded perspective on interconnection-wide decision making under climate uncertainty.
Power Purchase Agreements (PPAs) are becoming increasingly preferred among large energy consumers, such as data centers, to secure cost-effective energy and meet accelerating demand growth. Traditionally, variable renewable energy (VRE)-based PPAs operate on a pay-as-produced basis, balancing supply and demand for a relatively longer duration (e.g., annually). However, the focus is shifting toward matching supply and demand on an hourly basis to fully meet energy needs. This shift requires the integration of flexible energy resources, such as hydropower, thermal generation, and energy storage, to complement VRE sources like wind and solar, forming the foundation for 24/7 PPA. This work contributes by: (i) reviewing emerging market trends and current practices in PPA procurement, supported by data on PPA prices and technology portfolios; (ii) synthesizing the existing literature on modeling approaches for contract pricing, quantities, hybrid resource procurement, and risk management in 24/7 PPA design, while identifying key research gaps; and (iii) proposing an integrated 24/7 PPA design framework along with two contracting mechanisms from the perspectives of both PPA providers and consumers. The proposed framework highlights critical modeling challenges, risk-allocation issues, and future research opportunities for 24/7 PPA design.
In this article, we present a detailed simulation of floating photovoltaic's (PV) energy yield and associated evaporation reduction potential for the largest 128 US hydropower reservoirs. A recent article by Cavusoglu et al., published in the journal Nature Communications, outlined a hypothetical evaporation engine that could harness the energy of lake water evaporation while simultaneously conserving the water resource. Its authors suggest that evaporation engines deployed across all US lakes and reservoirs could, collectively, yield up to 70% of the total U.S. electricity production. We show that floating PV technology could: (1) deliver considerably more electrical energy than evaporation engines, amounting to 100% of the US production with only a fraction of the lakes; (2) deliver this energy on a firm, effectively dispatchable basis; and (3) conserve as much water as the evaporation engines.
This user manual offers a comprehensive guide for developing a Digital twin (DT) of a Kaplan turbine at Chelan County Public Utility District (Chelan PUD) using neural networks. As variable renewable generation expands, hydropower units must operate with optimal efficiency and stability. For Kaplan machines, this flexibility is achieved through coordinated control of guide vane (wicket gates) opening and runner blade pitch, which amplifies the plant’s inherent nonlinear behavior and challenges traditional physics-only modeling. The efficiency of the Kaplan turbine varies with different combinations of the guide vans (wicket gate) opening and the blade angle. Each guide van opening and blade angle has a corresponding highest efficiency point, forming a cam relationship that represents the optimal combination.The discharge of a hydraulic turbine is controlled by the opening angle of the guide vans. Therefore, for each value of head, there is a certain guide van opening and blade angle that corresponds to the highest efficiency. For a given head, different combinations of the guide van opening and blade angle have different efficiencies. Therefore, coordinate cam curves are used to describe the relationship between the wicket gate opening and blade angle with different water head. To address these challenges, the manual details a data-driven modeling and learning workflow centered on structured neural networks. The approach is designed to forecast critical operational variables—discharge flow, net head, penstock (or scroll-case) pressure, and generator electrical outputs—by leveraging real-time inputs such as the generator power control setpoint, exciter field current and field voltage, together with hydromechanical commands (e.g., gate position and, when available, runner blade-pitch angle). The neural models are trained and validated on operational data from a Kaplan unit operated by Chelan PUD, demonstrating that the structured NN architecture can learn the coupled gate–blade–electrical dynamics. The result is a robust DT that improves situational awareness and supports data-informed decision-making for Chelan PUD’s Kaplan turbine operations.
Recent proliferation of hydro-dams was one of the nature-based solutions to meet the increasing demand for energy and food in the Lower Mekong River Basin (LMRB). While construction of these hydro-dams generated some hydropower and facilitated expansion of irrigated lands, it also significantly altered the basin-wide hydrology and subsequently impacted wetland ecosystems. Unintended adverse consequences of ecosystem services from lakes and wetlands offset the intended gains in hydroelectricity and irrigated agriculture. The trade-offs between gains in energy and food production and losses in aquatic ecosystem services were perceived to be significant but knowledge of the magnitude, spatial extent, and type of ecosystem services change is lacking and, therefore, the question whether the hydro-dam is an optimized solution or a potential ecological problem remains unanswered. In this study, as the first step to answer this question and using the Tonlé Sap Lake as an example, we quantified one of the impacts of hydro-dams on lake ecosystem's phenology in terms of open water area, a critical ecological characteristic that affects lake systems’ fish production, biodiversity, and livelihoods of the local communities. We used the MODIS-NDVI time series, forecast function and the Mann-Kendall trend test method to first quantify the open water area, analyzed its changes over time, and then performed correlation analysis with climate variables to disentangle dam impacts. The results showed reduced hydro-periods, diminishing lake seasonality and a declining trend in Tonlé Sap Lake open water area over the past 15 years. These changes were insignificantly related to climatic influence during the same period. It is concluded that basin-wide hydro-dam construction and associated agricultural irrigation were deemed to be the primary cause of these ecological changes. Further analyses of changes in the lake's ecosystem services, including provision and cultural services, need to be carried out in order to have a holistic understanding of the trade-offs brought by the hydro-dam proliferation as a solution to the emerging energy and food demand in the LMRB. - Highlights: • The open water area of the Tonlé Sap Lake has declined over the past 15 years. • Hydro-dam construction is a key factor responsible for such lake phenological loss. • Climate doesn’t contribute much. • Tradeoffs should be evaluated to help establish an optimized nature-based solution.
Explore the source record for details and available documents.
This document describes some of the accomplishments of the Department of Energy Water Power Program, and how those accomplishments are supporting the advancement of renewable energy generated using hydropower technologies and marine and hydrokinetic technologies.
Bhutan's electricity system is already low-carbon through the use of hydropower. However, generation from hydroelectric plants is reduced during the dry winter months and will be impacted by climate change and other extreme weather events. Bhutan is mitigating these risks by diversifying their energy mix with clean energy resources. Bhutan is exploring photovoltaic (PV) solar energy development to enhance its energy system's overall resilience. To ensure efficient grid planning and solar integration, Bhutan's power generator, Druk Green Power Corporation, and the transmission and distribution utility, Bhutan Power Corporation, are partnering with the South Asia Group for Energy (SAGE) to develop their solar capabilities, integrate solar energy into the grid, and strengthen Bhutan's energy infrastructure and efficiency.
The power systems have faced progressively more demanding operational requirements over the last two decades. Several factors contribute to these challenging operating conditions, including load growth, aging infrastructure, increasing penetrations of distributed energy resources (DERs), electrification of the economy, and policy initiatives such as decarbonization. The power system and its components must provide high operational flexibility to mitigate these challenges. For example, the proliferation of intermittent DERs such as wind and solar has increased the need for conventional generation assets like hydropower plants to respond to sudden load-generation imbalances. The higher flexibility requirements for hydropower plants cause more wear and tear, potentially shortening the useful lifespan of hydropower turbines. To reduce the need for hydropower plants to follow sudden changes in the dispatch signal, we investigate their combined operation with the energy storage systems (ESSs; “ESS-based hybridization”). Our analyses focuses on improving the lifespan of hydropower plants through ESS-based hybridization. Wear and tear on hydropower turbines (particularly Francis turbines) is modeled using a loss-of-life concept that is based on damage experienced by the turbine due to various cycles of operation. Then, we show that using ESSs to offset some of the high variation increases the remaining life of the hydropower plants. To demonstrate this, a few modeling tools were developed for this work: (1) a dynamic model for various components of the turbine and its governor; (2) a control strategy that assigns a slow-varying dispatch signal to a hydropower unit versus a fastmoving signal to ESS, such that the overall power request remains the same; and (3) models for the financial analysis to quantify the economic merits of such a framework. We used the models we developed to analyze the dispatch pattern of an actual hydropower plant with a power output of 50 MW and a head height of 152 m. This work showed that ESS-based hybridization could extend the life of the hydropower plant by 5% on average. This extension in life was then used to estimate the economic benefit in terms of cost deferrals associated with hydropower plant maintenance and replacement: on average, $3.6 million. Sensitivity analysis with respect to the size of ESS and cost of turbines was performed to show the variation in benefits over the range of turbine costs and ESS sizes. Crucially, stacking damage reduction and lifetime extension with other ESS value streams such as providing ancillary services could substantially increase the financial benefits of ESS-based hybridization. The higher costs associated with ESS of appropriate size would make more financial sense when multiple value streams are stacked and co-optimized to extract the maximum benefit. This dimension will be explored in future work.
Scheduling and operational control of hydropower systems is accompanied with a keen awareness of the management of water use, environmental effects, and policy, especially within the context of strict water rights policy and generation maximization. This is a multi-objective problem for many hydropower systems, including the Cumberland and Mid-Columbia river systems. Though each of these two systems have distinct operational philosophies, hydrologic characteristics, and system dynamics, they both share a responsibility to effectively manage hydropower and the environment, which requires state-of-the art improvements in the approaches and applications for water quality modeling. The Department of Energy and Oak Ridge National Laboratory have developed tools for total dissolved gas (TDG) prediction on the Mid-Columbia River and a decision-support system used for hydropower generation and environmental optimization on the Cumberland River. In conjunction with IIHR - Hydroscience & Engineering, The University of Iowa and University of Colorado s Center for Advanced Decision Support for Water and Environmental Systems (CADSWES), ORNL has managed the development of a TDG predictive methodology at seven dams along the Mid-Columbia River and has enabled the ability to utilize this methodology for optimization of operations at these projects with the commercially available software package Riverware. ORNL has also managed the collaboration with Vanderbilt University and Lipscomb University to develop a state-of-the art method for reducing high-fidelity water quality modeling results into surrogate models which can be used effectively within the context of optimization efforts to maximize generation for a reservoir system based on environmental and policy constraints. The novel contribution of these efforts is the ability to predict water quality conditions with simplified methodologies at the same level of accuracy as more complex and resource intensive computing methods. These efforts were designed to incorporate well into existing hydropower and reservoir system scheduling models, with runtimes that are comparable to existing software tools. In addition, the transferability of these tools to assess other systems is enhanced due the use of simplistic and easily attainable values for inputs, straight-forward calibration of predictive equation coefficients, and standardized comparison of traditionally familiar outputs.
This report analyzes the U.S. Bureau of Reclamation's (Reclamation) lease of power privilege (LOPP) regulatory process for a nonfederal entity to use a Reclamation jurisdictional dam or conduit for power generation. Recent federal initiatives encouraging hydropower development at federally-owned facilities coupled with Reclamation's hydroelectric potential has led to an increased interest in powering Reclamation dams and conduits through the LOPP process. During the last five years, 23 of the 36 total LOPP projects (76 MW) have been initiated and are at some phase of the development process. Resource assessments analyzed in this report identify over 360 MW of hydroelectric potential at Reclamation-owned dams and conduits. This report provides considerations from Reclamation staff involved in the LOPP regulatory process and developers that have received an LOPP and are currently generating hydropower at a Reclamation dam or conduit. The authors also analyze LOPP regulatory processing timelines before and after the implementation of federal initiatives to streamline the LOPP process and provide case studies of hydropower projects that have obtained an LOPP.
In 2010, the U.S. Department of Energy’s (DOE’s) Wind and Water Power Technologies Office provided funding to Pacific Northwest National Laboratory, Oak Ridge National Laboratory (ORNL), and Argonne National Laboratory to develop an approach for assessing a river basin as an integrated system within the context of existing uses and environmental conditions to identify opportunities for sustainable hydropower development and environmental improvements. Called the Integrated Basin-Scale Opportunity Assessment Initiative (BSOA Initiative), the project is one of seven action items of the March 24, 2010 Memorandum of Understanding (MOU) for Sustainable Hydropower. Early efforts of the BSOA Initiative focused on forming a National Steering Committee, identifying potential basins for opportunity assessments, methodologies for stakeholder engagement, existing and needed analytical tools, barriers to the opportunity assessment process, and significant data gaps. One of the key outcomes was identifying a need for better collaborative decision-making tools that can be used by stakeholders. In response to this need, the Basin-Scale Project Team chose a scenario-based modeling approach for assessing hydropower, environmental, and other water-use opportunities. The approach involved the development of a daily hydrologic model for the Upper Deschutes River and Lower Crooked River subbasins to simulate alternative water management scenarios. Two example scenarios were constructed to demonstrate the use of the hydrologic model to explore three management goals in the Deschutes Basin: 1) increasing hydropower assets by adding new generation at existing dams or diversions and in existing irrigation canals or conduits, 2) increasing instream flows to benefit fish and aquatic ecosystems, and 3) maintaining existing water uses (primarily irrigation). Actions to achieve these goals were simulated by incrementally increasing minimum flow requirements during the storage season and reducing water demands during the irrigation season, while simulating hydropower generation at non-powered dams and in irrigation canals. As part of the effort to demonstrate scenario-based modeling, the project team also developed a web-based data-visualization interface for synthesizing modeling results. The interface allows users to view model results in raw form (daily flow) or in the form of value-based metrics that are based on specific information needs expressed by stakeholders (e.g., how often flow exceeds a conservation flow target at a certain location). In addition to the modeling efforts, 29 potential hydropower sites (14 non-powered dams, 15 canal/conduit sites) were evaluated for their technical and economic feasibility using ORNL’s Hydropower Energy and Economic Assessment tool. Results of the feasibility assessment indicated that eight of the sites (four non-powered dams, four canals/conduits) may be feasible and could add approximately 19 megawatts (MW) of hydroelectric capacity in the basin and generate over 78 gigawatt-hours (GWh) of energy per year. The approach presented here is intended to encourage consideration of methods that emphasize exploration of a range of potential management actions that may achieve a better balance among multiple, and often conflicting, management goals. It is important to consider the approach as an iterative and collaborative process focused on moving debates beyond agreement about an exact target that is acceptable to all parties to a discussion of how stakeholders can better understand how achieving their goals interacts with the achievement of goals by other stakeholder groups. By exploring the results of the model in this way, stakeholders are more likely to narrow the bounds of interest so that more in-depth analysis can be completed.
The renewable energy transition is leading to increased electricity trade between the United States and Canada, with Canadian hydropower providing firm lower-carbon power and buffering variability of wind and solar generation in the U.S. However, long-term power purchase agreements and transborder transmission projects are controversial, with two of four proposed transmission lines between Quebec, Canada and the northeast U.S. cancelled since 2018. Here, we argue that controversies are exacerbated by a lack of open-source data and tools to understand tradeoffs of new hydropower generation and transmission infrastructure in comparison to alternatives. This gap includes impacts that incremental transmission and generation projects have on the economics of the entire system, for example, how new transmission projects affect exports to existing markets or incentivize new generation. We identify priority areas for data synthesis and model development, such as integrating linked hydropower and hydrologic interactions in energy system models and openly releasing (by utilities) or back-calculating (by researchers) hydropower generation and operational parameters. Publicly available environmental (e.g. streamflow, precipitation) and techno-economic (e.g. costs, reservoir size,) data can be used to parameterize freely usable and extensible models. Existing models have been calibrated with operational data from Canadian utilities that are not publicly available, limiting the range of scientific and commercial questions these tools have been used to answer and the range of parties that have been involved. Studies conducted using highly resolved, national-scale public data exist in other countries, notably, the United States, and demonstrate how greater transparency and extensibility can drive industry action. Improved data availability in Canada could facilitate approaches that (1) increase participation in decarbonization planning by a broader range of actors; (2) allow independent characterizations of environmental, health, and economic outcomes of interest to the public; and (3) identify decarbonization pathways consistent with community values.