Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “hydroelectricity”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

CTES Pilot Plant Detailed Design Report

Energy storage is becoming an increasingly important component on modern power grids to ensure sufficient balancing capability for intermittent renewable power generations is available to maintain system reliability. Although energy storage has traditionally been provided by pumped storage hydroelectric systems, it is not possible to install these at every location and they can be expensive to construct. Lithium Ion batteries are increasingly being used to carry out energy storage grid services, however these can be expensive when specified over a few hours of capacity. An alternative way to store substantial energy is to use thermal energy storage (TES). This has been deployed on concentrated solar units using molten nitrate salts as a storage media. Again, the cost of the material can be prohibitive, thus lower cost alternative materials are being actively sought, such as sand, rocks and concrete. This project investigates the potential for Concrete Thermal Energy Storage (CTES) when used to directly store thermal energy from a thermal plant source. This report represents the Detailed Design phase deliverables comprising of the process, mechanical, electrical, piping along with control and instrumentation documents. Civil and structural deliverables are included on a preliminary basis due to outstanding site investigation activities. CTES block transportation testing results and the pilot plant testing plan is also included in this report.

25 ENERGY STORAGE↗

Basin-Wide Approaches to Hydropower Licensing

This presentation summarizes findings from a 2020 NREL technical report including the FERC relicensing process for non-federal hydropower projects, analyzes FERC-licensed projects with license expiration dates from 2018-2037, discusses FERC's authority to coordinate license terms of hydropower projects within a shared river basin and provides basin-wide case studies and considerations to hydropower relicensing. In the United States there are 1,043 active FERC-licensed hydroelectric projects with a total capacity of 56,097 MW. Of those, 647 with a total capacity of 21,870 MW have license expiration dates from 2018-2037. The expected workload in conjunction with the time, cost, and complexity associated with issuing a single new license has led to initiatives that aim to increase the efficiency of the relicensing process. Federal and state regulators and licensees in California, Maine, New York, and Wisconsin have begun to develop approaches to look at hydropower relicensing as part of a larger system - a river basin. These basin-wide approaches seek to coordinate different stages of the relicensing process for multiple projects at the same time. The goal of these basin-wide approaches is to increase the efficiency of the relicensing process and allow for a more comprehensive analysis of the cumulative impacts of the projects within the basin. These innovative approaches to relicensing could also reduce the workload for regulators and costs associated with relicensing. This presentation discusses some of the findings from the Basin-wide Approaches to Hydropower Relicensing: Case Studies and Considerations including a summary of the key considerations for the FERC relicensing process for non-federal hydropower projects, key findings from the analysis of FERC-licensed projects with license expiration dates from 2018-2037, discusses FERC's authority to coordinate license terms of hydropower projects within a shared river basin and provides basin-wide case studies and considerations to hydropower relicensing.

basin-wide↗

Ahtna Tribal Energy Planning and Technical Assistance Project (Final Report)

Ahtna Intertribal Resource Commission (AITRC) provided technical assistance and capacity building activities for eight (8) tribal communities in the Ahtna region to: 1. reduce energy costs; 2. improve community wildfire readiness and biomass utilization; 3. provide local food security; and 4. reduce unemployment, poverty and outmigration in the Ahtna villages. AITRC provided community education on energy needs, conservation and efficiency, issues and options, assisted the tribes in identifying appropriate renewable energy systems, and increased their capacity to implement successful energy projects that employed local tribal members. AITRC also successfully assisted the member Tribes and Alaska Native Corporations in pursuing additional funding to advance their energy goals and projects, including Tribal Resiliency Planning, community biomass heating and wood resource assessment projects, and hydroelectric.

09 BIOMASS FUELS↗

It's Not Just About the Megawatts - ARC Industry Forum, The Future of Power Generation

As the world transitions to less carbon intensive energy portfolios, much of the attention understandably centers on generating capacity – replacing megawatts of fossil fuel with megawatts of solar, wind, nuclear, hydroelectric, hydrogen, and more. The actual operation of a reliable grid needs more than just megawatts though: adequate quantities of a portfolio of essential reliability services; flexible and capable power delivery systems; governance to operate in 5-10 minute intervals, forecast hourly, and plan and build on a generational time horizon; and dependable and secure communications. We can choose our fuel mix for climate reasons, but the grid itself and the society that relies upon it impose constraints on those choices that we ignore at our peril.

13 HYDRO ENERGY↗

Hybrid renewable pumped storage hydropower energy storage system

A pumped storage hydroelectric system may include a reservoir system including an upper reservoir system and a lower reservoir system. At least one of the upper reservoir system and the lower reservoir system may include a modular reservoir arrangement. A penstock may be coupled with the upper reservoir system. A pump/turbine may be coupled with the penstock and with the lower reservoir system. The pump/turbine may be configured to receive water flowing from the upper reservoir system to the lower reservoir system for generating electrical power, and to pump water from the lower reservoir system to the upper reservoir system for storing energy.

Medina, Hector Eduardo↗

South Asia Group for Energy - Bhutan

Bhutan's electricity system is already low-carbon through the use of hydropower. However, generation from hydroelectric plants is reduced during the dry winter months and will be impacted by climate change and other extreme weather events. Bhutan is mitigating these risks by diversifying their energy mix with clean energy resources. Bhutan is exploring photovoltaic (PV) solar energy development to enhance its energy system's overall resilience. To ensure efficient grid planning and solar integration, Bhutan's power generator, Druk Green Power Corporation, and the transmission and distribution utility, Bhutan Power Corporation, are partnering with the South Asia Group for Energy (SAGE) to develop their solar capabilities, integrate solar energy into the grid, and strengthen Bhutan's energy infrastructure and efficiency.

Bhutan↗

Hydropower capacity factors trending down in the United States

Abstract The United States hydropower fleet has faced increasing environmental and regulatory pressures over the last half century, potentially constraining total generation. Here we show that annual capacity factor has declined at four fifths of United States hydropower plants since 1980, with two thirds of decreasing trends significant at p < 0.05. Results are based on an analysis of annual energy generation totals and nameplate capacities for 610 plants (>5 megawatt), representing 87% of total conventional hydropower capacity in the United States. On aggregate, changes in capacity factor imply a fleetwide, cumulative generation decrease of 23% since 1980 before factoring in capacity upgrades—akin to retiring a Hoover Dam once every two to three years. Changes in water availability explain energy decline in only 21% of plants, highlighting the importance of non-climatic drivers of generation, including deterioration of plant equipment as well as changes to dam operations in support of nonpower objectives.

13 HYDRO ENERGY↗

Offshore wind and wave energy can reduce total installed capacity required in zero-emissions grids

Abstract As the world races to decarbonize power systems to mitigate climate change, the body of research analyzing paths to zero emissions electricity grids has substantially grown. Although studies typically include commercially available technologies, few of them consider offshore wind and wave energy as contenders in future zero-emissions grids. Here, we model with high geographic resolution both offshore wind and wave energy as independent technologies with the possibility of collocation in a power system capacity expansion model of the Western Interconnection with zero emissions by 2050. In this work, we identify cost targets for offshore wind and wave energy to become cost effective, calculate a 17% reduction in total installed capacity by 2050 when offshore wind and wave energy are fully deployed, and show how curtailment, generation, and transmission change as offshore wind and wave energy deployment increase.

16 TIDAL AND WAVE POWER↗

Forty-year hydropower generation reanalysis for Conterminous United States

First published in 2022, the RectifHyd dataset provides hydrologically consistent estimates of monthly net generation for approximately 1,500 hydropower plants in the United States, addressing a gap in industrial surveys that have collected monthly generation data from only ~10% of plants post-2003. Here we present RectifHydPlus—an extended and enhanced dataset that improves on both the proxy information and temporal downscaling methodology adopted in RectifHyd. In addition to providing updated estimates of historical monthly generation for 590 plants with >10 MW nameplate capacity from 1980 through 2019, RectifHydPlus adds a hydrological control dataset that isolates the influence of historical water availability on generation. The new hydrological control dataset is suited to applications seeking to represent the capabilities of the contemporary fleet subject to historical interannual variability in climate. RectifHydPlus also includes a forty-year, daily-resolution, spill-adjusted water release time series for each dam, allowing users to aggregate generation estimates to the desired temporal resolution.

Hydroelectricity↗

CFD-based design optimization of ducted hydrokinetic turbines

Abstract Hydrokinetic turbines extract kinetic energy from moving water to generate renewable electricity, thus contributing to sustainable energy production and reducing reliance on fossil fuels. It has been hypothesized that a duct can accelerate and condition the fluid flow passing the turbine blades, improving the overall energy extraction efficiency. However, no substantial evidence has been provided so far for hydrokinetic turbines. To investigate this problem, we perform a CFD-based optimization study with a blade-resolved Reynolds-averaged Navier–Stokes (RANS) solver to explore the design of a ducted hydrokinetic turbine that maximizes the efficiency of energy extraction. A gradient-based optimization approach is utilized to effectively deal with the high-dimensional design space of the blade and duct geometry, with gradients being calculated through the adjoint method. The final design is re-evaluated through higher-fidelity unsteady RANS (URANS) simulations. Our optimized ducted turbine achieves an efficiency of about 54% over a range of operating conditions, higher than the typical 46% efficiency of unducted turbines.

13 HYDRO ENERGY↗

New Tool Evaluates the Financial Viability of Pumped Storage Hydropower

The rapidly evolving electricity system with increasing variable renewable energy (VRE) resources provides both opportunities and challenges for the power sector. With the significant ramps and intermittency associated with VRE resources, the requirements and need for additional flexible resources increase. Pumped storage hydropower (PSH) provides flexibility to the electricity grid to replace fossil fuel plants, which are responsible for 25% of U.S. emissions. PSH projects support various aspects of power system operations, including flexibility, ramping capability, energy, ancillary service, black start, and others. The significant potential of hydropower requires understanding the different value drivers to the electricity system specific to the location of a project and then optimizing the plant for the different system values. Thus, determining the value of PSH projects and their many services and contributions to the electricity system can be a challenge for potential developers, system owners, regulators, policy makers, and consultants.

13 HYDRO ENERGY↗

Cost Estimation of a Permanent Magnet Synchronous Machine for Use in Adjustable Speed-Pumped Storage Hydropower

Electric machine design has become an easier process with the availability of computers in recent decades. However, the interest in electric machine design among students has declined. University-level design courses must compete with courses perceived as more desirable by the potential job market. Hence, the power system engineers with this expertise are very few and are nearing retirement. Contrarily, renewable energy has been picking up in the past few decades. The indeterminacy and variation of renewable energy sources require a balancing mechanism to maintain the constant voltage and frequency of the grid. Adjustable-Speed Pumped-Storage Hydropower plants are considered the contender for future energy storage, providing large capacity and fast-acting response. Large-scale hydropower applications depend on the natural characteristics of each project site, making less expensive, off-the-shelf generators unfeasible. This work gives a shortcut to estimate the cost of constructing a permanent magnet generator for low-volume manufacturing.

13 HYDRO ENERGY↗

A metric framework for evaluating the resilience contribution of hydropower to the grid

This paper will describe a proposed framework for expressing the resilience of hydropower generation and provide initial case studies for three classes of hydropower, run-of-river hydropower, hydropower with reservoirs, and pumped storage hydropower. Hydropower has great flexibility to provide support during and after natural and man-made events that can disrupt critical infrastructure functionality. The concept of the framework provides for consideration of policy and rules, constraints of the water shed and other allocations of water, storage and plant capabilities to produce real and reactive power, and the strength of the delivery network. The paper details a resilience response metric that has inputs of state of storage and plant level constraints on real and reactive power production. Using the definition of resilience, based on maintaining a minimally normal operations, we provide a qualitative assessment of hydropower’s ability to address the various time scales comprising the “R”s of resilience.

13 HYDRO ENERGY↗

Frequency Response Improvement in a Standalone Small Hydropower Plant Using Battery Storage

This paper proposes a control architecture for frequency, current, and voltage control that facilitates using battery storage to improve the response of standalone small hydropower plants. The frequency controller uses rate-of-change of frequency and frequency-Watt-based generations to produce active power commands. The distinctive feature of the controller design is that it nicely integrates response to frequency change with constraints on frequency and state of battery to enable power injections. The current and voltage control scheme allows incorporating the frequency controller. The distinctive feature of this controller is that it incorporates a bounded integral control strategy that guarantees stability. Results on the stability of the hydropower plant with proposed scheme are presented and robust ways to choose the controller gains are investigated via root locus analysis. In conclusion, simulations performed show that: the hydropower plant response is significantly improved with battery storage using the proposed scheme; the load carrying capability of the hydropower plant is significantly improved with battery storage; the proposed scheme has the capability to recharge the battery; and the proposed control scheme gives improved performance.

13 HYDRO ENERGY↗

Evaluation of a Surface Spill Operation to Return Adult Steelhead Overshoots Downstream of McNary Dam

This study, funded by the U.S. Army Corps of Engineers (USACE), was conducted by the Pacific Northwest National Laboratory to evaluate the efficacy of operating one Top Spill Weir (TSW) at McNary Dam outside the normal TSW operation dates for juvenile salmon passage. Of interest is whether the TSW is an effective downstream passage route for adult steelhead overshoots. Overshoots are fish which, having passed upstream at McNary Dam, must pass downstream to return to their natal stream to spawn. This report covers Fall (2019) and Spring (2020) study periods. The study design arranged the available 24 hours of TSW spill per week into weekly blocks with sub-blocks differentiated into day and night operations with TSW discharge periods of 4- and 8-hours duration. Hydroacoustic techniques were used to sample adult fish passage at the TSW and at turbine units 1 and 10. The experimental design contrasted TSW spill periods of differing duration and at different times of the day. The small number of fish detected passing the TSW, and the smaller number of fish detected passing the turbine units, were best suited to an ad hoc, exploratory approach to evaluating the effect of TSW spill. It is worthwhile to note that the operations data obtained for the fall study period had a greater than expected number of gaps and apparent anomalies that we believe were a result of how the data were aggregated. These problems are not particularly problematic for the present study, because the available data still provide a good indication of whether the TSW was operating at each point in time. TSW flows in both fall and spring data sets were able to be cleaned up using the established relationship between forebay elevation and TSW discharge rate. Additional cleanup of operations data would be needed, however, if more quantitative evaluation of dam-wide flow and passage relationships were needed. This study contrasted TSW spill periods of differing duration and at different times of the day. The small number of fish detected passing the TSW, and the smaller number of fish detected passing the turbine units were best suited to an ad hoc, exploratory approach to evaluating the effect of TSW spill. Spring adult steelhead passage numbers estimated using hydroacoustics were notably lower than during the fall study period, and that was consistent with our analysis of PIT tagged fish likely to be in the vicinity during each study period. Detections of fish in BlueView sampling areas upstream of the TSW and powerhouse were not correlated with detections of fish passing hydroacoustic sampling areas, which suggests that fish approaching the face of the dam can move around the forebay before passing. Other fish detected in the forebay in large numbers, such as shad, were able to be filtered out of steelhead passage counts and did not appear to be influencing hydroacoustic passage rate estimates. A pulse of passage at the initial TSW opening was weakly evident, but trends across 4- and 8-hour operational periods did not show a distinct decline in passage over time as TSW operation continued. Our findings do not indicate a reason to choose one 8-hour period over two 4-hour periods, or vice versa. This suggests that the duration of spill periods can be chosen based on operational or other considerations. Passage rates were consistently higher during the daytime TSW discharge periods, relative to nighttime TSW discharge periods. The experimental design of the current study used start times near dawn for day periods and near dusk for night periods.

59 BASIC BIOLOGICAL SCIENCES↗

Energy 101: Hydropower [Slides]

The Energy 101: Hydropower presentation, developed for the Energy Technology Innovation Partnership Project (ETIPP), provides an overview of hydropower energy. It covers fundamental concepts, technologies, considerations, case studies, and additional resources.

13 HYDRO ENERGY↗