Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “grouting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

SALTSTONE 2QCY10 TCLP RESULTS

The Saltstone Production Facility (SPF) receives waste from Tank 50H for treatment. In the second quarter of the 2010 calendar year (2QCY10), Tank 50H accepted transfers of approximately 19 kgal from the Effluent Treatment Project (ETP), approximately 5 kgal from Tank 710 - the H-Canyon General Purpose Evaporator, approximately 42 kgal from the HCanyon Super Kukla campaign, and approximately 73 kgal from the Modular Caustic Side Solvent Extraction Unit (MCU) Decontaminated Salt Solution Hold Tank (DSS-HT). The Saltstone Grout Sampling plan provides the South Carolina Department of Health and Environmental Control (SCDHEC) with the chemical and physical characterization strategy for the salt solution which is to be disposed of in the Z-Area Solid Waste Landfill (ISWLF). During operation, samples were collected from Tank 50H and grout samples prepared to determine the non-hazardous nature of the grout to meet the requirements of the South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-79.261.24(b) and R.61-79.268.48(a). Savannah River National Laboratory (SRNL) was asked to prepare saltstone from samples of Tank 50H obtained April 4, 2010 during 2QCY10 to determine the non-hazardous nature of the grout. The samples were cured and shipped to Babcock & Wilcox Technical Services Group-Radioisotope and Analytical Chemistry Laboratory (B&W TSG-RACL) to perform the Toxic Characteristic Leaching Procedure (TCLP) and subsequent extract analysis on saltstone samples for the analytes required for the quarterly analysis saltstone sample. In addition to the eight toxic metals - arsenic, barium, cadmium, chromium, mercury, lead, selenium and silver - analytes included the underlying hazardous constituents (UHC) antimony, beryllium, nickel, and thallium which could not be eliminated from analysis by process knowledge. B&W TSG-RACL provided subsamples to GEL Laboratories, LLC for analysis for the UHCs benzene, phenols and total and amenable cyanide.

36 MATERIALS SCIENCE↗

Contaminant Leaching From Intact Saltstone Monoliths - 17517

At the Department of Energy's (DOE's) Savannah River Site (SRS) chemically reducing materials, such as blast furnace slag (BFS), are added to grout formulations mixed with low-level radioactive salt solution in order to enhance the attenuation of redox sensitive contaminants (e.g., technetium-99 (Tc-99)). The resulting cementitious material, known as saltstone, is deposited in a series of concrete vaults for permanent disposal at the Saltstone Disposal Facility (SDF). Under oxidizing conditions, Tc persists as an anion in the +7 oxidation state, i.e., pertechnetate (TcO{sub 4}{sup -}), with very limited retention generally associated with amphoteric soil oxides. However, Tc(VII) is subject to chemical reduction to the +4 oxidation state, which is less soluble and mobile in the environment. Thus, chemically reducing grouts provide both a physical (i.e., low saturated hydraulic conductivities (K{sub sat}) that limit H{sub 2}O turnover and O{sub 2} exposure) and chemical barrier (i.e., residual reductive capacity) to contaminant release. However, many of the previous experiments evaluating the ability of saltstone to chemically reduce and immobilize Tc have been conducted using ground saltstone materials as sorbents, a practice that is likely to reduce the moisture level in the material, enhance exposure to O{sub 2} and alter sorbent properties in an unpredictable manner. Therefore, the objective of the current study was to evaluate contaminant leaching from intact monoliths that better represent the initial physical and chemical state of saltstone within the SDF disposal units. For the current study, saltstone simulants were produced utilizing SRR prescribed formulations: initial batches were spiked with rhenium (Re) to serve as nonradioactive analog for Tc-99, and subsequent batches were spiked with Tc-99 for comparison. The relative concentrations of I, Re and Tc-99 in the salt-waste simulants were consistent with the average concentrations of I-129 and Tc-99 in the low-level feed waste. In addition, SRR retrieved intact monoliths from Saltstone Disposal Unit (SDU) Cell 2A in 2015 for testing. Contaminant mass transfer rates for Tc-99 and other contaminants from spiked saltstone simulants and actual SDF saltstone samples were assessed using EPA Method 1315, Mass Transfer Rates of Constituents in Monolithic or Compacted Granular Materials Using a Semi-Dynamic Tank Leaching Procedure. This method was recently adopted for evaluating contaminant leaching from intact monolithic materials. Given the importance of redox speciation in controlling the mobility of Tc-99, the EPA mass transfer tests for the spiked simulants were initially conducted using leachates in equilibrium with three different test atmospheres: (1) oxic, (2) anoxic, and (3) anoxic reducing. Nitrate (NO{sub 3}{sup -}) leaching was evaluated as a poorly retained waste constituent. The leaching behavior of cesium-137 (Cs-137), representing about 98% of the initial radioactivity of the saltstone, was also evaluated for the SDU-extracted samples. Results from Method 1315 were also compared to a novel Dynamic Leaching Method (DLM) in which a flexible-wall permeameter was used to achieve saturated leaching under an elevated hydraulic gradient in an effort to evaluate the persistence of reductive capacity and subsequent changes in contaminant partitioning within intact saltstone monoliths. The composition of the chemical leachates from both tests was thoroughly analyzed in an effort to identify potential solid phases controlling contaminant partitioning through geochemical modeling. For the EPA 1315 tests using spiked simulants, Re leaching rates (and other poorly sorbing contaminants like NO{sub 3}{sup -} and iodine), as indicated by high effective diffusivities (D{sub e}) and low leachability indices (i.e. LI = - log[D{sub e}]), were much higher than Tc-99, which was attributed to poor initial reduction and/or rapid oxidation of Re, indicating that Re is a poor chemical analog for evaluating Tc partitioning under reducing conditions. Technetium-99 leaching rates for the spiked saltstone samples also appeared to be sensitive to the estimated reduction capacity of the dry feed materials used in making grout, a characteristic that can vary between different BFS sources. Technetium-99 leaching rates for the intact saltstone samples in the EPA 1315 test were quite similar, with less variability between the three test samples. This may be indicative of the longer curing time before the SDF samples were tested (∼3 years). Somewhat surprisingly, the leaching rates for Cs-137 from the SDF samples were generally lower than the poorly sorbing contaminants, NO{sub 3}{sup -} and iodine. For the DLM tests, Re leaching from spiked saltstone was much higher than observed for Tc-99, with rates similar to that of non-reactive grout constituents, consistent with EPA 1315 leaching rates. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing Low-Level Waste at Dounreay - 16269

Dounreay Site Restoration Limited (DSRL) is the site licence company responsible for the clean-up and demolition of Britain's former centre of fast reactor research and development. The Dounreay site requires facilities to dispose of up to 175,000 cubic metres of low level waste (LLW) that has been and will continue to be generated during the decommissioning and restoration of the site. In May 2014, construction of two new vaults for the disposal of LLW at Dounreay was completed, including the necessary roads, infrastructures and services, followed by an encapsulation plant in September 2014. The vaults are located immediately to the northeast of the Dounreay licensed site, on NDA-owned land. The facilities are for disposal of the solid LLW generated at Dounreay and the adjacent Vulcan site only. In 2004, following consultation with stakeholders and members of the public, Dounreay issued the 'Best Practicable Environmental Option (BPEO) Report' on the management of Dounreay LLW. This report assessed potential management options for LLW against a range of criteria, including technical, environmental, cost, health and safety issues. The study was conducted in line with best practice and involved consultation with a range of people, including the local community and organisations with an interest in radioactive waste management. The recommendations and conclusions from the study provided the basis for the 'Dounreay Solid LLW Overall Strategy', which was published in March 2005. A fundamental component of this strategy was the development of new below-ground disposal vaults for LLW at Dounreay. Siting the vaults on land at Dounreay avoids any need to transport the LLW away from Dounreay on public roads. Disposal at Dounreay therefore satisfies the proximity principle of managing the waste at source. Disposal at Dounreay is also consistent with UK Government Policy on LLW management, the Scottish Government's Radioactive Waste Management Policy and the Nuclear Decommissioning Authority's (NDA's) strategy on management of LLW from the UK nuclear industry. A planning application was initially lodged with the Highland Council in June 2006. The period for the determination of this application was extended to allow the Scottish Environment Protection Agency (SEPA) sufficient time to assess fully the supporting Environmental Safety Case (ESC). The planning application was re-activated in May 2008, and planning permission was granted by Highland Council in April 2009. The planning permission included 26 conditions on DSRL, covering a wide range of environmental issues such as construction noise/dust, traffic, visual impact and also a condition to develop a community fund aimed at socio-economic development of the area around the Dounreay site. After undertaking the necessary detailed design work, construction of the phase one vaults commenced in November 2011 by principal contractor, Graham Construction. Work was undertaken on both vaults simultaneously, excavating around 243,000 m{sup 3} of rock. When excavation was complete, steel reinforcement was placed and concrete poured to construct the floor slabs. This was followed by the construction of the reinforced walls and then the installation of the steel support structure and materials that form the roof. Mechanical and electrical installation then followed, in parallel with the construction of the vault apron, ramps and access roads. A pumping system and control building was also constructed to remove groundwater from around the vaults to allow the vaults to be kept dry while they are being filled with waste. A layer of excavated material, approximately 3 m thick, was placed across the existing ground surface between the vaults and the coast, to ensure the water table lies well below the new ground surface after closure of the vaults, and that any future trace contaminated groundwater flows out to the sea rather than to the soil zone. This layer is referred to in project documents as the 'enhanced geosphere'. After disposals are completed and the vaults are closed, this layer will be joined to the capping over the vaults so that the ensemble merges visually with the surrounding landscape. The original vegetation and soil mix will be returned as far as is practicable. An encapsulation plant has been constructed to fill the LLW containers with grout prior to disposal in the vault, similar to the process used at the national Low-Level Waste Repository facility (LLWR), near Drigg in Cumbria. The plant has the capacity to grout up to four containers per day. The grout fills voids in the container and helps provide chemical conditions in the vault that limit the release of radionuclides in the far future, after the vault has been penetrated by groundwater. On April 24 2015, active commissioning began at the Encapsulation Plant and LLW Vaults. Half-height ISO containers packed with low level waste are currently being filled with grout and disposed of in the LLW Vault. Also packaged Demolition Low Level Waste (DLLW) is being processed and disposed of in the Demolition Low Level Waste Vault. To date over 2500 packages of DLLW and 70 containers LLW have been disposed of. Completion of construction and the start of operating the Phase One vaults and encapsulation plant are fundamental to the successful and efficient decommissioning of the Dounreay site, upon which many millions of pounds of investment and hundreds of jobs rely.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization and Remediation of the Hanford 618-10 Burial Ground Steel-pipe Vertical Pipe Units - 18238

The 618-10 Burial Ground is approximately 485 feet by 470 feet and consisted of 12 trenches and 94 VPUs. It is located approximately 5 miles north of Richland, Washington in the 600 Area of the Hanford Site. The 618-10 Burial Ground received low- to high-activity waste (e.g., fission products and some plutonium-contaminated waste). Most of the waste originated at the 300 Area laboratory facilities. Lower activity radioactive material and shielded drums were disposed in trenches, while laboratory wastes with higher levels of radiation were disposed in Vertical Pipe Units (VPUs). The 618-10 Burial Ground contained approximately 94 VPUs (uncertain mix of first and second generation). There are different variants of VPUs. The first generation of VPUs was simply corrugated culverts or standard pipes, 14-in diameter and 10- to 15-ft long, buried vertically. The second generation of VPUs was 22-in diameter, 15-ft long waste receptacles constructed by welding five 55-gallon bottomless drums together end-to-end and burying them vertically, separated by approximately 10 feet on center in rows approximately 25 feet apart. A subset of the first generation VPUs consisted of the steel pipe VPUs represented by carbon-steel pipes, 10 to 24 in. in diameter with various wall thicknesses. This paper will present the remediation of the steel-pipe VPUs, which were the last of the VPUs remediated in this project. The remediation process developed for steel pipe VPUs included exposing a section of the VPU within an excavated trench, placing a mix box around the VPU, filling the mix box with grout, shearing the VPU and contents, and then removing the grout waste mixture into a waste box for disposal at the Hanford Environmental Restoration Disposal Facility (ERDF). Prior the start of remedial activities extensive mock-ups were performed on surrogate steel-pipe VPUs to ensure the effectiveness of the process before introducing the hazards of radioactive VPU waste. The critical steps in the process of size reducing steel-pipe VPUs and mixing the contents with grout was successfully demonstrated. This process was completed for each steel-pipe VPU in successive lifts until the entire set of steel-pipe VPUs were mixed in grout and removed from the excavation. The remediation of the steel-pipe VPUs proved be successful in that all the VPUs were removed and transported to ERDF without a release to the local environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Assessment for Closure of the Calcined Solids Storage Facility at the INL Site - 19289

The Calcined Solids Storage Facility is composed of six discrete stainless steel 'bin sets' at the Idaho Nuclear Technology and Engineering Center at the INL Site. Approximately 4,440 m{sup 3} of the dry, granular calcine waste is stored in the facility. Closure of the facility will entail removal of the calcine waste followed by grouting. A 5-cm thick residual amount of calcine was assumed to remain at the bottom of the bins. Important radionuclides in the residual layer for the groundwater pathway were identified as the fission and activation products Tc-99, Se-79, I-129, Cs-135, H-3, and actinides Pu-239, and Pu-240. The stainless-steel bins prevent near-term release of grouted residual calcine waste to the environment. Future releases were conservatively based on the corrosion rate of the weld seams on the stainless-steel bins, which site-specific studies measured mean tunnel corrosion rates of 0.0132 mm/yr with a coefficient of variation of 0.333. Based on tunnel corrosion rates, mean bin hydrologic containment times were estimated to be between 238 years and 1,191 years, depending on the thickness of the bin. Any breach in the weld seam was assumed to result in water flow and radionuclide leaching through the bin. The structural integrity of the bin was assumed to be controlled by the general stainless-steel corrosion rate, which was much slower (3.5 x 10{sup -5} mm/yr), resulting in structural integrity times between 24,000 years to over 100,000 years. A mixing-cell model was used to compute water flow and transport through the hydrologically failed bins and the vadose zone. Credit was taken for the geochemical properties of the grout used to fill the bins at closure, which significantly slows the releases from the bins for key radionuclides like Tc-99. A semi-analytical model for three-dimensional dissolved-phase transport in an aquifer of constant unidirectional flow, infinite length and width, and finite thickness was used to compute concentrations in the aquifer across the model domain for a time varying source. Cumulative impacts from all bin sets were calculated by summation across the bin set sources that were superimposed on a uniform Cartesian grid. Effective doses were calculated for direct groundwater ingestion from wells located 100-m downgradient from each of the bin sets and ingestion of meat, milk, and vegetables irrigated with water derived from the well. Intruder doses were based on a well drilled through the grouted waste and cuttings spread around a home site after a 500-year institutional control period. Peak doses during the 1,000-year compliance period were less than 5% of the 250 μSv/yr (25 mrem/yr) performance objective and intruder doses were generally less 5% of the of the 5000 μSv/yr (500 mrem) and 1000 μSv/yr (100 mrem) performance objective for acute and chronic intruder exposure, respectively. Groundwater concentrations were all less than the maximum contaminant limits. In all cases, doses were highest for the oldest bin set because, compared to the other bin sets, it had the highest radionuclide concentrations in the calcine waste. The performance assessment results indicate that performance objectives can be met leaving considerably more than 5-cm of residual calcine waste in the bin sets. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of the long-term stability of cementitious barriers of radioactive waste repositories by using digital-image-based microstructure generation and reactive transport modelling

Cement-based grout plays a significant role in the design and performance of nuclear waste repositories: used correctly, it can enhance their safety. However, the high water-to-binder ratios, which are required to meet the desired workability and injection ability at early age, lead to high porosity that may affect the durability of this material and undermine its long-term geochemical performance. In this paper, a new methodology is presented in order to help the process of mix design which best meets the compromise between these two conflicting requirements. It involves the combined use of the computer programs CEMHYD3D for the generation of digital-image-based microstructures and CrunchFlow, for the reactive transport calculations affecting the materials so simulated. This approach is exemplified with two grout types, namely, the so-called Standard mix 5/5, used in the upper parts of the structure, and the 'low-pH' P308B, to be injected at higher depths. The results of the digital reconstruction of the mineralogical composition of the hardened paste are entirely logical, as the microstructures display high degrees of hydration, large porosities and low or nil contents of aluminium compounds. Diffusion of solutes in the pore solution was considered to be the dominant transport process. A single scenario was studied for both mix designs and their performances were compared. The reactive transport model adequately reproduces the process of decalcification of the C-S-H and the precipitation of calcite, which is corroborated by empirical observations. It was found that the evolution of the deterioration process is sensitive to the chemical composition of groundwater, its effects being more severe when grout is set under continuous exposure to poorly mineralized groundwater. Results obtained appear to indicate that a correct conceptualization of the problem was accomplished and support the assumption that, in absence of more reliable empirical data, it might constitute a useful tool to estimate the durability of cement-based structures.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Foam and Unreacted Material Reduction in Magnesium Oxysulfate for SRPPF Waste Solidification

A magnesium oxysulfate (MOS) grout formulation has been proposed to solidify the liquid effluent from the Savannah River Plutonium Processing Facility (SRPPF) Aqueous Recovery System (ARS). This formulation uses a combination of light-burnt MgO, anhydrous MgSO 4 , and dead-burnt MgO resulting in a grout with good mixability and acceptable density. The setting time for the grout is within the operational limits of the SRPPF facility and the leachate pH is ~9.4, which is within the assumed pH range of the brine from the Waste Isolation Pilot Plant (WIPP). When first tested at the 1-gallon small-scale and 55-gallon full-scale, there was a significant foam layer that raised concerns of a nonhomogeneous final form. A nonhomogeneous mixture could have variable density throughout the waste form and therefore allow for unequal shielding. To reduce the potential for unequal shielding in the final form, a series of foam reduction tests were carried out and a final formulation of 28 wt% light burnt MgO, 10 wt% MgSO 4 , and 62 wt% dead burnt MgO was used to remove the foam in under two hours while still maintaining a mix that has an acceptable density, mix time, peak temperature, and set time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reduction of Porosity in Cementitious Waste Forms to Reduce Effective Diffusivity

Although current practices meet regulations for grout waste forms, development of sequestration materials and techniques for contaminants of concern could expand the use of grout waste forms and reduce risk to established processes from future compositional changes. There are contaminants in waste streams that are not permanently and completely sequestered in current grout waste forms under certain conditions. These contaminants include methyl mercury, 129 I, 99 Tc, and nitrate. Each of these species have minor fractions that are not permanently and completely isolated from the environment and therefore potentially contribute to long-term environmental impacts. An approach of interest includes the technique of reducing porosity to result in reduced leachability of all contaminants simultaneously. The current Savannah River Site (SRS) saltstone formulation was used to evaluate the relationship between leachability and porosity reduced waste forms by altering the water-to-binder ratio. Results indicated decreasing the water-to-binder directly reduced porosity and resulted in the waste form’s ability to more effectively immobilize nitrate. This work was funded by the Department of Energy Office of Environmental Management (DOE-EM) Technology Operations Office (TOO) Project # HQ221818.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mega salt-stone Disposal Units at the Savannah River site - 15322

The Liquid Waste (LW) System at Savannah River Site (SRS) is a highly integrated operation involving safely storing radioactive liquid waste in underground storage tanks; vitrifying the higher activity waste; and storing the vitrified waste in stainless steel canisters until permanent disposition is provided; and removing, treating, and dispositioning the low-level waste (LLW) fraction in concrete with final disposition being the salt-stone Disposal Units (SDUs) at the SRS salt-stone Disposal Facility (SDF). Treatment and disposition of salt waste is the critical path to completion of the SRS Liquid Waste (LW) Disposition Program. Successful and timely salt waste removal and disposal is integral to efforts by SRS to proceed with all aspects of tank cleanup and removal from service. The construction and implementation of the first-of-a-kind Mega SDU (MSDU) is underway to provide the most environmentally safe and cost-effective solution for salt processing and long term storage of the LLW at SRS. The MSDU design is a duplicate of the Water Treatment Tanks located in Syracuse, New York. This commercial design, developed by an affiliate of Savannah River Remediation LLC (SRR), was slightly modified to meet the requirements of the nuclear industry. The MSDU is a critical link in salt disposition. In comparison to the current SDU design, approximately 46 meters (150 feet) in diameter and 7 meters (22 feet) tall with a capacity of approximately 11,000 m{sup 3} (3.0 million gallons), the MSDU is 114 meters (375 feet) in diameter and 13 meters (43 feet) tall which will provide a capacity of approximately 121,000 m{sup 3} (32.0 million gallons) to receive the LLW fraction embedded in a grout-like form. The MSDU will provide the taxpayers an estimated $300 M in life cycle savings at SRS by reducing the number of SDUs from the estimated 72 smaller vessels to 7 of the new larger vessels. Additionally, based on the reduced number of SDUs, the environmental footprint is significantly reduced as well. Due to the similarities between the existing SDU design and the MSDU design, efforts to integrate the MSDU into the LW system are minimal. Required infrastructure modifications will consist of tying into the existing grout and drain lines, as well as the installation of new electrical and instrumentation services for the MSDU. Grout flow testing has been successfully completed, with results showing the MSDU will be a safe and cost-effective replacement for the existing SDUs. The MSDU design is complete, Critical Decision (CD)-3 was approved on June 17, 2014, and the first MSDU, salt-stone Disposal Unit n.6 (SDU 6), is being constructed in the existing LW SDF operated by SRR as a Capital Line Item project. As an added benefit, once constructed, lessons learned will be available for future MSDUs at SRS and throughout the complex as necessary. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Engineering scale demonstration of a prospective cast Stone process - 15584

A cementitious waste form is one of the alternatives being evaluated for Supplemental Immobilization of Hanford Low Activity Waste (LAW). Washington River Protection Solutions (WRPS) is collecting data on cementitious or pozzolanic waste forms such as Cast Stone. The goal of this project for WRPS is to obtain data on the performance of the Cast Stone waste form for immobilizing LAW. As part of the data package being assembled, an engineering-scale demonstration with non-radioactive simulants was performed at the Savannah River National Laboratory (SRNL) using the Scaled Continuous Processing Facility (SCPF) to fill a container with simulated Cast Stone grout. Legacy salt solution from previous Hanford salt waste testing was trimmed to resemble the average composition generated from the Hanford Tank Waste Operation Simulator (HTWOS) used in the screening tests. The dry blend materials, ordinary portland cement (OPC), Class F fly ash, and ground granulated blast furnace slag (GGBFS or BFS) were obtained from Lafarge North America in Pasco, WA. Over three days, the SCPF was used to fill a 6,056 liter (1600 gallon) container with simulated Cast Stone grout. The tank was instrumented with x-, y-, and z-axis thermocouples to monitor curing temperature and two formed core sampling vials. The target production rate was 5.7 L/min (1.5 gpm). This required a salt solution flow rate of approximately 3.78 L/min (1 gpm) and a premix feed rate of approximately 263 kh/h (580 lb/h). The final surface slope at a fill height of 100 cm was 2.5-3.8 cm across the 260 cm (8.5 ft) diameter tank. During processing, grout was collected from both the mixer discharge and the discharge into the tank. These samples were stored in a humid environment either in a closed box proximal to the tank or inside the laboratory. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Saltstone Facility Operating Experience with Mega-Vault Disposal Units - 19497

The Saltstone Production Facility (SPF) has been treating low-level waste aqueous salt solution at the Savannah River Site (SRS) since 1990. Salt solutions are transferred from a large-volume, underground storage tank via underground waste transfer line into the SPF. The waste is received into one of two receipt tanks and then transferred to a twin-shaft mixer where dry feeds are introduced to create a fresh grout slurry. The grout exits the mixer into a hold tank, which has a residence time of approximately two minutes. The slurry is then pumped via peristaltic pump through a grout transfer line to one of several disposal units in the Saltstone Disposal Facility (SDF). The transfer line length varies from 0.4 km to 0.8 km depending on disposal location. With the salt disposal mission at SRS accelerating via the operation of the Modular Caustic Side Solvent Extraction (MCU) facility and the anticipated startup of the Salt Waste Processing Facility (SWPF), it is important that the SPF and SDF operate with minimal outage time and maximum facility availability. To this end, the design of the newest disposal units has incorporated the benefits of commercially available cylindrical concrete tank design on a very large scale to maximize economies of scale. This new design has been placed into radioactive service and the initial operational data will be compared with previous disposal operations along with an overview of how disposal unit design has significantly evolved since the initial construction in the early 1990's. Additionally, several processing facility modifications have either been implemented or developed in recent years to improve operating reliability and ensure facility availability once the SWPF becomes the primary waste generator providing feed for the SPF. These modifications, the issues driving their development, and an assessment of their effectiveness will also be discussed. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Defining a Metric to Assess Leachability of Contaminants from Cementitious Waste Forms in Lab Testing Related to Hanford - 20478

This paper reports on the determination of performance metrics for the release of four contaminants (technetium, iodine, nitrate, and chromium) from a theoretical supplemental low-activity waste (LAW) inventory of grout in the Hanford Integrated Disposal Facility (IDF). The performance metric was defined as a retardation factor, R, that can be used to quantify a waste form's ability to retain one contaminant compared with an un-retarded species (e.g., sodium). By setting the target R value at the magnitude required to maintain concentrations of the contaminants below the drinking water standard at the point of compliance for the IDF, a bar for grout leach performance can be established for screening laboratory leach test data. The R can be converted to a corresponding laboratory-observed diffusivity value against which to assess leach test data. The individual performance metrics were determined through an iterative set of simulations using a variable saturation and transport flow model of a grout waste form inventory in the IDF to calculate the resulting concentration-based requirements at the point of compliance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Declaration of the Chemical Composition of Waste-products for the German Repository Konrad Using Substance Vectors - 20500

The waste acceptance criteria of the German repository Konrad require beside a radiological declaration a compositional declaration to be able to avoid negative impact on the groundwater by a presumed leakage into the groundwater after complete corrosion of the containers in the future. The declaration of the composition has to specify compounds and substances not element analyses, because the chemical behavior and toxicity especially of organic compounds varies strongly The relevant compounds have to be described and quantified using defined substance codes provided by the operator. For simple waste types like pure concrete or steel components, the definition of the composition is rather simple. The composition of more complex waste streams is generally declared using producer specific material vectors, which can be derived for defined waste types (e.g. grouted fluids, ash from combustion, super-compacted mixed waste etc.). Additional substance vectors exist for containers, drums and grout, which together with the waste composition yield the total composition of the waste packages. The substance vectors for homogeneous waste streams like cementitious demolition waste, solidified fluids and ash are mostly based on analyses provided by the waste owner. In some cases, analyses from non-radioactive analogues or data sheets can also be used to demonstrate the composition. For each qualified treatment of radioactive waste streams the material composition is described and balanced on the basis of specific material vectors, which are composed of material codes from the material and cask list provided by the Federal company for radioactive waste disposal. For mixed waste streams like super-compacted or grouted mixed waste or materials simply packed in containers an analyses cannot be used. In these cases, the compositional information from the bookkeeping can be used for the entire waste stream to calculate a mean composition including a compositional range (min / max composition). Only waste packages with an approved material description can be delivered to Konrad. Therefore, the material declaration of all waste streams and the resulting waste products is crucial for all waste owners in Germany to be able to have enough waste packages ready, when the repository is going to open in 2027. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SAVANNAH RIVER SITE R REACTOR DISASSEMBLY BASIN IN SITU DECOMMISSIONING

The US DOE concept for facility in-situ decommissioning (ISD) is to physically stabilize and isolate in tact, structurally sound facilities that are no longer needed for their original purpose of, i.e., generating (reactor facilities), processing(isotope separation facilities) or storing radioactive materials. The 105-R Disassembly Basin is the first SRS reactor facility to undergo the in-situ decommissioning (ISD) process. This ISD process complies with the105-R Disassembly Basin project strategy as outlined in the Engineering Evaluation/Cost Analysis for the Grouting of the R-Reactor Disassembly Basin at the Savannah River Site and includes: (1) Managing residual water by solidification in-place or evaporation at another facility; (2) Filling the below grade portion of the basin with cementitious materials to physically stabilize the basin and prevent collapse of the final cap - Sludge and debris in the bottom few feet of the basin will be encapsulated between the basin floor and overlying fill material to isolate if from the environment; (3) Demolishing the above grade portion of the structure and relocating the resulting debris to another location or disposing of the debris in-place; and (4) Capping the basin area with a concrete slab which is part of an engineered cap to prevent inadvertent intrusion. The estimated total grout volume to fill the 105-R Reactor Disassembly Basin is 24,424 cubic meters or 31,945 cubic yards. Portland cement-based structural fill materials were design and tested for the reactor ISD project and a placement strategy for stabilizing the basin was developed. Based on structural engineering analyses and work flow considerations, the recommended maximum lift height is 5 feet with 24 hours between lifts. Pertinent data and information related to the SRS 105-R-Reactor Disassembly Basin in-situ decommissioning include: regulatory documentation, residual water management, area preparation activities, technology needs, fill material designs and testing, and fill placement strategy. This information is applicable to decommissioning both the 105-P and 105-R facilities. The ISD process for the entire 105-P and 105-R reactor facilities will require approximately 250,000 cubic yards (191,140 cubic meters) of grout and 2,400 cubic yards (1,840 cubic meters) of structural concrete which will be placed over a twelve month period to meet the accelerated schedule ISD schedule. The status and lessons learned in the SRS Reactor Facility ISD process will be described.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SAVANNAH RIVER SITE R-REACTOR DISASSEMBLY BASIN IN-SITU DECOMMISSIONING -10499

The US DOE concept for facility in-situ decommissioning (ISD) is to physically stabilize and isolate intact, structurally sound facilities that are no longer needed for their original purpose, i.e., generating (reactor facilities), processing(isotope separation facilities) or storing radioactive materials. The 105-R Disassembly Basin is the first SRS reactor facility to undergo the in-situ decommissioning (ISD) process. This ISD process complies with the 105-R Disassembly Basin project strategy as outlined in the Engineering Evaluation/Cost Analysis for the Grouting of the R-Reactor Disassembly Basin at the Savannah River Site and includes: (1) Managing residual water by solidification in-place or evaporation at another facility; (2) Filling the below grade portion of the basin with cementitious materials to physically stabilize the basin and prevent collapse of the final cap - Sludge and debris in the bottom few feet of the basin will be encapsulated between the basin floor and overlying fill material to isolate it from the environment; (3) Demolishing the above grade portion of the structure and relocating the resulting debris to another location or disposing of the debris in-place; and (4) Capping the basin area with a concrete slab which is part of an engineered cap to prevent inadvertent intrusion. The estimated total grout volume to fill the 105-R Reactor Disassembly Basin is 24,384 cubic meters or 31,894 cubic yards. Portland cement-based structural fill materials were designed and tested for the reactor ISD project, and a placement strategy for stabilizing the basin was developed. Based on structural engineering analyses and material flow considerations, maximum lift heights and differential height requirements were determined. Pertinent data and information related to the SRS 105-R Reactor Disassembly Basin in-situ decommissioning include: regulatory documentation, residual water management, area preparation activities, technology needs, fill material designs and testing, and fill placement strategy. This information is applicable to decommissioning both the 105-P and 105-R facilities. The ISD process for the entire 105-P and 105-R reactor facilities will require approximately 250,000 cubic yards (191,140 cubic meters) of grout and approximately 3,900 cubic yards (2,989 cubic meters) of structural concrete which will be placed over about an eighteen month period to meet the accelerated schedule ISD schedule. The status and lessons learned in the SRS Reactor Facility ISD process will be described.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Decommissioning the Fuel Process Building, a Shift in Paradigm for Terminating Safeguards on Process Holdup

INMM Abstract 51st Annual Meeting Decommissioning the Fuel Process Building, a Shift in Paradigm for Terminating Safeguards on Process Holdup The Fuel Process Building at the Idaho Nuclear Technology and Engineering Center (INTEC) is being decommissioned after nearly four decades of recovering high enriched uranium from various government owned spent nuclear fuels. The separations process began with fuel dissolution in one of multiple head-ends, followed by three cycles of uranium solvent extraction, and ending with denitration of uranyl nitrate product. The entire process was very complex, and the associated equipment formed an extensive maze of vessels, pumps, piping, and instrumentation within several layers of operating corridors and process cells. Despite formal flushing and cleanout procedures, an accurate accounting for the residual uranium held up in process equipment over extended years of operation, presented a daunting safeguards challenge. Upon cessation of domestic reprocessing, the holdup remained inaccessible and was exempt from measurement during ensuing physical inventories. In decommissioning the Fuel Process Building, the Idaho Cleanup Project, which operates the INTEC, deviated from the established requirements that all nuclear material holdup be measured and credited to the accountability books and that all nuclear materials, except attractiveness level E residual holdup, be transferred to another facility. Instead, the decommissioning involved grouting the process equipment in place, rather than measuring and removing the contained holdup for subsequent transfer. The grouting made the potentially attractiveness level C and D holdup even more inaccessible, thereby effectually converting the holdup to attractiveness level E and allowing for termination of safeguards controls. Prior to grouting the facility, the residual holdup was estimated by limited sampling and destructive analysis of solutions in process lines and by acceptable knowledge based upon the separations process, plant layout, and operating history. The use of engineering estimates, in lieu of approved measurement methods, was justified by the estimated small quantity of holdup remaining, the infeasibility of measuring the holdup in a highly radioactive background, and the perceived hazards to personnel. The alternate approach to quantifying and terminating safeguards on process holdup was approved by deviation.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Form and Aging of Plutonium in Savannah River Site Waste Tank 18

Process modeling; injection molding; long-fiber thermoplastic; fiber orientation; fiber lengt This report provides a summary of the effects of aging on and the expected forms of plutonium in Tank 18 waste residues. The findings are based on available information on the operational history of Tank 18, reported analytical results for samples taken from Tank 18, and the available scientific literature for plutonium under alkaline conditions. These findings should apply in general to residues in other waste tanks. However, the operational history of other waste tanks should be evaluated for specific conditions and unique operations (e.g., acid cleaning with oxalic acid) that could alter the form of plutonium in heel residues. Based on the operational history of other tanks, characterization of samples from the heel residues in those tanks would be appropriate to confirm the form of plutonium. During the operational period and continuing with the residual heel removal periods, Pu(IV) is the dominant oxidation state of the plutonium. Small fractions of Pu(V) and Pu(VI) could be present as the result of the presence of water and the result of reactions with oxygen in air and products from the radiolysis of water. However, the presence of Pu(V) would be transitory as it is not stable at the dilute alkaline conditions that currently exists in Tank 18. Most of the plutonium that enters Savannah River Site (SRS) high-level waste (HLW) tanks is freshly precipitated as amorphous plutonium hydroxide, Pu(OH) 4(am) or hydrous plutonium oxide, PuO 2(am,hyd) and coprecipitated within a mixture of hydrous metal oxide phases containing metals such as iron, aluminum, manganese and uranium. The coprecipitated plutonium would include Pu 4+ that has been substituted for other metal ions in crystal lattice sites, Pu 4+ occluded within hydrous metal oxide particles and Pu 4+ adsorbed onto the surface of hydrous metal oxide particles. The adsorbed plutonium could include both inner sphere coordination and outer sphere coordination of the plutonium. PuO 2(am,hyd) is also likely to be present in deposits and scales that have formed on the steel surfaces of the tank. Over the operational period and after closure of Tank 18, Ostwald ripening has and will continue to transform PuO 2(am,hyd) to a more crystalline form of plutonium dioxide, PuO 2(c) . After bulk waste removal and heel retrieval operations, the free hydroxide concentration decreased and the carbonate concentration in the free liquid and solids increased. Consequently, a portion of the PuO 2(am,hyd) has likely been converted to a hydroxy-carbonate complex such as Pu(OH) 2 (CO 3 ) (s) . or PuO(CO 3 ) · xH 2 O (am) . Like PuO 2(am,hyd) , Ostwald ripening of Pu(OH) 2 (CO 3 ) (s) or PuO(CO 3 ) · xH 2 O (am) would be expected to occur to produce a more crystalline form of the plutonium carbonate complex. Due to the high alkalinity and low carbonate concentration in the grout formulation, it is expected that upon interaction with the grout, the plutonium carbonate complexes will transform back into plutonium hydroxide. Although crystalline plutonium dioxide is the more stable thermodynamic state of Pu(IV), the low temperature and high water content of the waste during the operating and heel removal periods in Tank 18 have limited the transformation of the plutonium into crystalline plutonium dioxide. During the tank closure period of thousands of years, transformation of the plutonium into a more crystalline plutonium dioxide form would be expected. However, the continuing presence of water, reaction with water radiolysis products, and low temperatures will limit the transformation, and will likely maintain an amorphous Pu(OH) 4 or PuO 2(am,hyd) form on the surface of any crystalline plutonium dioxide produced after tank closure. X-ray Absorption Spectroscopic (XAS) measurements of Tank 18 residues are recommended to confirm coordination environments of the plutonium. If the presence of PuO(CO 3 ) (am,hyd) is confirmed by XAS, it is recommended that experiments be conducted to determine if plutonium carbonates are transformed back into PuO 2(am,hyd) upon contact with grout.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact of Standing Bleed Water on Saltstone Placement

The amount of water present during placement and subsequent curing of saltstone has the potential to impact several properties important for grout quality. An active drain water system can remove residual standing water and expose the surface of the placed saltstone to air. Oxidation of the saltstone may result in an increase in the leachability of redox sensitive elements. A dry surface can lead to cracking, causing an increase in hydraulic conductivity. An inactive drain water system can allow standing water that generates unnecessary hydrostatic head on the vault walls. Standing water that cannot be removed via the drain system will be available for potential incorporation into subsequent grout placements. The objective of this work is to study the impact of standing water on grout quality pertaining to disposal units. A series of saltstone mixes were prepared, and cured at ambient temperature to evaluate the impact of standing water on saltstone placement. The samples were managed to control drying effects on leachability by either exposing or capping the samples. The water to premix ratio was varied to represent a range of processing conditions. Samples were analyzed for density, leachability, and hydraulic conductivity. A monolith of each composition was cut into four sections to analyze the homogeneity of the sample with respect to vertical position within the sample. The density of each section was measured by two methods, helium pycnometry and by ASTM 642-06. The results show a trend of increasing density with increasing depth in the samples. This effect is more pronounced with the inclusion of excess bleed water and indicative of increased settling. The leachability of the eight different samples was analyzed by ANS/ANSI 16.1 method. These results indicate that drying of the saltstone during curing leads to decreased Leachability Indices (indicative of more release) for potassium, sodium, rhenium, nitrite, and nitrate. This may be caused by shrinkage cracking in the samples creating additional pathways for contaminant release. There was no noticeable effect on leachability by changing the water to premix ratio or by including excess bleed water. There was no detectable chromium release in any of the samples. Chromium and rhenium were added in equal amounts to determine whether rhenium might be an acceptable surrogate for chromium, a hazardous material. This testing shows no correlation between the behavior of the two elements, as chromium is not released at detectable levels and rhenium is released at a comparable rate to nitrate, the most prevalent and mobile species in saltstone.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗