Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “fuel infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

155 records · Page 9

Design of a lunar transportation system

The development of a good transportation infrastructure is a major requirement for the establishment of a permanent lunar base. Transportation is characterized by the technology available in a specific time frame and the need to transport personnel and cargo between Earth and Moon, and between lunar bases. In our study, attention was first focused on developing a transportation system for the first generation lunar base. As a first step, a tracked-type multipurpose lunar transportation vehicle was considered as a possible mode of transportation and a detailed study was conducted on the various aspects of the vehicle. Since the vehicle is composed of many moving parts, exposing it to the environment of the Moon, where fine dust particles are prevalent, can cause problems associated with lubrication and friction. The vehicle also posed problems concerning weight and power. Hence, several modifications were made to the above design ideas conceptually, and a Lunar Articulated Remote Transportation System (Lunar ARTS) is proposed as a more effective alternative with the following objectives: (1) minimizing the transportation of construction material and fuel from Earth or maximizing the use of the lunar material; (2) use of novel materials and light-weight structures; (3) use of new manufacturing methods and technology such as magnetic levitation using superconducting materials; and (4) innovative concepts of effectively utilizing the exotic lunar conditions, i.e., high thermal gradients, lack of atmosphere, lower gravity, etc. To achieve the above objectives of designing transportation systems from concept to operation, the project was planned in three phases: (1) conceptual design; (2) detailed analysis and synthesis; and (3) construction, testing, evaluation, and operation. In this project, both phases 1 and 2 have been carried out and work on phase 3 is in progress. In this paper, the details of the Lunar ARTS are discussed and the future work on the vehicle are also outlined.

Sankaravelu, A.↗

Synergism of He-3 acquisition with lunar base evolution

Researchers have discovered that the lunar surface contains a valuable fusion fuel element that is relatively scarce on Earth. This element, He-3, originates from the solar wind that has bombarded the surface of the Moon over geologic time. Mining operations to recover this resource would allow the by-product acquisition of hydrogen, water, carbon dioxide, carbon monoxide, methane, and nitrogen from the lunar surface with relatively minimal additional resource investment when compared to the costs to supply these resources from Earth. Two configurations for the He-3 mining system are discussed, and the impacts of these mining operations on a projected lunar base scenario are assessed. We conclude that the acquisition of He-3 is feasible with minimal advances in current state-of-the-art technologies and could support a terrestrial nuclear fusion power economy with the lowest hazard risk of any nuclear reaction known. Also, the availability of the by-products of He-3 acquisition from the Moon could significantly reduce the operational requirements of a lunar base and increase the commercialization potential of the base through consumable resupply of the lunar base itself, other components of the space infrastructure, and other space missions.

Crabb, T. M.↗

Analysis of Possible Explosions at Kennedy Space Center Due to Spontaneous Ignition of Hypergolic Propellants

NASA's Constellation Program plan currently calls for the replacement of the Space Shuttle with the ARES I & V spacecraft and booster vehicles to send astronauts to the moon and beyond. Part of the ARES spacecraft is the Orion Crew Exploration Vehicle (CEV), which includes the Crew Module (CM) and Service Module (SM). The Orion CM's main propulsion system and supplies are provided by the SM. The SM is to be processed off line and moved to the Vehicle Assembly Building (V AB) for stacking to the first stage booster motors prior to ARES move to the launch pad. The new Constellation Program philosophy to process in this manner has created a major task for the KSC infrastructure in that conventional QD calculations are no longer viable because of the location of surrounding facilities near the VAB and the Multi Purpose Processing Facility (MPPF), where the SM will be serviced with nearly 18,000 pounds of hypergolic propellants. The Multi-Payload Processing Facility (MPPF) complex, constructed by NASA in 1994, is located just off E Avenue south of the Operations and Checkout (O&C) building in the Kennedy Space Center industrial area. The MPPF includes a high bay and a low bay. The MPPF high bay is 40.2 m (132 ft) long x 18.9 m (60 ft) wide with a ceiling height of 18.9 m (62 ft). The low bay is a 10.4 m (34 ft) long x 10.4 m (34 ft) wide processing area and has a ceiling height of6.1 m (20 ft). The MPPF is currently used to process non-hazardous payloads. Engineering Analysis Inc. (EAI), under contract with ASRC Aerospace, Inc. in conjunction with the Explosive Safety Office, NASA, Kennedy Space Center (KSC), has carried out an analysis of the effects of explosions at KSC in or near various facilities produced by the spontaneous ignition ofhypergolic fuel stored in the CEV SM. The facilities considered included (1) Vehicle Assembly Building (VAB) (2) Multi-Payload Processing Facility (MPPF) (3) Canister Rotation Facility (CRF) Subsequent discussion deals with the MPPF analysis. Figure 1 provides a view of the MPPF from the northwest. An interior view ofthe facility is shown in Figure 2. The study was concerned with both blast hazards and hazardous fragments which exceed existing safety standards, as described in Section 2.0. The analysis included both blast and fragmentation effects and was divided into three parts as follows: (1) blast (2) primary fragmentation (3) secondary fragmentation Blast effects are summarized in Section 3.0, primary fragmentation in Section 4.0, and secondary fragmentation (internal and external) in Section 5.0. Conclusions are provided in Section 6.0, while references cited are included in Section 7.0. A more detailed description of the entire study is available in a separate document.

Brown, Stephen↗

Updated Human Mars Ascent Vehicle Concept in Support of NASA’s Strategic Analysis Cycle 2021

The NASA Artemis program has brought significant change to the agency’s human exploration strategy over the last several years. The human exploration of Mars remains an ultimate objective of the overall human exploration strategy. However, how the agency intends to execute initial human exploration of Mars has shifted to better align with current policy. These changes find their way into the design of key architecture elements, such as the Mars Ascent Vehicle (MAV). Of the numerous changes in the conceptual human Mars architecture, two in particular have had significant impact on the design of the human MAV: the desire for minimal surface infrastructure for initial human Mars missions, and technology investment timelines in support of initial human missions to Mars. The first leads to a surface mission architecture targeting a 30-day surface duration with two crewmembers. The second drives out in-situ resource utilization (ISRU) from the initial sortie. As a result, the reference MAV design for initial human Mars missions in the Human Exploration and Operations Mission Directorate’s Strategic Analysis Cycle 2021 (SAC21) is based around supporting the return of 2 crew from the surface of Mars, without surface ISRU. This has led to several design changes since 2019, when details of a reference human MAV were last published. The MAV concept for SAC21 consists of a two-stage vehicle capable of supporting two crew for 84 hours. This duration is derived from a baseline ascent trajectory targeting an apoapsis rendezvous with the habitation element in a nominal 5-sol Mars aggregation orbit. With the goal of minimizing technology investments for the initial surface sortie removing ISRU from the trade space, the MAV must now be landed either fully loaded with propellant, or with some portion of the propellant off-loaded. Landing a partially-fueled MAV will require additional surface assets to perform robotic propellant transfer on the surface of Mars from a pre-emplaced propellant depot. Furthermore, cryogenic fluid management and storage for extended duration with no losses represents additional technology investment that would have to be made to support cryogenic-based propellant concepts that have been the baseline in past architectures. As a result, the SAC21 architecture utilizes a storable propellant-based MAV propulsion system to minimize these potential technology investments incurred by cryogenic-based propulsion systems. Recent efforts also focused on evaluating the sensitivity of key design parameters, such as landing site latitude, elevation, and local atmospheric conditions. All play a large role in determining the predicted propellant requirements of the MAV. Understanding their potential impacts is important because of the rippling effects of changes to the MAV design on other architecture elements, such as entry, descent, landing, and transportation systems. Results indicate up to +2% to -4% wet mass variation due to landing site latitude, with higher latitudes greater than 70 degrees North resulting in greater than 6% wet mass increases. The MAV saw reduced impact due to atmospheric design parameters, which only accounting for -0.6% to +0.4% wet mass variation.

Douglas J. Trent↗

Making Rocket Fuel from Moon Rocks: Silicon-Liquid Oxygen (SiLOX) as a Hybrid Propellant

The research team at KSC explored the controlled passivation and burning of Lunar soil constituents in an oxygen combustion vessel for use as an in-space resource. Technologies such as carbothermal reduction (CaRD) and molten regolith electrolysis (MRE) are being developed to remove the oxygen for use and leave constituents in an enriched state. This leaves behind reduced compounds that can react with oxygen for heat generation. The team at KSC looked to explore the feasibility of controlling such reactions in a pure oxygen environment for potential technology integrations. Our proof-of-concept demonstrations have given promise to many potential applications for the controlled burning or combustion of nano- and porous silicon for silicon based, Lunar economy applications. The team at KSC was able to control the burn rate and total energy released effectively via pre-treatment of the nano-silicon in a muffle furnace at varying temperatures at one-hour durations. We created a new capability at KSC with the supporting safety documentation and procedural writeup. Our work highlights the need for greater investigation to understand the regenerative properties of the proposed porous silicon discs, and its viability of a thermal and electrical energy source. This work has demonstrated the proof-of-concept that elemental silicon is able to be combusted with gaseous and liquid oxygen in a controlled manner. This report provides such evidence as well as theoretical calculations and assumptions made for technologies that would be useful in Lunar surface operations with in-situ resources. The concepts are based on the assumption that oxygen extraction technologies from Lunar regolith processing will result in enriched silicon that may be adapted for the presented use cases. Additionally, the energy storage concept is able to be adapted for terrestrial use and integrated into already existing infrastructure.

Kenneth Engeling↗

Plasma Chemical Conversion and Resource Generation Beyond Low-Earth Orbit

As humanity gears up for its return to the moon after more than half a century, collaborative efforts between NASA, Artemis Accords Partners, and private industry are underway to establish the necessary infrastructure and technologies for lunar habitation and eventual Mars exploration. However, the traditional ISS resupply and waste management model is impractical and economically infeasible for prolonged missions to the Moon and Mars. Advanced chemical conversion technologies are needed to generate vital consumable products from local planetary resources (ISRU) and recycled gasses and waste within semi-closed loop life-support systems. Low-temperature plasma reactors are emerging power-to-gas technologies with the potential to facilitate various chemical synthesis processes with hardware commonality and redundancy. In plasma-based systems, electrical power is used to ionize a feedstock gas, creating a highly reactive environment that leverages electron excitation chemistry to break stable molecular bonds and form value added products. Unlike thermal chemical processes, plasma reactors operate at non-equilibrium conditions, allowing for lower-temperature operation and instantaneous start-up, making them adaptable to intermittent power availability. Moreover, their scalability permits deployment in both portable astronaut systems and large-scale industrial setups for colonies. One promising application of plasmas is for CO 2 conversion. Carbon dioxide comprises 96% of the Martian atmosphere and is a byproduct of human respiration, which typically must be scrubbed and vented from space habitats. A plasma source integrated with membrane separation technology could generate a stream of oxygen for life support and rocket propellant. CO 2 splitting may also be beneficial as a precursor to manufacture carbon-based products and fuels in situ, like methane, methanol, and polyethylene. Plasma-assisted CO 2 conversion is a simpler case to study without the concern of selectivity and is the first step toward complex chemical synthesis. This work presents preliminary experimental case study from a plasma reactor for CO 2 conversion and casts a vision for the potential of plasma technologies in a sub-architecture for resource production to enable the next generation of human spaceflight activities.

Plasma↗

Lunar campsite concept: Space transfer concepts and analysis for exploration missions

The lunar Campsite concept responds to a perceived need to identify early manned science and exploration missions that require minimal initial funding. The Campsite concept defers the build-up of many infrastructure components without escalating total program costs. The lunar Campsite has been sized nominally for four crew for 42 days (1 lunar night and 2 lunar days), but can be modified to span two lunar nights up to 60 days. Total mission fulfillment requires five Earth-to-LEO launches, four (100 mt class launch vehicle) for the two vehicle assemblies and one (PLS or NSTS) for the crew. The lunar Campsite mission mode is tandem direct using a booster stage and a lander stage. The booster is separated from the lander after the TLI burn and is expended into the Earth's atmosphere. In the Campsite mode, the lander lands on the surface not to be returned. In the crew delivery mode, the lander is guided to a precision landing about 500 m from the Campsite, and with enough propellant to return the crew to Earth. The Campsite consists of a habitat and airlock, body mounted radiators with a surface shield, sun tracking solar arrays, and an Earth-tracking high-gain antenna. The CV is very similar to the campsite delivery vehicle. The CV does not, however, have radiators or solar arrays. The vehicle stacks are essentially common in that they utilize the same structure system and engines, the same propellant tanks, the same 'cut-out' in which the CRV and payloads are incorporated, and the same RCS locations. The booster and lander stage propellant tank propellant capacities are identical and have margins which would allow additional fueling for propulsive capture of the boost stage into Earth orbit. This contractual study was performed to identify Campsite and vehicle interfaces and vehicle requirements, and to surface issues related to the integration of the Campsite and LTV's.

Source record↗

Large Payload Transportation and Test Considerations

Ironically, the limiting factor to a national heavy lift strategy may not be the rocket technology needed to throw a heavy payload, but rather the terrestrial infrastructure - roads, bridges, airframes, and buildings - necessary to transport, acceptance test, and process large spacecraft. Failure to carefully consider how large spacecraft are designed, and where they are manufactured, tested, or launched, could result in unforeseen cost to modify/develop infrastructure, or incur additional risk due to increased handling or elimination of key verifications. During test and verification planning for the Altair project, a number of transportation and test issues related to the large payload diameter were identified. Although the entire Constellation Program - including Altair - was canceled in the 2011 NASA budget, issues identified by the Altair project serve as important lessons learned for future payloads that may be developed to support national "heavy lift" strategies. A feasibility study performed by the Constellation Ground Operations (CxGO) project found that neither the Altair Ascent nor Descent Stage would fit inside available transportation aircraft. Ground transportation of a payload this large over extended distances is generally not permitted by most states, so overland transportation alone would not have been an option. Limited ground transportation to the nearest waterway may be permitted, but water transportation could take as long as 66 days per production unit, depending on point of origin and acceptance test facility; transportation from the western United States would require transit through the Panama Canal to access the Kennedy Space Center launch site. Large payloads also pose acceptance test and ground processing challenges. Although propulsion, mechanical vibration, and reverberant acoustic test facilities at NASA s Plum Brook Station have been designed to accommodate large spacecraft, special handling and test work-arounds may be necessary, which could increase cost, schedule, and technical risk. Once at the launch site, there are no facilities currently capable of accommodating the combination of large payload size and hazardous processing (which includes hypergolic fuels, pyrotechnic devices, and high pressure gasses).

Rucker, Michelle A.↗

High Speed Mobility Through On-Demand Aviation

Game changing advances come about by the introduction of new technologies at a time when societal needs create the opportunity for new market solutions. A unique opportunity exists for NASA to bring about such a mobility revolution in General Aviation, extendable to other aviation markets, to maintain leadership in aviation by the United States. This report outlines the research carried out so far under NASA's leadership towards developing a new mobility choice, called Zip Aviation1,2,3. The feasibility, technology and system gaps that need to be addressed, and pathways for successful implementation have been investigated to guide future investment. The past decade indicates exciting trends in transportation technologies, which are quickly evolving. Automobiles are embracing automation to ease driver tasks as well as to completely control the vehicle with added safety (Figure 1). Electric propulsion is providing zero tail-pipe emission vehicles with dramatically lower energy and maintenance costs. These technologies have not yet been applied to aviation, yet offer compelling potential benefits across all aviation markets, and in particular to General Aviation (GA) as an early adopter market. The benefits of such an adoption are applicable in the following areas: 􀁸 Safety: The GA market experiences accident rates that are substantially higher than automobiles or commercial airlines, with 7.5 fatal accidents per 100 million vehicle miles compared to 1.3 for automobiles and.068 for airlines. Approximately 80% of these accidents are caused by some form of pilot error, with another 13% caused by single point propulsion system failure. 􀁸 Emissions: Environmental constraints are pushing for the elimination of 100Low Lead (LL) fuel used in most GA aircraft, with aviation fuel the #1 source of lead emissions into the environment. Aircraft also have no emission control systems (i.e. no catalytic converters etc.), so they are gross hydrocarbon polluters compared to automobiles. 􀁸 Community Noise: Hub and smaller GA airports are facing increasing noise restrictions, and while commercial airliners have dramatically decreased their community noise footprint over the past 30 years, GA aircraft noise has essentially remained same, and moreover, is located in closer proximity to neighborhoods and businesses. 􀁸 Operating Costs: GA operating costs have risen dramatically due to average fuel costs of over $6 per gallon, which has constrained the market over the past decade and resulted in more than 50% lower sales and 35% less yearly operations. Infusion of autonomy and electric propulsion technologies can accomplish not only a transformation of the GA market, but also provide a technology enablement bridge for both larger aircraft and the emerging civil Unmanned Aerial Systems (UAS) markets. The NASA Advanced General Aviation Transport Experiments (AGATE) project successfully used a similar approach to enable the introduction of primary composite structures and flat panel displays in the 1990s, establishing both the technology and certification standardization to permit quick adoption through partnerships with industry, academia, and the Federal Aviation Administration (FAA). Regional and airliner markets are experiencing constant pressure to achieve decreasing levels of community emissions and noise, while lowering operating costs and improving safety. But to what degree can these new technology frontiers impact aircraft safety, the environment, operations, cost, and performance? Are the benefits transformational enough to fundamentally alter aircraft competiveness and productivity to permit much greater aviation use for high speed and On-Demand Mobility (ODM)? These questions were asked in a Zip aviation system study named after the Zip Car, an emerging car-sharing business model. Zip Aviation investigates the potential to enable new emergent markets for aviation that offer "more flexibility than the existing transportation solutions." These studies indicate that autonomy and electric propulsion technology infusions offer a unique opportunity to provide breakthrough capabilities for new high speed, on-demand travel alternatives that can leapfrog the need for future expensive ground-based infrastructure investment. At the same time, such investments offer a method of laying the foundation for these technologies to be incubated for commercial aviation at lower cost, and with lower initial certification thresholds due to the relatively poor capabilities of GA aircraft to permit early adoption and private market capitalization by rapid technology accelerations, as depicted in Figure 2.

Moore, Mark D.↗

Metrology of Large Parts

As discussed in the first chapter of this book, there are many different methods to measure a part using optical technology. Chapter 2 discussed the use of machine vision to measure macroscopic features such as length and position, which was extended to the use of interferometry as a linear measurement tool in chapter 3, and laser or other trackers to find the relation of key points on large parts in chapter 4. This chapter looks at measuring large parts to optical tolerances in the sub-micron range using interferometry, ranging, and optical tools discussed in the previous chapters. The purpose of this chapter is not to discuss specific metrology tools (such as interferometers or gauges), but to describe a systems engineering approach to testing large parts. Issues such as material warpage and temperature drifts that may be insignificant when measuring a part to micron levels under a microscope, as will be discussed in later chapters, can prove to be very important when making the same measurement over a larger part. In this chapter, we will define a set of guiding principles for successfully overcoming these challenges and illustrate the application of these principles with real world examples. While these examples are drawn from specific large optical testing applications, they inform the problems associated with testing any large part to optical tolerances. Manufacturing today relies on micrometer level part performance. Fields such as energy and transportation are demanding higher tolerances to provide increased efficiencies and fuel savings. By looking at how the optics industry approaches sub-micrometer metrology, one can gain a better understanding of the metrology challenges for any larger part specified to micrometer tolerances. Testing large parts, whether optical components or precision structures, to optical tolerances is just like testing small parts, only harder. Identical with what one does for small parts, a metrologist tests large parts and optics in particular to quantify their mechanical properties (such as dimensions, mass, etc); their optical prescription or design (i.e. radius of curvature, conic constant, vertex location, size); and their full part shape. And, just as with small parts, a metrologist accomplishes these tests using distance measuring instruments such as tape measures, inside micrometers, coordinate measuring machines, distance measuring interferometers; angle measuring instruments such as theodolites, autocollimators; and surface measuring instruments including interferometers, stylus profilers, interference microscopes, photogrammetric cameras, or other tools. However, while the methodology may be similar, it is more difficult to test a large object for the simple reason that most metrologists do not have the necessary intuition. The skills used to test small parts or optics in a laboratory do not extrapolate to testing large parts in an industrial setting any more than a backyard gardener might successfully operate a farm. But first, what is a large part? A simple definition might be the part's size or diameter. For optics and diffuse surface parts alike, the driving constraint is ability to illuminate the part's surface. For reflective convex mirrors, large is typically anything greater than 1 meter. But, for refractive optics, flats or convex mirrors, large is typically greater than 0.5 meter. While a size definition is simple, it may be less than universal. A more nuanced definition might be that a large part is any component which cannot be easily tested in a standard laboratory environment, on a standard vibration isolated table using standard laboratory infrastructure. A micro-switch or a precision lens might be easily measured to nanometer levels under a microscope in a lab, but a power turbine spline or a larger telescope mirror will not fit under that microscope and may not even fit on the table.

Stahl, H. Philip↗

Overview of NASA ISRU Plans, Priorites, and Activities

Introduction:The National Aeronautics andSpace Administration (NASA) of the United States ofAmerica (US) has initiated the Artemis Moon to Marsprogram to send astronauts (the first woman andperson of color) back to the lunar surface, create asustainable human lunar exploration program, andlead the first human exploration mission to the Marssurface in the 2030’s [1]. A major objective of thisprogram is to characterize the resources that exist onthe Moon and Mars, and learn how to utilize them forsustained and affordable exploration. Commonlyknown as In Situ Resource Utilization (ISRU), thesearch for, acquisition, and processing of resources inspace has the potential to greatly reduce thedependency on transporting mission consumables andinfrastructure from Earth, thereby reducing missioncosts, risks, and dependency on Earth.ISRU is Enabling: Through the extraction andprocessing of resources into mission commoditiessuch as rocket propellants, life support consumables,and fuel cell reactants, ISRU enhances and evolvesthe cis-lunar, lander, and surface transportationsystems required for human exploration; expandingand enhancing HOW humans can explore and returnfrom the Moon. Through the extraction andprocessing of resources into metals, silicon, and othermanufacturing and construction feedstock, ISRUenhances and allows for the expansion of criticalinfrastructure using in situ manufacturing andconstruction capabilities that influence WHAT humanscan do on the Moon and in cis-lunar space. Becauseof this, ISRU supports and enables commercialinvolvement beyond NASA and governmentalagencies by both lowering the cost of sustainedtransportation to/from/on the Moon as well assupporting the market required for needing thesetransportation systems. Strategic Framework:To achieve this vision,NASA’s Space Technology Mission Directorate(STMD) ensures the coordinated development ofISRU and other critical space and surfaceinfrastructure elements such as propulsion, power,manufacturing, construction, and robotics through theStrategic Technology Architecture Roundtable(STAR) process. Through STAR, an integratedframework and process has been created allowing forcapabilities and technologies to be linked andassessed, gaps to be identified, specifications andmetrics to be established, and provide a means toprioritize and implement technology development andmissions. A critical part of the STAR effort has beenthe establishment of the Strategic Framework thatorganizes all work under four major Thrusts (Go,Land, Live, and Explore) and identifies the drivingOutcomes for each of these Thrusts. From the Thrustsand Outcomes, all work can be categorized and linkedbetween Capability Areas, and Technology Gaps canbe identified and addressed (Figure 1.)Figure 1. Strategic Framework and STAR FrameworkISRU Envisioned Future: To drive thedevelopment of technologies and capabilities, theSTAR process starts with establishing a ‘grand vision’of where each Outcome and Capability is aiming tobe considered complete. For ISRU, the EnvisionedFuture is “Scalable ISRU production/utilizationcapabilities including sustainable commodities on thelunar and Mars Surface”. This involves starting with10’s of metric tons of products, but evolves into 100’sto 1000’s of metric tons of water, oxygen, propellants,construction and manufacturing feedstock, andcommodities for habitat and food production andoperations. For ISRU, the ‘Prospect to Product’philosophy starts with Destination Reconnaissance &Resource Assessment, followed by ResourceAcquisition, Isolation, and Preparation, leading intoResource Processing (which is further subdivided intomission consumables and feedstocks for constructionand manufacturing). The ISRU Envisioned Futurealso considers what resources are available andattempts to address what and when these resourceswill be evaluated and harnessed, as well asconsidering which products/commodities can beobtained for early use and which ones require moretime and/or users of refined products.It Takes an Architecture: ISRU does not existon its own. By definition, it requires customers/users SHORT TITLE HERE: A. B. Author and C. D. Authorto use the products/commodities produced by ISRUsystems. Also, for an ISRU capability to exist, itmust obtain products and services from other systemsand infrastructure. An important aspect of the STARprocess and the ISRU Envisioned Futures Prioritiesstrategy is to identify and link all of these systems andcapabilities to achieve the desired end state (Figure2).Figure 2. ISRU as Part of a Larger ArchitectureISRU Capability Drivers: The guidingprinciples for NASA’s Space TechnologyDevelopment for Artemis are to develop criticaltechnologies and capabilities that enable (i) asustainable Lunar surface presence, (ii) the future goalof sending humans to Mars, and (iii) promotingcritical technologies to enable future science andcommercial missions. It is a major goal of theArtemis campaign to establish some sort of base campat the lunar South Pole by approximately the end ofthe decade. The ISRU Envisioned Futures Prioritiesstrategy is aligned with the Artemis campaign todevelop and demonstrate ISRU capabilities in thistimeframe that could lead to sustained surfaceoperations, infrastructure growth, and commercialoperations in the next decade (Figure 3).Figure 3. ISRU Dual Path to Full Implementation and CommercializationState of the Art and Gaps: To achieve theenvisioned future, an extensive effort was performedto understand the State of the Art (SOA) for ISRUgoing back decades, and to assess the SOA against thenear and long-term goals and objectives of the ISRUStrategic Outcome objectives. While the releasedISRU Envisioned Futures Priorities only includes atop-level definition of both the SOA and Gaps, furtherinformation on these for ISRU can be found in theISRU Gap Assessment Study performed for theInternational Space Exploration Coordination Group(ISECG) [2]. To provide further guidance to industryand academia, a top level assessment was performedand provide that divides critical areas of ISRUcapabilities and technologies into 3 categories:Significant Funding, Partially Covered/MoreRequired, and Limited/No Funded Activities.Envisioned Future Priorities- Next Steps forISRU: While a significant amount of work over abroad range of technology areas has been performedover the last several years for lunar ISRU, to reach theenvisioned future for ISRU, a lot more work isrequired at the technology level leading to bothsystems and technology demonstrations in the nearfuture. To guide investments within NASA, industry,and academia, 5 specific areas of high priority wereidentified. These are:1.Complete development of the Water and Oxygen Mining Paths and close technology gaps, with emphasis on oxygen extraction from Highland regolith and parallel paths for polar water mining.2.Expand development of metal extraction and feedstock for manufacturing and construction, with emphasis on aluminum and initial/easy to obtain/make construction feedstocks leading to more refined metals and other regolith resources. Also, evaluate biologically inspired/derived technologies in bio-mining, bio-plastic, and other feedstock commodities.3.Ensure the resource assessment needed for future ISRU commercial operations is coordinated with both near/long-term science objectives as well as Artemis mission locations of interest.4.Initiate NASA and industry-led system-level analyses, integration, and testing activities for ISRU capabilities. While significant work has been performed at the technology and subsystemlevel, it is now important to understand how these technology investments can be leveraged and utilized in actual systems and applications5.Initiate lunar ISRU technology flight demonstrations leading to initial ‘Pilot Plant’ end-to-end production capability demonstrations, led by industry

ISRU↗