Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “forecast scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Real-time applications for remotely sensed lightning observations

Real-time monitoring of lightning activity, including the estimation of the location where the flash strikes the earth, provides a basis for the assessment of the impact of both the lightning hazard and severe weather on daily test and operation schedules. Applications to range meteorology are considered, taking into account the Space Transportation System, the handling of explosive materials, and test operations. Attention is given to details regarding forecasting and nowcasting, a low-cost lightning display system for electrical storm tracking and the support of lightning research activities, two versions of employed software, an example of the storm diagnostics and display products which will be available from the next generation weather radar, and a summary of the evolution of 12 New Mexico thunderstorms.

Goodman, S. J.↗

Forecasting the demand potential for STOL air transportation

A process for predicting the potential demand for STOL aircraft was investigated to provide a conceptual framework, and an analytical methodology for estimating the STOL air transportation market. It was found that: (1) schedule frequency has the strongest effect on the traveler's choice among available routes, (2) work related business constitutes approximately 50% of total travel volume, and (3) air travel demand follows economic trends.

Fan, S.↗

When to vaccinate for seasonal influenza: check the peak forecast

Background Seasonal influenza infects 5-20% of people every year in the United States, resulting in hospitalizations, deaths, and adverse economic impacts. To mitigate these impacts, influenza vaccines are developed and distributed annually; however, growing evidence suggests that vaccine effectiveness (VE) wanes over the course of a flu season. Delaying influenza vaccination for older adults has attracted attention as a potential public health strategy. However, given the uncertainties in seasonal peak, vaccine effectiveness, and waning rates, postponing vaccination could also lead to increased morbidity, motivating an evaluation of a range of potential scenarios. The aim of this study was to investigate favorable age group-specific vaccination schedules that could lead to the greatest disease burden reduction. Methods We systematically investigated a broad range of vaccination start times for five age groups under six combinations of initial effectiveness and waning rates, based on influenza cases and vaccine uptake data from 10 influenza seasons. We defined the most favorable vaccination schedule as the one that resulted in the greatest reduction in disease burden. Results In scenarios with fast waning, all age groups benefit from delaying vaccination regardless of initial VE and peak timing. In scenarios with slower waning, results are mixed. For the ≥65 group, high initial VE and slow waning suggests that in early-peaking seasons, early vaccination most effectively reduces disease burden, while in late-peaking seasons delaying vaccination is most effective. For the ≥65 group in medium and low initial VE, and slow waning scenarios, delaying vaccination appears to prevent the greatest number of cases, regardless of whether the season peaks early or late. Conclusion The most favorable vaccination schedule is sensitive to changes in initial VE, waning rate, and peak timing. Given estimates of these quantities from statistical and immunological models and observations, our methods can inform vaccination recommendations in order to most effectively reduce the annual disease burden caused by seasonal influenza. Specifically, accurate peak timing forecasts for the upcoming season have the potential to guide decisions on when to vaccinate.

59 BASIC BIOLOGICAL SCIENCES↗

Design considerations for a Digital Twin built to improve nitrification performance at a water resource recovery facility

A Digital Twin built around Activated Sludge Model No. 1 was deployed at a full-scale water resource recovery facility. Its design included a waste rate recommender system based on automatic scenario analyses, where influent loads and waste rates are varied to determine their impact on nitrification. At the same frequency as these scenario analyses, scheduled auto-calibrations allow for nitrifier maximum specific growth rate (μmax-NITO) soft sensing, the only kinetic parameter shown to require adjustment if the objective is aeration tank effluent ammonia forecasting accuracy. By integrating temperature forecasting over the next three sludge ages, this Digital Twin approach creates opportunities for advancing waste rate decisions in anticipation of seasonal temperature changes, optimizing ammonia control authority under varying influent loads, and furnishing valuable insights for future capital projects requiring nitrifier kinetic understanding and modelling.

54 ENVIRONMENTAL SCIENCES↗

Estimating the Need for Medical Intervention due to Sleep Disruption on the International Space Station

During ISS and shuttle missions, difficulties with sleep affect more than half of all US crews. Mitigation strategies to help astronauts cope with the challenges of disrupted sleep patterns can negatively impact both mission planning and vehicle design. The methods for addressing known detrimental impacts for some mission scenarios may have a substantial impact on vehicle specific consumable mass or volume or on the mission timeline. As part of the Integrated Medical Model (IMM) task, NASA Glenn Research Center is leading the development of a Monte Carlo based forecasting tool designed to determine the consumables required to address risks related to sleep disruption. The model currently focuses on the International Space Station and uses an algorithm that assembles representative mission schedules and feeds this into a well validated model that predicts relative levels of performance, and need for sleep (SAFTE Model, IBR Inc). Correlation of the resulting output to self-diagnosed needs for hypnotics, stimulants, and other pharmaceutical countermeasures, allows prediction of pharmaceutical use and the uncertainty of the specified prediction. This paper outlines a conceptual model for determining a rate of pharmaceutical utilization that can be used in the IMM model for comparison and optimization of mitigation methods with respect to all other significant medical needs and interventions.

Myers, Jerry G.↗

Applied Meteorology Unit (AMU)

This report summarizes the Applied Meteorology Unit (AMU) activities for the first quarter of Fiscal Year 2010 (October - December 2009). A detailed project schedule is included in the Appendix. Included tasks are: (1) Peak Wind Tool for User Launch Commit Criteria (LCC), (2) Objective Lightning Probability Tool, Phase III, (3) Peak Wind Tool for General Forecasting, Phase II, (4) Upgrade Summer Severe Weather Tool in Meteorological Interactive Data Display System (MIDDS), (5) Advanced Regional Prediction System (ARPS) Data Analysis System (ADAS) Update and Maintainability, (5) Verify 12-km resolution North American Model (MesoNAM) Performance, and (5) Hybrid Single-Particle Lagrangian Integrated Trajectory (HYSPLIT) Graphical User Interface.

Bauman, William↗

Solar Effects of Low-Earth Orbit objects in ORDEM 3.0

Variances in atmospheric density are directly related to the variances in solar flux intensity between 11- year solar cycles. The Orbital Debris Engineering Model (ORDEM 3.0) uses a solar flux table as input for calculating orbital lifetime of intact and debris objects in Low-Earth Orbit. Long term projections in solar flux activity developed by the NASA Orbital Debris Program Office (ODPO) extend the National Oceanic and Atmospheric Administration Space Environment Center (NOAA/SEC) daily historical flux values with a 5-year projection. For purposes of programmatic scheduling, the Q2 2009 solar flux table was chosen for ORDEM 3.0. Current solar flux activity shows that the current solar cycle has entered a period of lower solar flux intensity than previously forecasted in 2009. This results in a deviation of the true orbital debris environment propagation in ORDEM 3.0. In this paper, we present updated orbital debris populations in LEO using the latest solar flux values. We discuss the effects on recent breakup events such as the FY-1C anti-satellite test and the Iridium 33 / Cosmos 2251 accidental collision. Justifications for chosen solar flux tables are discussed.

Vavrin, A. B.↗

Short-range precipitation forecasts using assimilation of simulated satellite water vapor profiles and column cloud liquid water amounts

These observing system simulation experiments investigate the assimilation of satellite-observed water vapor and cloud liquid water data in the initialization of a limited-area primitive equations model with the goal of improving short-range precipitation forecasts. The assimilation procedure presented includes two aspects: specification of an initial cloud liquid water vertical distribution and diabatic initialization. The satellite data is simulated for the next generation of polar-orbiting satellite instruments, the Advanced Microwave Sounding Unit (AMSU) and the High-Resolution Infrared Sounder (HIRS), which are scheduled to be launched on the NOAA-K satellite in the mid-1990s. Based on cloud-top height and total column cloud liquid water amounts simulated for satellite data a diagnostic method is used to specify an initial cloud water vertical distribution and to modify the initial moisture distribution in cloudy areas. Using a diabatic initialization procedure, the associated latent heating profiles are directly assimilated into the numerical model. The initial heating is estimated by time averaging the latent heat release from convective and large-scale condensation during the early forecast stage after insertion of satellite-observed temperature, water vapor, and cloud water formation. The assimilation of satellite-observed moisture and cloud water, together withy three-mode diabatic initialization, significantly alleviates the model precipitation spinup problem, especially in the first 3 h of the forecast. Experimental forecasts indicate that the impact of satellite-observed temperature and water vapor profiles and cloud water alone in the initialization procedure shortens the spinup time for precipitation rates by 1-2 h and for regeneration of the areal coverage by 3 h. The diabatic initialization further reduces the precipitation spinup time (compared to adiabatic initialization) by 1 h.

Wu, Xiaohua↗

The large scale polarization explorer (LSPE) for CMB measurements: performance forecast

The measurement of the polarization of the Cosmic Microwave Background (CMB) radiation is one of the current frontiers in cosmology. In particular, the detection of the divergence-free component of the polarization field, the B-mode component, reveals the presence of gravitational waves in the early Universe. The detection of such component is at the moment the most promising technique to probe the inflationary theory describing the very early evolution of the Universe. The measurement of the polarization of the Cosmic Microwave Background (CMB) radiation is one of the current frontiers in cosmology. In particular, the detection of the primordial divergence-free component of the polarization field, the B-mode, could reveal the presence of gravitational waves in the early Universe. The detection of such a component is at the moment the most promising technique to probe the inflationary theory describing the very early evolution of the Universe. We present the updated performance forecast of the Large Scale Polarization Explorer (LSPE), a program dedicated to the measurement of the CMB polarization. LSPE is composed of two instruments: LSPE-Strip, a radiometer-based telescope on the ground in Tenerife-Teide observatory, and LSPE-SWIPE (Short-Wavelength Instrument for the Polarization Explorer) a bolometer-based instrument designed to fly on a winter arctic stratospheric long-duration balloon. The program is among the few dedicated to observation of the Northern Hemisphere, while most of the international effort is focused into ground-based observation in the Southern Hemisphere. Measurements are currently scheduled in Winter 2022/23 for LSPE-SWIPE, with a flight duration up to 15 days, and in Summer 2022 with two years observations for LSPE-Strip. In this work, we describe the main features of the two instruments, identifying the most critical aspects of the design, in terms of impact on the performance forecast. We estimate the expected sensitivity of each instrument and propagate their combined observing power to the sensitivity to cosmological parameters, including the effect of scanning strategy, component separation, residual foregrounds and partial sky coverage. We also set requirements on the control of the most critical systematic effects and describe techniques to mitigate their impact. LSPE will reach a sensitivity in tensor-to-scalar ratio of σr < 0.01, set an upper limit r < 0.015 at 95% confidence level, and improve constraints on other cosmological parameters.

79 ASTRONOMY AND ASTROPHYSICS↗

The First Seasat-A Industrial Users Workshop

The purpose of this workshop was to begin the process of definition and development of the SEASAT-A Demonstration Program, leading to the implementation of a set of experiments which would begin during the latter part of 1978 following the launch of SEASAT-A (now scheduled for May 1978). NASA through the SEASAT-A program, has encouraged the planning of cooperative experiments by industry and government agencies that operate in areas of ocean activity that could benefit from improved measurements and forecasts of weather and ocean conditions. The objectives of these experiments are to: (1) evaluate the significance of SEASAT-A data to commercial user organizations; (2) assist in identifying those characteristics of follow-on systems that are important to industrial users; (3) obtain experimental evidence that could be used to refine estimates of the economic potential of an operational system; and (4) begin the technology transfer process to the industrial users.

Hicks, K. W.↗

Continuously Improving Parametric Modeling with Historical Data on the ICESat-2 Mission

This paper delves into the details of the Joint Confidence Level (JCL) process performed for the Ice, Cloud, and Land Elevation Satellite (ICESat)-2 mission and how past performance was incorporated into subsequent JCL models to enable the project to continuously analyze potential slips to their launch readiness date (LRD). One year prior to the mission Preliminary Review (mPDR), the JCL model development process began. The first model was well received at the mPDR, held on October 10, 2012, and the input received by the Standing Review Board was incorporated into the model for the official data drop for key decision point (KDP)-C. The 70% JCL results of the October 2012 mPDR model forecast an LRD of February 2017 and associated cost of $830M. This result in 2012 immediately highlighted potential challenges with the project-planned LRD of July 2016. The year following the mPDR, the project had sustained a oneyear slip in the LRD due to problematic systems engineering requirement issues which impacted all project subsystems. This slip moved the project planned LRD from July 2016 to July 2017, an additional 5 months beyond the 2012 model’s 70% JCL result for the LRD of February 2017. As the project was quickly approaching the mission Critical Design Review (mCDR), the need for reliable JCL results increased significantly. The project held discussions on the JCL modeling process and focused on the input uncertainty distributions. Specifically, to identify the uncertainty distributions that the 2012 mPDR model would have needed to produce a 70% LRD result of July 2017. This led the project to compare multiple uncertainty distributions, and ultimately spurred the project to utilize uncertainty distributions that incorporated project past performance and historical data to forecast potential LRD slips. The revised results, created in 2014 and utilizing the new uncertainty distributions, showed that with 70% confidence, the ICESat-2 mission would launch in August 2018 with a cost of $1,044M. Today, ICESat-2 is scheduled to launch on September 15, 2018 with a project management (PM) agreement value of $1,056M. This illustrates how a JCL model can be continuously improved to produce valuable results for a project, even in cases of LRD delays. The primary reason for the ICESat-2 LRD delay is due to a laser failure on the primary instrument. Laser failure was one of the highest risk and uncertainty drivers within the JCL model. The project placed the most risk in this area of the model, and the model further identified the laser as the top risk driver and contributor to the LRD result. This further illustrates how a JCL can be used to predict and quantify possible issues on new technology missions.

Krygiel, Joseph↗

Remote sensing for urban planning

Utility companies are challenged to provide services to a highly dynamic customer base. With factory closures and shifts in employment becoming a routine occurrence, the utility industry must develop new techniques to maintain records and plan for expected growth. BellSouth Telecommunications, the largest of the Bell telephone companies, currently serves over 13 million residences and 2 million commercial customers. Tracking the movement of customers and scheduling the delivery of service are major tasks for BellSouth that require intensive manpower and sophisticated information management techniques. Through NASA's Commercial Remote Sensing Program Office, BellSouth is investigating the utility of remote sensing and geographic information system techniques to forecast residential development. This paper highlights the initial results of this project, which indicate a high correlation between the U.S. Bureau of Census block group statistics and statistics derived from remote sensing data.

Davis, Bruce A.↗

Development of an OSSE Framework for a Global Atmospheric Data Assimilation System

Observing system simulation experiments (OSSEs) are powerful tools for estimating the usefulness of various configurations of envisioned observing systems and data assimilation techniques. Their utility stems from their being conducted in an entirely simulated context, utilizing simulated observations having simulated errors and drawn from a simulation of the earth's environment. Observations are generated by applying physically based algorithms to the simulated state, such as performed during data assimilation or using other appropriate algorithms. Adding realistic instrument plus representativeness errors, including their biases and correlations, can be critical for obtaining realistic assessments of the impact of a proposed observing system or analysis technique. If estimates of the expected accuracy of proposed observations are realistic, then the OSSE can be also used to learn how best to utilize the new information, accelerating its transition to operations once the real data are available. As with any inferences from simulations, however, it is first imperative that some baseline OSSEs are performed and well validated against corresponding results obtained with a real observing system. This talk provides an overview of, and highlights critical issues related to, the development of an OSSE framework for the tropospheric weather prediction component of the NASA GEOS-5 global atmospheric data assimilation system. The framework includes all existing observations having significant impact on short-term forecast skill. Its validity has been carefully assessed using a range of metrics that can be evaluated in both the OSSE and real contexts, including adjoint-based estimates of observation impact. A preliminary application to the Aeolus Doppler wind lidar mission, scheduled for launch by the European Space Agency in 2014, has also been investigated.

Gelaro, Ronald↗

Assimilation of SeaWinds Scatterometer Data in the GEOS Data Assimilation System

The first SeaWinds scatterometer was launched in to space aboard the Quikscat satellite on June 19, 1999 at 7:15 p.m. PDT. Flying in a near polar orbit 800 km above the earth's surface, SeaWinds uses an advanced scatterometer design to measure surface wind velocity over 90 percent of the ice free oceans ever 24 hours. This first SeaWinds mission is designed to replace the NASA Scatterometer (NSCAT) which ceased providing wind velocity data when the ADEOS I satellite failed. A second SeaWinds is scheduled to be launched late in 2000 aboard ADEOS II. Previous scatterometer assimilation experiments conducted by the NASA Data Assimilation Office, using both ERS and NSCAT wind observations, have demonstrated considerable potential for this type of data to improve both atmospheric analyses and forecasts, however much of the smaller scale information content of the scatterometer data could not be taken into account in the early coarse resolution versions of the Goddard (GEOS) Data Assimilation System (DAS) or in operational data assimilation systems. In this paper, we will describe data assimilation experiments in which the new higher resolution versions of the GOES DAS are used to assimilate SeaWinds scatterometer winds. Following a brief discussion of the SeaWinds design and the methodology used to assimilate scatterometer data in the GOES DAS, the quality of the SeaWinds data and the impact of SeaWinds on GOES analyses and forecasts at different resolutions will be presented.

Atlas, Robert↗

A Markov Decision Process Framework for Optimal Airport Reconfiguration

The airport runway configuration is defined as a combination set of runways for arrivals and departures used at a point during operation of the airport. An optimal configuration of these runways depends on a number of factors, including traffic demand, wind magnitude and direction, other adverse weather conditions, and noise restrictions, among others. Based on the current state of these factors and predictions of traffic demand and weather conditions, runway configuration changes are made and coordinated between tower controller, other air traffic control facilities, pilots, and ground personnel. Reconfigurations can be quite disruptive to airport operations; minimizing their frequency and scheduling them well in advance is essential for mitigating some of the added workload for controllers and pilots. Unfortunately, deciding on an appropriate time to change is challenging for human decision makers. Not only do multiple factors need to be evaluated, but the uncertainty in their forecasts must also be considered. Previous optimization methods, such as mixed linear integer programming, have been proposed. Although these methods can reason over a large set of variables, they do not systematically handle the uncertainty associated with weather movement, traffic demands, and other variables. In this work, we introduce a Markov Decision Process (MDP)-based decision making framework which can reason effectively over the inherent uncertainties and make optimal decisions on if/when to change the airport configuration. In a prototype implementation, we present a single runway with three aircraft and utilize knowledge of the forecasted wind speed and direction to determine whether to keep or change the current runway configuration. Our aim through this work is to present a framework for airport reconfiguration which can be scalable to additional aircraft, multiple runways, and various input parameters. This technique will optimize the airport reconfiguration procedure by providing a proactive approach, optimizing not just at the next optimal opportunity for a reconfiguration based on varying atmospheric and traffic conditions in the terminal airspace, but also anticipating future necessary reconfigurations. This will eliminate the inefficiencies of frequent changes currently associated with runway reconfiguration procedures.

runway reconfiguration↗

GRACE Final Technical Report

The GRACE project (Grid that is Risk-Aware for Clean Electricity) was a five-year research initiative funded by the U.S. Department of Energy's Advanced Research Projects Agency- Energy (ARPA-E) under the PERFORM program. Led by Duke University's Nicholas School of the Environment, with contributions from The Ohio State University, North Carolina State University, Dartmouth College, and Pacific Northwest National Laboratory, the project addressed a fundamental challenge in grid management: conventional software plans for a single most-likely outcome and relies on reserves as a buffer, leaving utilities poorly equipped for the growing variability introduced by renewable energy. GRACE demonstrated a better approach: explicitly representing thousands of plausible future scenarios and choosing operating schedules that perform well across all of them.

14 SOLAR ENERGY↗

Leverage modern artificial intelligence (AI) enabled systems for waste reduction

Manufacturing industries continue to face challenges in reducing waste, as upstream strategies such as source reduction and product redesign require a deeper understanding of processes compared to conventional recycling methods. Recent advancements in artificial intelligence (AI) and machine learning (ML) have opened new opportunities to integrate modern computational techniques with traditional waste minimization strategies. This paper explores AI-enabled approaches for product redesign, source reduction, and recycling that can significantly reduce waste generation while improving efficiency and sustainability. AI-driven material substitution and lightweighting in product design enable discovery of novel materials with optimized properties, reducing waste without compromising performance. Reinforcement learning models optimize process parameters, raw material specifications, and machine sequencing to minimize production losses, while Industrial Internet of Things (IIoT) systems paired with AI analytics enhance real-time waste tracking, predictive maintenance, and quality inspection. Furthermore, AI-based demand forecasting and production planning reduce overproduction and excess inventory, as demonstrated in industrial applications. In recycling, ML-powered pattern recognition and robotic sorting technologies achieve higher accuracy in waste segregation, directly improving recycling efficiency. Complementary solutions such as smart bins and AI-enabled waste pickup scheduling optimize collection logistics, reducing both costs and emissions. Although implementation requires upfront investment in infrastructure and training, the long-term benefits include higher material efficiency, reduced waste, improved product quality, and stronger sustainability outcomes across the supply chain. By leveraging AI-enabled systems, manufacturers can align waste minimization efforts with circular economy principles, creating scalable solutions for both industry and society.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Simulations of the monthly mean atmosphere for February 1976 with the GISS model

Three monthly mean simulations of the global atmosphere were computed for February 1976 with the GISS model from observed initial conditions on the first day of the month. In a replication experiment, two of these computations generated slightly different monthly mean states, apparently due to the schedule of interruptions on the computer. The root-mean-square errors of replication over the Northern Hemisphere were found to be about 2 mb, 20 m and 1 K for sea level pressure, 500 mb height and 850 mb temperature, respectively. The monthly mean 500 mb forecast results for February 1976 over the Northern Hemisphere are consistent with those from earlier GISS model experiments and again indicate some predictive skill at that level. Use of the observed monthly mean sea surface temperature (SST) field for February 1976 in place of the climatological SST field for February resulted in slightly improved simulations over the globe and Northern Hemisphere,

Spar, J.↗