Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “finance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Lessons in Commercial PACE Leadership: The Path from Legislation to Launch

Property Assessed Clean Energy (PACE) financing enables building owners to finance energy efficiency, renewable energy, and, in some states, non-energy building improvements through a voluntary special assessment on their properties. For commercial buildings, there are many benefits to using Commercial PACE (C-PACE) financing. Still, using C-PACE financing is a multi-step process and involves diverse stakeholders (see Figure ES-1 for a simplified overview), and the process may vary depending on the state and policy context. The primary audience for this report, Lessons in Commercial PACE Leadership, is state and local decision makers that seek an informed, objective perspective of what it takes to launch a C-PACE program. The report is specifically for those states with enabling legislation and program sponsors (i.e., state or local governments) that are looking to launch or join a C-PACE program. The report is a starting point for understanding what approaches have worked to establish successful C-PACE programs. It examines the experience of programs across the country and provides insights for making the process smoother, and hopefully less cost and time-intensive, for new state and local governments sponsoring C-PACE programs. The report also provides a roadmap to key decision points on the path to setting up a program — the different paths taken and program models employed by those who have blazed the trail. The report is organized into three sections describing the decision points involved, options and considerations, and experience from the field.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Wind Technology Modeling Within the System Advisor Model (SAM) (Poster)

This poster provides detail for implementation and the underlying methodology for modeling wind power generation performance in the National Renewable Energy Laboratory's (NREL's) System Advisor Model (SAM). SAM's wind power model allows users to assess projects involving one or more large or small wind turbines with any of the detailed options for residential, commercial, or utility financing. The model requires information about the wind resource, wind turbine specifications, wind farm layout (if applicable), and costs, and provides analysis to compare the absolute or relative impact of these inputs. SAM is a system performance and economic model designed to facilitate analysis and decision-making for project developers, financers, policymakers, and energy researchers. The user pairs a generation technology with a financing option (residential, commercial, or utility) to calculate the cost of energy over the multi-year project period. Specifically, SAM calculates the value of projects which buy and sell power at retail rates for residential and commercial systems, and also for larger-scale projects which operate through a power purchase agreement (PPA) with a utility. The financial model captures complex financing and rate structures, taxes, and incentives.

17 WIND ENERGY↗

Strengthening Retrofit Markets for Comprehensive Savings in Multifamily Buildings (Interim Final Report)

Energy efficiency is vitally important in Maine. Nearly 70% of Maine households rely on fuel oil as their primary energy source for home heating, a higher share than in any other state. Coupled with the state's long, cold winters, Maine's dependence on oil renders homeowners particularly vulnerable to fluctuating fuel costs. With $\$$4.5 million in seed funding from the Energy Department's Better Buildings Neighborhood Program, the Governor's Energy Office (GEO), through Efficiency Maine Trust (the Trust), is spurring Maine landlords to lower their monthly energy bills and improve comfort for their tenants during the state's cold winter months and increasingly warmer summers. Maine's aging multifamily housing stock can be expensive to heat and costly to maintain. It is not unusual to find buildings with little or no insulation, drafty windows, and significant air leaks, making them ideal candidates for energy efficiency upgrades. Maine modeled its Multifamily Efficiency Program (MEP) after the state's highly successful Home Energy Savings Program (HESP) for single-family homes. HESP provided cash incentives and financing opportunities to owners of one-to four-unit structures, which resulted in thousands of energy assessments and whole-house energy upgrades in 225 communities. Maine's new MEP multifamily energy efficiency upgrade and weatherization initiative focuses on small to medium-sized (i.e., five to 20 units) apartment buildings. The program's energy efficiency upgrades will provide at least 20% energy savings for each upgraded multifamily unit. The Trust’s MEP relies on a network of approved program partners who help move projects through the pipeline from assessment to upgrade. MEP has two components: benchmarking and development of an Energy Reduction Plan (ERP). Using the ENERGY STAR® Portfolio Manager benchmarking tool, MEP provides an assessment of current energy usage in the building, establishes a baseline for future energy efficiency improvements, and enables tracking and monitoring of future energy usage at the building— all at no cost to the building owner. The ERP is developed by a program partner using either the Trust’s approved modeling or prescriptive tools; it provides detailed information about the current energy related conditions in the building and recommends energy efficiency, health, and safety improvements. The Trust's delivery contractor provides quality assurance and controls throughout the process. Through this effort, MEP's goal is to establish a self-sustaining, market-driven program, demonstrating the value of energy efficiency to other building owners. The increasing value of properties across the state will help incentivize these owners to continue upgrades after the grant period has ended. Targeting urban areas in Maine with dense clusters of multifamily units—such as Portland, Lewiston- Auburn, Bangor, and Augusta—MEP engaged a variety of stakeholder groups early on to design its multifamily program. Through direct emails and its website, program officials invited lending institutions, building professionals, engineering firms, equipment distributors, and local property owners associations to attend open meetings around the state to learn about the goals of the multifamily program and to help define its parameters. These meetings helped program administrators understand the diversity of the customer base: some owners are individuals with a single building, while other owners are groups of people or management companies with an entire portfolio of multifamily buildings. The diversity of the customer base notwithstanding, owners see MEP as an opportunity to make gains in their respective properties. Consistently high turnouts at stakeholder meetings fueled greater customer interest as awareness of the program spread through word of mouth. The program also gained traction by utilizing the program partner networks and building on the legacy of the Trust’s successful HESP for single-family residences. MEP offers significant incentives for building owners to participate in the upgrade program. Wholebuilding benchmarking services are available to most multifamily housing buildings free of charge. The service provides the building owner with an assessment of the building's current energy efficiency as compared to other multifamily buildings on a national scale, establishes a baseline to measure future improvements, and enables owners to track monthly energy consumption using the ENERGY STAR Portfolio Manager. Once the benchmarking process is complete, the program links building owners with approved program partners (e.g., energy professionals, home performance contractors) to identify and implement specific energy-saving opportunities in the building. Program partners can also provide project quotes with estimated financing incentives and payback period calculations that enable building owners to make informed decisions. What's more, the Trust provides two financial incentives for successful completion of program milestones. The first is a per-unit incentive for completion of an approved ERP (i.e., $\$$100 per unit if a prescriptive path is followed, and $\$$200 per unit for a modeled ERP). Upon final inspection of the installed project scope of work, an incentive of $\$$1,400 per unit or 50% of installed cost—whichever is less—is paid. The Trust originally established a $\$$1 million loan-loss reserve fund (LLRF) to further enhance financing opportunities for qualified multifamily building owners. This funding mechanism was designed to connect building owners with lenders that retain the mortgages for their properties and encourages the lenders to offer financing for energy efficiency improvements. However, there has been no interest in the LLRF and therefore the LLRF has been reduced. Ultimately, MEP plans to build an online tool for building owners to assess opportunities to make upgrades in their multifamily units. The tool will include a performance rating system to provide a way for building owners to more easily understand energy use in their building, and how it could be improved with energy efficiency upgrades. Prospective tenants will also be able to use the rating system to make informed decisions about where to rent. Furthermore, the rating can be incorporated into real estate listings as a way for prospective home buyers and the real estate financial community to evaluate a home's operating costs. The Trust’s MEP has identified the state's most experienced energy professionals, vendors, suppliers, and contractors that install energy efficiency equipment in the multifamily sector to be qualified program partners. To be eligible for partnership, energy assessment professionals and contractors are required to have demonstrated experience in the multifamily sector and hold associated professional certifications, such as Building Operator Certification (BOC), Certified Energy Manager (CEM), Professional Engineer (PE), or Building Performance Institute (BPI) Multifamily Building Analyst. Widespread program interest has enabled the Trust to redirect funds that might otherwise be needed for program promotion to building capacity through contractor training. In addition to boosting professional training and certification opportunities, MEP teaches its partners how to market the multifamily program to prospective multifamily homeowners.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

2022 Product Commercialization and Market Development Awardee: Bergey Windpower

In 2023, consumers will finance more than 80% of the residential solar energy systems they purchase, which they use as collateral (called "non-recourse loans"). Similar loans are not yet offered to fund distributed wind energy systems. To accelerate deployment of small wind systems, which power individual rural homes and farms, the United States will need to make consumer loans available at reasonable rates with modest downpayments and collateral requirements. A team led by Bergey Windpower Co. is creating new consumer financing options to reduce or eliminate the upfront cash needed to buy distributed wind energy systems. This new financing structure would decrease purchase costs for small wind turbines produced by Bergey Windpower and possibly other manufacturers. Product financing is instrumental in growing wind power market share, clean energy manufacturing, and installation jobs while reducing greenhouse gas emissions. Bergey Windpower's previous Competitiveness Improvement Project (CIP) awards have led to the development of affordable, high-performance wind turbines, microgrids, and components.

CIP↗

Decommissioning of obsolete Nuclear Facilities in the UJV Rez, a. s. - 19027

UJV Rez, a. s. (further also UJV) is a leading institution in all areas of nuclear R and D in the Czech Republic and has had a dominant position in the nuclear program since it was established in 1955 as the Nuclear Research Institute Rez. The activities of UJV encompass nuclear physics, chemistry, nuclear power and many other topics. The main issues addressed at UJV in past decades have included research, development and services for NPPs, the fuel cycle and irradiation services for research and development in the industrial sector and medicine. UJV also manages most institutional radioactive wastes (RAW) produced in the Czech Republic (approx. 90 %). After more than 60 years of activities of the UJV in the nuclear field, there were obsolete nuclear facilities to be decommissioned. Decommissioning of nuclear facilities UJV is the only ongoing decommissioning project in the Czech Republic. Preparations for decommissioning began in 1996. Safety analysis report (SAR) was performed comprising the identification and characterization of potential sources of risk, potentially exposed receptors and exposure pathways, potential chemical compounds, radionuclides and media of concern. The results of the SAR enabled to determine the priorities of the decommissioning, the decommissioning the expenses and as well as project implementation. The decommissioning project was revised on the base of information obtained during decommissioning. The decommissioning was divided into two phases according to the level of risk and the financing limitations. The Ministry of Finance significantly financially contributed the decommissioning, although the UJV also contributed a considerable amount. Overall cost is close to the amount of Eur 27 million. Decommissioning started in 2003 and will be finished in 2018. Almost all facilities have already been successfully decommissioned. In the following table, the status of decommissioning of facilities is described. 1) Reloading site for RAW storage (Building 211/6): last item in progress 2003 - 2018; 2) Special Sewage System: decommissioned 2004 - 2005, reused; 3) Liquid RAW storage tanks (Building 211/3): decontaminated 2004 - 2013, reused; 4) Technology for RAW treatment (Building 241): decommissioned 2003 - 2011; 5) Contaminated equipment (Building 250): decommissioned 2003 - 2016; 6) Systems for storage of sealed sources (Building 261); decommissioned 2003 - 2005; 7) Decay tanks (Building 211/5); decommissioned 2003 - 2014, reused; 8) Old bituminating unit (Building 211/3); decommissioned 2004 - 2008; 9) Surface RAW storage site; decommissioned 2009 - 2014. Later, other unused decommissioning facilities, which were not included in the decommissioning project financed by the state, were included. These facilities are continuously decommissioned and financed from own resources of UJV. These facilities are like facilities already decommissioned: radiochemical laboratories, (including glove boxes), liquid RW storage tanks (including sewage systems), liquid RW treatment technology, hot cells, accumulated RW, etc. Realization started 2016 and expected duration is till 2026. Estimated budget is approximately Eur 17 million. The decommissioning of nuclear facilities in UJV is being carried out on the high level of radiation protection and up to now there was no extraordinary event or accident, although some challenges we were forced to address. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Accelerating Clean Energy Commercialization. A Strategic Partnership Approach

Technology development in the clean energy and broader clean tech space has proven to be challenging. Long-standing methods for advancing clean energy technologies from science to commercialization are best known for relatively slow, linear progression through research and development, demonstration, and deployment (RDD&D); and characterized by well-known valleys of death for financing. Investment returns expected by traditional venture capital investors have been difficult to achieve, particularly for hardware-centric innovations, and companies that are subject to project finance risks. Commercialization support from incubators and accelerators has helped address these challenges by offering more support services to start-ups; however, more effort is needed to fulfill the desired clean energy future. The emergence of new strategic investors and partners in recent years has opened up innovative opportunities for clean tech entrepreneurs, and novel commercialization models are emerging that involve new alliances among clean energy companies, RDD&D, support systems, and strategic customers. For instance, Wells Fargo and Company (WFC) and the National Renewable Energy Laboratory (NREL) have launched a new technology incubator that supports faster commercialization through a focus on technology development. The incubator combines strategic financing, technology and technical assistance, strategic customer site validation, and ongoing financial support.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Achieving Cooperative Community Equitable Solar Sources (ACCESS) (Final Technical Report)

Since 2011, solar has grown from a niche technology to a widely accessible source of power for homes and businesses across the United States and has become a fundamental part of the modern grid. There are still challenges, however, in learning how to integrate and use PV most effectively and how to make PV universally available. Most low- and moderate-income (LMI) customers cannot currently afford PV; capital costs and financing costs are too high to drive significant penetration. Providing access to LMI individuals and communities is a critical and immediate priority, and the focus of this project. The overall objective of the Achieving Cooperative Community Equitable Solar Sources (ACCESS) project is to explore and amplify the use of innovative, cost-effective energy access programs to serve co-ops’ LMI members1. ACCESS will research at least three financing mechanisms and at least six LMI program designs including LMI engagement strategies to maximize participation for these hard-to-reach audiences. ACCESS evaluated the financial mechanisms and program designs from field tests sited at diverse co-ops that provide recognizable models for the broader co-op community to identify optimal solutions for small utilities. The research with these cooperatives allowed testing of concepts and development of models and tools for other utilities to adapt to their own program designs and expansions. ACCESS published results and developed an “ACCESS Solar Access Toolkit” consisting of program designs, LMI engagement strategies, how-to guidance, and other tools to facilitate replication at small utilities across the country. Through the dissemination practices of the ACCESS project team, all NRECA member co-ops (~900) were made aware of the “ACCESS Solar Access Toolkit” and all other ACCESS resources. NRECA and its partners developed innovations to expand co-ops’ solar energy offerings to provide all of a co-op’s members—especially those who struggle to pay their bills—with cost-effective options that meet their needs. ACCESS specifically explored utility financing mechanisms and program designs that, independently or used in combination, increase solar access for rural electric cooperatives’ LMI members/ratepayers and that reduce LMI member/ratepayers’ electricity costs by at least 10%. LMI engagement strategies focused on maximizing the number of members who receive benefits and on the cost savings to LMI participants.

14 SOLAR ENERGY↗

The Danish contribution to the European DEMOCOPHES project: A description of cadmium, cotinine and mercury levels in Danish mother-child pairs and the perspectives of supplementary sampling and measurements

Human biomonitoring (HBM) is an important tool, increasingly used for measuring true levels of the body burdens of environmental chemicals in the general population. In Europe, a harmonized HBM program was needed to open the possibility to compare levels across borders. To explore the prospect of a harmonized European HBM project, DEMOCOPHES (DEMOnstration of a study to COordinate and Perform Human biomonitoring on a European Scale) was completed in 17 European countries. The basic measurements performed in all implemented countries of DEMOCOPHES included cadmium, cotinine and phthalate metabolites in urine and mercury in hair. In the Danish participants, significant correlations between mothers and children for mercury in hair and cotinine in urine were found. Mercury in hair was further significantly associated with intake of fish and area of residence. Cadmium was positively associated with BMI in mothers and an association between cadmium and cotinine was also found. As expected high cotinine levels were found in smoking mothers. For both mercury and cadmium significantly higher concentrations were found in the mothers compared to their children. In Denmark, the DEMOCOPHES project was co-financed by the Danish ministries of health, environment and food safety. The co-financing ministries agreed to finance a number of supplementary measurements of substances of current toxicological, public and regulatory interest. This also included blood sampling from the participants. The collected urine and blood samples were analyzed for a range of other persistent and non-persistent environmental chemicals as well as two biomarkers of effect. The variety of supplementary measurements gives the researchers further information on the exposure status of the participants and creates a basis for valuable knowledge on the pattern of exposure to various chemicals. - Highlights: • Levels of cadmium, mercury and cotinine in the Danish subpopulation are comparable to levels in the total DEMOCOPHES population with mercury in hair above the European median. • Supplementary sample collection and measurements in Denmark gave valuable exposure information on a variety of other chemicals of current toxicological, public and regulatory interest, such as persistent organic pollutants. • It is highly valuable to obtain as much exposure information as possible once you have established the study cohort.

54 ENVIRONMENTAL SCIENCES↗

Non-Hardware ("Soft") Cost-Reduction Roadmap for Residential and Small Commercial Solar Photovoltaics, 2013-2020

The objective of this analysis is to roadmap the cost reductions and innovations necessary to achieve the U.S. Department of Energy (DOE) SunShot Initiative's total soft-cost targets by 2020. The roadmap focuses on advances in four soft-cost areas: (1) customer acquisition; (2) permitting, inspection, and interconnection (PII); (3) installation labor; and (4) financing. Financing cost reductions are in terms of the weighted average cost of capital (WACC) for financing PV system installations, with real-percent targets of 3.0% (residential) and 3.4% (commercial).

14 SOLAR ENERGY↗

City of Phoenix - Energize Phoenix Program

Energize Phoenix (EPHX) was designed as an ambitious, large-scale, three-year pilot program to provide energy efficiency upgrades in buildings, along Phoenix’s new Light Rail Corridor – part of a federal effort to reduce energy consumption and stimulate job growth, while simultaneously reducing the country’s carbon footprint and promoting a shift towards a green economy. The program was created through a 2010 competitive grant awarded to the City of Phoenix who managed the program in partnership with Arizona State University (ASU), the state’s largest university, and Arizona Public Service (APS), the state’s largest electricity provider. The U.S. Department of Energy (DOE) Better Buildings Neighborhood Program (BBNP) and the American Recovery and Reinvestment Act (ARRA) of 2009 provided $25M in funding for the EPHX program. The Light Rail Corridor runs through the heart of downtown Phoenix, making most high-rise and smaller commercial buildings eligible to participate in the EPHX program, along with a diverse mix of single and multi-family residential buildings. To ensure maximum impact and deeper market penetration, Energize Phoenix was subdivided into three unique parts: i. commercial rebate program, ii. commercial financing program, and iii. residential program Each component was managed by the City of Phoenix in partnership with APS. Phoenix was fortunate to partner with APS, which already operated robust commercial and residential rebate programs within its service territory. Phoenix tapped into the existing utility contractor network, provided specific training to over 100 contracting firms, and leveraged the APS rebate program structure (energy efficiency funding) to launch the EPHX commercial and residential rebate programs. The commercial finance program was coordinated and managed through a contract with National Bank of Arizona, NBAZ, which also provided project capital leveraging EPHX finance funds. Working in unison, approved contractors jointly produced more than 161,000 labor hours in pursuit of EPHX goals over the life of the project. Labor hours were spread among electricians, heating, ventilating and air-conditioning (HVAC) technicians, marketing professionals, engineers, sales, and administrative support staff across the approved contractor workforce. Program participants received both the utility rebate along with the EPHX rebate, and depending on project size and utility rebate structure some projects resulted in low to no-cost upgrades for customers. Phoenix also partnered with ASU, a grant sub-recipient, to leverage the institution’s expertise in research and data analysis. In this partnership, ASU accepted marketing responsibilities for the grant and partnered with DRA Communications (DRA), a Phoenix-based marketing firm, to create and communicate the message out to the marketplace. The EPHX program has completed its energy upgrade activities. A review of the work completed by ASU revealed that the EPHX program substantially exceeded the program’s stated goals by retrofitting/upgrading over 33 million sq ft of commercial space (30 million sq ft goal exceeded by 11%) and 2,014 residential units (1,700 unit goal exceeded by 18%) along the Light Rail Corridor. The program helped stimulate economic growth by adding $31million to the local economy and enhanced an already robust energy efficiency contractor network. This contractor network will continue to promote utility energy incentives to sustain energy efficiency upgrade activities in the future. Finally, EPHX helped reduce participants annual energy consumption by 135 million kilowatt-hour (kWh) translating into over $12.5 million of annual energy cost avoidance for the community. This also resulted in projected payback period of 4.5 years for total investment by all parties and reduced greenhouse gas emissions by over 95,000 metric tons of carbon dioxide equivalent (CO2e).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Bookending the Opportunity to Lower Wind’s LCOE by Reducing the Uncertainty Surrounding Annual Energy Production

Reducing the performance risk surrounding a wind project can potentially lead to a lower weighted-average cost of capital (WACC), and hence a lower levelized cost of energy (LCOE), through an advantageous shift in capital structure, and possibly also a reduction in the cost of capital. Specifically, a reduction in performance risk will move the 1-year P99 annual energy production (AEP) estimate closer to the P50 AEP estimate, which in turn reduces the minimum debt service coverage ratio (DSCR) required by lenders, thereby allowing the project to be financed with a greater proportion of low-cost debt. In addition, a reduction in performance risk might also reduce the cost of one or more of the three sources of capital that are commonly used to finance wind projects: sponsor or cash equity, tax equity, and/or debt. Preliminary internal LBNL analysis of the maximum possible LCOE reduction attainable from reducing the performance risk of a wind project found a potentially significant opportunity for LCOE reduction of ~$10/MWh, by reducing the P50 DSCR to its theoretical minimum value of 1.0 (Bolinger 2015b, 2014) and by reducing the cost of sponsor equity and debt by one-third to one-half each (Bolinger 2015a, 2015b). However, with FY17 funding from the U.S. Department of Energy’s Atmosphere to Electrons (A2e) Performance Risk, Uncertainty, and Finance (PRUF) initiative, LBNL has been revisiting this “bookending” exercise in more depth, and now believes that its earlier preliminary assessment of the LCOE reduction opportunity was overstated. This reassessment is based on two new-found understandings: (1) Due to ever-present and largely irreducible inter-annual variability (IAV) in the wind resource, the minimum required DSCR cannot possibly fall to 1.0 (on a P50 basis), and (2) A reduction in AEP uncertainty will not necessarily lead to a reduction in the cost of capital, meaning that a shift in capital structure is perhaps the best that can be expected (perhaps along with a modest decline in the cost of cash equity as new investors enter the market).

17 WIND ENERGY↗

Assessing the PACE of California residential solar deployment: Impacts of Property Assessed Clean Energy programs on residential solar photovoltaic deployment in California, 2010-2015

A new study by Berkeley Lab found that residential Property Assessed Clean Energy (R-PACE) programs increased deployment of residential solar photovoltaic (PV) systems in California, raising it by about 7-12% in cities that adopt these programs. R-PACE is a financing mechanism that uses a voluntary property tax assessment, paid off over time, to facilitate energy improvements and, in some jurisdictions, water and resilience measures. While previous studies demonstrated that early, regional R-PACE programs increased solar PV deployment, this new analysis is the first to demonstrate these impacts from the large, statewide R-PACE programs dominating the California market today, which use private capital to fund the upfront costs of the improvements. Berkeley Lab estimated the impacts using econometric techniques on two samples: -Large cities only, allowing annual demographic and economic data as control variables -All California cities, without these annual data Analysis of both samples controls for several factors other than R-PACE that would be expected to drive solar PV deployment. We infer that on average, cities with R-PACE programs were associated with greater solar PV deployment in our study period (2010-2015). In the large cities sample, solar PV deployment in jurisdictions with R-PACE programs was higher by 1.1 watts per owner-occupied household per month, or 12%. Across all cities, solar PV deployment in jurisdictions with R-PACE programs was higher by 0.6 watts per owner-occupied household per month, or 7%. The large cities results are statistically significant at conventional levels; the all-cities results are not. The estimates imply that the majority of solar PV deployment financed by R-PACE programs would likely not have occurred in their absence. Results suggest that R-PACE programs have increased PV deployment in California even in relatively recent years, as R-PACE programs have grown in market share and as alternate approaches for financing solar PV have developed. The U.S. Department of Energy’s Building Technologies Office supported this research.

14 SOLAR ENERGY↗

Transforming Public Housing with Deep Energy Retrofits

Open Market ESCO’s (OME) Transforming Public Housing through Deep Energy Retrofits project demonstrated new design and financing solutions for implementing deep energy retrofits (DERs) in occupied low-income multifamily housing. The Project performed an integrated project delivery process, including designing low-carbon retrofit solution packages, construction pricing, and financing. The Project developed a constructible and financeable DER scope for a 102-unit extremely low-income multifamily property in Boston. This Project demonstrated a replicable approach for streamlining and implementing DER projects in occupied housing, including real solutions for overcoming design complexities and cost barriers.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Clean Energy Revolving Loan Funds: International Experience [Slides]

Tunisia’s Energy Transition Fund (FTE), created in 2013, was established to promote energy efficiency and renewable energy projects in the public and private sectors. To overcome financing challenges related to the energy transition, Tunisia’s National Agency for Energy Conservation (ANME) seeks both to strengthen available financial resources and to develop innovative financing structures. Revolving Loan Funds (RLFs) are one such innovative financing structure, used by countries around the world to foster the development of distributed clean energy projects. This report aims to inform policy makers and various stakeholders on the opportunity to design an RLF by drawing on successful experiences from other countries. Specifically, this report provides analytical support for discussions with ANME and its partners to develop an RLF in the context of Tunisia. It outlines the 12 essential steps for establishing a RLF and includes detailed case studies demonstrating successful RLF implementation across various contexts.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Coalition for Community-Supported Affordable Geothermal Energy Systems (C2SAGES)

The C2SAGES project evaluated the feasibility of a community geothermal system for the planned Windy Ridge affordable housing development in Hinesburg, Vermont. Led by GTI Energy with Vermont Gas Systems, LN Consulting, NREL, and Frontier Energy, the work assessed technical design, energy performance, costs, business models, community engagement, maintenance, workforce development, and permitting. The proposed system was designed to serve 100% of the development’s heating, cooling, and domestic hot water loads. Compared with a baseline using air-source heat pumps and natural gas water heating, the geothermal system was estimated to reduce HVAC and domestic hot water energy use by about 45% to 48%, lower operating and maintenance costs, and reduce 30-year life-cycle costs by 37% for Phase 1 and 10% for Phase 2. Technical testing and modeling indicated that the Windy Ridge site is suitable for a community-scale geothermal system. The project also developed borehole field layouts, piping concepts, pump house designs, controls, maintenance plans, and supporting engineering drawings. The business model analysis found that first cost, ownership structure, and customer affordability remain major deployment challenges. Utility-led maintenance and operation were viewed favorably, but traditional utility cost-recovery models may require subsidy or revised financing structures to be practical for affordable housing. Community engagement highlighted the need for clear public education, transparent financing, reliable long-term maintenance, trained technicians, and the potential to pair geothermal systems with weatherization. Overall, the report concludes that community geothermal is technically feasible and offers meaningful energy, emissions, and life-cycle cost benefits, but broader deployment will depend on workable financing models and workforce readiness.

15 GEOTHERMAL ENERGY↗

Advancing Clean Energy Equity

This year’s Financial Innovations Roundtable (June 16-17, 2022) focused on advancing clean energy equity and was co-hosted by the University of New Hampshire's Carsey School of Public Policy and the Federal Reserve Bank of New York. Clean energy technologies are better than ever, with costs continuing to decline. Yet the low-income and under-resourced communities – particularly communities of color, Native communities, and other traditionally marginalized populations – that are disproportionately impacted by climate and severe weather-related events lag in clean energy investments. Community Development Financial Institutions (CDFIs) have a long track record of providing access to capital to low- and moderate-income communities nationwide. Green Banks, established at state and local levels, use innovative financing to attract private capital and incentivize investments in clean and renewable energy. Together, the nation's network of more than 1,300 CDFIs and 21 Green Banks have the financing expertise and deep market understanding and relationships to finance a transition to clean energy. This event explored how Green Banks and CDFIs can funnel creditworthy projects to market and efficiently raise capital for them. Building on the Carsey School White Paper, Clean Energy Project Development for Low-Income Communities: Strengthening the Ecosystem for Delivering Solar Energy and Deep Efficiency Retrofits (Hangen, 2022), the FIR sought to identify options and create opportunities for Green Banks, CDFIs, and impact investors to collaborate in offering a range of products, approaches, and tools to better serve communities and individuals who have thus far been left out of the transition to clean energy. The event had 101 participants from a variety of sectors including CDFIs, Green Banks, mission-driven clean energy organizations, government agencies, banks, and impact investment professionals.

14 SOLAR ENERGY↗

Decommissioning costs - some international perspectives and initiatives. Presentation for Panel discussion. Session No. 024: 'Getting a Handle on Decommissioning Costs - a Global Perspective'

Financing for decommissioning: Are the cost estimates valid? Are the financing arrangements suitable? Are the fund management systems appropriate? Cost estimates are estimated, analysed and updated on a regular basis, but cost comparisons are not straight-forward. There is an incomplete understanding of variability between estimates. Multiple internal and external factors impact estimates: Institutional, legal and policy, purpose, Strategies and plans, overall context, Facility characteristics and history Contingencies and risk, Limited actual cost data. The financing arrangements: there exists a range of systems in place for the implementation of Funding Policy and Strategy, but there are Considerable variations in: Calculating funding requirements, contributions/provisions, Allocating risks and requirements for securities Managing funds and accounting, adjusting the system, Managing disbursements, Reporting and supervision. All cost estimates for future decommissioning activities include considerable uncertainties. These uncertainties will gradually diminish with growing experience from current and planned projects. Different costing methods have different data requirements. Their reliability depends on the extent to which various data are available and applicable to the specific case being considered. Independent of the assessment method, some uncertainty is inevitable in all estimates of future costs. Analysis of the costing method may be useful in order to locate the key uncertainties in each specific estimate. NEA's Decommissioning Cost Estimation Group (DCEG) was Created in 2008 to foster the exchange of information and experience. It Aims to enhance the credibility, reliability, and auditability of the cost estimation process. It Helps define international good practices in decommissioning cost estimation. However, some major challenges remain. Weaknesses in: Understanding relations between estimates and actual costs, Lack of relevant cost data, sharing data. How might be addressed: Improved sharing of cost data, Systematic analyses of estimates and actual costs, Developing benchmarking approaches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Germany's First Steps in the Restarted Site Selection Process - 18015

After the Fukushima event in 2011 Germany has decided to phase out nuclear power. Subsequently, it seemed to be politically attractive also to achieve a broad consensus with respect to final disposal of the high-active heat-generating waste after a long societal conflict lasting for decades. Germany has then decided to start a new site selection program for the determination of a site for high-active and heat-generating waste. In 2013, an overall parliamentary consensus could be achieved to agree on a new Repository Site Selection Act. This law has then been evaluated by a commission and the Repository Site Selection Act became amended. Besides, also organization and responsibilities became adapted as well as the financing system. A fund has been installed, which was financed by the utilities, to secure the availability of money to finance the whole process. In the meanwhile, the organizations for licensing of interim storage and final disposal facilities (BfE), for the operation of interim storage facilities for spent fuel, high-active waste and low and intermediate level waste (BGZ) and for site investigation, construction, operation and decommissioning of repositories for spent fuel and high-active waste as well as for low and intermediate level waste (BGE) had been founded and the site investigation process has just started. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗