Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “field testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Field Test of Enhanced Remedial Amendment Delivery Using a Shear-Thinning Fluid

Heterogeneity of hydraulic properties in aquifers may lead to contaminants residing in lower-permeability zones where it is difficult to deliver remediation amendments using conventional injection processes. The focus of this effort is to examine use of a shear-thinning fluid (STF) to improve the uniformity of remedial amendment distribution within a heterogeneous aquifer. Previous studies have demonstrated the significant potential of STFs for improving remedial amendment delivery in heterogeneous aquifers, but quantitative evaluation of these improvements from field applications are lacking. A field-scale test was conducted that compares data from successive injection of a tracer in water followed by injection of a tracer in a STF to evaluate the impact of the STF on tracer distribution uniformity in the presence of permeability contrasts within the targeted injection zone. Data from tracer breakthrough at multiple depth-discrete monitoring intervals and electrical resistivity tomography showed that inclusion of STF in the injection solution slowed movement in high-permeability pathways, improved delivery of amendment to low-permeability materials, and resulted in better uniformity in injected fluid distribution within the targeted treatment zone.

bioremediation, groundwater↗

Field Test of Enhanced Remedial Amendment Delivery Using a Shear-Thinning Fluid

Heterogeneity of hydraulic properties in aquifers may lead to contaminants residing in lower-permeability zones where it is difficult to deliver remediation amendments using conventional injection processes. The focus of this effort is to examine use of a shear-thinning fluid (STF) to improve the uniformity of remedial amendment distribution within a heterogeneous aquifer. Previous studies have demonstrated the significant potential of STFs for improving remedial amendment delivery in heterogeneous aquifers, but quantitative evaluation of these improvements from field applications are lacking. A field-scale test was conducted that compares data from successive injection of a tracer in water followed by injection of a tracer in a STF to evaluate the impact of the STF on tracer distribution uniformity in the presence of permeability contrasts within the targeted injection zone. Data from tracer breakthrough at multiple depth-discrete monitoring intervals and electrical resistivity tomography showed that inclusion of STF in the injection solution slowed movement in high-permeability pathways, improved delivery of amendment to low-permeability materials, and resulted in better uniformity in injected fluid distribution within the targeted treatment zone.

54 ENVIRONMENTAL SCIENCES↗

Field Testing of Cryogenic Carbon Capture

Sustainable Energy Solutions has been developing Cryogenic Carbon Capture™ (CCC) since 2008. In that time two processes have been developed, the External Cooling Loop and Compressed Flue Gas Cryogenic Carbon Capture processes (CCC ECL™ and CCC CFG™ respectively). The CCC ECL™ process has been scaled up to a 1TPD CO2 system. In this process the flue gas is cooled by an external refrigerant loop. SES has tested CCC ECL™ on real flue gas slip streams from subbituminous coal, bituminous coal, biomass, natural gas, shredded tires, and municipal waste fuels at field sites that include utility power stations, heating plants, cement kilns, and pilot-scale research reactors. The CO2 concentrations from these tests ranged from 5 to 22% on a dry basis. CO2 capture ranged from 95-99+% during these tests. Several other condensable species were also captured including NO2, SO2 and PMxx at 95+%. NO was also captured at a modest rate. The CCC CFG™ process has been scaled up to a .25 ton per day system. This system has been tested on real flue gas streams including subbituminous coal, bituminous coal and natural gas at field sites that include utility power stations, heating plants, and pilot-scale research reactors. CO2 concentrations for these tests ranged from 5 to 15% on a dry basis. CO2 capture ranged from 95-99+% during these tests. Several other condensable species were also captured including NO2, SO2 and PMxx at 95+%. NO was also captured at 90+%. Hg capture was also verified and the resulting effluent from CCC CFG™ was below a 1ppt concentration. This paper will focus on discussion of the capabilities of CCC, the results of field testing and the future steps surrounding the development of this technology.

20 FOSSIL-FUELED POWER PLANTS↗

Compressible Arch Segments for the Cigeo Access Ramps, Drifts and Vaults - A Field Test - 17011

Andra is currently implementing the detailed engineering phase of the step-wise design development of Cigeo (the French HLW and IL-LLW Deep Geological Repository). Various technical issues are at stake, including the requirements linked to 'Reversibility / Retrievability', at different stages of the repository life cycle (from its construction start-up to its final closure and monitoring). These reversibility requirements have a significant impact on the way Cigeo is designed, will be progressively developed, operated, later closed and monitored. On a shorter term, one must demonstrate that the waste container retrieval operations are technically safe and feasible. In that sense, the structural dimensioning of the ramps and mains, as well as that of the IL-LLW disposal vaults, is critical, since the concrete liner supporting the rock walls must last over a period of some 100 to 150 years (lapse of time during which retrieval operations are likely to take place). The present paper starts with a description of the geomechanical conditions prevailing in the Callovo-Oxfordian (COX) clay-stone formation (aka the argillite). The structural dimensioning of the IL-LLW disposal vault liner, as calculated at the end of the basic engineering phase is indicated. The thickness values obtained so far have led to considering an alternative design in which a compressible material is positioned between the concrete liner intrados and the rock walls: in such situation, the 'creeping effect' of the rock is mitigated, for a time, by the compressible material (nearly a perfect elastoplastic material), hence reducing the stress level exerted inside the concrete liner. This situation enables to significantly reduce the liner thickness and provides potentially significant saving in the construction of the works concerned (preliminary sensitivity results are given). The following part of the paper is then focused on a practical case story: a technological demonstration (still ongoing) of a tunnel boring experiment, implemented underground (in a dedicated drift of the Meuse Haute Marne URL infrastructures, at scale 1:2 of the Cigeo drifts/vaults). In this excavation and construction experiment, the tunnel boring machine (TBM) lays (via an erector) 'classical' concrete arch segments (forming a ring) in a first portion of the drift and 'compressible' ones (the compressible material is positioned on their extrados) in a second portion of the drift. The technical demonstration objective is two-fold: the capacity to lay compressible arch segments with a TBM is checked, their structural behavior (with time) is compared with that of 'classical' ones. The way the compressible material is produced and then fixed on the arch concrete segment is also documented, c/w a description of the complementary testing campaign to be carried out on a test bench (on surface) of a concrete ring (at a scale 1:2 of Cigeo) formed of compressible arch segments. This paper concludes with a timeline of the experiment. Should the results obtained provide some perspectives of technical and economic improvement (i.e. saving vis-a-vis the 'classical' solution) a decision could be taken by Andra to incorporate this alternative solution in the 'design freeze' of Cigeo underground infrastructures. The positive outcomes of this technical test campaign would also pave the way for specifying the Cigeo TBM characteristics (dimensions and handling equipment), scheduled for manufacturing order around 2020. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recent Cryogenic Carbon Capture™ Field Test Results

Sustainable Energy Solutions (SES) has been developing Cryogenic Carbon Capture™ (CCC) since 2008. In that time, two processes have been developed, the External Cooling Loop and Compressed Flue Gas CCC processes (CCC-ECL and CCC-CFG, respectively). The CCC-ECL process cools the flue gas with an external refrigerant loop. This process currently captures up to 1 tonne of CO2 per day (TPD). SES has tested CCC-ECL on real flue gas slip streams from subbituminous coal, bituminous coal, biomass, natural gas, shredded tires, and municipal waste fuels at field sites that include utility power stations, heating plants, cement kilns, and pilot-scale research reactors. The CO2 concentrations from these tests ranged from 5 to 22% on a dry basis. CO2 capture ranged from 95-99+% during these tests. Several other condensable species were also captured including NO2, SO2 and PMxx at 95+%. NO was also captured at a modest rate. The CCC-CFG process has been scaled up to a 0.25 ton per day system. This system has been tested on real flue gas streams including subbituminous coal, bituminous coal, and natural gas at field sites that include utility power stations, heating plants, and pilot-scale research reactors. CO2 concentrations for these tests ranged from 5 to 15% on a dry basis. CO2 capture ranged from 95-99+% during these tests. Several other condensable species were also captured including NO2, SO2, and PMxx at 95+%. NO was also captured at 90+%. Hg capture was also verified and the resulting effluent from CCC-CFG was below a 1ppt concentration. This paper will focus on discussion of the capabilities of CCC generally, the results of CCC-ECL field testing, and future steps surrounding the development of this technology. Test results that will be presented have been collected during 9 months of testing at a commercial power plant under funding from the US Department of Energy (DOE) and the host utility. Testing of one of the systems at a commercial cement plant in the United States will also be discussed. During this testing, the system captured CO2 from the cement plant and stored the CO2 in pressurized tanks. These tanks were provided to a partner company that later used the CO2 in a CO2 utilization demonstration. The CO2 was utilized to cure concrete manufactured using cement from the same plant where the CO2 was captured. This integrated capture and utilization demonstration was the first time that the cement industry has shown in the field that it can sequester its CO2 emissions in its main product stream. This represents a potential game changing solution for industrial CO2 emissions. Operational data and host-site feedback indicate that the CCC process is ideally suited for deployment into a variety of commercial environments. A few areas of de-risking remain to make sure the technology can meet very strict industrial reliability standards. These areas of de-risking are identified and discussed. The product CO2 is shown to meet specification for many uses including industrial and merchant applications. The technology is nearing readiness for deployment at commercial scale and several initial target markets have been identified.

20 FOSSIL-FUELED POWER PLANTS↗

Advanced wind turbine control development using field test analysis for generator overspeed mitigation

Abstract Turbulent and gusty wind conditions can cause generator overspeed peaks to exceed a threshold that then lead to wind turbine shutdowns, which then decrease the energy production of the wind turbines. We derive so‐called “gust measures” that predict when generator overspeed peaks may occur. These gust measures are then used to develop advanced controllers to mitigate generator overspeed peaks so that wind turbines can operate more robustly in difficult wind conditions without exceeding generator overspeed thresholds that would lead to turbine shutdown events. The advanced controllers are demonstrated in nonlinear aeroelastic simulations using the open‐source wind turbine simulation tool OpenFAST. To increase the realism of the simulations, they are run using field‐replicated wind conditions and a wind turbine model based on data from an experimental field campaign on a downscaled demonstrator of a novel extreme‐scale, two‐bladed, downwind rotor design.

17 WIND ENERGY↗

A Practical Approach of Mining Operational Risks in Cigeo - A field-test - 19349

Andra is currently completing the detailed engineering phase of the stepwise design development of Cigeo (the French HLW and IL-LLW Deep Geological Repository, aka DGR). Various technical issues are at stake, including the risk management requirements linked to the safety of 'Mining Operations' (i.e. occupational safety issues related to underground excavation/dismantling works at some 500 m of depth), at different stages of the DGR life cycle (i.e. from its construction start-up to its final closure and future monitoring/or conversely a decision of waste retrieval). These occupational safety requirements have a significant impact on Cigeo's design, its progressive construction and later closure. On a shorter term, one must demonstrate that the design bases are technically sound and that the solutions selected (to build, operate, close the DGR infrastructures or conversely retrieve the waste) are both feasible and safe. In that sense (and following an identification of operational risks during construction), Andra focused on two sensitive cases: - The construction of large diameter drift crossings, in particular those related to the connection between a transfer drift (main) and a IL-LLW disposal vault (i.e. during construction operations), - The partial dismantling of a drift concrete lining (made of concrete segment rings, erected and placed by a TBM) at time of construction of a horizontal seal (i.e. during closure operations). The discussion starts with a description of the geotechnical conditions prevailing at the (French) Bure site, in the Callovo-Oxfordian (COx) claystone formation. Then the paper presents the Cigeo underground architecture (at large) and the specific structural choices made (at the end of the detailed engineering phase) for drifts, disposal vaults and seals. The discussion on construction - deconstruction challenges for each of the critical issues cited above provides an opportunity to explain the operational sequences (and how the methodology selected enables to reduce the risks). The following part of the paper focuses the technological demonstration (an in-situ test to be planned in detail) of a partial dismantling of the concrete segments rings forming the support lining of two tunnels previously built in the Meuse/Haute-Marne URL (Underground Research Laboratory) infrastructures, combined with the construction of a specific drift crossing. In this dismantling and construction test, the technical demonstration objective is three-fold: - The capacity to lay down compressible arch segments and support (by bolts and mesh) the rock after the lining removal, - The capacity to excavate and line the drift crossing, - The structural / geomechanical behavior (evolution with time) of the rock and lining compared with that of 'neighboring' zones. This paper provides a timeline of the tests. Should the results obtained deliver some positive perspectives of technical feasibility (and convincing operational safety) Andra will incorporate this dismantling/construction solution in the 'design freeze' of the DGR underground infrastructures. The positive outcomes of this technical test campaign will also provide 'elements of proof' for the instruction of the Cigeo licensing (a process likely to take place between 2020 and 2024) by the French Nuclear Safety Authority (ASN). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Field Test Report: Preliminary Aquifer Test Characterization Results for Well 299-W15-225: Supporting Phase I of the 200-ZP-1 Groundwater Operable Unit Remedial Design

This report examines the hydrologic test results for both local vertical profile characterization and large-scale hydrologic tests associated with a new extraction well (well 299-W15-225) that was constructed during FY2009 for inclusion within the future 200-West Area Groundwater Treatment System that is scheduled to go on-line at the end of FY2011. To facilitate the analysis of the large-scale hydrologic test performed at newly constructed extraction well 299-W15-225 (C7017; also referred to as EW-1 in some planning documents), the existing 200-ZP-1 interim pump-and-treat system was completely shut-down ~1 month before the performance of the large-scale hydrologic test. Specifically, this report 1) applies recently developed methods for removing barometric pressure fluctuations from well water-level measurements to enhance the detection of hydrologic test and pump-and-treat system effects at selected monitor wells, 2) analyzes the barometric-corrected well water-level responses for a preliminary determination of large-scale hydraulic properties, and 3) provides an assessment of the vertical distribution of hydraulic conductivity in the vicinity of newly constructed extraction well 299-W15-225. The hydrologic characterization approach presented in this report is expected to have universal application for meeting the characterization needs at other remedial action sites located within unconfined and confined aquifer systems.

54 ENVIRONMENTAL SCIENCES↗

Support to DHS Chemical Detection Field Testing and Countermeasures Studies: Report to Sponsors

This document reports on work that Lawrence Berkeley National Laboratory performed to support the Department of Homeland Security's testing of ARFCAM and LACIS systems. In the sections that follow, LBNL lists the scope of work, field analyses conducted, and preliminary results. LBNL developed a model of the Port Gaston building at the Nevada Test Site and calibrated it using data from field experiments, both blower door and tracer gas tests. Model development and comparison to data show very good agreement. The model was developed to (1) support the interpretation of data from field trials performed by Signature Science LLC, (2) support the placement of sampler equipment, and (3) predict if meteorological differences between the Wet-Run/Dry-Run and the Hot-Run might adversely affect the development of the Hot Run Test Plan. LBNL reported its findings on each task to the experiment team at scheduled planning meetings. In the end, we note that the model was used limitedly because the data from the Wet-Run/Dry Run were if such high quality. Lastly, LBNL conducted a research experiment at the end of the Wet-Run/Dry-Run to study if, and to what degree, specific TICs sorb and desorb on indoor surfaces. We found that several of the TICs either sorb onto surfaces or are lost through chemical reactions. These findings may have important implications on determining sheltering-in-place concepts of operation.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Design and Preliminary Experimental Results on a Uniform-Field Test Fixture for Power Flow Experiments

Electrodes that produce a uniform electric field across their surfaces are desired for a variety of high-voltage systems including spark-gap switches and transversely excited atmospheric lasers. Here, the implementation of uniform-field electrodes to a parallel-plate load is described for the study of vacuum power flow under pulsed-power applications. We begin with an overview of general uniform-field geometries, and provide an open-source program that generates these geometries as described by Ernst. Following that, a modification to an existing power-flow experimental platform, that adopts a uniform-field geometry, is introduced and its utility is described. Lastly, preliminary experimental results are presented and future steps are outlined.

Capacitors↗

Analysis and Validation of Spectral Irradiance Simulations for 75 kW Bifacial Solar Test Field

This work investigates how the spectrum of irradiance incident on the rear of bifacial modules impacts their performance. Light incident on the rear of bifacial modules can be reflected from the ground, mounting structures, and other nearby objects, causing both the intensity and spectrum to be modified. As a result, PV cells and sensors with different spectral responses report different values for the rear irradiance, leading to increased uncertainty when modeling performance. Here, we calculate the spectral irradiance incident on the rear of modules through raytrace simulations and validate with measured field data collected from a 75kW single-axis-tracked bifacial test site. Spectral responses for different sensors and PV cells are applied and compared with field measurements for four days. Based on these results, a method for improving non-spectral simulations is proposed. In addition, a linear regression is applied to the modeled spectral results as a method to gain insight into the contributions of ground reflected light to total rear irradiance.

bifacial photovoltaics↗

Results from field tests of the one-dimensional Time-Encoded Imaging System.

A series of field experiments were undertaken to evaluate the performance of the one dimensional time encoded imaging system. The significant detection of a Cf252 fission radiation source was demonstrated at a stand-off of 100 meters. Extrapolations to different quantities of plutonium equivalent at different distances are made. Hardware modifications to the system for follow on work are suggested.

Marleau, Peter↗

Field Test Design Simulations of Pore-Water Extraction for the SX Tank Farm

A proof of principle test of pore water extraction is being performed by Washington River Protection Solutions for the U.S. Department of Energy, Office of River Protection. This test is being conducted to meet the requirements of Hanford Federal Facility Agreement and Consent Order (HFFACO) (Ecology et al. 1989) Milestone M 045-20, and is described in RPP-PLAN-53808, 200 West Area Tank Farms Interim Measures Investigation Work Plan. To support design of this test, numerical simulations were conducted to help define equipment and operational parameters. The modeling effort builds from information collected in laboratory studies and from field characterization information collected at the test site near the Hanford Site 241-SX Tank Farm. Numerical simulations were used to evaluate pore-water extraction performance as a function of the test site properties and for the type of extraction well configuration that can be constructed using the direct-push installation technique. Output of simulations included rates of water and soil-gas production as a function of operational conditions for use in supporting field equipment design. The simulations also investigated the impact of subsurface heterogeneities in sediment properties and moisture distribution on pore-water extraction performance. Phenomena near the extraction well were also investigated because of their importance for pore-water extraction performance.

54 ENVIRONMENTAL SCIENCES↗

Oil Recovery Prediction for Polymer Flood Field Test of Heavy Oil on Alaska North Slope Via Machine Assisted Reservoir Simulation

The first ever polymer flood field pilot to enhance the recovery of heavy oils on the Alaska North Slope is ongoing. This study constructs and calibrates a reservoir simulation model to predict the oil recovery performance of the pilot through machine-assisted reservoir simulation techniques. To replicate the early water breakthrough observed during waterflooding, transmissibility contrasts are introduced into the simulation model, forcing viscous fingering effects. In the ensuing polymer flood, these transmissibility contrasts are reduced to replicate the restoration of injection conformance during polymer flooding, as indicated by a significant decrease in water cut. Later, transmissibility contrasts are reinstated to replicate a water surge event observed in one of the producing wells during polymer flooding. This event may represent decreased injection conformance from fracture overextension; its anticipated occurrence in the other production well is included in the final forecast. The definition of polymer retention in the simulator incorporates the tailing effect reported in laboratory studies; this tailing effect is useful to the simultaneous history match of producing water cut and produced polymer concentration. The top 24 best-matched simulation models produced at each stage of the history matching process are used to forecast oil recovery. The final forecast clearly demonstrates that polymer flooding significantly increases the heavy oil production for this field pilot compared to waterflooding alone. This exercise displays that a simulation model is only valid for prediction if flow behavior in the reservoir remains consistent with that observed during the history matched period. Critically, this means that a simulation model calibrated for waterflooding may not fully capture the benefits of an enhanced oil recovery process such as polymer flooding. Therefore, caution is recommended in using basic waterflood simulation models to scope potential enhanced oil recovery projects.

Keith, Cody Douglas↗

Design and Field Testing of Manufacturable Advanced Low-Cost Receiver for Parabolic Trough Solar Power

This project addresses the 30-yr service life, ease of manufacturability for low cost, and low Operations and Maintenance (O&M) costs for our novel parabolic trough receiver, SunTrap. Current trough-based commercial power plants operate at 400°C or below, in part due to poor performance and lifetime of existing receivers at higher temperatures. Thermal losses from such receivers are dominated by radiation; by the Stefan- Boltzmann law, radiative losses have a component that scales as T 4, challenging high-temperature efficiency. Our novel SunTrap receiver offers increased reliability by eliminating the need to operate in a vacuum, while improving performance at higher temperatures by using high-performance insulation on exposed sections of the receiver that absorb negligible solar flux. As a result, SunTrap offers comparable optical efficiency to currently available technology while reducing thermal losses at higher temperatures. In this project, our novel receiver and all subcomponents have been designed to be compatible with molten salts to enable operation at next generation trough-based exit temperatures between 500 and 550°C. Norwich Technologies, with collaborators from Creare, Thermodyne, Solar Dynamics (previously Abengoa Solar), and the University of Louisiana – Lafayette successfully iterated the design of the SunTrap receiver through a series of modelling efforts, cost analyses, prototype builds, and performance and lifetime tests to minimize the levelized cost of energy (LCOE). The final design (1) realized predicted receiver performance in a series of field optical efficiency, laboratory thermal efficiency and freeze/thaw recovery tests, (2) optimized the receiver with respect to integration with standard collector systems, receiver-to-receiver connections, and receiver-to-mirror connections, (3) demonstrated 30-yr service life of receiver and all components of the receiver, (4) developed commercialization and manufacturing plans to enable rapid deployment, and (5) demonstrated durability of an air-stable solar-selective coating. NT’s disruptive technology marshals diverse advances in design, materials and coatings to revolutionize key aspects of the CSP trough solar field. By enabling significant operational and cost advances, this technology offers potential decreases in LCOE of over 20% compared to traditional parabolic trough systems.

14 SOLAR ENERGY↗

Experiences from Field Testing for Black Start of a Run-of-the-river Hydropower Plant in Idaho Falls Power Distribution Grid

Idaho Falls Power (IFP) utility has local generation portfolio comprising of 56.3MVA of run-of-the-river (ROR) hydropower that can serve typically 25%-30% of the total load demand. The remaining load is served by importing power from Bonneville Power Administration through two Pacificorp transmission interconnections. In case of emergencies (power disruption or directed load reduction), the capability to island from transmission grid and stably serve critical loads in the IFP distribution grid can be a huge advantage. In this direction, the capability to black start with ROR is an essential requirement, and a challenge due to limited dispatchability and requires re-tuning of hydro-governor and excitation system controls. This paper presents the field experience from the testing done for black start of 8.9 MW ROR hydro plant in the IFP distribution grid using an adjustable load bank in December 2017. The lessons from the successful black start testing is presented along with test results to establish the potential value and requirements to develop black start capability with a ROR hydro plant.

13 HYDRO ENERGY↗