Quantum/AI Topology-Aware Latency-Adaptive HPC Workflow Scheduling Optimization

The growing demand for more powerful high-performance computing (HPC) systems has led to a steady rise in energy consumption by supercomputing worldwide. This study is focused on comparing our Application-Topology Mapper (ATMapper) to the popular Simple Linux Utility for Resource Management (SLURM) for the purpose of exploring methods that can further optimize job-scheduling within HPC systems. ATMapper is an Artificial-Intelligence based approach to job-scheduling that is currently being enhanced with quantum annealing (QA) to generate optimal schedules faster. We are applying QA to speedup our ATMapper process to achieve higher computing efficiency, thereby reducing HPC energy consumption. Here, we examine how four job-scheduling approaches perform in processor node assignment when using an example network architecture of 4 interconnected nodes. Using a specialized script, we are assessing the schedule of a computation flow with 11 interdependent tasks. The data movements among nodes were tracked to count for the number of interactions (network hops) between nodes needed to complete the tasks. The total number of hops and the job completion time were then used to quantify the efficiency of the different mapping approaches. In addition to SLURM, we also compare our ATMapper to the QA-enabled LBNL TIGER and the D-Wave Distributed Computing processor assignment approaches. The preliminary results showed that our topology-aware, latency-adaptive ATMapper is significantly more efficient when compared to the other scheduling approaches due to its load-imbalance network allocation. The scheduler displayed a computing efficiency of 53% by performing significantly fewer network hops than its alternatives. By reducing the number of hops, ATMapper was able to perform all 11 tasks by using only 3 nodes out of given 4. This research indicates the potential to use QA/AI for HPC job-scheduling. Later, we will test a SLURM simulator program to draw further comparisons on the effectiveness of ATMapper's scheduling approach. The results of this comparison will serve as a baseline for later improving SLURM's performance using a QA-enhanced ATMapper approach.

Caraveo, Braulio [University of Huston - Clear Lak↗

Towards Optimal and Executable Distribution Grid Restoration Planning With a Fine-Grained Power-Communication Interdependency Model

Distribution service restoration (DSR) under natural disasters is always a critical and challenging problem for utility companies. An effective solution must not ignore the power-communication interdependency as various systems are getting increasingly connected in the Smart Grid era. In this paper, we propose a two-layer distribution system model with both power and communication components. Based on this model, we formulate the restoration process as a routing problem that schedules the path and action sequence of utility crews that involves repairing damaged components, closing power switches, and enabling communication paths between the control center and remote field devices. Further, we develop a simulation-based method to quantitatively evaluate the restoration process with public reference models of large-scale power systems. The experimental results show that our method improves the total restored energy up to 57.6% and reduces the recovery time up to 63% by considering the power-communication interdependency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Microgrid energy scheduling under uncertain extreme weather: Adaptation from parallelized reinforcement learning agents

Microgrids are useful solutions for integrating renewable energy resources and providing seamless green electricity to minimize carbon footprint. In recent years, extreme weather events happened often worldwide and caused significant economic and societal losses. Such events bring uncertainties to the microgrid energy scheduling problems and increase the challenges of microgrid operation. Traditional optimization approaches suffer from the inaccuracy of the uncertain microgrid model and the unseen events. Existing reinforcement learning (RL) - based approaches are also hampered by the limited generalization and the increasing computational burden when stochastic formulations are required to accommodate the uncertainties. This paper proposes a new parallelized reinforcement learning (PRL) method based on the probabilistic events to handle the microgrid energy uncertainties. Specifically, several local learning agents are employed to interact with pertinent microgrid environments in a distributed manner and report outcomes to the global agent, which will optimize microgrid energy resources online during extreme events. The stochastic microgrid energy optimization problem is reformulated to include all possible scenarios with probabilities. The advantage estimate functions of learning agents are designed with a backward sweep to transfer the outcomes to the value function updating process. Two simulation studies, stochastic optimization and online testing, are performed to compare with several existing RL approaches. Results substantiate that the proposed PRL method can achieve up to 20% optimization performance improvement with 4 and 28 times less computation cost than Q-learning with experience replay and multi-agent Q-learning approaches, respectively.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Computer-controlled finishing via dynamically constraint position-velocity-time scheduler

In a Computer Numerical Controlled (CNC) finishing process, the target material removal from an optical surface is guided by the convolution between the influence function of a machine tool and its dwell time at certain points over the surface. To reduce dynamics stressing and increase machining efficiency, the dwell time must be converted to varying velocities, which are the actual inputs to the machine tool controller. Conventionally, the conversion assumed constant acceleration and relied on linear motion interpolation, which caused discontinuities in velocities. This unsmooth motion affects the material removal distribution, and, thus, the accuracy of the finished surface shape. Many modern CNC machines support the smoother, cubic-polynomial interpolated Position-Velocity-Time (PVT) motion mode; however, the conventional scheduler may fail to provide suitable velocities for the PVT. Here in this study answers this challenge by proposing a novel PVT-based velocity scheduler that achieves smooth motion while considering CNC dynamic limits. Firstly, the principle of the PVT is explained, and the PVT-based velocity scheduler is formulated. Secondly, a quadratic programming is used to optimize the velocities by imposing the CNC dynamic constraints and the C 1 continuities (zeroth and first derivatives are continuous) simultaneously. Thirdly, the smoothness and accuracy of the scheduled velocities are studied on different kinds of tool paths via simulation. Finally, a sub-0.3 nm level surface finishing experiment using ion beam figuring is demonstrated to verify the feasibility of the proposed method. The PVT-based scheduler and simulator code is open-sourced.

36 MATERIALS SCIENCE↗

Tightest Mixed-Integer Programming Formulations for Quadratic SCUC Optimization

In this project, we developed new, tighter Mixed-Integer Programming (MIP) formulations for the combined Alternating Current (AC) Security-Constrained Unit Commitment (SCUC) and Security-Constrained Optimal Power Flow (SCOPF). The work addresses a critical challenge in power system operations: efficiently determining which generation units to commit and how to optimally dispatch them while maintaining network reliability constraints for both normal and contingency scenarios. Our efforts: 1. Advance the Understanding of SCUC/SCOPF Modeling: By introducing tighter MIP formulations and leveraging cutting-edge optimization tools (Julia/JuMP, PowerModels.jl), this project has pushed forward the state of the art in efficient power systems scheduling. 2. Enhance Technical and Economic Feasibility: The methods developed provide more accurate and potentially faster solutions to large-scale, realistic scheduling and dispatch problems in electric power systems, which can translate into improved reliability and potentially lower costs for grid operations. 3. Benefit to the Public: Greater efficiency in power system operations leads to cost savings for utilities and end-users. Improved reliability and integration of advanced modeling approaches can facilitate the adoption of clean energy resources and better accommodate uncertainties in renewable generation. Because this technology could impact bulk power markets and reliability, these innovations have far-reaching public benefits in terms of cost savings, reliability, and sustainability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Pricing Strategy of Electric Vehicle Aggregators Based on Locational Marginal Price to Minimize Photovoltaic (PV) Curtailment

The global climate crisis demands urgent action to mitigate global warming. Using renewable energy sources, such as solar and wind power, for electricity generation is crucial. This shift from centralized to distributed power systems, however, brings challenges, including voltage fluctuations and renewable energy curtailment. The rapid growth of the electric vehicle (EV) industry adds complexity, increasing overall electricity demand and straining the power supply during peak charging times. This paper proposes a scheduling strategy for EV aggregators to reduce renewable energy curtailment and stabilize grid operation by strategically scheduling EV charging. Using Multi -Agent Transport Simulation (MATSim), a traffic simulation tool, EV driving data in Denver, Colorado, USA, were modeled. The EV aggregator adjusts charging fees based on locational marginal prices, encouraging EVs to charge at different stations according to pricing. Simulations on an IEEE 33-bus system with distributed energy resources and EV charging stations validate the proposed algorithm, demonstrating its effectiveness in reducing curtailment by 12.55% and stabilizing grid operation.

33 ADVANCED PROPULSION SYSTEMS↗

Deep Reinforcement Learning Enabled Physical-Model-Free Two-Timescale Voltage Control Method for Active Distribution Systems

Active distribution networks are being challenged by frequent and rapid voltage violations due to renewable energy integration. Conventional model-based voltage control methods rely on accurate parameters of the distribution networks, which are difficult to achieve in practice. This paper proposes a novel physical-model-free two-timescale voltage control framework for active distribution systems. To achieve fast control of PV inverters, the whole network is first partitioned into several subnetworks using voltage-reactive power sensitivity. Then, the scheduling of PV inverters in the multiple sub-networks is formulated as Markov games and solved by a multi-agent soft actor-critic (MASAC) algorithm, where each subnetwork is modeled as an intelligent agent. All agents are trained in a centralized manner to learn a coordinated strategy while being executed based on only local information for fast response. For the slower time-scale control, OLTCs and switched capacitors are coordinated by a single agent-based SAC algorithm using the global information with considering control behaviors of the inverters. Particularly, the two-level agents are trained concurrently with information exchange according to the reward signal calculated from the data-driven surrogate model. Comparative tests with different benchmark methods on IEEE 33-and 123-bus systems and 342-node low voltage distribution system demonstrate that the proposed method can effectively mitigate the fast voltage violations and achieve systematical coordination of different voltage regulation assets without the knowledge of accurate system model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Managed Tokens Service for Securely Keeping and Distributing Grid Tokens

Fermilab is transitioning authentication and authorization for grid operations to using bearer tokens based on the WLCG Common JWT (JSON Web Token) Profile. One of the functionalities that Fermilab experimenters rely on is the ability to automate batch job submission, which in turn depends on the ability to securely refresh and distribute the necessary credentials to experiment job submit points. Thus, with the transition to using tokens for grid operations, we needed to create a service that would obtain, refresh, and distribute tokens for experimenters' use. This service would avoid the need for experimenters to be experts in obtaining their own tokens and would better protect the most sensitive long-lived credentials. Further, the service needed to be widely scalable, as Fermilab hosts many experiments, each of which would need their own credentials. To address these issues, we created and deployed a Managed Tokens Service. The service is written in Go, taking advantage of that language's native concurrency primitives to easily be able to scale operations as we onboard experiments. The service uses as its first credentials a set of kerberos keytabs, stored on the same secure machine that the Managed Tokens service runs on. These kerberos credentials allow the service to use htgettoken via condor_vault_storer to store vault tokens in the HTCondor credential managers (credds) that run on the batch system scheduler machines (HTCondor schedds); as well as downloading a local, shorter-lived copy of the vault token. The kerberos credentials are then also used to distribute copies of the locally-stored vault tokens to experiment submit points.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Bayesian Structural Time Series for Behind-the-Meter Photovoltaic Disaggregation

Distributed photovoltaic (PV) generation often occurs ``behind the meter": a grid operator can only observe the net load, which is the sum of the gross load and distributed PV generation. This lack of observability poses a challenge to system operation at both bulk level and distribution level. The lack of real-time or near-future disaggregated estimates of gross load and PV generation will lead to over scheduling of energy production and regulation reserves, reliability constraints violations, wear and tear of controller devices, and potentially cascading failures of a system. In this paper we propose the use of a Bayesian Structural Time Series (BSTS) model with local solar irradiance measurements to disaggregate the summed PV generation and gross load signals at a downstream measurement site. BSTSs are a highly expressive model class that blends classic time series models with the powerful Bayesian state space estimation framework. Disaggregation is done probabilistically, which automatically quantifies the uncertainties of the estimated PV generation and gross load consumption. Depending on the data availability in real-time, it can be used to disaggragate PV and gross load at customer site, or can be used at the feeder level. In this paper, we focus on solving the problem at feeder level. We compare the performance of a BSTS model as well as a handful of state-of-the-art methods on a Pecan Street AMI dataset, using the National Solar Radiation Database (NSRDB) to estimate local irradiance.

bayesian structural time series↗

Joint optimal scheduling for electric vehicle battery swapping-charging system based on wind farms

Insufficiencies in charging facilities limit the broad application of electric vehicles (EVs). In addition, EV can hardly represent a green option if its electricity primarily depends on fossil energy. Considering these two problems, this paper studies a battery swapping-charging system based on wind farms (hereinafter referred to as W-BSCS). In a W-BSCS, the wind farms not only supply electricity to the power grid but also cooperate with a centralized charge station (CCS), which can centrally charge EV batteries and then distribute them to multiple battery swapping stations (BSSs). The operational framework of the W-BSCS is analyzed, and some preprocessing technologies are developed to reduce complexity in modeling. Then, a joint optimal scheduling model involving a wind power generation plan, battery swapping demand, battery charging and discharging, and a vehicle routing problem (VRP) is established. Then a heuristic method based on the exhaustive search and the Genetic Algorithm is employed to solve the formulated NP-hard problem. Numerical results verify the effectiveness of the joint optimal scheduling model, and they also show that the W-BSCS has great potential to promote EVs and wind power.

17 WIND ENERGY↗

Analysis and design of DC-link capacitor in cascaded H-bridge multilevel active front-end converter

Medium-voltage grid-tied systems often use a cascaded H-bridge multi-level active front-end. In this converter, dc link bus capacitors play an important role in stabilizing the converter and enabling both active and reactive power injections. The present work provides analytical expressions for the capacitor current, which are essential for optimizing system design (especially capacitor size vs. lifetime). Then, the expression is incorporated into the grid connected bidirectional power system model. Consequently, this work contributes to the guiding principles to choose accurate dc link capacitor ratings against grid-side power delivery requirements. DC-link capacitors come with an expiration date which is dependent on the operating power and voltage values. Lack of information about the lifetime of the dc-link capacitor creates uncertainty in the duration of online operation of the converter, thus increasing the probability of a contingency outage. The lifetime of the capacitor can range from only a few seconds of online operation of the station due to under-sizing, to a compromised quality of power flowing through other solid state devices which may not have been designed for the transients that are caused by over-sizing of the dc-link capacitor. A better estimate of the lifetime of these capacitors can help maximize usage and maintain scheduled outages more efficiently, without disruption in service.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transition to Online Cable Insulation Condition Monitoring

Nuclear power plant cables were originally qualified for 40 year life and generally have not required specific test verification to assure service availability through the initial plant qualification period. However, license renewals to 60 and 80 years of operation require a cable aging management program that depends on some form of test and verification to assure fitness for service. Environmental stress (temperature, radiation, chemicals, water, and mechanical) varies dramatically within a nuclear power plant and, in some cases, cables have degraded and required repair or replacement before their qualified end-of-life period. In other cases, cable conditions have been mild and dependable cable performance confirmed to extend well beyond the initial qualified life. Most offline performance-based testing requires cables to be de-coupled and de-energized for specially trained technicians to perform testing. These offline tests constitute an expensive operational burden that limits the economic viability of nuclear power plants. Although initial investment may be higher, new online test practices are emerging as options or complements to offline testing that avoid or minimize the regularly scheduled offline test burden. These online methods include electrical and fiber-optic partial discharge measurement, spread spectrum time or frequency domain reflectometry, distributed temperature profile measurements, and local interdigital capacitance measurement of insulation characteristics. Introduction of these methods must be supported by research to confirm efficacy plus either publicly financed or market driven investment to support the start-up expense of cost-effective instrumentation to monitor cable condition and assure reliable operation. This work summarizes various online cable assessment technologies plus introduces a new cable motor test bed to assess some of these technologies in a controlled test environment.

Glass, Samuel W.↗

Computational fluid dynamic modeling to determine the indoor environment of an electron-ion collider service building

The design for the Electron-Ion Collider (EIC) calls for several service buildings that house various power supplies and control electronics for the collider ring itself. In order to operate within specified conditions, the ambient air entering the power supplies needs to be within a certain temperature range while dissipating the heat from losses. Proper cooling is therefore a necessity in the service buildings to ensure that every aspect of the EIC works as intended. Since the EIC is in the design stage, we are evaluating the indoor environment of the service building using the current design specifications. We have researched multiple forms of literature and performed the necessary calculations to compile a list of boundary conditions that accurately represent the situation at hand. We are using computational fluid dynamics modeling to solve the conservation equations for mass, momentum, and energy (Navier-Stokes). This allows us to perform a finite element analysis which will give us the flow distribution in the room as well as temperature profiles throughout the building. We have obtained a simulation result giving us the temperature profiles for the building and it shows that the placement of the racks and supply vents are essential to obtaining an even temperature distribution. This model will provide a basis for design decisions which will affect the overall cooling of the service building without extending the schedule and avoiding a costly reworking of the cooling system.

43 PARTICLE ACCELERATORS↗

Dispatch Manager for NEML2 Constitutive Model Calculations Embedded in MOOSE

This report describes the extended capabilities of the NEML2 constitutive modeling library, including a flexible and efficient work dispatching system designed to leverage both CPU and GPU resources. This enhancement addresses one of the primary computational challenges in large-scale simulations: the ability to distribute and execute batches of material model evaluations across heterogeneous computing devices. The new dispatch system introduces a modular set of dispatcher and scheduler classes that coordinate the flow of data and execution between devices. The dispatcher is responsible for efficiently packaging work, managing device-specific memory operations, and synchronizing results. This modularity allows for extensibility, making it straightforward to integrate additional computing backends in the future. From an implementation standpoint, the dispatcher system interfaces seamlessly with NEML2's existing models. They handle device-aware tensor operations, optimize memory transfers, and support asynchronous execution when applicable. This design ensures that batches of material points can be evaluated concurrently, substantially improving throughput compared to previous single-device or serial implementations. These improvements not only enhance the raw performance of NEML2 but also improve its usability in multiscale and high-fidelity simulations, where the simultaneous evaluation of large material point batches is critical. Benchmarks included in the report demonstrate the system’s scalability, highlighting its effectiveness when leveraging modern GPU architectures.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Power system restoration incorporating diverse distributed energy resources

An example system includes an aggregator configured to receive a service collaboration request and iteratively determine, based on minimum and maximum power values for DERs under its management, an optimized operation schedule. The aggregator may also be configured to iteratively determine, based on the optimized operation schedule, an estimated flexibility range for devices under its management and output an indication thereof. The system may also include a power management unit (PMU) configured to iteratively receive the indication and determine, based on a network model that includes the estimated flexibility range, a reconfiguration plan and an overall optimized operation schedule for the network. The PMU may also be configured to iteratively cause reconfiguration of the network based on the plan. The PMU and aggregator may also be configured to iteratively, at a fast timescale, cause energy resources under their management to modify operation based on the overall optimized operation schedule.

Ding, Fei↗

Arbitrage and Capacity Firming in Coordination with Day-Ahead Bidding of a Hybrid PV Plant

A hybrid PV plant (HPP) combines a photovoltaic (PV) plant with a battery energy storage system (BESS), which is considered a promising step towards the future of renewable power plants by the U.S. Department of Energy. When the renewable penetration reaches a significant level, a hybrid PV plant can bid in as a controllable thermal plant in the future electricity market. In this study, a bidding and BESS scheduling model is proposed for the HPP. The robust optimization (RO) technique has been utilized to identify the worst-case scenario of uncertainties during the bidding process. To address the overly conservative issue of the single-stage RO, we have decoupled the BESS schedule for arbitrage and PV capacity firming by a two-stage RO formulation. By comparing the output of single-stage RO and two-stage RO, the two-stage RO bids and schedules in a more aggressive manner, which increases the income of HPP. Also, the penalty of under-generation is considered in our model so that the day-ahead bidding decision and arbitrage schedules can be adjusted based on the potential UNDER-GENERATION penalty. Because the proposed model is non-convex and contains multi-stages, the Column-and-Constraint Generation (C&CG) algorithm is applied to the model as the solution. The proposed model has shown better economic performance compared to a state-of-art single-stage bidding method in case studies.

BESS scheduling↗

Arbitrage and Capacity Firming in Coordination with Day-Ahead Bidding of a Hybrid PV Plant: Preprint

A hybrid PV plant (HPP) combines a photovoltaic (PV) plant with a battery energy storage system (BESS), which is considered a promising step towards the future of renewable power plants by the U.S. Department of Energy. When the renewable penetration reaches a significant level, a hybrid PV plant can bid in as a controllable thermal plant in the future electricity market. In this study, a bidding and BESS scheduling model is proposed for the HPP. The robust optimization (RO) technique has been utilized to identify the worst-case scenario of uncertainties during the bidding process. To address the overly conservative issue of the single-stage RO, we have decoupled the BESS schedule for arbitrage and PV capacity firming by a two-stage RO formulation. By comparing the output of single-stage RO and two-stage RO, the two-stage RO bids and schedules in a more aggressive manner, which increases the income of HPP. Also, the penalty of under-generation is considered in our model so that the day-ahead bidding decision and arbitrage schedules can be adjusted based on the potential UNDER-GENERATION penalty. Because the proposed model is non-convex and contains multi-stages, the Column-and-Constraint Generation (C&CG) algorithm is applied to the model as the solution. The proposed model has shown better economic performance compared to a state-of-art single-stage bidding method in case studies.

BESS scheduling↗