Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost of wind”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

The 40 X 80 X 120 Wind Tunnel Project

The scope of this project includes increasing the speed of the 40 x 80 x 120 foot closed circuit wind tunnel to 300 knots to expand rotorcraft research capability, and to add an 80 x 120 foot open circuit wind tunnel with 100 knot maximum speed to expand vertical supersonic takeoff and landing research and capability. Topics discussed in viewgraph format are: wind tunnel characteristics, a cost analysis, and design of wind tunnel models.

Falarski, Michael D.↗

Definition and preliminary design of the Laser Atmospheric Wind Sounder (LAWS) phase 1. Volume 3: Program cost estimates

Cost estimates for phase C/D of the laser atmospheric wind sounder (LAWS) program are presented. This information provides a framework for cost, budget, and program planning estimates for LAWS. Volume 3 is divided into three sections. Section 1 details the approach taken to produce the cost figures, including the assumptions regarding the schedule for phase C/D and the methodology and rationale for costing the various work breakdown structure (WBS) elements. Section 2 shows a breakdown of the cost by WBS element, with the cost divided in non-recurring and recurring expenditures. Note that throughout this volume the cost is given in 1990 dollars, with bottom line totals also expressed in 1988 dollars (1 dollar(88) = 0.93 1 dollar(90)). Section 3 shows a breakdown of the cost by year. The WBS and WBS dictionary are included as an attachment to this report.

Source record↗

Wind turbine generator rotor blade concepts with low cost potential

Four processed for producing blades are examined. Two use filament winding techniques and two involve filling a mold or form to produce all or part of a blade. The processes are described and a comparison is made of cost, material properties, design and free vibration characteristics. Conclusions are made regarding the feasibility of each process to produce low cost, structurally adequate blades.

Sullivan, T. L.↗

Optimized Carbon Fiber Composites in Wind Turbine Blade Design: Follow-On Studies

This project has identified opportunities to bring further reductions in the mass and cost of modern wind turbine blades through the use of alternative material systems and manufacturing processes. The fiber reinforced polymer material systems currently used by the wind industry have stagnated as the technology continues to mature and as a means to reduce risk while introducing new products with continually increasing blade lengths. However, as blade lengths continue to increase, the challenge of controlling blade mass becomes even more critical to enabling the associated levelized cost of energy reductions. Stiffer and stronger reinforcement fibers can help to resolve the challenges of meeting the loading demands while limiting the increase in weight, but these materials are substantially more expensive than the traditional E-glass fiber systems. One goal of this project and associated work is to identify pathways that improve the cost-effectiveness of carbon fiber such that it is the reinforcement of choice in the primary structural elements of wind blades. The use of heavy-tow textile carbon fiber material systems has been shown to reduce the blade mass by 30-31% when used in the spar cap and by up to 7% when used in edgewise reinforcement. A pultrusion cost model was developed to enable a material cost comparison that includes an accurate estimate of the intermediate manufacturing step of pultrusion for the carbon fiber composite. Material cost reductions were revealed in most cases for the heavy-tow textile carbon fiber compared to infused fiberglass. The use of carbon fiber in the edgewise reinforcement produced the most notable material cost reduction of 33% for the heavy-tow textile carbon fiber. The mass and cost savings observed when using carbon fiber in edgewise reinforcement demonstrate a clear opportunity of this design approach. A carbon fiber conversion cost model was expanded to include a characterization of manufacturing costs when using advanced conversion processes with atmospheric plasma oxidation. This manufacturing approach was estimated to reduce the cost of carbon fiber material systems by greater than 10% and can be used with textile carbon systems or traditional carbon fiber precursors. The pultrusion cost model was also used to assess the opportunity for using pultruded fiberglass in wind blades, studying conventional E-glass fiber reinforcement. When using pultruded fiberglass as the spar cap material for two design classifications, the blade weight was reduced by 6% and 9% compared to infused fiberglass. However, due to the relatively large share of the pultrusion manufacturing cost compared to fiber cost, the spar cap material cost increased by 12% and 7%. When considering the system benefits of reduced blade mass and potentially lower blade manufacturing costs for pultruded composites, there may be opportunity for pultruded E-glass in wind blade spar caps, but further studies are needed. There is a clearer outcome for using pultruded fiberglass in the edgewise reinforcement where it resulted in a blade mass reduction of 2% and associated reinforcement material cost reduction of 1% compared to infused E-glass. The use of higher performing glass fibers, such as S-glass and H-glass systems, will produce greater mass savings but a study is needed to assess the cost implications for these more expensive systems. The most likely opportunity for these high-performance glass fibers is in the edgewise reinforcement, where the increased strength will reduce the damage accumulation of this fatigue-driven component. The blade design assessments in this project characterize the controlling material properties for the primary structural components in the flapwise and edgewise directions for modern wind blades. The observed trends with low and high wind speed turbine classifications for carbon and glass fiber reinforced polymer systems help to identify where cost reductions are needed, and where improvements in mechanical properties would help to reduce the material demands.

17 WIND ENERGY↗

Cost effective use of liquid nitrogen in cryogenic wind tunnels

A method of reliquefying from 12 to 19% of the nitrogen exhaust gas from a cryogenic wind tunnel has been developed. Technical feasibility and cost effectiveness of the system depends on performance of an innovative positive displacement expander which requires scale model testing to confirm design studies. The existing cryogenic system at the 0.3-m transonic cryogenic tunnel has been surveyed and extensive upgrades proposed. Upgrades are generally cost effective and may be implemented immediately since they are based on established technology.

Mcintosh, Glen E.↗

Techno-economic analysis of offshore wind PEM water electrolysis for H 2 production

A model for producing hydrogen via offshore wind electrolysis was developed and the levelized costs of both energy and hydrogen were calculated. Here, this model calculated the cost of hydrogen produced by offshore wind and showed that the levelized cost of energy for hydrogen production and transportation to shore could be lower than for electricity transmission from offshore wind farms, using real wind data from a particular location. Therefore, direct coupling of the electrolysis system with offshore wind turbine is more advantageous than transmitting electricity to shore and then producing hydrogen via traditional electrolysis; the cost of hydrogen from offshore wind electrolysis is estimated to be $\$2.09$/kg, vs $\$3.86$/kg from traditional electrolysis using wind power.

08 HYDROGEN↗

AnnualReportingWind [SWR-26-026]

AnnualReportingWind is a version-controlled repository used to generate the cost and performance results published in major wind energy reports such as the Cost of Wind Energy Review (COWER) and the Annual Technology Baseline (ATB). The repository consolidates the model configurations, assumptions, and scripts used in each reporting year so that published results can be transparently reproduced and traced back to the exact analytical setup used in the analysis. The workflows rely on several techno-economic modeling tools developed at the National Laboratory of the Rockies (NLR), including WAVES, ORBIT, LandBOSSE, WOMBAT, and FLORIS.

Mulas Hernando, Daniel [National Laboratory of the↗

Experimental evaluation of an injector system for powering a high Reynolds number transonic wind tunnel

The problems of powering a large, high-Reynolds number transonic wind tunnel are briefly reviewed, and the advantages of an injector drive system are presented. This paper is based on the results of an experimental investigation of a series of injector configurations and test variables using a pilot wind tunnel with a 6-in.-diameter test section. The purpose of this investigation is to determine the efficiency and flow quality of an injector driven wind tunnel and develop configurations that will reduce the initial cost of a wind tunnel without seriously reducing efficiency and flow quality. The results indicate that high efficiencies can be obtained and that injector drive does not compromise flow quality in a transonic wind tunnel.

Muhlstein, L., Jr.↗

2022 Product Commercialization and Market Development Awardee: Bergey Windpower

In 2023, consumers will finance more than 80% of the residential solar energy systems they purchase, which they use as collateral (called "non-recourse loans"). Similar loans are not yet offered to fund distributed wind energy systems. To accelerate deployment of small wind systems, which power individual rural homes and farms, the United States will need to make consumer loans available at reasonable rates with modest downpayments and collateral requirements. A team led by Bergey Windpower Co. is creating new consumer financing options to reduce or eliminate the upfront cash needed to buy distributed wind energy systems. This new financing structure would decrease purchase costs for small wind turbines produced by Bergey Windpower and possibly other manufacturers. Product financing is instrumental in growing wind power market share, clean energy manufacturing, and installation jobs while reducing greenhouse gas emissions. Bergey Windpower's previous Competitiveness Improvement Project (CIP) awards have led to the development of affordable, high-performance wind turbines, microgrids, and components.

CIP↗

Evaluation of feasibility of prestressed concrete for use in wind turbine blades

A preliminary evaluation of the feasibility of the use of prestressed concrete as a material for low cost blades for wind turbines was conducted. A baseline blade design was achieved for an experimental wind turbine that met aerodynamic and structural requirements. Significant cost reductions were indicated for volume production. Casting of a model blade section showed no fabrication problems. Coupled dynamic analysis revealed that adverse rotor tower interactions can be significant with heavy rotor blades.

Leiblein, S.↗

Development of Event-Based Data Acquisition for Acoustic Emission Monitoring of the Structural Integrity of Wind Turbine Blades [Slides]

DOE Alignment: Reduce the cost of floating offshore wind energy in deep waters to $45/MWh by 2035 from today’s estimated $150/MWh20 by: Developing operations and maintenance strategies and increasing wind turbine reliability to reduce periods of non-operation and reduce labor at sea through remote system health monitoring, inspection, and maintenance capabilities incorporating artificial intelligence and predictive maintenance.

17 WIND ENERGY↗

Acetolysis for Epoxy-Amine Carbon Fibre-Reinforced Polymer Recycling

Carbon fibre-reinforced polymers (CFRPs) are used in many applications in the global energy transition, including for lightweighting aircraft and vehicles and in wind turbine blades, shipping containers and gas storage vessels1,2,3,4. Given the high cost and energy-intensive manufacture of CFRPs5,6,7, recycling strategies are needed that recover intact carbon fibres and the epoxy-amine resin components. Here we show that acetic acid efficiently depolymerizes both aliphatic and aromatic epoxy-amine thermosets used in CFRPs to recoverable monomers, yielding pristine carbon fibres. Deconstruction of materials from multiple sectors demonstrates the broad applicability of this approach, providing clean fibres from 2 h reactions. The optimal conditions were scaled to 80.0 g of post-consumer CFRPs, and demonstrative composites were fabricated from the recycled carbon fibres, which were recycled two more times, maintaining their strength throughout. Process modelling and techno-economic analysis, with feedstock cost informed by wind turbine blade waste generation8, indicates this method is cost effective, with a minimum selling price of US$1.50 per kg for recycled carbon fibres whereas life cycle assessment shows process greenhouse gas emissions around 99% lower than virgin carbon fibre production. Overall, this approach could enable recycling of industrial CFRPs as it provides clean, mechanically viable recycled carbon fibres and recoverable resin monomers from the thermoset.

09 BIOMASS FUELS↗

Effect of rotor configuration on guyed tower and foundation designs and estimated costs for intermediate site horizontal axis wind turbines

Three designs of a guyed cylindrical tower and its foundation for an intermediate size horizontal axis wind turbine generator are discussed. The primary difference in the three designs is the configuration of the rotor. Two configurations are two-blade rotors with teetering hubs - one with full span pitchable blades, the other with fixed pitch blades. The third configuration is a three-bladed rotor with a rigid hub and fixed pitch blades. In all configurations the diameter of the rotor is 38 meters and the axis of rotation is 30.4 meters above grade, and the power output is 200 kW and 400 kW. For each configuration the design is based upon for the most severe loading condition either operating wind or hurricane conditions. The diameter of the tower is selected to be 1.5 meters (since it was determined that this would provide sufficient space for access ladders within the tower) with guy rods attached at 10.7 meters above grade. Completing a design requires selecting the required thicknesses of the various cylindrical segments, the number and diameter of the guy rods, the number and size of soil anchors, and the size of the central foundation. The lower natural frequencies of vibration are determined for each design to ensure that operation near resonance does not occur. Finally, a cost estimate is prepared for each design. A preliminary design and cost estimate of a cantilever tower (cylindrical and not guyed) and its foundation is also presented for each of the three configurations.

Frederick, G. R.↗

Preliminary results of the large experimental wind turbine phase of the national wind energy program

A major phase of the wind energy program is the development of reliable wind turbines for supplying cost-competitive electrical energy. This paper discusses the preliminary results of two projects in this phase of the program. First an experimental 100 kW wind turbine design and its status are reviewed. Also discussed are the results of two parallel design studies for determining the configurations and power levels for wind turbines with minimum energy costs. These studies show wind energy costs of 7 to 1.5 c/kWH for wind turbines produced in quantities of 100 to 1000 a year and located at sites having average winds of 12 to 18 mph.

Thomas, R. L.↗

A Clean Energy Korea by 2035

The current global energy crisis has massive implications for the people and economy of South Korea (Korea), where at least 90% of energy use depends on foreign fossil fuels. Clean electricity accounts for only 39% of total generation, with electricity demand expected to increase 30% by 2035. This study shows that Korea can achieve 80% clean electricity by 2035 by capitalizing on rapid technological improvements and decreasing costs of solar, wind, and battery technology. Doing so would slightly lower electricity supply costs, significantly reduce dependence on imported natural gas and coal, and dramatically cut power sector emissions. Further, this study finds that Korea’s power grid under a clean energy scenario will maintain reliability without coal generation or new natural gas plants. To realize these significant economic, environmental, and energy security benefits, policies such as an 80% clean electricity standard by 2035 and corresponding renewable energy deployment goals are required.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Wind energy developments in the 20th century

Wind turbine systems for generating electrical power have been tested in many countries. Representative examples of turbines which have produced from 100 to 1250 kW are described. The advantages of wind energy consist of its being a nondepleting, nonpolluting, and free fuel source. Its disadvantages relate to the variability of wind and the high installation cost per kilowatt of capacity of wind turbines when compared to other methods of electric-power generation. High fuel costs and potential resource scarcity have led to a five-year joint NASA-NSF program to study wind energy. The program will study wind energy conversion and storage systems with respect to cost effectiveness, and will attempt to estimate national wind-energy potential and develop techniques for generator site selection. The studies concern a small-systems (50-250 kW) project, a megawatt-systems (500-3000 kW) project, supporting research and technology, and energy storage. Preliminary economic analyses indicate that wind-energy conversion can be competitive in high-average-wind areas.

Vargo, D. J.↗

Least-Cost Pathways for India's Electric Power Sector

The Government of India has a target of deploying 175 GW from renewable energy by 2022 and 40% of electricity capacity from renewable energy by 2030 and has indicated that ambitions for 2030 could be higher. Rapid changes in technology costs and performance could drive further deployment of wind and solar capacity beyond these policy targets. Increased deployment of variable renewable energy (VRE) raises new questions for power system planning regarding the optimal siting of generation capacity, trade-offs between generation and transmission infrastructure, and system flexibility needs. This study aims to evaluate least-cost pathways for India's electric power system over the period 2017-2047. Uniquely, this work considers an expanded planning horizon and range of scenarios not previously analyzed in national planning studies in India. The data collection and model design processes undertaken for this study provides a framework for recurring planning studies. This study finds anticipated changes in electricity demand and component costs can drive a significant shift in India's future electricity supply and how this system will be operated. In the Base scenario, the share of generation from VRE reaches 54% by 2047. Reducing the capital cost of wind has a larger impact on VRE penetration than reducing the capital cost of solar PV or battery storage. In the lowest wind cost scenario (40% capital cost decline by 2047 relative to the Base scenario), the penetration of VRE in the generation mix reaches 722%, exceeding the penetration levels achieved when the cost of battery storage or solar PV are reduced by an even greater 50%. In a future system with high penetrations of RE, capacity additions are driven by the coincidence of demand and RE generation rather than peak demand alone. This study finds the system could have surplus capacity during the peak demand months of July–September because this period corresponds to periods with high wind speeds and more wind generation available to meet peak demand. By contrast, new capacity is needed to meet demand during moderate demand months of October–November when output from wind plants falls more than 75% nationally compared to the previous two months. Finally, the success for gas for electricity production may depend on cost competitiveness rather than fuel availability. Increasing the amount of gas available for electricity production had no significant impact on the capacity or generation mix by 2047, as determined from a scenario that significantly increases fuel availability throughout the planning horizon. In fact, over 80% of new gas fuel available for the power sector remains unused. This suggests the high cost of gas plant operations relative to other technologies may constrain the expansion of gas generation in India more than fuel availability.

14 SOLAR ENERGY↗

Preliminary results of the large experimental wind turbine phase of the national wind energy program

The preliminary results of two projects in the development phase of reliable wind turbines designed to supply cost-competitive electrical energy were discussed. An experimental 100 kW wind turbine design and its status are first reviewed. The results of two parallel design studies for determining the configurations and power levels for wind turbines with minimum energy costs are also discussed. These studies predict wind energy costs of 1.5 to 7 cents per kW-h for wind turbines produced in quantities of 100 to 1000 per year and located at sites having average winds of 12 to 18 mph.

Thomas, R. L.↗