Modeling preparation costs for space missions by using major cost drivers

A model is suggested for making long range planning cost estimates for Deep Space Network (DSN) support of future space missions. The model is a function of major mission cost drivers, such as maintenance and operations, downlink frequency upgrade, uplink frequency upgrade, telemetry upgrade, antenna gain/noise temperature, radiometric accuracy upgrade, radio science upgrade, and very long baseline interferometry. The model is derived from actual cost data from three space missions: Voyager (Uranus), Voyager (Neptune), and Magellan. The model allows one to estimate the total cost and the cost over time of a similar future space mission. The model was back tested against the three projects and gave cost estimates that range from 17 pct. below to 19 pct. above actual mission preparation costs. The model was also compared with two other independent projects: Mariner Jupiter/Saturn (MJS later became Voyager) and Viking. The model gave total preparation cost estimates that range from 15 pct. above to 4 pct. below actual total preparation costs for MJS and Viking, respectively.

Sherif, J. S.↗

Study of selected tether applications in space, phase 3, volume 2

The results of a Phase 3 study of two Selected Tether Applications in Space (STAIS); deorbit of a Shuttle and launch of an Orbital Transfer Vehicle (OTV), both from the space station using a tether were examined. The study objectives were to: perform a preliminary engineering design, define operational scenarios, develop a common cost model, perform cost benefits analyses, and develop a Work Breakdown Structure (WBS). Key features of the performance analysis were to identify the net increases in effective Shuttle cargo capability if tethers are used to assist in the deorbit of Shuttles and the launching of the OTVs from the space station and to define deployer system designs required to accomplish these tasks. Deployer concepts were designed and discussed. Operational scenarios, including timelines, for both tethered and nontethered Shuttle and OTV operations at the space station were evaluated. A summary discussion of the Selected Tether Applications Cost Model (STACOM) and the results of the cost benefits analysis are presented. Several critical technologies needed to implement tether assisted deployment of payloads are also discussed. Conclusions and recommendations are presented.

Source record↗

A life cycle cost economics model for projects with uniformly varying operating costs

A mathematical model is developed for calculating the life cycle costs for a project where the operating costs increase or decrease in a linear manner with time. The life cycle cost is shown to be a function of the investment costs, initial operating costs, operating cost gradient, project life time, interest rate for capital and salvage value. The results show that the life cycle cost for a project can be grossly underestimated (or overestimated) if the operating costs increase (or decrease) uniformly over time rather than being constant as is often assumed in project economic evaluations. The following range of variables is examined: (1) project life from 2 to 30 years; (2) interest rate from 0 to 15 percent per year; and (3) operating cost gradient from 5 to 90 percent of the initial operating costs. A numerical example plus tables and graphs is given to help calculate project life cycle costs over a wide range of variables.

Remer, D. S.↗

Cost estimation model for advanced planetary programs, fourth edition

The development of the planetary program cost model is discussed. The Model was updated to incorporate cost data from the most recent US planetary flight projects and extensively revised to more accurately capture the information in the historical cost data base. This data base is comprised of the historical cost data for 13 unmanned lunar and planetary flight programs. The revision was made with a two fold objective: to increase the flexibility of the model in its ability to deal with the broad scope of scenarios under consideration for future missions, and to maintain and possibly improve upon the confidence in the model's capabilities with an expected accuracy of 20%. The Model development included a labor/cost proxy analysis, selection of the functional forms of the estimating relationships, and test statistics. An analysis of the Model is discussed and two sample applications of the cost model are presented.

Spadoni, D. J.↗

Deep space network software cost estimation model

A parametric software cost estimation model prepared for Deep Space Network (DSN) Data Systems implementation tasks is presented. The resource estimation model incorporates principles and data from a number of existing models. The model calibrates task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit DSN software life cycle statistics. The estimation model output scales a standard DSN Work Breakdown Structure skeleton, which is then input into a PERT/CPM system, producing a detailed schedule and resource budget for the project being planned.

Tausworthe, R. C.↗

Deep space network software cost estimation model

A parametric software cost estimation model prepared for Jet PRopulsion Laboratory (JPL) Deep Space Network (DSN) Data System implementation tasks is described. The resource estimation mdel modifies and combines a number of existing models. The model calibrates the task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit JPL software life-cycle statistics.

Tausworthe, R. C.↗

Hydrogen Production Cost with Anion Exchange Membrane Electrolysis

Rigorous stakeholder-vetted techno-economic analysis was performed to assess the cost of hydrogen (H 2 ) produced using state-of-the-art Anion Exchange Membrane (AEM) electrolysis. Projected high-volume, untaxed and unsubsidized levelized cost of hydrogen (LCOH)1 range from 2020 $\$$1.78 to $\$$3.68/kg H 2 depending on technology year, process design, and electrolyzer project scale, assuming an electricity price of $\$$0.03/kWh and a capacity factor of 97%. The total installed capital cost for an AEM electrolysis plant was estimated from bottom-up stack and process plant cost models. The stack cost model accounts for manufacturing equipment, equipment maintenance, material, tooling, cycle time, yield, labor, utilities and general overhead. The process plant cost model accounts for purchased equipment, installation costs, site preparation, and general overhead costs. For this study, the AEM electrolysis plant is assumed to be a stick-built, greenfield project developed by an engineering, procurement, and construction (EPC) firm with electrolysis stacks purchased directly from an electrolysis stack manufacturer. The price of the electrolysis stacks is based on a bottom-up cost assessment with business markup for the electrolysis company fabricator. Methods from the Hydrogen Analysis (H2A) production model, a peer-reviewed national laboratory-developed discounted cash flow (DCF) model, were used to calculate the production LCOH in 2020 $\$$/kg H 2 . The baseline electricity price case ($\$$0.03/kWh) corresponds to average wholesale electricity prices currently possible in U.S. markets with plentiful wind. Similar low-cost electricity pricing is possible from solar Power Purchase Agreements (PPA) although these prices are typically limited by renewable energy capacity factors.

08 HYDROGEN↗

The human role in space (THURIS) applications study. Final briefing

The THURIS (The Human Role in Space) application is an iterative process involving successive assessments of man/machine mixes in terms of performance, cost and technology to arrive at an optimum man/machine mode for the mission application. The process begins with user inputs which define the mission in terms of an event sequence and performance time requirements. The desired initial operational capability date is also an input requirement. THURIS terms and definitions (e.g., generic activities) are applied to the input data converting it into a form which can be analyzed using the THURIS cost model outputs. The cost model produces tabular and graphical outputs for determining the relative cost-effectiveness of a given man/machine mode and generic activity. A technology database is provided to enable assessment of support equipment availability for selected man/machine modes. If technology gaps exist for an application, the database contains information supportive of further investigation into the relevant technologies. The present study concentrated on testing and enhancing the THURIS cost model and subordinate data files and developing a technology database which interfaces directly with the user via technology readiness displays. This effort has resulted in a more powerful, easy-to-use applications system for optimization of man/machine roles. Volume 1 is an executive summary.

Maybee, George W.↗

A life cycle cost economics model for automation projects with uniformly varying operating costs

The described mathematical model calculates life-cycle costs for projects with operating costs increasing or decreasing linearly with time. The cost factors involved in the life-cycle cost are considered, and the errors resulting from the assumption of constant rather than uniformly varying operating costs are examined. Parameters in the study range from 2 to 30 years, for project life; 0 to 15% per year, for interest rate; and 5 to 90% of the initial operating cost, for the operating cost gradient. A numerical example is presented.

Remer, D. S.↗

Modeling the Deep Space Network costs for future space missions by using major cost drivers

This paper develops a cost model to do long range planning cost estimates for Deep Space Network (DSN) support of future space missions. The model is a function of eight major mission cost drivers such as uplink frequency upgrade, telemetry upgrade, and antenna gain/noise temperature upgrade. This paper focuses on the costs required to modify and/or enhance the DSN to prepare for supporting future space missions. Two models are derived from actual cost data from three space missions: Voyager (Uranus), Voyager (Neptune), and Magellan. Model A makes it possible to estimate the total cost, and Model B makes it possible to estimate the time profile cost and total cost for DSN support of a similar future space mission. The models were back tested against the total cost and the time profile cost for DSN support of the three projects, and gave cost estimates which range from 17 percent below to 19 percent above actual costs for Model A, and 22.5 percent below to 17.5 percent above for Model B. The total cost Model A was also applied to estimate the total costs for DSN support of two other independent projects: Mariner Jupiter/Saturn (MJS later became Voyager), and Viking. This model gave total cost estimates for DSN support which range from 15 percent to 4 percent above actual total costs for MJS and Viking, respectively.

Remer, Donald S.↗

Development of a Multivariable Parametric Cost Analysis for Space-Based Telescopes

Over the past 400 years, the telescope has proven to be a valuable tool in helping humankind understand the Universe around us. The images and data produced by telescopes have revolutionized planetary, solar, stellar, and galactic astronomy and have inspired a wide range of people, from the child who dreams about the images seen on NASA websites to the most highly trained scientist. Like all scientific endeavors, astronomical research must operate within the constraints imposed by budget limitations. Hence the importance of understanding cost: to find the balance between the dreams of scientists and the restrictions of the available budget. By logically analyzing the data we have collected for over thirty different telescopes from more than 200 different sources, statistical methods, such as plotting regressions and residuals, can be used to determine what drives the cost of telescopes to build and use a cost model for space-based telescopes. Previous cost models have focused their attention on ground-based telescopes due to limited data for space telescopes and the larger number and longer history of ground-based astronomy. Due to the increased availability of cost data from recent space-telescope construction, we have been able to produce and begin testing a comprehensive cost model for space telescopes, with guidance from the cost models for ground-based telescopes. By separating the variables that effect cost such as diameter, mass, wavelength, density, data rate, and number of instruments, we advance the goal to better understand the cost drivers of space telescopes.. The use of sophisticated mathematical techniques to improve the accuracy of cost models has the potential to help society make informed decisions about proposed scientific projects. An improved knowledge of cost will allow scientists to get the maximum value returned for the money given and create a harmony between the visions of scientists and the reality of a budget.

Dollinger, Courtnay↗

A cost-performance model for ground-based optical communications receiving telescopes

An analytical cost-performance model for a ground-based optical communications receiving telescope is presented. The model considers costs of existing telescopes as a function of diameter and field of view. This, coupled with communication performance as a function of receiver diameter and field of view, yields the appropriate telescope cost versus communication performance curve.

Lesh, J. R.↗

Predicting Production Costs for Advanced Aerospace Vehicles

For early design concepts, the conventional approach to cost is normally some kind of parametric weight-based cost model. There is now ample evidence that this approach can be misleading and inaccurate. By the nature of its development, a parametric cost model requires historical data and is valid only if the new design is analogous to those for which the model was derived. Advanced aerospace vehicles have no historical production data and are nowhere near the vehicles of the past. Using an existing weight-based cost model would only lead to errors and distortions of the true production cost. This paper outlines the development of a process-based cost model in which the physical elements of the vehicle are soared according to a first-order dynamics model. This theoretical cost model, first advocated by early work at MIT, has been expanded to cover the basic structures of an advanced aerospace vehicle. Elemental costs based on the geometry of the design can be summed up to provide an overall estimation of the total production cost for a design configuration. This capability to directly link any design configuration to realistic cost estimation is a key requirement for high payoff MDO problems. Another important consideration in this paper is the handling of part or product complexity. Here the concept of cost modulus is introduced to take into account variability due to different materials, sizes, shapes, precision of fabrication, and equipment requirements. The most important implication of the development of the proposed process-based cost model is that different design configurations can now be quickly related to their cost estimates in a seamless calculation process easily implemented on any spreadsheet tool.

Bao, Han P.↗

Manned Mars mission cost estimate

The potential costs of several options of a manned Mars mission are examined. A cost estimating methodology based primarily on existing Marshall Space Flight Center (MSFC) parametric cost models is summarized. These models include the MSFC Space Station Cost Model and the MSFC Launch Vehicle Cost Model as well as other modes and techniques. The ground rules and assumptions of the cost estimating methodology are discussed and cost estimates presented for six potential mission options which were studied. The estimated manned Mars mission costs are compared to the cost of the somewhat analogous Apollo Program cost after normalizing the Apollo cost to the environment and ground rules of the manned Mars missions. It is concluded that a manned Mars mission, as currently defined, could be accomplished for under $30 billion in 1985 dollars excluding launch vehicle development and mission operations.

Hamaker, Joseph↗

Laser Atmospheric Wind Sounder (LAWS) phase 1. Volume 3: Project cost estimates

The laser atmospheric wind sounder (LAWS) cost modeling activities were initiated in phase 1 to establish the ground rules and cost model that would apply to both phase 1 and phase 2 cost analyses. The primary emphasis in phase 1 was development of a cost model for a LAWS instrument for the Japanese Polar Orbiting Platform (JPOP). However, the Space Station application was also addressed in this model, and elements were included, where necessary, to account for Space Station unique items. The cost model presented in the following sections defines the framework for all LAWS cost modeling. The model is consistent with currently available detail, and can be extended to account for greater detail as the project definition progresses.

Source record↗

A Survey of Cost Estimating Methodologies for Distributed Spacecraft Missions

Satellite constellations and Distributed Spacecraft Mission (DSM) architectures offer unique benefits to Earth observation scientists and unique challenges to cost estimators. The Cost and Risk (CR) module of the Tradespace Analysis Tool for Constellations (TAT-C) being developed by NASA Goddard seeks to address some of these challenges by providing a new approach to cost modeling, which aggregates existing Cost Estimating Relationships (CER) from respected sources, cost estimating best practices, and data from existing and proposed satellite designs. Cost estimation through this tool is approached from two perspectives: parametric cost estimating relationships and analogous cost estimation techniques. The dual approach utilized within the TAT-C CR module is intended to address prevailing concerns regarding early design stage cost estimates, and offer increased transparency and fidelity by offering two preliminary perspectives on mission cost. This work outlines the existing cost model, details assumptions built into the model, and explains what measures have been taken to address the particular challenges of constellation cost estimating. The risk estimation portion of the TAT-C CR module is still in development and will be presented in future work. The cost estimate produced by the CR module is not intended to be an exact mission valuation, but rather a comparative tool to assist in the exploration of the constellation design tradespace. Previous work has noted that estimating the cost of satellite constellations is difficult given that no comprehensive model for constellation cost estimation has yet been developed, and as such, quantitative assessment of multiple spacecraft missions has many remaining areas of uncertainty. By incorporating well-established CERs with preliminary approaches to approaching these uncertainties, the CR module offers more complete approach to constellation costing than has previously been available to mission architects or Earth scientists seeking to leverage the capabilities of multiple spacecraft working in support of a common goal.

A Survey of Cost Estimating Methodologies for Distributed Spacecraft Missions

Satellite constellations and Distributed Spacecraft Mission (DSM) architectures offer unique benefits to Earth observation scientists and unique challenges to cost estimators. The Cost and Risk (CR) module of the Tradespace Analysis Tool for Constellations (TAT-C) being developed by NASA Goddard seeks to address some of these challenges by providing a new approach to cost modeling, which aggregates existing Cost Estimating Relationships (CER) from respected sources, cost estimating best practices, and data from existing and proposed satellite designs. Cost estimation through this tool is approached from two perspectives: parametric cost estimating relationships and analogous cost estimation techniques. The dual approach utilized within the TAT-C CR module is intended to address prevailing concerns regarding early design stage cost estimates, and offer increased transparency and fidelity by offering two preliminary perspectives on mission cost. This work outlines the existing cost model, details assumptions built into the model, and explains what measures have been taken to address the particular challenges of constellation cost estimating. The risk estimation portion of the TAT-C CR module is still in development and will be presented in future work. The cost estimate produced by the CR module is not intended to be an exact mission valuation, but rather a comparative tool to assist in the exploration of the constellation design tradespace. Previous work has noted that estimating the cost of satellite constellations is difficult given that no comprehensive model for constellation cost estimation has yet been developed, and as such, quantitative assessment of multiple spacecraft missions has many remaining areas of uncertainty. By incorporating well-established CERs with preliminary approaches to approaching these uncertainties, the CR module offers more complete approach to constellation costing than has previously been available to mission architects or Earth scientists seeking to leverage the capabilities of multiple spacecraft working in support of a common goal.

Foreman, Veronica L.↗