Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost model”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Carbon Capture, Transport, And Storage (CTS) Cost Modeling Of The Onshore Gulf Coast

The onshore Gulf of Mexico region presents significant opportunities for CO2 capture, transport, and storage due to its numerous CO2 sources, such as power plants, refineries, and its substantial CO2 storage potential. However, operators face critical decisions in designing an efficient and cost-effective CO2 pipeline network. This study examines the economic implications of two primary strategies: constructing a trunkline with excess initial capacity versus developing dedicated pipelines incrementally as new CO2 sources come online. Building a trunkline first offers the advantage of future-proofing the network, allowing for the accommodation of increased CO2 volumes from various sources over time. However, this approach incurs higher upfront costs and risks underutilizing the transport capacity in the initial stages, potentially resulting in economic inefficiencies. Conversely, constructing dedicated pipelines for each new CO2 source as it becomes operational may avoid the initial overcapacity issue but fails to capitalize on the economies of scale. This could lead to higher overall costs due to the duplication of infrastructure and increased complexity in network management. This research employs a comprehensive cost-benefit analysis, integrating factors such as capital expenditure, operational costs, projected CO2 volumes, and potential economies of scale. Through this analysis, we aim to provide operators with insights into the most economically viable strategy for CO2 pipeline network design in the region. The findings underscore the importance of strategic planning and highlight the trade-offs between immediate capacity utilization and long-term cost savings, ultimately guiding stakeholders towards informed decision-making in the development of CO2 transport infrastructure. Presented at the 41st USAEE/IAEE North American Conference, 3-6 November 2024, Baton Rouge, LA, United States.

Shih, Chung Yan↗

A comprehensive methodology for intelligent systems life-cycle cost modelling

As NASA moves into the last part on the twentieth century, the desire to do 'business as usual' has been replaced with the mantra 'faster, cheaper, better'. Recently, new work has been done to show how the implementation of advanced technologies, such as intelligent systems, will impact the cost of a system design or in the operational cost for a spacecraft mission. The impact of the degree of autonomous or intelligent systems and human participation on a given program is manifested most significantly during the program operational phases, while the decision of who performs what tasks, and how much automation is incorporated into the system are all made during the design and development phases. Employing intelligent systems and automation is not an either/or question, but one of degree. The question is what level of automation and autonomy will provide the optimal trade-off between performance and cost. Conventional costing methodologies, however, are unable to show the significance of technologies like these in terms of traceable cost benefits and reductions in the various phases of the spacecraft's lifecycle. The proposed comprehensive life-cycle methodology can address intelligent system technologies as well as others that impact human-machine operational modes.

Korsmeyer, David J.↗

Modeling the Cost of Onshore CO2 Pipeline Transport and Onshore CO2 Saline Storage

This paper describes the FECM/NETL CO2 Transport Cost Model (CO2_T_COM), a technoeconomic model of CO2 transport by pipeline, and the FECM/NETL CO2 Saline Storage Cost Model (CO2_S_COM), a technoeconomic model of storage of CO2 in a deep, subsurface saline formation. The results of applying CO2_T_COM to calculate break-even CO2 prices to transport CO2 at different mass flow rates and different distances are presented. Similarly, CO2_S_COM is used to calculate the break-even CO2 price for storing CO2 in 314 potential storage formations across the US. These break-even prices are used to construct cost-supply curves for CO2 storage which are presented on a national and regional basis. CO2_T_COM and CO2_S_COM are the most comprehensive open source technoeconomic models available for analyzing CO2 pipeline transport and CO2 saline storage. To be presented at the SPE?AAPG/SEG Carbon Capture Utilization and Storage Conference in Houston, TX, March 11-13, 2024.

Morgan, David↗

Assessing the New Home Market Opportunity: Case Study and Cost Modeling for Solar and Storage in 2030

In 2020, the United States had a cumulative 19 gigawatts (GWdc) of residential solar photovoltaic (PV) capacity. A growing percentage of these solar installations are paired with battery storage, up from 0.1% in 2015 to 8.1% in 2020. Some states are considering or have already adopted policy mandates to require solar and storage systems. The cost of installing residential solar and battery storage projects remains a barrier to widespread adoption nationwide. For example, the cost of a typical residential retrofit solar and storage system ranges from $\$ 26,153$ to $\$ 37,909$, which is 38% to 100% higher than a standalone PV system.

14 SOLAR ENERGY↗

Baseline Cost Model for Hydropower: Documentation (2025)

Hydropower currently contributes about 80 GW of conventional and 23 GW of pumped storage capacity to the United States (US) power grid. Previous studies have estimated a considerable amount of remaining US hydropower resources, including non-powered dams (NPD) (Hadjerioua et al., 2012), new stream-reach developments (NSD) (Kao et al., 2014), pumped storage hydropower (PSH) and canal/conduit (Kao et al., 2022). The combined theoretical capacity potential of these various hydropower resources is comparable to the existing US hydropower capacity. There is a continuing interest in developing this hydropower potential, particularly to help meet the increasing demand for electricity. However, available data (Sasthav and Oladosu, 2022) show that the rate of new hydropower development has slowed considerably over time despite the interest of industry stakeholders. This is partly due to the competition from other energy resources and from the highly dispersed nature of remaining hydropower resources, which lead to high information requirements for evaluating the feasibility of potential projects. Cost information provides the most succinct summary of the feasibility of a potential hydropower project required by stakeholders, including developers, investors, policymakers, consumer groups, etc., considering investment options. The best estimates of hydropower costs can be obtained through detailed engineering design and cost assessments of individual projects. However, this approach has high data and resource (time, funds, cross-disciplinary expertise) requirements that render it inapplicable for rapid cost estimation with limited data. Although innovative approaches can overcome some of these impediments (see Oladosu and Ma, 2024 for such an application to potential NPD projects), the development of such approaches still requires significant amounts of resources and are not generally applicable to all hydropower project types. Therefore, statistical and parametric methods using simpler cost specifications remain of significant utility to hydropower stakeholders and are, at the least, complementary to more detailed approaches, particularly when evaluating many potential projects.

13 HYDRO ENERGY↗

Calibration of a COTS Integration Cost Model Using Local Project Data

The software measures and estimation techniques appropriate to a Commercial Off the Shelf (COTS) integration project differ from those commonly used for custom software development. Labor and schedule estimation tools that model COTS integration are available. Like all estimation tools, they must be calibrated with the organization's local project data. This paper describes the calibration of a commercial model using data collected by the Flight Dynamics Division (FDD) of the NASA Goddard Spaceflight Center (GSFC). The model calibrated is SLIM Release 4.0 from Quantitative Software Management (QSM). By adopting the SLIM reuse model and by treating configuration parameters as lines of code, we were able to establish a consistent calibration for COTS integration projects. The paper summarizes the metrics, the calibration process and results, and the validation of the calibration.

Boland, Dillard↗