Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “construction costs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Quantum algorithm for electronic band structures with local tight-binding orbitals

While the main thrust of quantum computing research in materials science is to accurately measure the classically intractable electron correlation effects due to Coulomb repulsion, designing optimal quantum algorithms for simpler problems with well-understood solutions is a useful tactic to advance our quantum “toolbox”. With this in mind, we consider the quantum calculation of a periodic system’s single-electron band structure over a path through reciprocal space. Previous efforts have used the Variational Quantum Eigensolver algorithm to solve the energy of each band, which involves numerically optimizing the parameters of a variational quantum circuit to minimize a cost function, constructed as the expectation value of a Hamiltonian operator. Traditionally, a unique Hamiltonian operator is constructed for each k-point, so that many cost functions, each with their own parameter space, must be optimized to generate a single band. Similarly, calculating higher bands than the first has traditionally involved modifying the cost function with additional overlap terms to ensure higher-energy eigenstates are orthogonal to those of lower bands. In this paper, we adopt a direct space approach, using a novel hybrid first/second-quantized qubit mapping which allows us to construct a single Hamiltonian, and a single cost-function, suitable for solving the entire electronic band structure. In contrast to previous approaches, the k-point and the band index are selected by additional parameters in our quantum circuit, rather than through modifications to the cost function. The result is a technically and conceptually simpler approach to band structure calculations on a quantum computer. Moreover, we expect that the tools developed herein will motivate new strategies for tackling highly-correlated materials beyond the grasp of classical computing.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Modeling for a Digital Twin-Based Remote Operation System Framework

New reactor designs and technologies are being developed to grow and advance the nuclear industry. Microreactors are one of the many new concepts for advancing the industry. Microreactors are very small reactors generally designed to have an operating power of 20 MWth or less. They are ideal for many applications in which it would not be feasible to have a large-scale reactor, such as powering remote communities, military bases, and mining sites. Many of these applications currently rely on diesel generators for power, and replacing those generators with the carbon-free energy of a microreactor is a major driving factor for microreactor development. However, most of the use cases for microreactors are in isolated locations where construction and labor costs are much higher. Microreactors will need to be comparable to other energy production methods for their deployment to be successful. Remotely operating the microreactor has a great potential to benefit the economics and make it more cost competitive. With remote operations, the operation facility location could be strategically chosen based on factors such as construction costs, workforce size, etc. The benefits of remote operations could be leveraged even more if the remote operation system is semi-autonomous. If the remote operation system is semi-autonomous, more microreactors could be operated and monitored from one remote operation facility. Additionally, with the system handling some tasks for the human operator, it could reduce the number of operating staff necessary for the microreactor. Digital twins can be used to introduce a level of automation to the remote operation system. Digital twins are capable of component monitoring, system operation and control, and predictive performance [1]. All of those features are important for a successful semi-autonomous remote operation system.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

GCAM–GLORY v1.0: representing global reservoir water storage in a multi-sector human–Earth system model

Abstract. Reservoirs play a significant role in modifying the spatiotemporal availability of surface water to meet multi-sector human demands, despite representing a relatively small fraction of the global water budget. Yet the integrated modeling frameworks that explore the interactions among climate, land, energy, water, and socioeconomic systems at a global scale often contain limited representations of water storage dynamics that incorporate feedbacks from other systems. In this study, we implement a representation of water storage in the Global Change Analysis Model (GCAM) to enable the exploration of the future role (e.g., expansion) of reservoir water storage globally in meeting demands for, and evolving in response to interactions with, the climate, land, and energy systems. GCAM represents 235 global water basins, operates at 5-year time steps, and uses supply curves to capture economic competition among renewable water (now including reservoirs), non-renewable groundwater, and desalination. Our approach consists of developing the GLObal Reservoir Yield (GLORY) model, which uses a linear programming (LP)-based optimization algorithm and dynamically linking GLORY with GCAM. The new coupled GCAM–GLORY approach improves the representation of reservoir water storage in GCAM in several ways. First, the GLORY model identifies the cost of supplying increasing levels of water supply from reservoir storage by considering regional physical and economic factors, such as evolving monthly reservoir inflows and demands, and the leveled cost of constructing additional reservoir storage capacity. Second, by passing those costs to GCAM, GLORY enables the exploration of future regional reservoir expansion pathways and their response to climate and socioeconomic drivers. To guide the model toward reasonable reservoir expansion pathways, GLORY applies a diverse array of feasibility constraints related to protected land, population, water sources, and cropland. Finally, the GLORY–GCAM feedback loop allows evolving water demands from GCAM to inform GLORY, resulting in an updated supply curve at each time step, thus enabling GCAM to establish a more meaningful economic value of water. This study improves our understanding of the sensitivity of reservoir water supply to multiple physical and economic dimensions, such as sub-annual variations in climate conditions and human water demands, especially for basins experiencing socioeconomic droughts.

54 ENVIRONMENTAL SCIENCES↗

Siting and sizing of public–private charging stations impacts on household and electric vehicle fleets

To facilitate the provision of electric vehicle charging stations (EVCS) in urban areas, this study investigates the benefits of co-locating fleet-owned chargers with public charging stations to enable construction incentives and cord-sharing cost savings. Shared EVCS can serve charging demand from both user types: private (household) EV owners and those managing fleet vehicles – like shared and fully automated EV (SAEV) fleets. Using POLARIS to simulate all person-travel across the 6-county Austin, Texas region, new EVCS were sited and sized with DC fast-charging (DCFC) plugs to lower operating and construction costs while providing public + private (PP) service across an 81-square-mile core geofence (where 200 SAEVs were active) over 24-hour days. When co-location is permitted, 115 DCFC cords were added to the 23 existing (publicly available) stations to enable SAEVs and household EVs (HHEVs) charging access, within the geofence. Each 250-mile-range SAEV was simulated to travel an average of 330 miles per day, serve over 92 person-trips, and recharge 2.7 times a day (for 2.4 h per session). The new DCFC plugs were primarily added to public EVCS at shopping centers and schools, and in residential settings along freeways. The average plug served 4.8 EVs per day. Most co-located PP EVCS permitted immediate (no-wait) charging, except for 2 stations along freeways that averaged 8 min of wait time to begin charging. In conclusion, the co-location strategy lowered fleet owners’ initial EVCS construction costs by 12 % (thanks to cord-sharing to avoid cord duplication), while reducing SAEV wait times to just 3.1 min (versus 10.7 min if SAEV managers had to build and operate their own EVCS).

EV charging modeling↗

Integrating Energy Efficiency Strategies with Industrialized Construction for Our Clean Energy Future: Preprint

NREL’s Industrialized Construction Innovation Team has developed an ambitious plan to accelerate the integration of energy efficiency (EE) strategies with Industrialized Construction (IC). The United States (U.S.) construction industry is beginning to use IC methods to build multifamily apartment buildings to address affordability and labor shortages. Apart from reducing cost of construction and delivery times, the IC method of permanent modular construction has the potential to facilitate the integration of a wide range of EE strategies and advanced controls into such buildings. While there may be unintended EE benefits to IC such as a tighter envelope due to higher construction quality, the process has not been leveraged specifically to enhance EE. NREL aims to claim this missed opportunity and integrate IC benefits with EE as well as advanced controls, distributed energy resources, and grid-friendly design strategies. The paper proposes an ‘IC Assessment Framework’ to achieve affordable zero-energy modular multifamily buildings. Through the selection criteria of Design for Manufacturing and Assembly, the framework aims to distill a broad range of proven EE strategies for site-built into a set of strategies that qualify as easy to integrate for off-site. The output is a Factory Information Model (FIM) that represents a process-based digital twin to enable advanced time-and-motion study, plugs into open source building energy modeling platform (EnergyPlus), and serves as a vital tool facilitating wider adoption of EE integration. Conclusively, the paper delineates next steps for upcoming pilots with NREL’s IC partners towards developing a transformational pathway for our Clean Energy Future.

30 DIRECT ENERGY CONVERSION↗

Potential Cost Reduction in New Nuclear Deployments Based on Recent AP1000 Experience

The completion of Vogtle Units 3 and 4, despite significant cost and schedule overruns, a major bankruptcy, and a pandemic, demonstrates that the U.S. nuclear industry can still develop new supply chains, train a highly skilled workforce, and build large nuclear power plants. Vogtle, being a first-of-a-kind (FOAK) plant, faced overruns, but FOAK overruns can decrease with more deployments through a combination of design standardization and modularization, transferring and implementing lessons learned between consecutive projects, and innovation. This report quantifies the potential cost and schedule reductions in future AP1000 plants in the US and identifies the barriers in achieving those reductions. It starts with a summary and analysis of the cost and construction timeline data for AP1000 plants that started construction in the United States (Vogtle) and China. Motivated by the steep schedule reductions from the first to second series of AP1000 plants in China, a cost reduction model was developed to quantify potential reductions for future AP1000 builds in the US. Results show that within about 3 more builds, AP1000s can become economically attractive in large markets in the U.S., without leveraging the Investment Tax Credit (ITC) or Production Tax Credit (PTC), and much sooner if these tax credits are available. Importantly the financial risks for future AP1000 builds in the US might be much smaller than observed in the FOAK plants. The study also identifies various barriers for future builds including the availability of a supply chain and a skilled workforce, and emphasizes the importance of making investments to gather and implement lessons learned between consecutive projects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Feasibility Assessment of Using Electrical Impedance Tomography for Damage Localization in Graphite Microreactor Components

Microreactors have great potential to decrease capital costs and construction timelines, reducing the barriers to implementing advanced nuclear reactor technologies. However, the lower power output of these microreactors introduces economic challenges if the operation and maintenance costs cannot be reduced sufficiently. Many microreactor concepts use graphite materials for in-core moderator and structural purposes, which will require periodic inspection or, ideally, in situ structural health monitoring. This work describes an initial evaluation of the feasibility of leveraging graphite’s semiconducting properties to perform electrical impedance tomography (EIT) for defect localization. First, a study was performed to identify the best methods for bonding electrical contacts to minimize the effects of contact resistance that interfere with impedance measurements of the graphite. After determining the best bonding approach, electrodes were attached to multiple graphite components with varying geometries (e.g., simple block and more representative microreactor hexagonal block). In parallel, finite element analysis approaches were developed and implemented to analyze the impact of defects and contact resistances and to inform an iterative inverse model for reconstructing the conductivity distribution. The results of this study show that defect localization in graphite components is possible using EIT if a sufficient number of electrodes (to improve spatial resolution) can be bonded using a technique with very low contact resistance and those contact resistances remain stable during reactor operation. If the reactor core and vessel design do not allow electrodes to be bonded during reactor operation, then it may be possible to detach/reattach electrodes between reactor operation and outages if a suitable mechanical connection that offers repeatable contact resistance can be identified. Alternatively, future work could focus on identifying contacts that can survive the harsh reactor operating environment so that contacts do not need to be removed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

LLNS Request for Variance From 10 CFR 851 for Construction of LLNL Emergency Operations Center

Lawrence Livermore National Security, LLC (LLNS) is submitting the following variance application requesting the use of the State of California’s Occupational Safety and Health Administration (Cal/OSHA) Regulations in lieu of Title 10 Code of Federal Regulations Part 851 (10 CFR 851, the Rule), Worker Safety and Health Program, Subpart B (Program Requirements), Subpart C (Specific Program Requirements), and Appendix A (Worker Safety and Health Functional Areas), solely with respect to the construction of the new Lawrence Livermore National Laboratory (LLNL) Emergency Operations Center (EOC) facility. The request is in support of the National Nuclear Security Administration (NNSA) “pilot” to streamline the delivery of commercial-like line item construction projects under $50 million. This pilot is aligned with the approved NA-50 safety approach for the projects in the pilot. This pilot is to test and demonstrate innovation leading to a reduced cost of construction for building commercial type structures at Department of Energy (DOE)/NNSA facilities. The variance proposes to permit local/regional construction businesses contracted to Management & Operation contractor operated facilities to bid, operate, execute, and comply with safety and health standards they utilize in their business outside of the DOE Complex. This will permit compliance to standards that are as safe and healthful as those in 10 CFR 851 without confusion, additional cost, and inefficiencies associated with the burden of compliance to an unfamiliar regulatory spectrum.

99 GENERAL AND MISCELLANEOUS↗

Inexpensive and Sustainable Anti-Corrosion Coating for Power Generation Applications

The goal of the project was to achieve lab-scale demonstration of a corrosion prevention technology, which will facilitate the capture of CO 2 from coal and natural gas fired power generation by reducing the cost of construction materials and maintenance. The project built on technology previously developed by LumiShield to address more broad-based corrosion issues and the results shown will be applicable to a wide range of markets requiring cost effective corrosion resistant coatings. That technology developed is a base layer to improve the performance and reduce the cost of organic anti-corrosion coatings. The impact of those changes on overall plant economics were demonstrated with the help of engineers at AECOM through an initial cost-benefit-analysis at the end of BP1 which will be updated at the end of BP2.

01 COAL, LIGNITE, AND PEAT↗

Kernel fusion in atomistic spin dynamics simulations on Nvidia GPUs using tensor core

In atomistic spin dynamics simulations, the time cost of constructing the space- and time-displaced pair correlation function in real space increases quadratically as the number of spins N, leading to significant computational effort. The GEMM subroutine can be adopted to accelerate the calculation of the dynamical spin-spin correlation function, but the computational cost of simulating large spin systems (>40000 spins) on CPUs remains expensive. In this work, we perform the simulation on the graphics processing unit (GPU), a hardware solution widely used as an accelerator for scientific computing and deep learning. Here we show that GPUs can accelerate the simulation up to 25-fold compared to multi-core CPUs when using the GEMM subroutine on both. To hide memory latency, we fuse the element-wise operation into the GEMM kernel using CUTLASS that can improve the performance by 26% ~ 33% compared to implementation based on cuBLAS. Furthermore, we perform the on-the-fly calculation in the epilogue of the GEMM subroutine to avoid saving intermediate results on global memory, which makes the large-scale atomistic spin dynamics simulation feasible and affordable.

97 MATHEMATICS AND COMPUTING↗

Novel, Simplified Air Delivery System Design Gets Commercialized

Typical air delivery systems require contractors to design systems that are complex, difficult to integrate into the framing and structural components of a home, and often do not meet the optimization demands of newer energy-efficient homes. This complex process can be a burden to already strained construction labor costs. However, a new technology simplifies duct system design to improve comfort and eliminate sources of installation error for residential air delivery systems.

Building America↗

Economic solution for low carbon process heat: A horizontal, compact high temperature gas reactor

In 2018, nuclear energy generated 55% of United States’ and one third of the world’s carbon free electricity, making nuclear energy a key tool in efforts to mitigate climate change before 2050. However, the current nuclear technology, light water reactors (LWRs), is limited to 300°C, so it cannot be used to decarbonize industrial process heat which accounts for 12% of US greenhouse gas emissions. High temperature gas reactors (HTGRs) can meet the high temperature demand with carbon free nuclear heat. The estimated cost of HTGRs, such as the Next Generation Nuclear Plant (NGNP), are even higher than state-of-the-art LWRs. In this paper, we expanded our nuclear cost estimating tool to include HTGRs and find that the NGNP overnight capital costs were 32% higher than an advanced LWR per unit capacity. The higher cost will naturally result in larger risk to cost overrun as recently experienced by larger LWRs in western nations. With a design-to-build mindset to minimize cost and construction risk, we introduce the horizontal, compact HTGR (HC-HTGR). The reactor core and steam generator are mounted horizontally on rails and in-line with one another, decreasing the size of the reactor building relative to the power capacity four times when compared to traditional HTGRs. The HC-HTGR reduced overnight civil structure costs by 42%, indirect costs by 38%, and total capital costs by 20% from NGNP. We discussed the required engineering of new systems for the HC-HTGR including vessel supports, the reactor cavity cooling system, and steam generator design. Finally, we estimated the fuel and operations costs of the HC-HTGR, and a survey of low-carbon industrial process heat technology showed the HC-HTGR can deliver a highly competitive levelized cost of heat in the range of $6.13–12.48/GJ.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

ORBIT: Offshore Renewables Balance-of-System and Installation Tool

This report describes the Offshore Renewables Balance-of-system Installation Tool ("ORBIT"), a new model developed by the National Renewable Energy Laboratory (NREL) to evaluate the balance-of-system (BOS) costs associated with offshore wind projects. In the context of wind energy projects BOS costs encompass all expenses required to construct a project other than the capital expenditures (CapEx) of the turbines and towers, including the procurement costs for all other components (such as substructures, cables, and electrical infrastructure), offshore and land-based construction costs, port costs, site surveying fees, permitting fees, and leasing fees are all categorized as BOS costs. BOS costs significantly contribute to the levelized cost of energy (LCOE) for offshore wind, typically comprising over 50\% of the CapEx for a fixed-bottom offshore wind project and 60\% for a floating project. In addition, technology solutions and installation methods vary drastically between projects as they are impacted by factors such as vessel availability, geographic considerations and site geotechnical conditions. These effects require a model with appropriate fidelity to understand how these costs scale as turbine rating increases and the offshore wind supply chain, particularly offshore construction vessels, is expanded. For offshore wind, cost savings attributed to increased turbine rating are primarily realized through BOS procurement and project installation as fewer substructures and less cable are required. BOS costs represent both a modeling challenge, as well as an opportunity, for project developers to optimize solutions to reduce costs. It is critical to understand how these costs are affected by novel technologies, innovative installation processes, and operational constraints in order identify meaningful cost reductions for offshore wind energy.

17 WIND ENERGY↗

Modeling the Cost of Onshore CO2 Pipeline Transport and Onshore CO2 Saline Storage

This paper describes the FECM/NETL CO2 Transport Cost Model (CO2_T_COM), a technoeconomic model of CO2 transport by pipeline, and the FECM/NETL CO2 Saline Storage Cost Model (CO2_S_COM), a technoeconomic model of storage of CO2 in a deep, subsurface saline formation. The results of applying CO2_T_COM to calculate break-even CO2 prices to transport CO2 at different mass flow rates and different distances are presented. Similarly, CO2_S_COM is used to calculate the break-even CO2 price for storing CO2 in 314 potential storage formations across the US. These break-even prices are used to construct cost-supply curves for CO2 storage which are presented on a national and regional basis. CO2_T_COM and CO2_S_COM are the most comprehensive open source technoeconomic models available for analyzing CO2 pipeline transport and CO2 saline storage. To be presented at the SPE?AAPG/SEG Carbon Capture Utilization and Storage Conference in Houston, TX, March 11-13, 2024.

Morgan, David↗

Potential Supply Chain and Cost Reduction Strategies for Advanced Nuclear Reactors

This milestone represents a level of effort to provide recommendations for a supply chain plan and establish relationships between advanced reactor companies and large companies in the oil & gas and chemical industries. It represents a starting point to develop the plan with options, general equipment lists, and rough associated cost estimates of major equipment and the associated systems needed. This effort will provide an opportunity to leverage the experience that oil & gas and chemicals companies possess in large capital equipment procurement, modularization, acquisition and installation. Potential supply chain solutions will be discussed and preliminary options for worldwide manufacturers will be elucidated. The goal of this effort will be to leverage the years of accumulated experience in the oil & gas and chemical industries in the area of capital equipment acquisition to understand the potential supply chain options and to reduce potential acquisition costs by optimizing the supply chain options for advanced nuclear reactor modularization, manufacturing and acquisition.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Novel 3D Force Sensors for a Cost-Effective 3D Force Plate for Biomechanical Analysis

Three-dimensional force plates are important tools for biomechanics discovery and sports performance practice. However, currently, available 3D force plates lack portability and are often cost-prohibitive. To address this, a recently discovered 3D force sensor technology was used in the fabrication of a prototype force plate. Thirteen participants performed bodyweight and weighted lunges and squats on the prototype force plate and a standard 3D force plate positioned in series to compare forces measured by both force plates and validate the technology. For the lunges, there was excellent agreement between the experimental force plate and the standard force plate in the X-, Y-, and Z-axes (r = 0.950–0.999, p < 0.001). For the squats, there was excellent agreement between the force plates in the Z-axis (r = 0.996, p < 0.001). Across axes and movements, root mean square error (RMSE) ranged from 1.17% to 5.36% between force plates. Although the current prototype force plate is limited in sampling rate, the low RMSEs and extremely high agreement in peak forces provide confidence the novel force sensors have utility in constructing cost-effective and versatile use-case 3D force plates.

42 ENGINEERING↗

Degradation of Poly- and Perfluoroalkyl Substances (PFAS) in Water via High Power, Energy-Efficient Electron Beam Accelerator

The goal of the 2-year workplan was to see if electron beam (EB) could be used to break down a sub-set of the larger chemical family of per and polyfluoroalkylated substances (PFAS) in an energy efficient and economical manner when compared to conventional water treatment technologies. Year one (Y1) work focused on sample EB treatment work in the Fermi National Accelerator Laboratory’s (FNALs) Accelerator Applications Demonstration and Development (A2D2) EB accelerator. While there are reportedly thousands of types of PFAS, for the point of most of the work herein, a small subset was examined, typically perfluorooctane sulfonate (PFOS) and perfluorooctanoate (PFOA). PFOA and PFOS are two of the most well studied PFAS and are studied for baseline evaluations and are considered most useful. The work from Y1 provided information about the optimal operating parameters and additives to use when treating PFOS and PFOA via EB. The data were then used to see where in a water treatment system an EB accelerator would be best suited to treat PFAS. A conventional water treatment technology, GAC, was then compared to e-beam treatment technology with respect to energy and costs for treatment. In year two (Y2), several conventional e-beam accelerator designs, and FNAL’s developmental compact SRF accelerator design, were evaluated for their suitability in PFAS treatment, from an energy efficiency and cost standpoint. Several EB parameters were evaluated and optimized for the removal of PFOA and PFOS from water at normal pressure and temperature, measured as total PFAS removal. Under the optimized test conditions both PFOA showed complete destruction to inorganic fluoride, and PFOS to inorganic fluoride and sulfate, with mass balance. The effect on PFAS removal relative to solution pH, total EB dose, EB dose rate, dissolved oxygen concentration (DO), temperature, and initial PFAS concentration were evaluated. In general, PFOA was easier to destroy than PFOS. Degradation products, typically observed under less-than-optimal EB conditions, provided insight to degradation mechanisms. Products were identified to rule out possible deleterious biproduct formation. The water radiolysis radical reaction kinetics with PFOS and PFOA were not dependent on the initial concentration over 5-orders of magnitude from 2 μg/L to 20 mg/L. This is thought to be because there was an overabundance of the reactive water radiolysis radicals relative to PFAS molecules and largely attributed to aqueous electrons. The reaction rates appeared to be diffusion limited. Testing at higher concentrations (100-200 mg/L) showed a decrease in removal efficiency, suggesting alternative kinetics, possibly second order rates, at higher concentrations. In all, we successfully defined a set of optimal EB parameters to treat PFOA and PFOS at concentrations of 20 mg/L in water with destruction efficiencies near 100%. We further tested the optimized EB parameters with other types of PFAS, including shorter and longer fluorocarbon chain homologs of PFOA and PFOS, and PFAS with alternative functional groups such as sulfonamides. Based on our results EB can be optimized as an effective destructive technology for removing PFAS from water. The conditions optimized for PFOA and PFOS were less effective with ultra-short fluorocarbon compounds like TFMS, PFES, PFPS and PFBS, and likely require re-optimization of parameters to them. In all, it was determined that from a cost and energy efficiency standpoint, EB would be best applied to waste streams with relatively high concentrations of PFOS and PFOA and is not as cost effective as GAC treatment for removing low concentrations of PFAS from water. Higher concentrations of PFAS can be found in the wastewater of conventional treatment processes such as RO and IE and therefore EB may be used to supplement such treatment technologies. Some real-world IE regeneration wash water and RO reject water containing higher concentrations of PFAS and obtained from pilot scale industrial wastewater treatment system at a fluorochemical manufacturing facility, showed that EB could remove PFAS from such types of wastewaters. The IE regenerant wash water appeared to be the most efficient of the two types of wastewaters tested. However, some further optimization of the EB parameters for the specific PFAS types present in those wastewaters may be required. Also, the effects of co-present TOC and mineral salts should be considered during such optimization efforts. From the experimental Y1 results it was seen that the aqueous electron drives degradation of the PFAS. In a hypothetical water treatment skid using EB for PFAS destruction the parameters of the system should be optimized to promote aqueous electron production. Before EB treatment, the PFAS should be preconcentrated when possible, the pH should be raised to pH 10 or higher to enhance aqueous electron production, and the water should be nitrogen purged to remove dissolved oxygen to minimize aqueous electron scavenging. An excel spreadsheet was created that calculates optimal conditions based on inlet PFAS concentration and desired outlet concentration, by optimizing the accelerator power, dose rate, water treatment rate, pH and dissolved oxygen levels to reach the desired endpoint. Given this information on accelerator operating conditions five different EB accelerator systems were compared. One EB system was a continuous-wave, linear superconducting accelerator being designed at Fermilab. Three other EB systems (IMPELA at 5% and 25% duty factor and the ILU-14) were normal conducting pulsed linear accelerators. The fifth system was an IBA Rhodotron which is a normal conducting, circular, continuous-wave accelerator. The accelerator efficiency (% of the incoming power that is used in water treatment) was the dominating factor in accelerator choice. The radio frequency (RF) power supply and the accelerator design (superconducting versus warm technology) drive the accelerator efficiency. The IBA Rhodotron was seen to be the most energy efficient commercially available technology with a wall-plug (total) power efficiency of 43% at 400 kW. The Fermilab design, with a prototype for a different application currently being fabricated, was the most energy efficient at 55% when driven by a Klystron RF power supply and as high as 77% when powered by a magnetron. As the Fermilab design was the most energy efficient by approximately 10-30%, further design work was done on the accelerator and beam delivery system specific to the destruction of PFAS in water. The Fermilab design is unique from industrial accelerators in that is superconducting. Superconducting technology allows for the acceleration of electrons without losses. The accelerator must be cooled to below the point where it is superconducting and is operated around 4 degrees Kelvin. The bulk of the design work for the accelerator is on making the accelerator as energy efficient as possible so that it does not require liquid helium and can be cooled with conduction cooling via cryocoolers. Final design work resulted in an EB accelerator that would operate at minimally 200 kW and 10 MeV. Prototype construction would cost $\$ $7.8 million dollars when driven by a Klystron power supply. A second version of the same accelerator would cost $\$ $5.5 million dollars when driven by a magnetron that is still under development. The commercially available 300 kW IBA Rhodotron cost was estimated at approximately $\$ $9 million. While it is hard to directly compare, an operational GAC system used by 3M for groundwater treatment capital cost (2022 dollars) was estimated to cost $\$ $3.3 million. While the capital expense of the EB accelerator systems was higher than GAC, the accelerator EB treatment would result in destruction of the PFAS and not just sequestration of PFAS to form a new waste stream that requires further treatment or disposal. The operating cost to destroy the PFAS via 400 kw EB system was less than $\$ $1000/kg of PFAS destroyed when treating at a 20 mg/L PFAS concentration, compared to GAC with operating costs that calculated at $\$ $27,530 per kg of PFAS sequestered when treating 100 μg/L PFOA and PFOS combined concentration.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗