Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “completeness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Utah FORGE 1-2410: Development of a Smart Completion and Stimulation Solution - 2024 Annual Workshop Presentation

This is a presentation on the Development of a Smart Completion & Stimulation Solution by Welltec, presented by Ricardo Vasques. This video slide presentation discusses the development of an (1) annular isolation system, (2) a stimulation isolation system, and (3) a multi open-close flow system for geothermal environments. This presentation was featured in the Utah FORGE R&D Annual Workshop on August 15, 2024.

15 GEOTHERMAL ENERGY↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

43 PARTICLE ACCELERATORS↗

Complete 6D tracking of a single electron in the IOTA ring

We present the results of the first experiments on 6-dimensional phase-space tracking of a single electron in a storage ring, using a linear multi-anode photomultiplier tube for simultaneously measuring transverse coordinates and arrival times of synchrotron-radiation pulses. This technology makes it possible to fully reconstruct turn-by-turn positions and momentums in all three planes for a single particle. Complete experimental particle tracking enables the first direct measurements of dynamical properties, including invariants, amplitude and energy dependence of tunes with exceptional precision, and chaotic behavior.

43 PARTICLE ACCELERATORS↗

Complete 6D Tracking of a Single Electron in the IOTA Ring

We present the results of the first experiments on 6-dimensional phase-space tracking of a single electron in a storage ring, using a linear multi-anode photomultiplier tube for simultaneously measuring transverse coordinates and arrival times of synchrotron-radiation pulses. This technology makes it possible to fully reconstruct turn-by-turn positions and momentums in all three planes for a single particle. Complete experimental particle tracking enables the first direct measurements of dynamical properties, including invariants, amplitude and energy dependence of tunes with exceptional precision, and chaotic behavior.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Toward Complete Merger Identification at Cosmic Noon with Deep Learning

As we enter the era of large imaging surveys such as Roman, Rubin, and Euclid, a deeper understanding of potential biases and selection effects in optical astronomical catalogs created with the use of ML-based methods is paramount. This work focuses on a deeper understanding of the performance and limitations of deep learning-based classifiers as tools for galaxy merger identification. We train a ConvNeXT-Pico model on mock HST CANDELS images from the IllustrisTNG50 simulation. Our focus is on a more challenging classification of galaxy mergers and non-mergers at higher redshifts 1 < z < 1.5, including minor mergers and lower mass galaxies down to the stellar mass of 108M⊙. We demonstrate, for the first time, that a deep learning model, such as the one developed in this work, can successfully identify even minor and low mass mergers even at these redshifts. Our model achieves overall accuracy, purity, and completeness of over 73%. We show that some galaxy mergers can only be identified from certain observation angles, leading to a potential upper limit in overall accuracy. Using Grad-CAMs and UMAPs, we more deeply examine the performance and observe a visible gradient in the latent space with stellar mass and specific star formation rate, but no visible gradient with merger mass ratio or merger stage.

Schechter, Aimee L. [U. Colorado, Boulder]↗

Complete the Design, Cost Estimate, Assembly Plan, and Operating Instructions for a Bench-Scale Packed-Bed Tubular Methanol Catalyst Testing System

This report details the design of a test stand that converts carbon dioxide and hydrogen into methanol via a two-step process. The first step is a reverse water-gas shift reaction, carried out at 600°C and 25 bar to reduce carbon dioxide to carbon monoxide, and the second is a synthesis reaction that forms methanol at 260°C and 75 bar. The purpose of the system is to test catalysts for each of these steps. The test stand produces approximately 1.5 gallons of crude methanol (methanol mixed with water) per day, and recycles unreacted syngas for increased efficiency. At peak recycle, the stand is expected to consume 0.29 cylinders per day of carbon dioxide and 1.43 cylinders per day of hydrogen. It is planned to be built next to the Blue Star electrolysis unit in the Energy Systems Laboratory (ESL) and includes future plans of acquiring hydrogen from that stand rather than gas cylinders. At this phase of research, three key documents have been produced, as summarized in Table 1. These documents are primarily intended to describe the system and its operation, demonstrate that selected components are appropriate for the intended application, identify potential hazards, safeguards, and mitigation strategies, and ensure that the system is designed to appropriate standards. The body of the report and its appendices provide a narrative of the work completed in FY25. The parts required to build the test stand will be procured and assembled in FY26. Testing will be conducted in the final quarter.

10 - SYNTHETIC FUELS↗

Mechanistic and Kinetic Analysis of Complete Methane Oxidation on a Practical PtPd/Al 2 O 3 Catalyst

A PtPd/Al 2 O 3 catalyst developed for the complete oxidation of methane from the ventilation air of underground coal mines is compared against a model PdO/Al 2 O 3 catalyst. Although the PtPd/Al 2 O 3 catalyst is substantially more active and stable than the model catalyst, the nature of active sites between the two catalysts is deemed to be fundamentally the same based on their response to different feed gas compositions and the evolution of surface CO adsorption complexes during time-resolved CO adsorption DRIFTS experiment. For both catalysts, coordinatively unsaturated Pd sites are considered the active centers for methane activation and the subsequent oxidation reaction. H 2 O competes with CH 4 for the same active sites, resulting in severe inhibition. Additionally, the CH 4 oxidation reaction also causes self-inhibition. Taking both inhibition effects into consideration, a relatively simple kinetic model is developed. The model provides a good fit of the 72 sets of kinetic data collected on the PtPd/Al 2 O 3 catalyst under practically relevant reaction conditions with CH 4 concentration in the range of 0.05–0.4%, H 2 O concentration of 1.0–5.0%, and reaction temperatures of 450–700 °C. Kinetic parameters based on the model suggest that the CH 4 activation energy on the PtPd/Al 2 O 3 catalyst is 96.7 kJ/mol, and the H 2 O adsorption energy is –31.0 kJ/mol. Both values are consistent with the parameters reported in the literature. The model can be used to develop catalyst sizing guidelines and be incorporated into the control algorithm of the catalytic system.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Missing Wedge Completion via Unsupervised Learning with Coordinate Networks

Cryogenic electron tomography (cryoET) is a powerful tool in structural biology, enabling detailed 3D imaging of biological specimens at a resolution of nanometers. Despite its potential, cryoET faces challenges such as the missing wedge problem, which limits reconstruction quality due to incomplete data collection angles. Recently, supervised deep learning methods leveraging convolutional neural networks (CNNs) have considerably addressed this issue; however, their pretraining requirements render them susceptible to inaccuracies and artifacts, particularly when representative training data is scarce. To overcome these limitations, we introduce a proof-of-concept unsupervised learning approach using coordinate networks (CNs) that optimizes network weights directly against input projections. This eliminates the need for pretraining, reducing reconstruction runtime by 3–20× compared to supervised methods. Our in silico results show improved shape completion and reduction of missing wedge artifacts, assessed through several voxel-based image quality metrics in real space and a novel directional Fourier Shell Correlation (FSC) metric. Our study illuminates benefits and considerations of both supervised and unsupervised approaches, guiding the development of improved reconstruction strategies.

42 ENGINEERING↗