Integration and commissioning plan of Full Flow Purifier at Muon Campus

The Full Flow Purifier for Fermilab’s Muon Campus uses a charcoal bed surrounded by a liquid nitrogen jacket to purify up to 240 g/s of helium gas. Fabrication by Ability Engineering Technology Inc. has been completed and the purifier delivered to Fermilab. It is the largest purifier to be used at Fermilab based on both capacity and size. A previous paper discussed the design of purifier for various operational conditions and horizontal shipping. The purifier is designed to withstand 5g force in vertical and 2g force in lateral and longitudinal directions. Transportation experience from vendor to Fermilab and within site is discussed. Integration of the purifier involved design and fabrication of a liquid nitrogen transfer line, regeneration system, and helium piping to connect it to Muon Campus cryogenic system. It also involved establishing electrical, instrumentation and controls connections to the system. Integration of the purifier is discussed in detail. The purifier is to be commissioned using up to 4 MYCOM helium compressors to supply helium and liquid nitrogen supplied by a 15,000 -gallon tank. Actual effectiveness of the 3-stream heat exchanger is to be estimated based on measured temperatures and flow rate. Impurity levels shall be monitored at inlet and outlet of the purifier. Theoretical adsorption capacity of the purifier is calculated based on the measured temperatures and flowrates and is compared to actual adsorption capacity over time.

Subedi, Jeewan [Fermilab]↗

Wire Plane Transparency: Commissioning the Time Projection Chambers for the Short-Baseline Near Detector

The Short Baseline Near Detector (SBND) serves as the near detector for Fermilab's Short Baseline Neutrino (SBN) programme. It is a 112-ton Liquid Argon Time Projection Chamber (LArTPC) designed to study neutrino-argon interactions and search for new physics phenomena such as sterile neutrinos. Situated just 110 m from the Booster Neutrino Beam (BNB), SBND just began its first physics run and is expected to record over two million neutrino interactions annually. Commissioning the time projection chambers of SBND is crucial for optimising detector performance. Each of the two anodes is composed of three charge-sensing wire planes which detect drifting ionisation electrons from charged particles traversing the detector. The wire planes, arranged with different 2D orientations, facilitate the 3D reconstruction of neutrino interactions. Electron transport induces signals on the first two planes, with the signal being collected by the rear plane. The first two induction planes require transparency to ensure all drift electrons reach the collection plane. This transparency depends on the bias voltages applied to the wires and the spacing between them. Fine-tuning these bias voltages ensures the optimisation of wire plane transparency. In this poster, I will demonstrate how transparency can be assessed by analysing the waveforms from cosmic-ray muon tracks traversing the detector at specific orientations.

McCusker, Bethany [Unlisted, US]↗

Commission < 5 µm spatial resolution x-ray imager for High Resolution Turbulence experiments

This report presents the successful development, commissioning, and deployment of the Scintillation-Based X-ray Imager (SBXI) for the High-Resolution Turbulence (HRT) campaign at the National Ignition Facility (NIF). The SBXI system was designed to overcome the spatial resolution and efficiency limitations of conventional x-ray imaging detectors. Through careful system engineering, rigorous laboratory characterization, and experimental validation at NIF, the SBXI has demonstrated spatial resolution at the object plane of 5 μm (±0.5 μm) and a detective quantum efficiency (DQE) of 34% at 7.2 keV, both of which surpass the requirements set by the campaign, and meeting the L2 milestone. The system’s deployment enables high-fidelity imaging of fine-scale hydrodynamic instabilities, directly supporting advanced turbulence model validation and future high energy density physics research.

42 ENGINEERING↗

Furthering Advancements to Shorten the Time (FAST) to Commissioning for Pumped Storage Hydropower (PSH) Prize: Cooperative Research and Development (Final Report)

The National Renewable Energy Laboratory initiated a Prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, nine finalists have been chosen to develop their concepts in advance of the FAST Prize Pitch Contest to be held on October 7, 2019. The National Labs will provide technical and business advisement to the noted FAST Prize finalists in preparation for this Pitch Contest.

16 TIDAL AND WAVE POWER↗

State Spotlight on Resilience: The Michigan Public Service Commission and Data Informed Accountability

Resilience activities are an emerging area within regulatory utility policy. As resilience frameworks develop, many Public Utility Commissions (PUCs) are looking to initiate resilience activities and have identified enhancing grid reliability as a practical starting point. Reliability describes the grid’s ability to deliver electricity steadily and without interruptions under normal or “blue sky” conditions. Reliability is measured using industry standard metrics such as outage frequency (SAIFI) and outage duration (SAIDI). Resilience is broader, reflecting the grid’s ability to both withstand and recover from disruptions, particularly those caused by extreme events such as severe storms. A reliable grid minimizes routine disruptions; a resilient grid ensures the system can recover quickly when disruptions occur, preventing them from escalating into widespread or prolonged crises.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Retro-Commissioning Sensor Suitcase for Energy Efficiency (CRADA Final Report)

The Sensor Suitcase project aimed to enable cost-effective, data-driven retro-commissioning (RCx) in small commercial buildings through a self-installable toolkit consisting of portable sensors and diagnostic software. Results showed that the Sensor Suitcase could identify common operational faults leading to 5–15% energy savings opportunities, with automated reports requiring minimal user interpretation. The project adhered closely to its Statement of Work (SOW) but evolved the reporting interface and sensor logging duration based on field feedback. The development and validation of diagnostics are documented in PNNL technical reports and internal analysis summaries.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Commissioning of the Mu2e Data AcQuisition System and the Vertical Slice Test of the Straw Tracker

The report discusses the commissioning of the DAQ system of the Mu2e experiment. We studied how the tracker works and especially the tracker readout. We used a generator to send pulses and we tried to understand the output and non-output of the DTC, in order to validate the event and run format and all the failure modes. In section one, we describe Charged Lepton Flavour Violation, the main purpose of Mu2e, in section two we describe Mu2e experiment. Section three presents the tracker description and readout, meanwhile section four the DAQ system and event building. In section five, we start explaining the analysis we have done on events and all the failure modes we discovered. In section six, we have done an analysis of the logger and boardreader rate, we validated the generator frequency in section seven and studied the number of hits in function of the channel number in section eight. To conclude we investigated the channel to channel time differences in section nine and in section ten we explain our Monte Carlo simulation, reproducing ROCs readout.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Commissioning of the trigger system for the ICARUS T600 LAr-TPC detector in SBN Program

The ICARUS experiment at Fermilab is the far detector of the Short Baseline Neutrino Program (SBN), aimed at studing the neutrino oscillation to find a fourth type of neutrino, called sterile neutrino. A key component for this detector is the trigger system, which aims to identify and isolate the physical interactions from the background events. In this framework my internship program was dedicated to the development of trigger logic and trigger inhibit mechanism in order to select the genuine neutrino interaction and to guarantee a correct functioning of the readout system. These two steps, that represent a part of the commissioning of the trigger system, were implemented with LabVIEW Software. The obtained results are a fundamental step towards a succesful activation of the detector in the next few months.

43 PARTICLE ACCELERATORS↗

Pre-Commissioning of the Wide-Dynamic Range Halo Monitor to be Installed in the FERMILAB MI-8 Line

The beam halo can contribute to beam losses in accelerators and is very difficult to measure. With an increase in beam intensity following the PIP-II upgrade at Fermilab, the beam losses are expected to be higher with some coming from the beam halo. Therefore, it is important to measure the sources of beam halo to minimize the beam losses. A modified Halo Monitor developed by J-PARC will be installed in Fermilab MI-8 transfer line to measure the beam halo. In this paper, an update on the beam profile monitor fabrication is covered. The updates include the location selection for the Halo Monitor in the MI-8 transfer line, shielding options for instrumentation, and the next steps in commissioning.

Babacan, B. [IIT, Chicago; Fermilab]↗

Augmenting LLM-Based Agents for Improved Performance in Pentesting and Commissioning Operational Technology in Critical Infrastructure

Artificial intelligence (AI), and more specifically large language models (LLMs) have the potential for use in penetration testing (“pentesting”) against devices, networks, and computer systems in information technology (IT). We explore the possibility of extending pentesting from IT systems to operational technology (OT) systems, which are more obscure than IT systems in their protocols and design. A challenge therefore exists when applying pretrained LLMs to OT systems as corpora are likely to underrepresent OT systems in comparison to other more prevalent systems. We evaluate augmentations of LLMs with various methods, especially retrieval augmented generation (RAG), to improve performance of the LLMs in the OT domain. In addition to pentesting, some of the testing of these OT devices may include commissioning to ensure that the newly installed devices work correctly. Our framework may also be applied in such cases.

97 MATHEMATICS AND COMPUTING↗

Commissioning of the IOTA Proton Injector

The IOTA Proton Injector (IPI) at the Fermilab Accelerator Science and Technology facility (FAST) is a machine capable of delivering up to 14 mA pulses of protons at 2.5 MeV to the Integrable Optics Test Accelerator (IOTA) ring. Its construction was completed in the fall of 2025, followed by a successful commissioning run scheduled to conclude at the end of May 2026. It operates alongside the existing electron injector beamline to facilitate further beam physics research and continued development of novel accelerator technologies at the IOTA ring. This report details the current operational profile, known challenges, and future plans for the proton program development at FAST.

Romanov, A. [Fermilab] (ORCID:0000000287065709)↗

Overview and Commissioning Status of the UCLA MITHRA Facility

Presented here are the first results of commissioning of the S-Band hybrid photoinjector and laser systems at the new accelerator and light source facility, MITHRA, at UCLA. The radiation bunker and capabilities of the facility are described with motivation for detailed measurement of beam parameters explained. Following thorough characterization of the photoinjector, a 1.5 m linac is to be installed and experiments up to 30 MeV will begin. These will include experiments in basic plasma physics, space plasma, terahertz production in dielectric structures, and inverse Compton scattering and applications for the X-rays produced.

Williams, Oliver (ORCID:0000000255874982)↗

LSST Commissioning Camera

The LSST Commissioning Camera (LSSTComCam) was mounted on the Simonyi Survey Telescope in August 2022 and observed for seven weeks in late 2024 until it was removed from the telescope in December 2024. It is a smaller, fully functional version of LSSTCam, with only the central raft of 9 4k x 4k CCDs (all ITL sensors) and comprising 144 megapixels. Every CCD has 16 amplifiers, each reading 1 million pixels. LSSTComCam was designed to enable end-to-end testing of the observatory’s systems, including data acquisition, image processing, and observatory operations.

79 ASTRONOMY AND ASTROPHYSICS↗

Actions to implement the recommendations of the Presidential Commission on the Space Shuttle Challenger Accident. Report to the President

The status of the implementation of the recommendations of the Presidential Commission on the Space Shuttle Challenger Accident is reported. The implementation of recommendations in the following areas is detailed: (1) solid rocket motor design; (2) shuttle management structure, including the shuttle safety panel and astronauts in management; (3) critical item review and hazard analysis; (4) safety organization; (5) improved communication; (6) landing safety; (7) launch abort and crew escape; (8) flight rate; and (9) maintenance safeguards. Supporting memoranda and communications from NASA are appended.

Source record↗

Report of the Presidential Commission on the Space Shuttle Challenger Accident, Volume 5

This volume contains all the hearings of the Presidential Commission on the Space Shuttle Challenger accident from 26 February to 2 May 1986. Among others is the testimony of L. Mulloy, Manager, Space Shuttle Solid Rocket Booster Program, Marshall Space Flight Center and G. Hardy, Deputy Director, Science and Engineering, Marshall Space Flight Center.

Source record↗

Actions to Implement the Recommendations of the Presidential Commission on the Space Shuttle Challenger Accident: Executive Summary

The status of the implementation of the recommendations of the Presidential Commission on the Space Shuttle Challenger Accident is reported. The implementation of recommendations in the following areas is detailed: (1) solid rocket motor design; (2) shuttle management structure, including the shuttle safety panel and astronauts in management; (3) critical item review and hazard analysis; (4) safety organization; (5) improved communication; (6) landing safety; (7) launch abort and crew escape; (8) flight rate; and (9) maintenance safeguards. Supporting memoranda and communications from NASA are appended.

Source record↗