Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “capital”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

University-level Non-proliferation and Safeguards Education and Human Capital Development Activities at Brookhaven National Laboratory

BNL has offered Nuclear Nonproliferation, Safeguards and Security in the 21st Century,? referred to as NNSS, every year since 2009 for graduate students in technical and policy fields related to nuclear safeguards and nonproliferation. The course focuses on relevant policy issues, in addition to technical components, and is part of a larger NGSI short course initiative that includes separate courses that are delivered at three other national laboratories and NNSA headquarters. [SCHOLZ and ROSENTHAL] The course includes lectures from esteemed nonproliferation experts, tours of various BNL facilities and laboratories, and in-field and table-top exercises on both technical and policy subjects. Topics include the history of the Treaty on the Non-proliferation of Nuclear Weapons (NPT) and other relevant treaties, the history of and advances in international nuclear safeguards, current relevant political situations in countries such as Iran, Iraq, and the Democratic Peoples? Republic of Korea (DPRK), nuclear science and technology, instrumentation and techniques used for verification activities, and associated research and development. The students conduct a mock Design Information Verification (DIV) at BNL?s decommissioned Medical Research Reactor. The capstone of the course includes a series of student presentations in which students act as policy advisors and provide recommendations in response to scenarios involving a current nonproliferation related event that are prepared by the course organizers. ?The course is open to domestic and foreign students, and caters to students in, entering, or recently having completed graduate school. Interested students must complete an application and provide a resume and a statement describing their interest in the course. Eighteen to 22 students attend annually; 165 students have completed the course to date. A stipend helps to defray students? travel and subsistence expenses. In 2015, the course was shortened from three weeks to two weeks to streamline the material, standardize NGSI course length, and draw in a larger applicant pool. ?The international and interdisciplinary mix of students attending the course encourages discussions of the topics presented during the course. Information about the course is available at https://www.bnl.gov/nnsscourse/. While a complete analysis of course students has not been undertaken, BNL is aware of three individuals who worked at national laboratories after attending the NNSS course, one who worked at a national laboratory prior to attending NNSS, two who worked as federal employees after attending NNSS, three who were Nonproliferation Graduate Fellows before or after attending NNSS, and three who have participated in other NGSI activities.?Design Information Verification is an IAEA inspection activity that is implemented for the purpose of ensuring that the facility design is consistent with the declared use of a facility.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Convex Capital Cost Optimization: A Rwandan Case

Most power grids were designed and constructed for a centralized generation system, under the principle of large plants transmitting power over long distances. For grids with increasingly high renewable generators, the intermittent nature of renewable energy production can cause large seasonal swings in the supply [1]. To account for these changes, developing countries often use centralized diesel generation to satisfy energy peak demand each day, as diesel generation is relatively easy to ramp, is not dependent on weather, and has a fairly low fixed cost to add capacity. However, in this study we want to provide a tool to question whether diesel is the most economic way to shave peak demand in some developing countries.

13 HYDRO ENERGY↗

A Proposed Framework For Planning Deactivation And Decommissioning Engineering And Design Activities To Meet The Requirements Of DOE Order 413.3A, Program And Project Management For The Acquisition Of Capital Assets

This paper applies the DOE O 413.3A Design/Engineering requirements to Deactivation and Decommissioning (D and D) projects. A list of 41 activities for which Design/Engineering is generally required and which are relevant and common to many D and D projects was generated. For several activities in this list, examples of the level of development and/or types of deliverables that might be expected at the completion of the conceptual, preliminary and final project design phases described in the Order are provided. This paper also discusses tailoring the application of the Order to a facility based on the complexity of the facility's engineered systems and the hazards existing in the facility. DOE D and D projects are expected to meet the requirements of DOE O 413.3A. For D and D engineering and design activities only, this paper provides guidance for applying these requirements to the Order. A list of 41 typical D and D engineering and design activities has been provided. The Order divides projects into conceptual, preliminary and final design phases. Development of each of the 41 activities can also be organized in conceptual, preliminary and final levels. In general, at the conceptual level project engineers should be determining the what (i.e., the scope) for each activity. At the preliminary level they should be resolving how the activity will be accomplished. At the final level, all the engineering and design details for the activity should be completed so that the activity is ready to implement in the field. It may not be appropriate that development of each individual activity correspond to the current phase of the project. For example, at CD-2 (end of the preliminary design phase) not all activities need be developed to the same level of detail. Only those that are truly significant to the project baseline must be developed to the level of detail necessary to create a reliable project baseline. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A PROPOSED FRAMEWORK FOR PLANNING DEACTIVATION AND DECOMMISSIONING ENGINEERING AND DESIGN ACTIVITIES TO MEET THE REQUIREMENTS OF DOE ORDER 413.3A, PROGRAM AND PROJECT MANAGEMENT FOR THE ACQUISITION OF CAPITAL ASSETS

This paper provides guidance in applying the requirements of DOE O 413.3A to Deactivation and Decommissioning (D&D) projects. A list of 41 engineering and design activities relevant to D&D projects was generated. For several activities in this list, examples of the level of development and/or types of deliverables that might be expected at the completion of the conceptual, preliminary and final project design phases described in the Order are provided.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Techno-Economic Assessment of the Factory Production of Small Modular Reactor

The demand for electricity continues to grow around the world while pressures remain high to reduce carbon emissions. Nuclear energy provides a strong and reliable baseload power component without a high output of greenhouse gases. Global nuclear energy capacity is increasing with 62 reactors under construction in 14 countries. Nuclear energy will be crucial as energy demands are met with a sustainable and diverse energy portfolio. Small modular reactors (SMRs) are small scale (less than 300 MWe) reactors that incorporate the same advanced technologies included in recent LR nuclear reactor designs. SMRs are designed to include the latest reactor technology including passive safety features. SMRs offer economic advantages over LRs such as lower up-front capital and easier integration into the existing power grid. The modular characteristic of SMRs would allow incremental additions to power plants years after its completion. The cost of constructing SMR power plants will determine their future in the energy industry. Three SMR reactors are in advanced stages of design in the United States; the Westinghouse 225 MWe, mPower 180 MWe and nuScale 45 MWe. SMRs are expected to have lower capital expenses of reactor components due to factory production. Current estimates predict these savings to reduce SMR capital 30-40%. Existing studies have estimated SMR capital using economies of scale and holistic discounts applied to an overall capital expense figure, but do not include the expense of an SMR factory facility. To better understand the actual costs associated with construction of an SMR power plant, capital components will be broken down according to its place in the construction phase. The expense of a factory facility will also be included with SMR capital expenses to determine its significance and benefits to overall capital expenses. Results from this study show that SMRs can compete with LRs in terms of startup costs. The capital cost of building a factory for SMRs was previously overlooked for SMR capital estimates. The annualized capital expenses expected for an SMR factory are very small, but offer significant discounts to the overall capital costs for SMRs. Case 3 shows that factory production can reduce SMR capital expenses to the range of 30%-40% when compared to Case 1 in this study. Factory savings of this magnitude would require factory production of several SMR reactor and generator components including the reactor pressure vessel, control rods, steam generation, and chemical and volume control system, containment, condenser and turbo-generator. SMRs will also benefit from lower indirect expenses due to a much smaller construction duration. It is expected that SMRs will have capital costs competitive with LRs. The differences between Case 2 and Case 3 in this study show that SMRs are heavily dependent on the cost reductions coming from factory production. The factory facility represents a small increase in capital expense, but accounts for a large reduction of cost for factory components. SMRs have the potential to meet growing energy demands in the United States and around the world, but their economic viability is dependent on a factory facility that will lower the capital expenses of reactor and generator components. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Economic Benefits of Advanced Materials in Nuclear Power Systems

One of the key obstacles for the commercial deployment of advanced fast reactors (for either transuranic element burning or power generation) is the capital cost. There is a perception of higher capital cost for fast reactor systems than advanced light water reactors (ALWR). However, the cost estimates for a fast reactor come with a large uncertainty due to the fact that far fewer fast reactors have been built than LWR facilities. Furthermore, the large variability of industrial cost estimates complicates accurate comparisons. For example, under the Gen IV program, the Japanese Sodium Fast Reactor (JSFR) has a capital cost estimate that is lower than current LWR s, and considerably lower than that for the PRISM design (which is arguably among the most mature of today s fast reactor designs). Further reductions in capital cost must be made in US fast reactor systems to be considered economically viable. Three key approaches for cost reduction can be pursued. These include design simplifications, new technologies that allow reduced capital costs, and simulation techniques that help optimize system design. While it is plausible that improved materials will provide opportunities for both simplified design and reduced capital cost, the economic benefit of advanced materials has not been quantitatively analyzed. The objective of this work is to examine the potential impact of advanced materials on the capital investment costs of fast nuclear reactors.

Busby, Jeremy T↗