Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “building layout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

The reservoir network: A new network topology for district heating and cooling

Thermal district networks are effective solutions to substitute fossil fuels with renewable energy sources for heating and cooling. Moreover, thermal networking of buildings allows energy efficiency to be further increased. The waste heat from cooling can be reused for heating in thermal district systems. Because of bidirectional energy flows between prosumers, thermal networks require new hydraulic concepts. In this work, we present a novel network topology for simultaneous heating and cooling: the reservoir network. The reservoir network is robust in operation due to hydraulic decoupling of transfer stations, integrates heat sources and heat sinks at various temperature levels and is flexible in terms of network expansion. Furthermore, we used Modelica simulations to compare the new single-pipe reservoir network to a basecase double-pipe network, taking yearly demand profiles of different building types for heating and cooling. The electric energy consumed by the heat pumps and circulations pumps differs between the reservoir and base case networks by less than 1%. However, if the reservoir network is operated with constant instead of variable mass flow rate, the total electrical consumption can increase by 48% compared to the base case. As with any other network topology, the design and control of such networks is crucial to achieving energy efficient operation. Investment costs for piping and trenching depend on the district layout and dimensioning of the network. If a ring layout is applied in a district, the reservoir network with its single-pipe configuration is more economical than other topologies. For a linear layout, the piping costs are slightly higher for the reservoir network than for the base case because of larger pipe diameters.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ORCHA: A performance portability system for extreme heterogeneity

Heterogeneity is the prevalent trend in the rapidly evolving high-performance computing (HPC) landscape in both hardware and application software. The diversity in hardware platforms, currently comprising various accelerators and a future possibility of specializable chiplets, poses a significant challenge for scientific software developers aiming to harness optimal performance across different computing platforms while maintaining the quality of solutions when their applications are simultaneously growing more complex. Code synthesis and code generation can provide mechanisms to mitigate this challenge. We have developed a divide and conquer approach where different aspects of performance are handled by different stand-alone tools that are interfaced with the application through generated code. This portability system, ORCHA, enables users to configure and orchestrate their computations among available resources on a platform by specifying a high-level recipe, thereby permitting a many-to-many paradigm where each recipe results in a different variant of the application. The core design goal is to let users decide the application’s hardware mapping and orchestration by editing only the high-level recipe—without modifying the maintained source code or binding the application to a particular runtime system. Tools in ORCHA distribution are: CG-Kit for translating the recipe into an execution graph; Milhoja to execute the graph by orchestrating data and task movement among hardware resources; and Macroprocessor that enables users to define their own code-shorthand for higher composability and easier management of code variants. Additionally, the design of ORCHA permits tools to work in a plug-and-play mode where the application can build and run without CG-Kit and Milhoja, and either tool can be swapped out for other tools with similar capabilities by modifying the code generation portion of ORCHA. In this paper, we describe the design of ORCHA and the role that code-generation plays in isolating applications from tools. We demonstrate the breadth of configurations ORCHA enables with a case study in which an application configuration is realized on three distinct hardware mappings—a GPU-centric, a CPU/GPU balanced, and a CPU/GPU concurrent layouts by using different recipes.

Lee, Youngjun↗

Space Launch System Co-Manifested Payload Options for Habitation

The Space Launch System (SLS) has a co-manifested payload capability that will grow over time as the rocket matures and planned upgrades are implemented. The final configuration is planned to be capable of inserting a payload greater than 10 metric tons (mt) into a trans-lunar injection trajectory along with the crew in the Orion capsule and the service module. The co-manifested payload is located below the Orion and its service module in a 10-meter high fairing similar to the way the Saturn launch vehicle carried the lunar lander below the Apollo command and service modules. A variety of approaches have been explored that utilizes this co-manifested payload capability to build up infrastructure in deep space in support of future asteroid, lunar, and Mars mission scenarios. This paper is a report on the findings from the Advanced Concepts Office study team at the NASA Marshall Space Flight Center, working with the Advanced Exploration Systems Program on the Exploration Augmentation Module Project. It includes some of the possible options for habitation in the co-manifested payload volume on SLS. Findings include module designs that can be developed in 10mt increments to support these missions, including overall conceptual layouts, mass properties, and approaches for integration into various scenarios for near-term support of deep space habitat research and technology development, support to asteroid exploration, and long range support for Mars transfer flights.

Smitherman, David↗

Pre-Project Planning for a Flameless Pressurized Oxy-Combustion Pilot Plant (Final Technical Report)

The team of Southwest Research Institute® (SwRI®), ITEA, Electric Power Research Institute, Inc. (EPRI), GE Global Research (GE), Jacobs Engineering (Jacobs), and Peter Reineck Associates (PRA) are advancing Flameless Pressurized Oxy-Combustion (FPO), a novel coal technology. This effort seeks to complete the preliminary engineering and planning of a 50-MWth Pilot Plant that produces electricity and steam for district heating. The technology, pioneered by ITEA at the 5-MWth scale, must be brought to a higher technology readiness level (TRL) to be viable at the commercial scale. This project builds upon extensive evaluation of the techno-economic performance of the FPO technology already performed by ITEA. This includes system improvements, such as the addition of a turbo-expander to the flue gas stream. Some of the performance-enhancing components are not as well defined as others. The primary goal of this project was to bring all of the core cycle components to the same level of design maturity. Extensive cycle modeling and evaluation explored various configurations of the process. Different coals, operating conditions, and heat recovery devices were considered and modeled using Aspen Plus. The results of the cycle modeling informed the pilot plant configuration and the planned configuration at the commercial scale. The system pressurization is maintained in the flue gas clean-up and water removal. This allows for efficient and cost-effective carbon dioxide compression and sequestration package. Once the cycle was optimized, preliminary drawings, layouts, and plans defined the pilot facility. Process flow diagrams (PFD) were used to describe the pilot configuration in greater detail. A heat and mass balance with stream data was created. A master equipment list specified the operating conditions for major pieces of equipment within the pilot using this heat and mass balance. A detailed cost estimate for the planned configuration was completed with an Association for the Advancement of Cost Engineering (AACE) Class IV level of cost analysis. A site selection effort evaluated a variety of potential candidate sites. The selection effort focused on three sites for an in-depth evaluation of the merits and viability of hosting a pilot demonstration. The ability of the host site to support the project with cost sharing was also assessed. The selection process chose the University of Wyoming (UW) as the host site, and cost estimates for the pilot capital estimate were made using local data. A preliminary test plan and operation plan, which creates figures of merit, control, and instrumentation was produced. An effort that outlines methods of pilot cost reduction was completed near the end of the project. A techno-economic assessment (TEA) evaluated the FPO technology at the commercial scale in comparison to the NETL baseline cases. The reference plants were used in combination with proprietary equipment estimates to build a plant capital cost and cost of electricity evaluation. FPO performed better than the sub-bituminous post-combustion capture cases. Further preliminary estimates of improvements to the FPO cycle show even further gains when compared to conventional carbon capture methods.

01 COAL, LIGNITE, AND PEAT↗

MODELING AND TESTING OF A NOVEL ULTRA-LOW TEMPERATURE SCO2 OPPOSING PISTON EXPANDER

The Flameless Pressurized Oxy-Combustion (FPO) cycle, a novel flexible fuel technology, is being developed into a large pilot. This effort seeks to complete the preliminary engineering and planning of a 25 MWth Pilot Plant that will demonstrate the technology for scale-up to a commercial unit. The technology, pioneered by ITEA at the 5 MWth scale, must be brought to a higher technology readiness level (TRL) to be viable at the commercial scale. The 25 MWth pilot cycle was optimized for cost and technology development and demonstration. Preliminary drawings, layouts, and plans were defined. Process flow diagrams were used to describe the pilot configuration in greater detail. A heat and mass balance with stream data was created. A master equipment list specified the operating conditions for major pieces of equipment within the pilot using this heat and mass balance. The 25 MWth FPO pilot is assessed for environmental performance. A test campaign is developed to assess the type of test and number of hours required for pilot demonstration. The environmental performance is compared against projected performance at the commercial scale. This project builds upon extensive evaluation of the techno-economic performance of the FPO technology already performed by ITEA. This includes system improvements, such as the addition of a turbo-expander to the flue gas stream. Some of the performance-enhancing components are not as well defined as others. The primary goal of this effort was to bring all of the core cycle components to the same level of design maturity. A techno-economic assessment (TEA) evaluated the FPO technology at the commercial scale in comparison to the NETL baseline cases. The reference plants were used in combination with proprietary equipment estimates to build a plant capital cost and cost of electricity evaluation. FPO performed better than the sub-bituminous post-combustion capture cases. Further preliminary estimates of improvements to the FPO cycle show even further gains when compared to conventional carbon capture methods.

01 COAL, LIGNITE, AND PEAT↗

DEVELOPMENT OF A 25 MWTH FLAMELESS PRESSURIZED OXY-COMBUSTION PILOT

The Flameless Pressurized Oxy-Combustion (FPO) cycle, a novel flexible fuel technology, is being developed into a large pilot. This effort seeks to complete the preliminary engineering and planning of a 25 MWth Pilot Plant that will demonstrate the technology for scale-up to a commercial unit. The technology, pioneered by ITEA at the 5 MWth scale, must be brought to a higher technology readiness level (TRL) to be viable at the commercial scale. The 25 MWth pilot cycle was optimized for cost and technology development and demonstration. Preliminary drawings, layouts, and plans were defined. Process flow diagrams were used to describe the pilot configuration in greater detail. A heat and mass balance with stream data was created. A master equipment list specified the operating conditions for major pieces of equipment within the pilot using this heat and mass balance. The 25 MWth FPO pilot is assessed for environmental performance. A test campaign is developed to assess the type of test and number of hours required for pilot demonstration. The environmental performance is compared against projected performance at the commercial scale. This project builds upon extensive evaluation of the techno-economic performance of the FPO technology already performed by ITEA. This includes system improvements, such as the addition of a turbo-expander to the flue gas stream. Some of the performance-enhancing components are not as well defined as others. The primary goal of this effort was to bring all of the core cycle components to the same level of design maturity. A techno-economic assessment (TEA) evaluated the FPO technology at the commercial scale in comparison to the NETL baseline cases. The reference plants were used in combination with proprietary equipment estimates to build a plant capital cost and cost of electricity evaluation. FPO performed better than the sub-bituminous post-combustion capture cases. Further preliminary estimates of improvements to the FPO cycle show even further gains when compared to conventional carbon capture methods.

20 FOSSIL-FUELED POWER PLANTS↗

Converter/Compressor Building Solid Waste Management Unit (SWMU) #89 Monitoring Well 21 Area Interim Measure Work Plan

This Work Plan details the approach and design for the Interim Measure (IM) to remediate groundwater within the MW21 Area where VOC concentrations exceed Florida Department of Environmental Protection Natural Attenuation Default Concentrations. The IM includes in-situ bioremediation via injection of emulsified vegetable oil (EVO) and emulsified zero-valent iron (EZVI). The in-situ bioremediation technology consists of injecting an electron donor substrate into the subsurface to promote microbial breakdown of VOCs. The EVO injections for this IM are designed based on the use of Provectus ERD-CH4, which is a vegetable oil/carbon substrate mixture. The EZVI injections for this IM are designed based on the use of Provectus EZVI-CH4. The IM treatment layout consists of nine injection locations of EVO at approximately 10-foot radius of influence (ROI) and three injections locations of EZVI at approximately 6-foot ROI. The injection method will be direct push using a DPT rig. The overall injection depths range from 7 to 17 ft bls. The 7 ft bls top depth is designed to be 2 ft below the water table to prevent substrates from reaching the top of the water table. Injections are planned to be implemented using 2 ft intervals and will take place using a bottom-up approach to 2 ft below the water table. This work plan further describes the IM design, injection calculations, performance monitoring plan, and provides an injection layout. Revision 1 of this Work Plan includes quarterly performance sampling during Year 1 in accordance with F.A.C. 62-780. These changes are reflected in Section 7 and Table 2 of the Work Plan.

Mark J Jonnet↗

Space to Space Advanced EMU Radio

The main task for this project was the development of a prototype for the Space to Space Advanced EMU Radio (SSAER). The SSAER is an updated version of the Space to Space EMU Radio (SSER), which is the current radio used by EMUs (Extravehicular Mobility Unit) for communication between suits and with the ISS. The SSER was developed in 1999, and it was desired to update the design used in the system. Importantly, besides replacing out-of-production parts it was necessary to decrease the size of the radio due to increased volume constraints with the updated Portable Life Support System (PLSS) 2.5, which will be attached on future space suits. In particular, it was desired to fabricate a PCB for the front-end of the prototype SSAER system. Once this board was manufactured and all parts assembled, it could then be tested for quality of operation as well as compliancy with the SSER required specifications. Upon arrival, a small outline of the target system was provided, and it was my responsibility to take that outline to a finished, testable board. This board would include several stages, including frequency mixing, amplification, modulation, demodulation, and handled both the transmit and receive lines of the radio. I developed a new design based on the old SSER system and the outline provided to me, and found parts to fit the tasks in my design. It was also important to consider the specifications of the SSER, which included the system noise figure, gain, and power consumption. Further, all parts needed to be impedance matched, and spurious signals needed to be avoided. In order to fulfill these two requirements, it was necessary to perform some calculations using a Smith Chart and excel analysis. Once all parts were selected, I drew the schematics for the system in Altium Designer. This included developing schematic symbols, as well as layout. Once the schematic was finished, it was then necessary to lay the parts out onto a PCB using Altium. Similar to the schematic design, in order to accomplish this it was necessary to develop component land patterns and add component 3D models. All of this was achieved, and the PCB is currently in review. After it is finished being reviewed, this board will be sent out for manufacture. All electronic components used in the PCB have been acquired, and once the board arrives they will be soldered onto the board using a machine in building 44. Finally, the board will be tested for performance on-site. This will likely be accomplished by the end of the internship.

Maicke, Andrew↗

Fusion PIC code performance analysis on the Cori KNL system

We study the attainable performance of Particle-In-Cell codes on the Cori KNL system by analyzing a miniature particle push application based on the fusion PIC code XGC1. We start from the most basic building blocks of a PIC code and build up the complexity to identify the kernels that cost the most in performance and focus optimization efforts there. Particle push kernels operate at high AI and are not likely to be memory bandwidth or even cache bandwidth bound on KNL. Therefore, we see only minor benefits from the high bandwidth memory available on KNL, and achieving good vectorization is shown to be the most beneficial optimization path with theoretical yield of up to 8x speedup on KNL. In practice we are able to obtain up to a 4x gain from vectorization due to limitations set by the data layout and memory latency.

97 MATHEMATICS AND COMPUTING↗

PDF Entity Annotation Tool (PEAT)

While different text mining approaches – including the use of Artificial Intelligence (AI) and other machine based methods - continue to expand at a rapid pace, the tools used by researchers to create the labeled datasets required for training, modeling, and evaluation remain rudimentary. Labeled datasets contain the target attributes the machine is going to learn; for example, training an algorithm to delineate between images of a car or truck would generally require a set of images with a quantitative description of the underlying features of each vehicle type. Development of labeled textual data that can be used to build natural language machine learning models for scientific literature is not currently integrated into existing manual workflows used by domain experts. Published literature is rich with important information, such as different types of embedded text, plots, and tables that can all be used as inputs to train ML/natural language processing (NLP) models, when extracted and prepared in machine readable formats. Currently, both normalized data extraction of use to domain experts and extraction to support development of ML/NLP models are labor intensive and cumbersome manual processes. Automatic extraction of data and information from formats such as PDFs that are optimized for layout and human readability, not machine readability. The PDF (Portable Document Format) Entity Annotation Tool (PEAT) was developed with the goal of allowing users to annotate publications within their current print format, while also allowing those annotations to be captured in a machine-readable format. One of the main issues with traditional annotation tools is that they require transforming the PDF into plain text to facilitate the annotation process. While doing so lessens the technical challenges of annotating data, the user loses all structure and provenance that was inherent in the underlying PDF. Also, textual data extraction from PDFs can be an error prone process. Challenges include identifying sequential blocks of text and a multitude of document formats (multiple columns, font encodings, etc.). As a result of these challenges, using existing tools for development of NLP/ML models directly from PDFs is difficult because the generated outputs are not interoperable. We created a system that allows annotations to be completed on the original PDF document structure, with no plain text extraction. The result is an application that allows for easier and more accurate annotations. In addition, by including a feature that grants the user the ability to easily create a schema, we have developed a system that can be used to annotate text for different domain-centric schemas of relevance to subject matter experts. Different knowledge domains require distinct schemas and annotation tags to support machine learning.

97 MATHEMATICS AND COMPUTING↗

Evaluation of performance indicators applied to a material recovery facility fed by mixed packaging waste

Highlights: • Material Flows assessment of a Material Recovery Facility has been realized. • Performance Indicators for a generic MRF have been proposed. • A Dashboard has been utilized to measure the facility performance. • Experimental values of incoming waste and output products composition are reported. - Abstract: Most of the integrated systems for municipal solid waste management aim to increase the recycling of secondary materials by means of physical processes including sorting, shredding and reprocessing. Several restrictions prevent from reaching a very high material recycling efficiency: the variability of the composition of new-marketed materials used for packaging production and its shape and complexity are critical issues. The packaging goods are in fact made of different materials (aluminium, polymers, paper, etc.), possibly assembled, having different shape (flat, cylindrical, one-dimensional, etc.), density, colours, optical properties and so on. These aspects limit the effectiveness and efficiency of the sorting and reprocessing plants. The scope of this study was to evaluate the performance of a large scale Material Recovery Facility (MRF) by utilizing data collected during a long period of monitoring. The database resulted from the measured data has been organized in four sections: (1) data related to the amount and type of inlet waste; (2) amount and composition of output products and waste; (3) operating data (such as worked hours for shift, planned and unscheduled maintenance time, setting parameters of the equipment, and energy consumption for shift); (4) economic data (value of each product, disposal price for the produced waste, penalty for non-compliance of products and waste, etc.). A part of this database has been utilized to build an executive dashboard composed by a set of performance indicators suitable to measure the effectiveness and the efficiency of the MRF operations. The dashboard revealed itself as a powerful tool to support managers and engineers in their decisions in respect to the market demand or compliance regulation variation as well as in the designing of the lay-out improvements. The results indicated that the 40% of the input waste was recovered as valuable products and that a large part of these (88%) complied with the standards of the recycling companies. The evaluation of the indicators led to the decision to modify the layout to improve the interception of some polymers for which the performance indicators were poor. In particular, two additional optical sorters have to be inserted to increase the yield indicator and to the overall performance of the facility. Definitely, the results of the work allowed to: increase the yield and purity of products’ flows; ensure the compliance of waste flows; increase the workability.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AP1000{sup R} design robustness against extreme external events - Seismic, flooding, and aircraft crash

Both the International Atomic Energy Agency (IAEA) and the U.S. Nuclear Regulatory Commission (NRC) require existing and new nuclear power plants to conduct plant assessments to demonstrate the unit's ability to withstand external hazards. The events that occurred at the Fukushima-Dai-ichi nuclear power station demonstrated the importance of designing a nuclear power plant with the ability to protect the plant against extreme external hazards. The innovative design of the AP1000{sup R} nuclear power plant provides unparalleled protection against catastrophic external events which can lead to extensive infrastructure damage and place the plant in an extended abnormal situation. The AP1000 plant is an 1100-MWe pressurized water reactor with passive safety features and extensive plant simplifications that enhance construction, operation, maintenance and safety. The plant's compact safety related footprint and protection provided by its robust nuclear island structures prevent significant damage to systems, structures, and components required to safely shutdown the plant and maintain core and spent fuel pool cooling and containment integrity following extreme external events. The AP1000 nuclear power plant has been extensively analyzed and reviewed to demonstrate that it's nuclear island design and plant layout provide protection against both design basis and extreme beyond design basis external hazards such as extreme seismic events, external flooding that exceeds the maximum probable flood limit, and malicious aircraft impact. The AP1000 nuclear power plant uses fail safe passive features to mitigate design basis accidents. The passive safety systems are designed to function without safety-grade support systems (such as AC power, component cooling water, service water, compressed air or HVAC). The plant has been designed to protect systems, structures, and components critical to placing the reactor in a safe shutdown condition within the steel containment vessel which is further surrounded by a substantial 'steel concrete' composite shield building. The containment vessel is not affected by external flooding, and the shield building design provides hazard protection beyond that provided by a comparable reinforced concrete structure. The intent of this paper is to demonstrate the robustness of the AP1000 design against extreme events. The paper will focus on the plants ability to withstand extreme external events such as beyond design basis flooding, seismic events, and malicious aircraft impact. The paper will highlight the robustness of the AP1000 nuclear island design including the protection provided by the unique AP1000 composite shield building. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Results of Modeling and Simulation Support to Specia Nuclear Material Handling Facility Operations - 16053

Newport News Shipbuilding (NNS) is the sole designer and provider of nuclear powered aircraft carriers and one of only two companies in the United States to build nuclear powered submarines. As part of the upkeep of aircraft carriers, the ships return to NNS once in their lifetime for a complex overhaul and to be refueled. In support of overhaul operations NNS maintains a state of the art Special Nuclear Material (SNM) handling facility. Due to the complex nature of the operations that occur within this facility, during the design and initial operation of the building NNS developed a facility simulation model to provide decision support during the project planning and operational phases. This tool allows users to experiment with process times, process order, equipment utilization, personnel utilization and spatial utilization. By capturing the planned operations, time distributions for operations, equipment sizes and uses and personnel requirements, the tool accurately reflects the planned use of the facility. This realism allows the user to experiment with any aspect of the facility, in a controlled and cost effective space, and determine how changes or potential delays may impact overall facility operations. Thus the model allows for rapid exploration of multiple scenarios to determine likely outcomes, allowing a user to identify risks well ahead of their realization and explore mitigation strategies in a controlled space, to determine the ideal path forward. The tool was successful during the initial operation of the facility in helping to identify and mitigate risks related to the complex operations occurring during SNM handling. The tool is now in use to support planning for the next series of operations that will occur within the facility. The initial operations the model supported occurred during the deactivation of the USS Enterprise, and future operation will focus on the overhaul of Nimitz class aircraft carriers. The NNS planning team is currently using the tool to assess potential risks and challenges that are identified as potentially impacting the schedule and timelines for these overhaul processes. In addition, the NNS development team is working to add new operational steps to the model, capturing work that is occurring near the facility, but which directly impacts the facilities operational abilities. In conjuncture with the engineering planning division, the NNS development team has run over 20 complex scenarios through the tool. The team has provided output from these scenarios to both NNS personnel and government representatives. To date the model has successfully supported the identification of several feasible paths to incorporate new processes, dictated by the work to support a overhaul vs a deactivation. The model also provides a spatial arrangement component that allows users to experiment with different equipment placement within the facility. Due to the fidelity of the model, arranging equipment with the spatial component allows a user to set up the facility in an experimental layout and run the processes inside the facility to determine if the layout will be feasible, or if it would impact operational capabilities. Additionally, the spatial component allows for visual collaboration between stakeholders to ensure all operational personnel are aware of the current and planned layout, and that they do not locate equipment or work stations in locations that would interfere with facility operations. The spatial component, in combination with the simulation component, has resulted in several documented improvements in process. These include: the identification of additional equipment which could be stored outside the facility, without impacting operations, to increase space; confirmation of the ideal placement of a large water tank; and identification of several risks related to planned equipment storage area, allowing the team to develop new plans and avoid realizing the risk. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Analysis of a Modular Small-Diameter Air Distribution System

This report investigates the feasibility of using a home-run manifold small-diameter duct system to provide space-conditioning air to individual thermal zones in a low-load home. This compact layout allows duct systems to easily be brought within conditioned space via interior partition walls. Centrally locating the air handling unit in the house significantly reduces duct lengths. The plenum box is designed so that each connected duct receives a similar amount of airflow—regardless of its position on the box. Furthermore, within a reasonable set of length restrictions each duct continues to receive similar airflow.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of a Universal Waste Management System

NASA is working with a number of commercial companies to develop the next low Earth orbit spacecraft. The hardware volume and weight constraints are similar to or greater than those of the Apollo era. This, coupled with the equally demanding cost challenge of the proposed commercial vehicles, causes much of the Environmental Control and Life Support System (ECLSS) designs to be reconsidered. The Waste Collection System (WCS) is within this group of ECLSS hardware. The development to support this new initiative is discussed within. A WCS concept - intended to be common for all the vehicle platforms currently on the drawing board - is being developed. The new concept, referred to as the Universal Waste Management System (UWMS), includes favorable features from previous designs while improving on other areas on previous Space Shuttle and the existing International Space Station (ISS) WCS hardware, as needed. The intent is to build a commode that requires less crew time, improved cleanliness, and a 75% reduction in volume and weight compared to the previous US ISS/Extended Duration Orbitor WCS developed in the 1990s. The UWMS is most similar to the ISS Development Test Objective (DTO) WCS design. It is understood that the most dramatic cost reduction opportunity occurs at the beginning of the design process. To realize this opportunity, the cost of each similar component between the UWMS and the DTO WCS was determined. The comparison outlined were the design changes that would result with the greatest impact. The changes resulted in simplifying the approach or eliminating components completely. This initial UWMS paper will describe the system layout approach and a few key features of major components. Future papers will describe the UWMS functionality, test results, and components as they are developed.

Stapleton, Thomas J.↗

Mars 2020 Entry, Descent and Landing Instrumentation (MEDLI2)

This paper will introduce Mars Entry Descent and Landing Instrumentation (MEDLI2) on NASA's Mars2020 mission. Mars2020 is a flagship NASA mission with science and technology objectives to help answer questions about possibility of life on Mars as well as to demonstrate technologies for future human expedition. Mars2020 is scheduled for launch in 2020. MEDLI2 is a suite of instruments embedded in the heatshield and backshell thermal protection systems of Mars2020 entry vehicle. The objectives of MEDLI2 are to gather critical aerodynamics, aerothermodynamics and TPS performance data during EDL phase of the mission. MEDLI2 builds up the success of MEDLI flight instrumentation on Mars Science Laboratory mission in 2012. MEDLI instrumentation suite measured surface pressure and TPS temperature on the heatshield during MSL entry into Mars. MEDLI data has since been used for unprecedented reconstruction of aerodynamic drag, vehicle attitude, in-situ atmospheric density, aerothermal heating, transition to turbulence, in-depth TPS performance and TPS ablation. [1,2] In addition to validating predictive models, MEDLI data has highlighted extra margin available in the MSL forebody TPS, which can potentially be used to reduce vehicle parasitic mass. MEDLI2 expands the scope of instrumentation by focusing on quantities of interest not addressed in MEDLI suite. The type the sensors are expanded and their layout on the TPS modified to meet these new objectives. The paper will provide key motivation and governing requirements that drive the choice and the implementation of the new sensor suite. The implementation considerations of sensor selection, qualification, and demonstration of minimal risk to the host mission will be described. The additional challenges associated with mechanical accommodation, electrical impact, data storage and retrieval for MEDLI2 system, which extends sensors to backshell will also be described.

Thermal Protection System↗

Enhancing Worker Safety During Off-Site Construction of Energy-Efficient, Low-Carbon Exterior Envelope

The construction industry is not doing enough to embrace off-site modular construction. It is a missed opportunity for optimized energy efficiency because prefabricated exterior wall envelopes are lower in cost and faster and easier to install. Factory off-site construction offers improved safety for construction workers because work is done in a controlled environment, but lack of intent, understanding, and data is also a missed opportunity for enhancing worker safety. This research looks specifically at the prefabricated wall exterior envelope in the context of safety. The research question is "off-site factories build with ease of energy efficiency and lowered carbon emissions, but is the process safer?" This research was funded by NREL Student Training in Applied Research (STAR) program, University Partnerships Program, and Wells Fargo Bank. Key finding is that modular and prefabricated construction are perceived to be safer, but the accident rates are much higher than in the general construction and manufacturing industries. Proposed solutions to decrease accidents in off-site prefabricated construction includes safety training for workers, provide movable kiosks with PPE at workstations, ensure tools are well-maintained and place safety posters in visible locations. Future work includes improving worker safety to increase worker productivity, perform pilot demonstration, work with factory designers for new modular layout for worker safety, i.e., easy access to PPE kiosks, and work closely with OSHA so that they take notice of this safety niche.

drywall↗

Security-by-Design: Light Water Small Modular Reactor

The growing demand for nuclear power is increasing pressure to find solutions to cost prohibitive requirements of both construction and security. Offsite response has been proposed as an option to reduce costs associated with training and maintaining an onsite response force. A previous report explored this option and revealed that security could be provided at the required level, but cost savings was not a result of this methodology. An offsite response strategy required costly active and passive delay barriers to provide sufficient time for responders to muster and deploy to a site in time to interrupt a determined and well-equipped adversary. Also, contrary to the hypothesis, the number of responders required for this strategy exceeded that needed for an onsite response force, as the adversaries could avail themselves of advantageous positions within the facility to repel arriving responders. This report builds upon the previous evaluation by using the same hypothetical light water small modular reactor (LWSMR) facility model, but this time an onsite response strategy was assessed. The goal of this analysis was to show that an onsite response strategy could be implemented effectively at a cost point that removes barriers within the industry at this critical time of growth and development. The assessment of the facility design and response strategy was completed through modeling using Scribe3D© and subsequent scenario analysis over the course of a two-day tabletop exercise. Subject matter experts in nuclear security, nuclear facility design, and response strategy and tactics contributed to the effort to ensure accurate representation of hypothetical scenarios. Several adaptations were made to the layout of the LWSMR based on lessons learned during the first day of scenario analysis. The subsequent design evaluated on the second day proved to provide a robust response posture against a large and well-trained adversary force. This report details the process of the analysis and compares the cost of the final facility design with that of the LWSMR model used for evaluation of offsite response. Ultimately, the results of this effort indicate that, when implemented correctly, an onsite response strategy is the best option from a security and cost perspective.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗