Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Upgrade”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Correlation electron cyclotron emission diagnostic and improved calculation of turbulent temperature fluctuation levels on ASDEX Upgrade

A newly upgraded correlation electron cyclotron emission (CECE) diagnostic has been installed on the ASDEX Upgrade tokamak and has begun to perform experimental measurements of electron temperature fluctuations. CECE diagnostics measure small amplitude electron temperature fluctuations by correlating closely spaced heterodyne radiometer channels. This upgrade expanded the system from six channels to thirty, allowing simultaneous measurement of fluctuation level radial profiles without repeat discharges, as well as opening up the possibility of measuring radial turbulent correlation lengths. Newly refined statistical techniques have been developed in order to accurately analyze the fluctuation data collected from the CECE system. This paper presents here the hardware upgrades for this system and the analysis techniques used to interpret the raw data, as well as measurements of fluctuation spectra and fluctuation level radial profiles.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The upgrade of the CMS hadron calorimeter with silicon photomultipliers

The upgrade of the hadron calorimeter of the CMS experiment at the CERN Large Hadron Collider is currently underway. The endcap sections will be upgraded in the winter of 2016–2017 and the barrel sections during the second LHC long shutdown in 2019. The existing photosensors will be replaced with about 16 000 new silicon photomultipliers (SiPMs), resulting in the first large installation of SiPMs in a radiation environment. All associated front-end electronics will also be upgraded. Here, this paper discusses the motivation for the upgrade and provides a description 17 of the new system, including the SiPMs with associated control electronics and the front-end readout cards.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Radioactive source calibration test of the CMS Hadron Endcap Calorimeter test wedge with Phase I upgrade electronics

The Phase I upgrade of the CMS Hadron Endcap Calorimeters consists of new photodetectors (Silicon Photomultipliers in place of Hybrid Photo-Diodes) and front-end electronics. The upgrade will eliminate the noise and the calibration drift of the Hybrid Photo-Diodes and enable the mitigation of the radiation damage of the scintillators and the wavelength shifting fibers with a larger spectral acceptance of the Silicon Photomultipliers. The upgrade also includes increased longitudinal segmentation of the calorimeter readout, which allows pile-up mitigation and recalibration due to depth-dependent radiation damage. As a realistic operational test, the responses of the Hadron Endcap Calorimeter wedges were calibrated with a $^{60}$Co radioactive source with upgrade electronics. The test successfully established the procedure for future source calibrations of the Hadron Endcap Calorimeters. Lastly we describe the instrumentation details and the operational experiences related to the sourcing test.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The ATLAS multi-user upgrade and potential applications

With the recent integration of the CARIBU-EBIS charge breeder into the ATLAS accelerator system to provide for more pure and efficient charge breeding of radioactive beams, a multi-user upgrade of the ATLAS facility is being proposed to serve multiple users simultaneously. ATLAS was the first superconducting ion linac in the world and is the US DOE low-energy Nuclear Physics National User Facility. The proposed upgrade will take advantage of the continuous-wave nature of ATLAS and the pulsed nature of the EBIS charge breeder in order to simultaneously accelerate two beams with very close mass-to-charge ratios; one stable from the existing ECR ion source and one radioactive from the newly commissioned EBIS charge breeder. In addition to enhancing the nuclear physics program, beam extraction at different points along the linac will open up the opportunity for other potential applications; for instance, material irradiation studies at ~ 1 MeV/u and isotope production at ~ 6 MeV/u or at the full ATLAS energy of ~ 15 MeV/u. Furthermore, the concept and proposed implementation of the ATLAS multi-user upgrade will be presented. Future plans to enhance the flexibility of this upgrade will also be presented.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The CMS Phase-1 Pixel Detector Upgrade

The CMS detector at the CERN LHC features a silicon pixel detector as its innermost subdetector. The original CMS pixel detector has been replaced with an upgraded pixel system (CMS Phase-1 pixel detector) in the extended year-end technical stop of the LHC in 2016/2017. The upgraded CMS pixel detector is designed to cope with the higher instantaneous luminosities that have been achieved by the LHC after the upgrades to the accelerator during the first long shutdown in 2013–2014. Compared to the original pixel detector, the upgraded detector has a better tracking performance and lower mass with four barrel layers and three endcap disks on each side to provide hit coverage up to an absolute value of pseudorapidity of 2.5. This paper describes the design and construction of the CMS Phase-1 pixel detector as well as its performance from commissioning to early operation in collision data-taking.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Modeling for the phased injector upgrade for 12 GeV CEBAF

As a follow on to the 12 GeV upgrade to the Continuous Electron Beam Accelerator Facility, the front end of the DC photo-gun-based injector has gone through a phased upgrade. The first phase focused on the beamline between the gun and the RF chopper system, and the second phase addresses the beamline after the RF chopper system including replacing the capture section and quarter cryomodule with a new booster module containing a 2-cell and 7-cell cavity string. Throughout the design process, we maintained and developed three models, one for the existing injector and one for each of the upgrade phases. With these models, we evaluated proposed hardware upgrades, evaluated and determined optimized beamline element positions, developed buncher voltage requirements, and settings for optimal injector running. In this paper, we will describe the models and results from these various studies and provide a brief summary of Phase 1 commissioning.

Kazimi, R.↗

The Cost of Decarbonization and Energy Upgrade Retrofits for US Homes

Cost is a major barrier when upgrading homes to reduce carbon emissions required to meet DOE’s climate-related goals. This report summarizes a nationwide effort to gather home energy upgrade project cost data along with household energy performance data. The goal was to develop cost benchmarks and to guide future R&D efforts aimed at cost compression and scaling of the residential upgrade market. The cost data were compiled for both total project costs and costs of individual measures. The majority of energy savings were modeled, with some models using measured site data for calibration. The database was analyzed using clustering techniques to find common energy and CO2 reduction approaches. The individual measures were combined into archetypal solutions to determine least-cost approaches to maximizing energy and carbon savings. Several financial analyses were preformed to examine other cost metrics beyond first cost. Project data was obtained for 1,739 projects, from 15 states and 12 energy programs, with a total of 10,512 individual measures. The database includes a wide-array of projects, ranging from single-measure HVAC upgrades to net-zero energy whole home remodels. Projects were predominantly single-family detached dwellings with wood frame construction. Most of the data was obtained from energy programs because they had recorded the necessary information and were willing to share with this study. This sample of convenience can provide broad guidance and national cost benchmarks, but lacks sufficient detail to draw more disaggregated conclusions, such as geographical trends. The majority of data contributions were obtained without compensation from sources where the required data was already in some sort of structured format. We compensated sources to enter data from individual projects into a structured data format for about 500 projects, with an average cost of about $40 per project. The database was highly skewed to lower cost, lower impact projects due to the nature of the sample of convenience. Less than 10% of projects had savings greater than 50%. The cost data for individual measures in the database are being used in other DOE efforts on residential energy use/decarbonization. This data collection effort should continue in order to provide the best-informed guidance for DOE and industry R&D, as well as deployment efforts (including policy and program planning).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Standard Work Specifications for Single-Family Home Energy Upgrades Summary (Fact Sheet)

The U.S. Department of Energy (DOE), the National Renewable Energy Laboratory (NREL) and numerous industry stakeholders developed the Standard Work Specifications for Single-Family Home Energy Upgrades to define the minimum requirements for high-quality residential energy upgrades. Today, the Standard Work Specifications provide a unique source for defining high-quality home energy upgrades,establishing clear expectations for homeowners, contractors, trainers, workers, program administrators, and organizations that provide financing for energy upgrades.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Reproduction of the Yucca Mountain Project TSPA-LA Uncertainty and Sensitivity Analyses and Preliminary Upgrade of Models

Sandia National Laboratories (SNL) continued evaluation of total system performance assessment (TSPA) computing systems for the previously considered Yucca Mountain Project (YMP). This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment (TSPA) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. This work is a continuation of the ongoing readiness evaluation reported in Lee and Hadgu (2014) and Hadgu et al. (2015). The TSPA computing hardware (CL2014) and storage system described in Hadgu et al. (2015) were used for the current analysis. One floating license of GoldSim with Versions 9.60.300, 10.5 and 11.1.6 was installed on the cluster head node, and its distributed processing capability was mapped on the cluster processors. Other supporting software were tested and installed to support the TSPA-type analysis on the server cluster. The current tasks included verification of the TSPA-LA uncertainty and sensitivity analyses, and preliminary upgrade of the TSPA-LA from Version 9.60.300 to the latest version 11.1. All the TSPA-LA uncertainty and sensitivity analyses modeling cases were successfully tested and verified for the model reproducibility on the upgraded 2014 server cluster (CL2014). The uncertainty and sensitivity analyses used TSPA-LA modeling cases output generated in FY15 based on GoldSim Version 9.60.300 documented in Hadgu et al. (2015). The model upgrade task successfully converted the Nominal Modeling case to GoldSim Version 11.1. Upgrade of the remaining of the modeling cases and distributed processing tasks will continue. The 2014 server cluster and supporting software systems are fully operational to support TSPA-LA type analysis.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Catalytic Upgrading of Thermochemical Intermediates to Hydrocarbons (Final Report)

A lot of activity in catalytic pyrolysis and hydroprocessing occurred in the past 10-15 years with notable successes and failures; however, very little technical information is available in the open literature from pilot-scale studies such as those performed in this project. Besides, the next step along the technology commercialization pathway is to scale-up the catalytic biomass pyrolysis process, integrate this technology with a hydroprocessing unit, and demonstrate the long-term operation and performance of the integrated process; notably, these were achieved in this project. RTI International has developed a single-step catalytic biomass pyrolysis process to produce a hydrocarbon-rich bio-crude intermediate. This bio-crude is more thermally stable and has lower oxygen content than conventional biomass fast pyrolysis oil, so it can be effectively and efficiently upgraded with traditional hydroprocessing technology to produce gasoline and diesel. Our partner, Haldor Topsøe, has developed a strategy for hydroprocessing bio-crude intermediates based on extensive catalyst and process development in support of converting vegetable oils and waste greases into high-quality diesel fuel. The goal of the originally proposed project was to demonstrate an advanced biofuels technology that integrates a catalytic biomass pyrolysis step and a hydroprocessing step to produce infrastructure-compatible biofuels. The specific technical goals of this project were 1) to optimize the catalytic biomass pyrolysis process to achieve high degree of deoxygenation, while maximizing the bio-crude production, 2) improve bio-crude thermal stability, 3) evaluate the impact of bio-crude quality in the hydroprocessing step, 4) minimize hydrogen demand of the integrated process, and 5) maximize biofuels yields. This project showed that it is technically feasible to use non-zeolitic solid acid catalyst to consistently generate bio-crude with 20% oxygen content and that these liquids can be effectively hydrotreated into low oxygen fuel blendstocks. The reproducibility of the small-scale pyrolysis yields at the 1 tonne/day scale is an achievement worth noting and the effect of pyrolysis temperature on biocrude yields and quality was investigated at the pilot scale. Additionally, advanced analytical techniques were used to analyze bio-crude to investigate the effect of process conditions and feedstock on the concentration and speciation of oxygen-containing compounds. Insights into the impact of oxygen content and oxygen speciation on bio-crdue upgrading were also sought. Clearly, more successful upgrading correlated with bio-crudes with lower oxygen content. This was most evident when partially upgraded bio-crude with 55-90% less oxygen compared to the starting bio-crude was blended with straight run diesel and hydrotreated without any noticeable increase in pressure drop across the reactor or any measurable loss of hydrodenitrification (HDN) activity. Minimizing hydrogen demand while maximizing biofuels yield are the desired outcomes for the integrated process. In summary, several technical challenges remain before catalytic biomass pyrolysis becomes a commercial reality, most notably bio-crude yields and quality still need to be improved. The integrated catalytic biomass pyrolysis hydroprocessing scheme being developed produces intermediates that can be refined for use as drop-in hydrocarbon replacement fuels. From a technology perspective, this advanced biofuel technology produces liquid transportation fuels that can leverage capital expenditures in the existing petroleum refining and distribution infrastructure. From a business perspective, this technology does not face potential market limitations as other nonhydrocarbon biofuels caused by oxygenated blending limitations and fuel certification for light-duty vehicle applications.

09 BIOMASS FUELS↗

An Integrated Risk Assessment Process for Digital Instrumentation and Control Upgrades of Nuclear Power Plants

Most of the existing nuclear power plants (NPPs) in the world rely on traditional analog instrumentation and control (I&C) systems for monitoring, control, and protection functions. With the industrial base largely moving to digital systems, the operation and maintenance of plants involves managing issues including lack of needed analog spare parts, increasing maintenance costs, and the loss of vendor support. Compared with existing analog I&C systems, digital I&C systems have significant functional advantages, such as reliable system performance in terms of accuracy and computational capability, high data handling and storage capabilities to fully measure and display operating conditions, and improved capabilities (e.g., fault tolerance, self-testing, signal validation, process system diagnostics). Therefore, the U.S. nuclear power industry has initiated the replacement of existing, aging analog systems with digital I&C technology, and is developing new designs for advanced plants using digital systems in integrated control rooms to provide modern control and protection systems. However, the qualification of digital I&C systems remains a challenge, especially the issue of software common cause failure (CCF), which has been difficult to address. A CCF is the malfunction of two or more plant components or functions due to a single failure source. CCFs have the potential to generate unanalyzed events or sequences that may not be bounded by previous plant accident analyses, therefore, to challenge the plant safety. Existing analyses on CCF in I&C systems are mainly focusing on hardware failures. With the application and upgrades of new digital I&C systems, software CCFs due to design flaws have become a potential threat to plant safety considering most redundancy designs are using the similar digital platforms or software in the operating and application systems. With complex multi-layer redundancy designs to meet the single failure criterion, these I&C safety systems are of a particular concern in the U.S. Nuclear Regulatory Commission (NRC) licensing procedures. Therefore, there is a need to develop an integrated risk assessment strategy with digital CCF and plant transient responses considered to assure the long-term safety and reliability of vital digital systems and reduce uncertainties in costs, time, and support integration of digital systems in the plant. The overall goal of this project is to deliver a strong technical basis to support effective, licensable, and secure digital I&C technologies for the digital upgrades to existing NPPs. To deal with the expensive licensing justifications from regulatory insights, this technical basis is instructive for nuclear vendors and utilities to effectively lower the costs associated with digital compliance and speed-up industry advances by: (1) defining an integrated risk-informed analysis process for digital I&C upgrades including hazard analysis, reliability analysis, and consequence analysis; (2) applying systematic and risk-informed tools to address CCFs and quantify responding failure probabilities for digital I&C technologies; (3) evaluating the impact of digital failures at the individual level, system level, and plant level; and (4) providing insights and suggestions on designs to manage the risks, thus to support the development, licensing, and deployment of advanced digital I&C technologies on NPPs. Upgrading digital I&C (safety and non-safety related) systems in existing NPPs within a cost-effective and regulatory acceptable way offers the foremost means of performance improvements and cost-reductions for existing NPPs. One key outcome of this project is to perform plant-specific risk assessment to provide a sustainable scientific support for enabling industry to balance the digital-related risks, costs, reliability, and safety.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Safety-Related Instrumentation and Control Pilot Upgrade (Initial Scoping Phase Implementation Report)

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP), NISP-EN-04, Standard Digital Engineering Process (SDEP), and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrade.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Techno-Economic Assessment for the Production of Hydrocarbon Fuels via Catalytic Upgrading of Furans

This technical report documents the techno-economic analysis (TEA) implications of a biochemical/catalytic pathway for the production of long-chain hydrocarbon fuels in support to the multi-lab Catalytic Upgrading of Biochemical Intermediates (CUBI) project within the Chemical Catalysis for Bioenergy Consortium (ChemCatBio). Two distinct conceptual biorefineries centered around the process encompassing sugar dehydration to furans, aldol condensation between furans and a ketone (methyl ethyl ketone [MEK]), and a final step of hydrotreating to obtain hydrocarbons in the C 14 -C 16 range are considered: an integrated plant that simultaneously produces both furans (furfural and HMF) and ketone (MEK via 2,3-butanediol [BDO]) from sugars and a dedicated facility focused on producing furans from corn stover hydrolysate and procuring the ketone externally. In either plant, the main coproducts are adipic acid (derived from lignin) and sodium sulfate. The results from the assessment are quite comparable to those reported in previous design case focused on biological conversion of sugars to fermentation intermediates with subsequent catalytic upgrading of those intermediates to hydrocarbon fuels, thus presenting another viable alternative pathway to achieve similar fuel cost targets through purely catalytic upgrading of sugars. Since this study considers long-term performance targets for the full pathway dedicated to sugar upgrading to fuels, the critical remaining research points needed to achieve future cost goals are also discussed. Finally, this report presents a single-point sensitivity analysis around selected parameters to identify the major cost drivers of the biorefineries and provides a qualitative discussion on additional opportunities for cost reduction within the proposed concepts, namely through adding value to furans, to coproducts that may be obtained following BDO dehydration, and to lignin through alternative pathways.

09 BIOMASS FUELS↗

Performance Testing of Software Upgrade for SRNL CPC Instrument at the Nuclear Material Laboratory, Office of Safeguards Analytical Services, International Atomic Energy Agency

This report summarizes the performance testing for the Software upgrade for the Savannah River National Laboratory (SRNL) Controlled Potential Coulometry (CPC) instrument. This upgrade is specifically to meet the needs of the Nuclear Material Laboratory, Office of Safeguards Analytical Services, International Atomic Energy Agency at Seibersdorf, Austria. The instrument hardware was upgraded in 2010, but the software continued to operate on a Windows platform using a High Tech Basic (HT Basic) application. HT Basic usage is declining. The IAEA requested an upgrade to the existing coulometer software to Laboratory Virtual Instrument Engineering Workbench (LabVIEW), an object-oriented programming language in wide use and one the NML staff is familiar with. The software was developed by SRNL Software Engineer, with assistance from Electrical Engineer and Scientist. Once developed, the new LabVIEW software was validated, tested with Iron (surrogate for plutonium) and plutonium. Once testing was completed, the software was installed at the International Atomic Energy Agency Nuclear Material Laboratory (IAEA NML) coulometer, and SRNL provided hands on training to NML staff on using the new software.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Forward Pixel Detector for the Phase 2 Upgrade of CMS And Module Testing at UIC

High-Luminosity Large Hadron Collider (HL-LHC) upgrade aims to increase performance. In order to efficiently handle the larger particle flux and increased radiation, an upgrade is planned for the inner Tracker of the Compact Muon Solenoid (CMS) detector, which is located at the innermost part of the CMS. To efficiently reconstruct and track particles, the existing pixel tracker will be upgraded with novel sensors, readout chips, and front-end electronics designed to handle increased data rates. These improvements will allow the detector to track particles more precisely. In the United States, we are working on assembling new sensor modules to be inserted into disks, referred to as TFPX, for installation in the CMS detector for the HL-LHC era. We are currently testing the prototype of TFPX modules to ensure the upgrade is carried out in the best way possible. The University of Ilinois Chicago has been tasked with testing the final versions of the TFPX sensor modules before they are sent to CERN to be installed into the CMS detector. This work is supported by NSF.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

SPERLU Selective Process for Efficient Removal of Lignin and Upgrading (Final Technical Report)

To meet the growing demand for bio-based chemicals and improve the profitability and efficiency of the emerging biorefinery industry, lignin is an abundant and attractive feedstock. Spero Renewables has developed a proprietary and patent-pending technology, the Selective Process for Efficient Removal of Lignin and Upgrading (SPERLU). The technology is a catalytic deconstruction and upgrading of lignin in lignocellulosic biomass or commercially available technical lignin to produce multi-functional phenol (MFP) products. The SPERLU process has been demonstrated and vetted on a lab scale to convert commercially available technical lignin to MFPs in yields of 60-90% (based on lignin). The MFP products can be separated and further upgraded through catalytic or biological means. Spero performed a detailed kinetic study of the SPERLU process and used the resulting kinetic data to design and construct a mini-pilot-scale reactor for routine production of hundreds of grams of MFP products. Spero’s lignin-based MFPs have been demonstrated for use as a drop-in replacement for bisphenol A (BPA) in the synthesis of thermoset polymers. Spero’s lignin-based thermoset polymers exhibit excellent mechanical properties and can be used in many applications. Additionally, a collaboration with the National Renewable Energy Lab (NREL) was used to evaluate the feasibility of upgrading SPERLU products through biological means into valuable chemicals. A comprehensive technoeconomic analysis (TEA) and Life-cycle analysis (LCA) have been completed and support the case for commercialization of the SPERLU technology. Through this project Spero has significantly de-risked the SPERLU technology and is actively planning larger scale pilot projects.

09 BIOMASS FUELS↗

Fermilab’s horizontal test stand upgrade overview and commissioning

Cryo-assemblies with the low-beta Nb3Sn quadrupoles for the High Luminosity LHC (HL-LHC) upgrade will be tested at Fermilab’s magnet test facility. Total of 10 cryo-assemblies will be delivered to CERN within the US HL-LHC Accelerator Upgrade Project (AUP). The horizontal test stand at Fermilab already has been used for testing the existing LHC inner-triplet quadrupoles, but the stand and corresponding electrical and cryogenic sub-systems were not operational more than a decade. In order to restore the test stand functions and meet the design and test requirements for the high luminosity LHC magnets, the existing horizontal test facility at Fermilab underwent a significant refurbishment of the cryogenic and mechanical components. Most of the upgrades were completed and verified during so called zero-magnet test by late 2020, and then final commissioning of the upgraded test stand was completed during the first cryo-assembly test in 2023. These tests verified all the cryo-mechanical installations, as well as the test stand operations, including controlled cooldown and operation at 1.9 K, the helium recovery capabilities, magnet protection and process controls.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Risk-based System Upgrade Planning for AOT-IC Presentation [Slides]

The number of deployed systems and different HW/SW form factors makes it difficult to maintain a complete understanding of their health which leads to a reduced level of certainty when assessing risk and trying to prioritize system upgrade efforts. AOT-IC must constantly plan and execute system upgrade and replacement projects to ensure the longevity of the control system. There are many more projects needed than the group can realistically accomplish given schedule and resource constraints. The group must prioritize their upgrade projects to choose only the highest priority projects to execute each year. Currently plans upgrade and replacement projects based on alignment with mission needs, group vision, resource availability, and qualitative risk assessments based on SME estimates. The group maintains a risk register. This is useful as a tool for shaping strategic planning but currently lacks the quantitative data and process needed to generate accurate risk assessments.

43 PARTICLE ACCELERATORS↗