Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Uncrewed”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

NASA’s Space Launch System: Progress Toward Launch

The Space Launch System (SLS), NASA’s cornerstone launch capability for a new generation of deep space exploration, has begun assembly at Kennedy Space Center (KSC) in preparation for launch in 2021. SLS will provide an unparalleled launch capability for human and robotic deep space exploration missions. Its proven propulsion system, upgrade path to more powerful vehicles, and high-volume payload fairings make it the foundation for ambitious and demanding as part of the Artemis program. Artemis is NASA’s 21st-century plan to put boots on the Moon and to perform sustainable, long-term science in deep space, with eyes toward sending explorers to Mars. The initial SLS vehicle to fly, Block 1 in the crew configuration – with the new Orion spacecraft – is scheduled to lift off from revitalized launch facilities at KSC in 2021 for an uncrewed test flight known as Artemis I. Manufacturing is complete on the vehicle and all elements have been delivered to the Exploration Ground Systems (EGS) Program, except the core stage. The program’s all-new development, the core stage is currently in the midst of a “Green Run” test campaign at Stennis Space Center (SSC). Eight progressively more challenging tests in the Green Run series will culminate in a hot-fire of four flight-proven liquid hydrogen/liquid oxygen (LH2/LOX) RS25 engines. Following the Green Run hotfiring, the core stage will ship to KSC. Already at KSC, aft sections of the fivesegment solid rocket boosters are being assembled. Previously delivered elements, including the upper stage, are undergoing final checkouts in preparation for stacking. An exciting 2021 will include such milestones as stacking SLS and Orion in KSC’s Vehicle Assembly Building (VAB), modal testing, roll out to Launch Pad 39B, Wet Dress Rehearsal (WDR), and launch. Teams across the country are preparing for launch by finalizing procedures, defining launch constraints and flight rules, training console operators, performing simulations, and more. With the SLS Block 1 vehicle for Artemis I nearing integration and launch, the second Block 1 vehicle in the crew configuration, which will carry astronauts on an Artemis II hybrid lunar flyby mission, has several elements manufactured. In fact, the solid rocket motor segments and RS-25 engines are complete. Those program elements are processing hardware for the third flight and working toward manufacturing the second SLS variant to fly, Block 1B, which will onramp a powerful new upper stage, the Exploration Upper Stage (EUS).

John Honeycutt↗

Next Steps: Laying the Groundwork for Bundle Protocol v7

Delay/Disruption Tolerant Networking (DTN) is a networking model and protocol suite that extends the terrestrial internet to the challenging communication environments of space. These environments are typically subject to frequent disruptions, which can cause delays or errors. DTN protects data transmission by wrapping data into bundles (similar to Internet Protocol packets), storing them until a connection can be established between two nodes (similar to terrestrial routers or computers), and forwarding them to their destinations. Bundle Protocol (BP) is responsible for generating those bundles and creates the transport layer of DTN, much like how Transmission Control Protocol (TCP) and User Datagram Protocol (UDP) create the transport layer of the Internet Protocol. BPv6 is the current, accepted version of the Bundle Protocol standard. However, recent missions and test implementations have revealed missing components and areas for improvement in the standard. Using lessons learned from NASA missions and gathering inspiration from the Internet Protocol, BPv7 is intended to be a more robust Bundle Protocol that improves upon its predecessor and increases the technology readiness level of the DTN architecture. The DTN Standard Interface Design team, a sub-team of the DTN Infusion Project at the Goddard Space Flight Center, worked to create a dictionary of terms for bundle components and functional decomposition of the protocol. These efforts aided in the standardization of BP interfaces, something missing from BPv6, and supported parallel network management and configuration work. This standardization will ultimately contribute to LunaNet (a lunar communications and navigation architecture that will bring networking, positioning, navigation, timing and science services to the Moon), the Solar System Internet (SSI), and expand crewed and uncrewed space exploration opportunities.

dtn↗

Stationkeeping, Orbit Determination, and Attitude Control for Spacecraft in Near Rectilinear Halo Orbits

From a Near Rectilinear Halo Orbit (NRHO), NASA’s Gateway at the Moon is planned to serve as a proving ground and a staging location for human missions beyond Earth. Stationkeeping, Orbit Determination (OD), and attitude control are examined for uncrewed and crewed Gateway configurations. Orbit maintenance costs are investigated using finite maneuvers, considering skipped maneuvers and perturbations. OD analysis assesses DSN tracking and identifies OD challenges associated with the NRHO and crewed operations. The Gateway attitude profile is simulated to determine an effective equilibrium attitude. Attitude control propellant use and sizing of the required passive attitude control system are assessed.

Ryne, Mark S.↗

Biofilm Management in a Microgravity Water Recovery System

Biofilm growth continues to be a significant concern for NASA’s current and future water systems. The International Space Station (ISS) Water Processor Assembly (WPA) produces potable water from a combination of humidity condensate and urine distillate. The WPA waste tank requires significant management to prevent biofilm growth from impacting downstream components. This issue is magnified for future NASA manned missions due to the need to place the vehicle’s life support system in a dormant state during uncrewed operations (e.g., when the vehicle is in Mars orbit during the surface mission). NASA personnel and the Center for Biofilm Engineering at Montana State University are evaluating various methods for mitigating biofilm growth, including reduced nutrient levels, thermal treatment, sonic waves treatment, and identifying effective biocides in this application. This paper provides an overview of the current status of this effort.

Yo-ann Velez Justiniano↗

Development of a Lunar Lander Modeling and Simulation Capability

The development and validation of a capability to perform quantitative, physics-based analysis of alternatives of conceptual unmanned, reusable lunar cargo lander architectures is discussed. The lander is conceptualized as a suite of disciplines that need to be sized, synthesized, and optimized for a mission. As such, models of these disciplines were developed and integrated in a recently-developed multi-disciplinary analysis and optimization framework for space systems. The development of the disciplines, as well as how they are integrated into the framework, is discussed. Additionally, validation studies were performed against the Descent Module of the Altair lunar lander. Finally, an example problem for an uncrewed, reusable lander is presented.

Eugina Mendez Ramos↗

Risk-Reduction Autonomy Implementation to Enable NASA Artemis Missions

To achieve NASA’s Artemis program mission objectives a high level of autonomy and ubiquitous autonomy throughout the systems that are being developed will be necessary. The autonomous systems of Artemis will require a distributed autonomy capability, with autonomous systems organized functionally in a hierarchical architecture, where systems at higher levels of the hierarchy have authority over systems at lower levels. The challenge of developing autonomy technologies and concepts of operations for Artemis has been undertaken by the NASA Gateway Working Group. This group has developed requirements, architectures, concepts of operations, and interface control documents, in the context of a hierarchical distributed architecture that includes the following: a Vehicle System Manager (VSM) that autonomously manages the entire Gateway; Module System Managers (MSMs) that autonomously manage each module; and System Managers (SMs) that autonomously manage systems within a module(i.e. ECLSS).A substantially high level of autonomy needs to be achieved by each element of the hierarchy (VSM, MSM, SM)to meet requirements for uncrewed operations; this includes conditions that will have minimal and/or delayed ground intervention (i.e. requirements for sustainability for months of operation without crew or ground support). To advance an implementation of this autonomy design (Gateway Autonomy Design –GAD), a collaboration was established between the Autonomous Systems Laboratory (ASL) at NASA Stennis Space Center and Lockheed Martin. The objectives of this partnership were the following: (1)to implement autonomy at the VSM, MSM, and SM levels;(2) to implement communications among a VSM, 2 MSMs, ORION (a visiting vehicle somewhat equivalent to a module) and 1 SM (a power system), and (3) test autonomous operations with representative use cases. A SM backed by a high-fidelity simulation was created to facilitate demonstrations of use cases that originated in a system of a module. Communication between the VSM and MSMs was implemented according to Concepts of Operations and Interface Control Documents (ICDs). Demonstrations were conducted to address nominal and off-nominal operations and multi-module interactions with VSM. Additionally, user interfaces were created to provide awareness about ongoing processes and results while enhancing the demonstration. Demonstrations included the following use cases: (1)Orion as visiting vehicle registers with VSM;(2) VSM reschedules a module’s timelines when another module’s MSM task fails; and (3) a module’s Power System Manager (PSM) standalone demonstration that included component failure diagnostics, tracing component failure to effected components, which in turn, reports failure information up to the VSM for acknowledgement and display. This paper will describe the detailed technology and autonomous systems developed, and the integrated multi-module demonstrations conducted. Also, challenges that must be met to fully implement the GAD defined by Gateway will be addressed.

Autonomous Systems↗

NASA's Artemis Human Landing Systems

The Human Landing System (HLS) is the mode of transportation that will take astronauts to the lunar surface in NASA's Artemis lunar exploration program. On early missions, the astronauts will live inside the pressurized crew cabin portion of the lander for up to a week. The HLS program, based at Marshall Space Flight Center in Huntsville, Alabama, is working closely with commercial partners to build innovative and technically advanced lunar landers, leveraging decades of human spaceflight experience and the speed of the commercial sector. In addition to the NextSTEP-2 Broad Agency Announcement Appendix H Option A contract that includes one uncrewed and one crewed demonstration mission to the lunar surface, the HLS program is taking steps to establish a regular cadence of crewed missions to the surface of the Moon. This paper will discuss the HLS program’s latest development activities.

Lisa Watson-Morgan↗

NASA Space Launch System Completes Key Hot Fire Test and Begins Vehicle Integration

The Moon is again in reach. NASA and its commercial and international partners are on the way back. The team is working to land the first woman and the first person of color on the planetary body. NASA and its partners made significant progress towards that goal in the latter half of 2020 and the first half of 2021, including on the agency’s Space Launch System (SLS) rocket – a key part of the Artemis program. The SLS core stage for the Artemis I mission – the first launch of SLS and an uncrewed Orion capsule – completed the Green Run test series and was successfully mated with the SLS twin solid rocket boosters on the mobile launcher at Kennedy Space Center (KSC). All of the major systems for Artemis I are at KSC for assembly, integration, and launch, targeted for late 2021. Work also continued on SLS hardware for Artemis II, which will be the first flight of crew on Orion and SLS. Work progressed on core stage components, booster segments, and other hardware for Artemis III and future missions. This paper will detail the progress made.

John Honeycutt↗

Summer 2021 Student Showcase

NASA’s Launch Services Program (LSP) is responsible for launching uncrewed commercial rockets carrying NASA missions. LSP’s Flight Analysis Division independently verifies launch vehicle analysis to ensure successful missions. The Strength & Fatigue/Fracture Mechanics Group focuses specifically on structural, fatigue, & fracture analyses.

Libby Carso↗

ISAAC: An Integrated System for Autonomous and Adaptive Caretaking

The Integrated System for Autonomous and Adaptive Caretaking (ISAAC) project is developing technology for autonomous caretaking of spacecraft, primarily during uncrewed mission phases. ISAAC aims to integrate autonomous intra-vehicular robots (IVR) with spacecraft infrastructure (power, life support, etc.) and ground control. It focuses on capabilities required for NASA’s Gateway cis-lunar outpost that also apply to human missions to Mars and beyond. Its development strategy is to test using existing IVR on the ISS (the Astrobee free-flyer and Robonaut dextrous manipulator) as an analog for future IVR on Gateway.

Trey Smith↗

Automated Software for Crewed Spacecraft - Bridging the Gap from Sci Fi to Reality

With a voice command or a few taps on the console, the spacecraft pivots on a dime at high velocity and gently docks to an orbiting space platform. This is the image most people have of the complex software computations and integrated hardware performance necessary for a spacecraft to successfully perform an automated launch, rendezvous, and docking. Today’s reality is that while computer operations are advancing rapidly, science fiction over-simplifies and over-sells current capabilities. This paper discusses the integration of spacecraft computer automation into the operation of one of the United States’ new Commercial Crew vehicles - the Boeing CST-100 Starliner. Lessons learned by the Boeing Mission Operations team, a unique private-public partnership with NASA, from conceptual design through real-time operation of the first test flight will be discussed along with evolution of the system in preparation for the second uncrewed test flight. Focus will center on how operations has learned to use the automated software to their advantage while also knowing how to adjust the automation in response to spacecraft or mission anomalies.

Robert C. Dempsey↗

Standard Materials and Processes Requirements for Spacecraft

This NASA Technical Standard is directed toward materials and processes (M&P) used in the design, fabrication, and testing of space program flight hardware for NASA, including but not limited to crewed, uncrewed, robotic, launch vehicle, lander, in-space and surface systems, and spacecraft program/project hardware elements. All spaceflight hardware is covered by the M&P requirements of this document, including vendor-designed, off-the-shelf, and vendor-furnished items. M&P used in interfacing ground support equipment (GSE), test equipment, hardware processing equipment, hardware packaging, and hardware shipment is covered by the M&P requirements of this NASA Technical Standard only to the extent required to prevent damage to or contamination of spaceflight hardware (see section 4). M&P used in NASA aircraft and aircraft operations are not covered by the M&P requirements of this document.

Materials↗

NASA Space Launch System Completes Key Hot Fire Test and Begins Vehicle Integration

NASA and its commercial and international partners are on the way back to the Moon. Significant progress towards that goal was made in 2021, including on the agency’s Space Launch System (SLS) rocket – a key part of the Artemis initiative. The SLS core stage for the Artemis I mission – the first launch of SLS and an uncrewed Orion capsule – completed its Green Run test series in early 2021 and was successfully mated with the SLS twin solid rocket boosters on the mobile launcher at Kennedy Space Center (KSC). The launch vehicle stage adapter, interim cryogenic propulsion stage, and the Orion stage adapter structural test article and Orion spacecraft mass simulator were also stacked. The flight Orion spacecraft and Orion stage adapter are being prepared for stacking and launch, targeted for late 2021 following a wet dress rehearsal at Launch Complex 39B. SLS hardware for Artemis II, which will be the first flight of crew on Orion and SLS, is also in work. Work progressed on core stage components, booster segments, and other hardware for Artemis III and future missions. This paper will detail the progress made.

John Honeycutt↗

Risk-Reduction Autonomy Implementation to Enable NASA Artemis Missions

To achieve NASA’s Artemis program mission objectives a high level of autonomy that is ubiquitous throughout the systems that are being developed will be necessary. The autonomous systems of Artemis will require a distributed autonomy capability, with autonomous systems organized functionally in a hierarchical architecture, where systems at higher levels of the hierarchy have authority over systems at lower levels. The challenge of developing autonomy technologies and Concepts of Operations (ConOps) for Artemis has been undertaken by the NASA Gateway Working Group. This group has developed requirements, architectures, ConOps, and interface control documents (ICDs), in the context of a hierarchical distributed architecture that includes the following: a Vehicle System Manager (VSM) that autonomously manages the entire Gateway; Module System Managers (MSMs) that autonomously manage each module; and System Managers (SMs) that autonomously manage systems within a module (i.e. ECLSS). A substantially high level of autonomy needs to be achieved by each element of the hierarchy (VSM, MSM, SM) to meet requirements for uncrewed operations; this includes conditions that will have minimal and/or delayed ground intervention (i.e. requirements for sustainability for months of operation without crew or ground support). To advance an implementation of this autonomy design (Gateway Autonomy Design – GAD), a collaboration was established between the Autonomous Systems Laboratory (ASL) at NASA Stennis Space Center and Lockheed Martin. The objectives of this partnership were the following: (1) to implement autonomy at the VSM, MSM, and SM levels; (2) to implement communications among a VSM, 2 MSMs, ORION (a visiting vehicle somewhat equivalent to a module) and 1 SM (a power system), and (3) test autonomous operations with representative use cases. A SM backed by a high-fidelity simulation was created to facilitate demonstrations of use cases that originated in a system of a module. Communication between the VSM and MSMs was implemented according to Concepts of Operations and Interface Control Documents (ICDs). Demonstrations were conducted to address nominal and off-nominal operations and multi-module interactions with the VSM. Additionally, user interfaces were created to provide awareness about ongoing processes and results while enhancing the demonstration. Demonstrations included the following use cases: (1) Orion as visiting vehicle registers with VSM; (2) VSM reschedules a module’s timelines when another module’s MSM task fails; and (3) a module’s Power System Manager (PSM) demonstration that included component failure diagnostics, tracing component failure to effected components, which in turn, reports failure information up to the VSM for acknowledgement and display. This paper will describe the detailed technology and autonomous systems developed, and the integrated multi-module demonstrations conducted. Also, challenges that must be met to fully implement the GAD defined by Gateway will be addressed.

Fernando Figueroa↗

The Gandalf Staff: A Mobile Tool for Lunar Exploration (2nd year of development)

The Gandalf Staff is a mobile tool designed to be a flexible device supporting crewed and uncrewed operations on the lunar surface. The core of the device is a 24v battery with communications and data storage systems. Initial optional components supporting crewed Extra-Vehicular Activity (EVA) include a LiDAR and 360˚ camera. These provide 3D mapping of the traverse for documentation, and to aid future planning. The mapping also creates outreach opportunities for the public to “stand beside” the astronaut in Virtual Reality (VR). The staff provides external lighting for field site illumination in the south polar region low sun angle environment. Navigation instruments for crew position determination with Lunar Search and Rescue (LunaSAR) are also included. The staff itself can be used as a walking aid or as a splint for Incapacitated Crew Rescue (ICR). As a stand-alone device, the staff operates as a long duration untended science platform collecting environmental data and sending it to a lunar base station. The stand-alone mode requires connection to an auxiliary power source (e.g. solar array) and energy storage system (e.g. battery), so it could become an electrical recharging station. To make rapid progress in the 1st year, and also to demonstrate innovative project management techniques, NASA guided a private industry partner, T STAR, in leading Capstone Engineering student teams at Texas A&M University (TAMU) for proof-of-concept development and testing. These teams developed the power system and demonstrated successful integration of LiDAR, WiFi communications, and external lighting subsystems. Another industry team at Jacobs Technology prototyped a tripod to hold the staff upright. For the 2nd year (FY’22), NASA will again collaborate with partners to prototype enhanced power and lighting concepts. Year 2 will also add new capability for LunaSAR and geophysical science instrumentation using a heat probe. The heat probe is based upon Apollo heritage but modified to measure subsurface volatile ice regimes at the Artemis landing site. Components of the Gandalf Staff can be developed, tested, and deployed independently, or on the integrated staff, rovers, or utility trailers. The project supports crew safety, lunar sample curation, mission science, and public outreach goals of NASA. PLAIN TEST SUMMARY: Gandalf Staff is a 24v battery powered mobile tool for the lunar surface supporting crewed geologic field site exploration, or as a stand-alone science platform. As a tool assisting astronauts conducting field geology, the Gandalf Staff provides external lighting to illuminate shadowed regions on the surface. It also documents the process of collecting rocks and dust samples using a LiDAR (laser range instrument) and cameras. The staff provides a beacon for emergency location of astronauts and augments communications when the astronauts are blocked by large boulders. As a standalone science platform, the Gandalf Staff provides a power system for instruments and sensors to measure the lunar environment over long periods of time. The staff gathers data and sends the results to a lunar base station for analysis.

External Lighting↗

NASA’s Artemis Human Landing Systems

The Human Landing System (HLS) is the mode of transportation that will take astronauts to the lunar surface in NASA's Artemis lunar exploration program. On early missions, the astronauts will live inside the pressurized crew cabin portion of the lander for up to a week. The HLS program, based at NASA’s Marshall Space Flight Center in Huntsville, Alabama, is working closely with commercial partners to build innovative and technically advanced lunar landers, leveraging decades of human spaceflight experience and the speed of the commercial sector. In addition to the NextSTEP-2 Broad Agency Announcement Appendix H Option A contract that includes one uncrewed and one crewed demonstration mission to the lunar surface, the HLS program is taking steps to establish a regular cadence of crewed missions to the surface of the Moon. This paper will discuss the HLS program’s latest development activities.

Lisa Watson-Morgan↗

NASA Environmental Control and Life Support Technology Development for Exploration: 2021 to 2022 Overview

Over the past year, significant progress has occurred in technology development, ground testing, and ISS technology demonstrations within the NASA Environmental Control and Life Support (ECLSS) community. This paper provides a technology development update in the following capability areas: life support, environmental monitoring, fire safety, and logistics. Technologies for exploration missions must be reliable in their operation which support crewed mission phases. However, they also need to be put into a reduced use or dormant states to support uncrewed mission phases and then successfully and reliably returned to a nominal state to support crew. Multi-year demonstration of systems operation across this range of conditions are essential to mission success. Project overviews will include how the current activity supports the goal of multi-year demonstrations, planned follow-on activities, and what type of exploration mission elements are targeted for infusion. Technologies must be demonstrated and validated early enough to inform early exploration element milestone reviews (mission concept reviews, systems requirement reviews and no later than preliminary design reviews) so that supporting vehicle systems can also be matured. Consequently, for low technology readiness activities, it is important to also identify which mission elements they might infuse into and how they may offer potential operational, dormancy, or mass benefits. While low TRL technology timelines may not support initial mission needs, early infusion is still reasonable with sufficient testing to validate performance and reliability.

Life Support↗

Development of a Lunar Lander Modeling and Simulation Capability

The development and validation of a capability to perform quantitative, physics-based analysis of alternatives of conceptual unmanned, reusable lunar cargo lander architectures is discussed. The lander is conceptualized as a suite of disciplines that need to be sized, synthesized, and optimized for a mission. As such, models of these disciplines were developed and integrated in a recently-developed multi-disciplinary analysis and optimization framework for space systems. The development of the disciplines, as well as how they are integrated into the framework, is discussed. Additionally, validation studies were performed against the Descent Module of the Altair lunar lander. Finally, an example problem for an uncrewed, reusable lander is presented.

Eugina Mendez Ramos↗