Design and Construction of the Paddys Run Streambank Stabilization Project at the Fernald Preserve, Harrison, Ohio - 16165

The Fernald Preserve is a former uranium-processing plant that underwent extensive remediation pursuant to CERCLA and is now managed by the US DOE Office of Legacy Management. While remediation of buildings and soil contamination was completed in 2006, aquifer remediation is ongoing. Paddys Run is a second-order stream that runs to the south along the western side of the Fernald Preserve. The Paddys Run watershed encompasses nearly 41 km{sup 2} (16 mi{sup 2}), including most of the Fernald site. Field personnel conducting routine site inspections in March 2014 observed that Paddys Run was migrating east via bank erosion into the 'Pit 3 Swale', an area of known surface-water contamination. The soil there was certified pursuant to site regulatory agreements and meets all final remediation levels. However, weekly surface-water monitoring is conducted from two puddles within the swale area, when water that exceeds the final remediation levels is present. Paddys Run had migrated east approximately 4 m (13 ft) in 2 years and was approximately 29 m (95 ft) from the sample location. This rapid migration threatened existing conditions that allowed for continued monitoring of the swale area and also threatened Paddys Run water quality. Therefore, DOE and regulators determined that the east bank of Paddys Run required stabilization. This was accomplished with a design that included the following components: relocation of approximately 145 m (475 ft) of streambed 9 m (30 ft) west, installation of a rock toe along the east bank, installation of two cross-vane in-stream grade-control structures, stabilization of a portion of the east bank using soil encapsulated lifts, and regrading, seeding, and planting within remaining disturbed areas. In an effort to take advantage of low-flow conditions in Paddys Run, construction was initiated in September 2014. Weather delays and subsurface flow within the Paddys Run streambed resulted in an interim shutdown of the project area in December 2014. Construction activities resumed in April 2015, with completion in November 2015. To date, this stabilization project has been successful. The regraded bank and streambed have remained stable, and no compromise to installed cross-vanes, the rock toe, or the soil encapsulated lifts has been observed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Niagara Falls Storage Site - Interim Waste Containment Structure - 16199

The Niagara Falls Storage Site (NFSS) is a 77.3-hectare (ha) (191-acre) property that is owned by the United States Government and located in the township of Lewiston, Niagara County, New York. The NFSS is part of the former Lake Ontario Ordnance Works (LOOW) that was used by the War Department beginning in 1942 for the production of trinitrotoluene (TNT). During the 1940's and 1950's, the Manhattan Engineer District and the Atomic Energy Commission brought various radioactive wastes and uranium processing byproducts (residues) resulting from our nation's atomic energy program to the LOOW for storage. Site operations caused soil, sediment, and groundwater contamination that lead to several remedial actions, which culminated in the construction of the Interim Waste Containment Structure (IWCS) on the NFSS. The U.S. Army Corps of Engineers (USACE)-Buffalo District is the lead Federal agency for Formerly Utilized Sites Remedial Action Program (FUSRAP) remediation of the NFSS. As the lead agency, USACE is conducting a remedial investigation/feasibility study (RI/FS) pursuant to the protocols set forth in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). CERCLA activities at the NFSS have transitioned from the site RI activities to the FS evaluation of potential remediation alternatives. USACE recognizes the need to implement a focused CERCLA FS process and, therefore, has established three separate operable units (OUs) for NFSS: the IWCS OU, the Balance of Plant (BOP) OU [i.e., all on-site areas outside the boundary of the IWCS], and the Groundwater OU. This paper will discuss the following: - Provide background information on the NFSS including the nature of the materials within the IWCS. - Explain the steps of the CERCLA and associated processes the Formerly Utilized Sites Remedial Action Program (FUSRAP) employs. - Describe the OUs for the NFSS property and the subunit designations used in the FS evaluations for the IWCS OU. - Provide the current project status within the CERCLA framework and path forward for all OUs and Vicinity Properties (VPs). Identify the Applicable or Relevant and Appropriate Requirements (ARARs) preferred by USACE and the regulatory agencies and explain the differences between the two positions. - Provide the comparative evaluation of the remedial alternatives assessed in the FS. - Identify the justifications for the USACE - Buffalo District selecting the preferred remedial alternative within the Proposed Plan. The remedial action objectives for the IWCS OU are designed to provide short- and long-term protection of human health and the environment. CERCLA requires that any action taken be protective of human health and the environment as well as be compliant with identified ARARs. USACE evaluated 'No Action' and four potential remedial alternatives for the IWCS OU that ranged from leaving all of the wastes in-place and installing a final cover to partial and full removal of the contents. The four alternatives met the remedial action objectives defined identified for the IWCS OU. In accordance with the statutory requirements of CERCLA Section 121, remedial alternatives must comply with two threshold criteria, overall protection of human health and the environment and compliance with ARARs, in order to be carried forward for further evaluation. If a remedial alternative meets the threshold criteria, it is evaluated against the following five balancing criteria: - Long-term effectiveness and permanence; - Reduction in toxicity, mobility, or volume through treatment; - Short-term effectiveness; - Implementability; and, - Cost. The Feasibility Study evaluation led to the preferred remedial alternative selection and this will be the focus of this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Public Outreach in FUSRAP - 16201

The U. S. Army Corps of Engineers (USACE) is the lead federal agency for the Formerly Utilized Sites Remedial Action Program (FUSRAP) which was initiated in 1974 to address contamination remaining from Manhattan Engineer District and early U.S. Atomic Energy Commission activities. As the lead agency, USACE follows the protocols set forth in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) to address FUSRAP sites. During certain project milestones of the CERCLA process, community outreach initiatives occur to communicate the status and/or findings from site investigations and project decision documents. The style of public interaction is tailored to match the project milestone, technical complexity of a project, the stakeholder involvement level, or type of decision being made on a particular project. Community involvement is one of the most important aspects of environmental work, and proactive and transparent communication can build meaningful relationships with the community and between project stakeholders. The USACE Buffalo District has experience using different stakeholder interaction techniques and providing information on projects through a variety of media. Rather than simply distributing information, the goal of community outreach is to encourage participation in the process and to provide opportunities for the public to fully understand, ask questions about, and provide feedback on the complex technical issues involved in decision-making for each FUSRAP site. The frequency and method of interaction depends on the project, and the USACE Buffalo District has worked to promote openness and transparency and to ensure the community is provided with many opportunities for public participation. Project information has been provided to stakeholders using multiple techniques, such as formal project workshops, poster sessions, site tours, news releases, storybooks, and videos. Aside from project-specific community relations plans, the USACE Buffalo District has participated in Science, Technology, Engineering and Math (STEM) programs established to inspire current and future generations of young people to pursue careers in STEM fields. Each year, the USACE Buffalo District performs outreach in the community to share information on our projects as well as to introduce students to various disciplines associated with environmental careers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of New CERCLA Five-Year Review Guidance at Hanford - 16403

Under CERCLA, the implementation of remedial actions established in records of decision (ROD) are required to be reviewed every five years to evaluate their effectiveness in protecting human health and the environment. Past reviews have included evaluation of actions that were not implemented under existing RODs and, therefore, not subject to the requirement. While commendable for its transparency, discussing these out-of-scope actions created confusion and elicited comments that required time and effort to resolve. The fourth CERCLA Five Year Review (FYR) at the Hanford Site embraces the EPA guidance designed to streamline the process and focuses on the specific objectives of the review. This guidance and the training materials developed jointly by multiple federal agencies including EPA, DOE, DOD, and Department of the Interior (DOI), demonstrate a focused approach to the FYR process and offer real-world examples for streamlining this important document. This paper discusses the focused approach and process changes implemented at the Hanford Site that reduced the size and complexity of the document and provided the DOE, Richland Operations Office, with an efficient, effective template for preparing subsequent reviews. One key change was a thorough evaluation of what operable units were discussed and what operable units were not discussed in the five-year review. This process resulted in a reduction of 14 operable unit discussions. Additionally, extensive referencing of previously published CERCLA documents including closure reports and periodic groundwater monitoring reports minimized the amount of analytical data tables necessary to support the discussion. The Hanford five year review made good use of technology and provided internet links to existing documents where detailed information and voluminous analytical data reside. This eliminated the use of extensive data tables and summaries. The resulting five protectiveness determinations include: 1) 'Protective' which is used when there is sufficient data to conclude that the remedy is functioning as intended; 2) 'Protective in the short term' which is used when the data and/or documentation review raises issues that could affect future protectiveness; 3) 'Will be protective' which is used when the remedy under construction is anticipated to be protective on completion; 4) 'Protectiveness deferred' which is typically used when additional information is needed; and 5) 'Not protective' which is used when risks are not under control. Reviewing only on the appropriate operable units, and supporting the analysis of remedy performance with focused data, the resulting protectiveness determinations and overall effectiveness of the document were significantly improved. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of D-Area Ash Units, Savannah River Site - 18151

At the Savannah River Site (SRS), under the tri-party Federal Facility Agreement (FFA) between the United States Department of Energy (US DOE), United States Environmental Protection Agency (US EPA), and South Carolina Department of Health and Environmental Control (SCDHEC), agreement was reached to remediate two ash basins, one coal pile runoff basin and one ash landfill as Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Removal Actions within a schedule of five years (2014 - 2019). These removal actions complete the remediation of these basins and the ash landfill which originated from nearly 60 years of powerhouse operations and cover a total area of nearly 40.5 hectares (100 acres). Utilizing proven as well as state of the art technologies and methods, the completed actions culminate in two protective multi-layer cover systems and the conversion of the coal pile runoff basin to an ecological diverse storm water retention basin. Completion of these removal actions has been determined to provide protection of future industrial workers and ecological receptors as well as prevent migration of mobile contaminants found in coal residues (e.g., arsenic) from powerhouse operations, achieving all applicable or relevant and appropriate requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioactive Waste Disposal Strategies within the US Army Corps of Engineers FUSRAP - 18328

The U.S. Army Corps of Engineers' (USACE) highest priority is the protection of human health and the environment and public and worker safety during the cleanup, transportation, and disposal of Formerly Utilized Sites Remedial Action Program (FUSRAP) material. In addition to following all appropriate federal and state rules and regulations, the USACE has its own safety program that ensures that we are being protective. One aspect of the USACE FUSRAP is the radioactive waste disposal strategies that we must consider. The USACE will only dispose of FUSRAP material in a facility that is licenses/permitted to accept it. The estimated exposures to facility workers and members of the public from the permitted disposal of FUSRAP wastes is evaluated as part of this process. The USACE uses the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process to study and remediate FUSRAP sites. An evaluation is performed to decide whether it is best to manage the waste on-site or off-site and the requirements for disposal. The action selected must be protective of human health and the environment and must comply with regulations. When making the decision, there are several other factors taken into consideration including cost of the disposal and whether the public and state agencies support the action. Prior to determining disposal options, wastes must first be characterized. This involves an evaluation of both site history and analytical data. Determining the proper disposal requirements and subsequent disposal option involves: Characterizing the waste as stated above. This is important because there are several regulatory agencies which may oversee management of the waste. The US Nuclear Regulatory Commission, the US Environmental Protection Agency (US EPA), the US Department of Transportation, and state hazardous waste and/or radiation protection agencies may all have varying degrees of involvement. Identifying disposal requirements. Certain wastes must be disposed at licensed radioactive waste disposal facilities. Wastes containing US EPA regulated hazardous waste must be disposed at permitted hazardous waste disposal facilities. Certain wastes must be disposed at facilities licensed/permitted for both radioactive and hazardous waste. Some lower activity wastes may be accepted for disposal at other types of landfills. Considering acceptance criteria of the disposal facility. Radionuclides and/or hazardous constituents in the waste, as well as physical and chemical form of the waste, are evaluated to ensure they meet the acceptance criteria of the receiving facility's license and/or permit. If they don't, another disposal location must be used. Considering the accessibility and location of the disposal facility. Some facilities are able to accept shipments only by truck and others can accept material via railcar as well. The distance to a disposal facility impacts the risk of transportation accidents and efficient use of project resources such as the number of trucks required to perform the transportation. These factors are also important in evaluating whether material can be cost effectively shipped to a disposal facility. Evaluating the compliance status of the receiving facility. It is not assumed that just because a facility has a license or permit that it is acceptable for the USACE' waste. Prior to selecting a facility for disposal of FUSRAP waste, a site visit, audit and consultation with the US EPA is required to determine whether there are any known relevant violations at the facility. Facilities that have violations that negatively impact the USACE or US EPA approval of the facility are not used for disposal of FUSRAP waste. Once a facility is selected. The USACE procures contracts, or utilizes existing contracts, to facilitate the transportation and disposal action. Additionally, the USACE continues to consult with US EPA routinely to confirm the compliance status of the facility. Considering state acceptance of wastes to a facility. The USACE seeks to obtain written authorization from the facility state regulator indicating the action is compliant with existing licenses, permits, laws, and regulations. Each of these factors is considered by the USACE in selecting a FUSRAP disposal location. The goal is to provide safe, cost effective disposal which is protective of human health and the environment and which complies with all regulatory requirements. These steps all feed in to the disposal strategy consideration that USACE must go through for our FUSRAP waste streams. There are a number of challenges in the process to include In order to achieve the Congressional mandate of completing cleanup work under FUSRAP in a more cost effective, timely manner, while assuring protection of public health and safety. USACE must determine all disposal options that are available for the types of waste at each FUSRAP site. As a solution, completion of a disposal strategy document can help ensure this goal is met and will foster consistency across the FUSRAP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unique Facilities, Innovative Treatment Processes, and a Talented Workforce Allow Fluor Idaho to Successfully Disposition Transuranic Waste - 18388

Fluor Idaho is utilizing state-of-the-art equipment, treatment technologies, and employee expertise at the Department of Energy's (DOE) Idaho Site to treat contact-handled transuranic (CH-TRU) waste, as well as extremely challenging remote-handled transuranic (RH-TRU) waste forms, to prepare the material for shipment and permanent disposal at the Department's Waste Isolation Pilot Plant (WIPP). Nowhere else in the DOE Complex - perhaps the world - will one find the compilation of tools and an experienced workforce with an unparalleled history of safely retrieving, characterizing, treating, repackaging, certifying, and shipping TRU waste. Since 2003, the Advanced Mixed Waste Treatment Project (AMWTP) has used both conventional and unique retrieval concepts, high-tech characterization equipment - including real-time radiography and radioassay - robotics, and automated treatment processes to retrieve and treat 65,000 cubic meters of above-ground CH-TRU waste. Additionally, engineered controls and specialized personal protective equipment have allowed employees to make thousands of entries into high-radiation areas without a skin or clothing contamination incident - evidence of the employees' commitment to safety. AMWTP has encountered and found solutions for many challenging waste forms, including polychlorinated biphenyl-contaminated wastes, TRU waste containers with up to 1,000 fissile gram equivalent plutonium-239, oversized TRU boxes, and partially absorbed organic sludge waste. By utilizing additional facilities and equipment at the Accelerated Retrieval Project V and VII, Fluor Idaho has developed new processing lines and capabilities to ensure worker safety and milestone completion. These two soft-sided buildings, located at a facility adjacent to AMWTP, were originally constructed to exhume Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) TRU wastes from a section of a 97-acre landfill. After a total of 1,150 cubic meters of targeted waste were removed, personnel, working in collaboration with state regulators, successfully implemented a unique regulatory strategy that allowed these CERCLA facilities to be modified and permitted to treat Resource Conservation and Recovery Act (RCRA) wastes from the AMWTP - a savings of tens of millions of dollars over the cost of constructing new buildings. Adding to the AMWTP's technological uniqueness is its ability to treat wastes from other facilities in the DOE Complex. Two prior decision documents and an agreement with the state of Idaho have allowed AMWTP to treat wastes from 15 other DOE sites. It is the only project in the complex to have done so. At another project located next to AMWTP, targeted waste exhumation within the Subsurface Disposal Area is approximately two years ahead of schedule. Crews have removed more than 8,600 cubic meters of CH-TRU and hazardous wastes from eight exhumation areas that equal a combined footprint of 4.75 acres. Less than one acre remains to be exhumed to satisfy the 2008 Record of Decision waste exhumation end state between the DOE, Environmental Protection Agency, and state of Idaho. Construction of the final building where targeted waste exhumation will continue was completed during the summer of 2017. Exhumation will be completed within the next few years. Following exhumation completion, an evapotranspiration barrier (or cap) will be constructed over the entire landfill. Fluor Idaho continues to make progress on a more challenging project involving an inventory of RH-TRU waste that also contains the reactive metal sodium. Crews are utilizing hot cells, once used for spent nuclear fuel reprocessing and high-level waste treatment at the Idaho Nuclear Technology and Engineering Center, to render this challenging waste form safe for disposal in a national geologic waste repository. The treatment methods being employed on this RH-TRU waste are unique in the DOE Complex. Minute concentrations of water are sprayed onto the sodium-contaminated material in a process called 'spritzing' to chemically change the sodium from a reactive metal to a non-reactive salt. In other cases, sodium-contaminated waste is dipped in water to initiate a reaction in a process called 'immersion.' Lastly, for more challenging waste shapes that could not be successfully treated with the two prior methods, crews lower the sodium-contaminated RH-TRU waste into a one-of-a-kind distillation unit that uses high temperature and vacuum to volatilize the sodium and recapture it in a condenser unit for disposal. The RH-TRU waste treated with this technology is then safe for permanent disposal. Fluor Idaho is proud to operate DOE's CH- and RH-TRU waste treatment facilities, as well as use innovative processes and its talented workforce to complete this important work-scope. Such capabilities allow the contractor to meet the commitments made by the DOE to the state of Idaho. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Achieving the Vision: An Update on Cleanup, Closure, and Reindustrialization of the East Tennessee Technology Park - 18401

URS-CH2M Oak Ridge LLC (UCOR) is responsible for cleanup of the U.S. Department of Energy's (DOE) East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Formerly known as the K-25 site, the facility enriched uranium for major defense nd energy programs for more than 40 years. The site's industrial processes - largely the gaseous diffusion method used for enriching uranium - left behind radioactive, chemical and industrial contaminants in soils and structures. Cleanup of the environmental legacies enables DOE's goal for converting ETTP into a private sector industrial park. Return of the restored site to the community will attract new industries to the region, creating jobs and growing the economy. The central elements to achieve DOE's vision for the site are 1) Cleanup, 2) Closure, and 3) Reindustrialization. Cleanup entails completion of all demolition activities and remedial actions consistent with the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA) agreements. Closure leaves facilities and infrastructure in a condition that enables transfer of the site to non-federal entities and reduces DOE's long-term stewardship costs. Closure activities include: - Infrastructure stabilization (site utilities, roads, stormwater, etc.); - Disposal or transfer of government property; - Relocation of most DOE contractors and support functions offsite; - Transfer of the majority of the site property to non-federal entities for redevelopment. Reindustrialization enables DOE's vision for the site as a multi-use private sector industrial park, reducing DOE's costs and enhancing the local economy. Transfer to the private sector will be accomplished through the Community Reuse Organization of East Tennessee (CROET), which will serve as the Park Manager. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Management Waste Management Facility Operations Team Commitment to Safety - 18546

The Environmental Management Waste Management Facility (EMWMF) is an above-grade waste disposal facility that is owned by DOE and operated by URS | CH2M Oak Ridge LLC (UCOR), a contractor to DOE's Oak Ridge Office of Environmental Management. The EMWMF landfill is located on the Oak Ridge Reservation (ORR) and has a 2.18 M cubic yard capacity. EMWMF is a key component of the cost-effective ORR cleanup program and accepts remediation waste from across the ORR. Multiple low-level and low-level mixed CERCLA waste streams are disposed at EMWMF, mostly as direct-dumped demolition and remediation debris. EMWMF receives and disposes of a myriad of contaminated waste streams and waste types, including massive structural steel from some of the largest buildings ever constructed, contaminated soils from legacy disposal areas, containers that must be grouted under negative pressure, and special waste that must be tightly controlled. Support activities include managing several million gallons of landfill wastewater per year and driving around 20,000 miles per year to transport leachate to a treatment facility. Even with the wide range of waste accepted and the diversity of support activities, EMWMF Operations has maintained an impressive safety record of no lost workday cases in nearly 16 years of continuous operation and was recently awarded the National Safety Council's Superior Safety Performance Award. This safety record is a testament to the commitment to safety by both workers and management. Several factors are key to the EMWMF Operations safety record. UCOR senior management established safety as a priority and allocates proper funding and resources. EMWMF Operations management embraces safety as an integral part of the work and also 'walks the talk'-emphasizing safety over productivity and showing personal commitment to safety. A stable workforce promotes a culture where safety is valued and helps train new personnel in this culture. The UCOR integrated safety management approach to work control is fully embraced, where worker feedback is highly valued and used to better identify and control job hazards. Finally, job supervisors actively encourage input. Worker concerns, suggestions, and observations are encouraged and positively addressed. As a result, the entire Operations Team is committed to identifying and mitigating hazards. This team commitment to safety results in a culture where safety is not only valued, but is expected. Safety concerns are identified and addressed proactively, and communication is encouraged. This strong safety culture and outstanding safety record have also proven to be good business, with the facility available to receive waste 99.6% of available work hours and outstanding turnaround times on waste shipments. The EMWMF Operations team commitment to safety can be used in other environments to develop an engaged, safety-conscious workforce. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design of an Evapotranspiration Surface Barrier for the Subsurface Disposal Area at INL - 19220

At the INL Site, the US DOE is planning to construct one of its largest CERCLA landfill covers. An evapotranspiration surface barrier that will be approximately 65 ha (160 acres) will cover the 39-ha (97-acre) Subsurface Disposal Area at the INL to isolate legacy mixed waste disposed of prior to 1988, low-level radioactive waste disposed of after 1988, and debris from demolition of structures being used to process some of the legacy mixed waste. The evapotranspiration surface barrier will limit percolation to less than 1 cm (0.39 in.) per year under typical precipitation conditions; provide a minimum 3-m (10-ft)-thick cover over all waste to minimize the potential for plant, animal, and inadvertent human intrusion; support growth of native vegetation; and visually blend in with the surrounding desert landscape. A robust design will allow the evapotranspiration surface barrier to resist erosion and perform for a minimum of 1,000 years. The 1-cm (0.39-in.)-per-year and 1,000-year performance objectives were established by a CERCLA record of decision and its implementing remedial design work plan, and these performance objectives are consistent with a performance assessment conducted under US DOE Order 435.1, 'Radioactive Waste Management.' (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Win-Win Regulatory Strategies in Idaho - 19241

During the course of any waste management or environmental remediation project, the earliest goals must include the creation and maintenance of mutual trust, respect, and cooperation with regulatory agencies and stakeholders. The heavy equipment and treatment systems remain idled until bounding characterization and risk analysis is complete, technical and functional requirements are identified, required controls and limits are established, and the proper permits and approvals are issued. Once a project receives approval to start up or break ground, the regulatory process has only just begun. Process modifications and improvements, as well as unexpected events, will continue to necessitate further reviews, discussions, and approvals. Building healthy professional relationships with the regulatory community and consistently meeting or exceeding their expectations, while operating within controls, is a cornerstone to jointly finding cost-effective solutions to complex issues, and streamlining the path to success. Navigating the optimal routes to compliance through the myriad regulatory waypoints is essential to avoiding schedule delays, staying within budget, and keeping clients continuously satisfied and delighted. Two complex case studies from the Idaho Cleanup Project Core will examine regulatory communication and integration strategies that have proven effective to date in obtaining timely approvals and maintaining compliance: (1) conducting Decontamination and Decommissioning as non-time critical removal actions (NTCRA) under CERCLA, and (2) preparing the integrated documentation necessary to obtain DOE, EPA, DEQ, and NRC approvals to close calcine storage units at the Idaho Nuclear Technology and Engineering Center (INTEC). (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiological Soil Sorting Considerations and Applications - 19363

A number of methods are available for soil sorting, specifically sorting of radiological materials. These methods have been applied from the Feasibility Study stage of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) in pilot study operations to full scale operations in the post Record of Decision stages at Formerly Utilized Sites Remedial Action Program (FUSRAP) sites. This application of sorting at multiple sites and under many different conditions has provided the United States Army Corps of Engineers (USACE) with many challenges and lessons learned. Mechanical soil sorting has had varying degrees of success and many factors have been evaluated. Some factors include the type of material that is best suited for sorting, contaminant distribution, and pre-screening of materials. Community acceptance is another non-technical issue that can be key in applying sorting to a FUSRAP cleanup. This paper will discuss multiple types of radiological soil sorting to include reversing belt conveyor, segmented gate, and manual as well as technical considerations and the factors impacting each type. Additionally, how and when soil sorting is applied to FUSRAP operations is discussed. The FUSRAP is conducted in accordance with CERCLA and the impacts to how sorting is applied in terms of considering it treatment under CERCLA will also be discussed. This paper and presentation will be useful for any project considering using radiological soil sorting. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Designing a Site Closure Strategy for Uranium in Groundwater and Surface Water - 19534

A site closure strategy was designed and mapped for residual uranium present in groundwater and surface water at the US DOE Office of Legacy Management (LM) Monticello Mill Tailings Site (MMTS) Operable Unit (OU) III, which is regulated under CERCLA. The MMTS is a former mill site that was used to process uranium and vanadium ore in southeastern Utah until 1960. OU III includes surface water in Montezuma Creek and groundwater present in a shallow alluvial aquifer along the creek valley for several kilometers downgradient of the former mill site. The current remedy consists of an operating pump-and-treat system, monitored natural attenuation (MNA), and institutional controls (ICs). Performance evaluations indicate that a prolonged restoration period is likely, as well as an asymptotic trend in uranium concentrations that still exceed the remediation goal. Multiple strategies and scenarios were evaluated before selecting a preferred site closure strategy. Recommendations were developed to support advancing the site towards closure over the next few years and guide the process of regulatory interactions and decision making at the MMTS OU III. Site closure is an important milestone that reflects successful remedial progress at LM sites. Post-closure site management would be maintained to ensure conditions are protective of human health and the environment. The site closure strategy was considered in the context of site remedial progress. The primary sources of groundwater contamination have been removed, including mill tailings and contaminated soils, sediment, and debris. Five-year reviews have regularly concluded that the remedy is protective of human health and environment and that ICs are effective in preventing exposure to contaminated groundwater. The affected aquifer is low-yielding and has no history of domestic use. In 2004, the final remedy selected in the Record of Decision (ROD) was MNA with ICs. However, a pump-and-treat system was installed and continues to operate as a contingency remedy in the area with the highest residual uranium concentrations. The need for a contingency pump-and-treat system was triggered by a departure of the long-term monitoring data from model projections that were used as the basis for remedy performance metrics specified in the ROD. In 2015, the pump-and-treat system was expanded. Average uranium concentrations have declined locally over time. However, monitoring data and column studies indicate that the system effectiveness will eventually become ineffective in reducing uranium concentrations, likely due to the reequilibration of uranium present in the solid matrix in various states (i.e., sorbed, precipitated). Currently, there are no agreed-upon metrics for discontinuing the contingency pump-and-treat system. Three closure strategies effectively applied at other CERCLA sites were considered at MMTS OU III: (1) restoring natural attenuation conditions and conducting MNA; (2) applying alternate concentration limits (ACLs); and (3) waiving a remedial goal based on technical impracticability (TI). Each closure strategy was evaluated in the following manner: (1) identifying the criteria and requirements associated with current regulations, policy, and guidance, (2) assessing the ability to meet those criteria based on the current site knowledge and the conceptual site model, and (3) identifying data gaps that need to be filled to further assess the closure strategy. Following this evaluation, a preferred closure strategy was selected: to transition to a remedy based on MNA and maintenance of ICs, without active remediation. Several scenarios for transitioning to the preferred closure strategy were identified. Each scenario consisted of 'if/then logic' associated with a larger decision diagram. The decision diagram considered the current conceptual site model (CSM) and potential outcomes of studies that will be conducted to fill data gaps, as well as the performance of the existing treatment system and long-term monitoring data. Two scenarios for transitioning to the preferred closure strategy were highlighted for future planning and were described in detail. For both scenarios, the preferred closure strategy includes demonstrating criteria for MNA acceptance, pump-and-treat termination, long-term monitoring, and eventual site delisting. Recommended actions over the next few years were also developed, including updating the CSM, conducting numerical modeling to predict remedial performance and time frames, conducting geochemical analyses to assess uranium fate and transport, and summarizing the lines of evidence and basis for MNA. This detailed example of the development of a site-specific closure strategy provides the thought process and decision logic used to assess uncertainty using an if/then framework; identify common elements and recommended actions to advance the site towards closure; and navigate the inherent uncertainty in the timing of future events, outcome of regulatory discussions, and remedial progress over time that is common to many complex US DOE facilities. In addition, the national regulations, policy, guidance, and state of practice regarding commonly used site closure strategies was summarized for consideration, including MNA, ACLs, and TI. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evolution of Stakeholder Relations at the Mound Laboratory-End of DoE's Mission to the Present - 19551

In November 1989, the same month the Berlin Wall fell, the US Environmental Protection Agency (EPA) placed the Mound Laboratory (Mound Plant or Mound site) in Ohio on the National Priorities List (NPL) due to volatile organic compound contamination in the groundwater. As a result of the Cold War ending, the United States sought to greatly reduce the nation's nuclear weapons arsenal, consolidate the US Department of Energy's (DOE) mission, and close many DOE facilities. In 1991, the City of Miamisburg learned that DOE was planning to close the Mound Laboratory. The city spent two years lobbying in Washington, DC, to keep the facility open; however, that effort was not successful. By 1993, DOE, EPA, and Ohio EPA had signed a Federal Facility Agreement that formalized EPA and Ohio EPA oversight of the DOE environmental cleanup of the Mound NPL site under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The decontamination and cleanup of the Mound site fell under two federal laws, CERCLA and the Resource Conservation and Recovery Act. DOE, EPA, Ohio EPA, the City of Miamisburg, and other local stakeholders all agreed that the Mound site should be cleaned up to an industrial/commercial land use standard. This would allow the site to transition into a privately owned business park. In 1994, the City of Miamisburg created the nonprofit Miamisburg Mound Community Improvement Corporation (MMCIC) that would own, market, and redevelop the site. The City also chartered the Mound Reuse Committee to act as an independent advisory organization, composed of representatives from the local community and business, government, education, and special interest groups. In 1994, DOE and the MMCIC entered into a lease agreement that facilitated immediate reuse of site buildings that were no longer required by DOE and did not require remediation. In 1995, DOE, EPA, and Ohio EPA developed the Mound 2000 Process to more effectively use CERCLA Removal Action authority to evaluate and remediate, as necessary, disparate areas of the Mound site. The Mound 2000 process divided the site into smaller, more manageable areas that accelerated cleanup and allowed areas to be reused more quickly. All areas of the Mound site were cleaned up to meet the EPA standard for industrial/commercial land use. The CERCLA process included opportunities for the public to review proposed cleanup strategies. Public input on cleanup and reuse included that from local citizens, businesses, Miamisburg City Council, local schools and financial institutions, Ohio EPA, Montgomery County, and the State of Ohio. In 1998, while site cleanup was still in process, DOE agreed to sell the entire Mound property to the MMCIC for $10.00. The site sales agreement accelerated reuse by allowing DOE to offer ownership of discrete land parcels to MMCIC as soon as EPA confirmed those areas met CERCLA standards for property transfer. This allowed the Mound site to become one of the first former DOE weapons sites to transition to reuse as a privately owned and operated community asset. Many other former DOE production facilities require continued federal ownership to protect the integrity of the environmental cleanup. In 2011, the MMCIC changed its name to the Mound Development Corporation (MDC) and continued to transition the site for reuse as part of the Mound Business Park. The MMCIC/MDC is a nonprofit economic development arm of the City of Miamisburg. DOE supported the economic development efforts with grants and matching funds. Individual land parcels were transferred from DOE to the MDC according to the DOE Mound Land Transfer Process. Ownership of parcels was transferred to the MDC via quitclaim deeds with no repair, replacements, or rebuild of areas. Each parcel's quitclaim deed contains the CERCLA institutional controls. To reduce the property tax burden, the Miamisburg City Council passed an ordinance that allowed the City to accept temporary ownership of specific parcels and hold ownership until the MDC could either lease or sell them. With the exception of one 23-acre parcel that includes the Operable Unit 1 area (site of former sanitary landfill), the entire site has been transferred to the MDC. Today, the former Mound Laboratory site is home to the vibrant Mound Business Park operated by the MDC. The site contains numerous buildings with active businesses and multiple areas suitable for new construction. Private companies continue cutting-edge work that carries forward the legacy of more than 50 years of DOE research, development, production, and inspiration from the former Mound Laboratory scientists, engineers, technicians, and support personnel. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing an Aging Pump-and-Treat Groundwater Remediation System at the Fernald Preserve - 19557

The Fernald Preserve, Ohio, Site underwent restoration and remediation under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). With the exception of the Great Miami Aquifer, the CERCLA remediation was declared physically complete on October 29, 2006, and the site was turned over to the US Department of Energy Office of Legacy Management for long-term care and maintenance. The Record of Decision under CERCLA specifies a concentration-based cleanup that requires the extraction and treatment of Great Miami Aquifer groundwater above Final Remediation Levels (FRLs) until the full, beneficial use potential of the aquifer is achieved, including use as a drinking water source. The area of the aquifer targeted for remediation is 126.5 hectares (312.70 acres). The groundwater pumping remediation was designed by modeling cleanup with the Variable Saturated Analysis Model in 3 Dimensions (VAM-3D) modeling code, developed by Hydrogeologic Inc. The original design called for 23 extraction wells operating at 379 liters per minute (lpm) (100 gallons per minute [gpm]) to 1135 lpm (300 gpm) each for a system total of 18,073 lpm (4775 gpm). In 2014, the system was optimized down to 20 extraction wells operating at 379 to 1893 lpm each for a system total of 19,180 lpm (5075 gpm). To date, pumping has been an effective remediation technology for the aquifer. At the end of 2017, the area of the aquifer remaining above FRLs was down to 38.2 hectares (94.4 acres). From August 1993 through December 2017 (24 years), 6235 kilograms (kg) (13,733 pounds) of uranium were removed from the aquifer by the pumping of 1.74 x 10{sup 11} liters (46.2 billion gallons) of water. Since 2010, treatment of groundwater to achieve regulatory discharge limits at the Great Miami River has not been needed on a routine basis. The ongoing remediation is now essentially a pumping operation, and this water does not require treatment. Metrics reported in the annual Site Environmental Report for the groundwater remediation indicate that, based on the model-predicted estimate of the mass of uranium that needs to be removed from the aquifer to achieve a concentration-based cleanup, the cleanup is approximately 86% - 87% complete. Current model predictions indicate that pumping will need to continue an additional 16 years (until 2035) in some of the wells. During the additional 16 years, it is estimated that approximately 1012 kg (2231 pounds) of uranium will be removed from the aquifer. System pumping rates are designed to decrease over the course of the remaining 16 years, dropping down to a system total of 11,638 lpm (3075 gpm) in 2022 and a system total of 4163 lpm (1100 gpm) in 2033. Even with the designed decreases in pumping rates, it is estimated that approximately 1 x 10{sup 11} liters (26.6 billion gallons) of water will be pumped from the aquifer to remove 1012 kg (2231 pounds) of uranium. This indicates that the remaining 16 years of operation will be much less efficient than the first 24 years. Decreasing efficiency is common for pumping operations. The worst-case scenario is that decreasing concentration trends stabilize above the cleanup FRLs and remediation goals are never achieved. Performance assessments of the pumping remedy will need to be routinely conducted to determine if pumping should be discontinued, if it should be continued but optimized, or if the pumping technology can be supplemented with a different technology that will improve the outcome of the remediation and make the operation more efficient and successful. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Successful Implementation of a Natural Resource Restoration Plan at the Fernald Preserve - 19568

The Fernald Preserve, Ohio, Site is a former uranium-processing plant that underwent extensive remediation pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). It is situated on a 425-hectare (ha) (1050-acre) tract of land, approximately 29 kilometers (km) (18 miles) northwest of Cincinnati, Ohio. The US Department of Energy (DOE) Office of Legacy Management is responsible for management of the site. Site remediation and subsequent ecological restoration have converted the site from an industrial production facility to an undeveloped park, encompassing a series of wetlands, prairies, and forested communities. The remediation of buildings and contaminated soil was completed in 2006, but aquifer remediation is ongoing. Portions of the site are open to the public, including approximately 11 km (7 miles) of walking trails that are open year-round and a Fernald Preserve Visitors Center open four days a week. Stakeholders were instrumental in providing recommendations for final land use of the site as an undeveloped park with an emphasis on wildlife. Final land use decisions were also instrumental in the resolution of a CERCLA natural resource damage claim. The State of Ohio sued DOE in 1986 for damages to state natural resources under Section 107 of CERCLA. The suit was stayed until completion of all Records of Decision (RODs) for the site. The last ROD was signed in 1996. DOE, which was both a Natural Resource Trustee (NRT) and a potentially responsible party (PRP) under CERCLA, initiated consultation with other site NRTs in 1993. A Trustee Council was formed that included DOE, Ohio Environmental Protection Agency (representing the State of Ohio), and the US Fish and Wildlife Service (representing the US Department of the Interior). The NRTs agreed collectively to conduct sitewide ecological restoration, consistent with the stakeholder vision of final land use. A conceptual restoration plan was drafted in 1998. This Natural Resource Restoration Plan (NRRP) developed goals for site restoration, as well as provisions for monitoring and maintenance of restored areas. The NRTs signed a Memorandum of Understanding in 2001, and DOE integrated ecological restoration design and construction into remediation and closure activities for the site. The NRT relationship became contentious in the following years as a result of a disagreement over monitoring commitments and compensation for groundwater injury. Final settlement was reached in 2008. As part of the settlement, DOE paid $13.75 million into the NRT fund as compensation for natural resource damages. In addition, the NRRP was finalized, and long-term commitments for monitoring and maintenance of ecologically restored areas were put in place. An Environmental Covenant was established and recorded with Hamilton and Butler Counties that ensures site activity and use limitations remain in place. The NRTs used a portion of the settlement funds to initiate the Paddys Run Conservation Project. This effort is a means to secure development rights and conservation easements within the Paddys Run watershed. Paddys Run is a third-order stream located on the western side of the Fernald Preserve. The NRTs partnered with Three Valley Conservation Trust to obtain assistance with land acquisition and conservation easement management, and since the program's inception in the Fall of 2012, more than 1820 ha (4500 acres) have been permanently protected via easement or purchase. Future decisions by the NRTs regarding monitoring and maintenance of restored areas will be negotiated in 2020. The site Restored Area Maintenance Plan (RAMP) was developed in 2010. The RAMP is a requirement within the NRRP and is scheduled for review following 10 years of implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Technology to Retrieve Waste Below the 324 Building at the Hanford Site - 19622

The Waste Technology Engineering Laboratory (324 Building) is a Category 2 Nuclear Facility at Hanford. The 324 Building Disposition Project is responsible for the removal and remedial actions under CERCLA. Additionally, there are RCRA Dangerous Waste Management Units which the CERCLA actions are presumed to satisfy. The Radiochemical Engineering Complex (REC) is a group of four hot cells (A, B, C and D Cells) with an interconnecting airlock inside of the 324 Building. Underneath the REC B-Cell are contaminated soils that have an estimated 12,793 R/Hr dose rate and remediation is under CERCLA 300-FF-2 Operable Unit. The current action consists of debris removal from the floor of B-Cell, B-Cell floor removal, and excavation of the soils beneath the floor to a depth of up to twelve feet with four Remote Excavator Arms (REA). This paper provides insight into the preparation and performance of high tolerance core drilling into a hot cell complex. Installation of the REA Through Support (REA TS) mechanism through the 4'-6' concrete shield walls is a complex series of tasks with demanding tolerances at each of four locations around the perimeter of B-Cell. The use of training mock ups was included in the completion of this work. The REA TS is two 11 inch diameter high strength steel sleeves that have expandable collars at each end allowing the interstitial space between the outside of the sleeve and inside of the core drill to be grouted to form a substantial structural connection, and a 10 inch pipe with hydraulic hoses to power the REA. There are three cores required for each REA location. The REAs themselves are customized excavator arms, mounted on support columns to be used in the excavation and transfer of the contaminated soil into storage facilities. The tasks for the installation of the REA TSs are: 1) Characterization of B-Cell Cubicles. 2) Embedded Pipe Fill. 3) Interference Removal. a. Internal Walls, b. External Walls. 4) Core Drilling. 5) Go/No-Go gauge, and video inspection. 6) Installation of REA Through Support Assembly. The 324 Building REC Hot Cells have internal, external, and embedded utilities throughout the shield walls in conflict with the REA TS locations. Some of the embedded utilities have connection points inside of the B-Cell Cubicles. There were two separate issues at the conflicted locations. The first issue was the core drill cooling water would flow along the embedded utility potentially spreading legacy chemical and radiological contamination to areas of the facility that was unwanted. The second issue was that the REA TS required a substantial structural connection to the B-Cell wall, the cored diameter is larger than the REA TS and these interstitial areas required a full grouted connection. The embedded utilities posed a hazard that if unfilled, the interstitial grout would flow into the embedded utility and destabilize the required grouted structural connection. The B-Cell Cubicles had not been opened in over 10 years. A mockup was completed to install a glovebag over the cubicle opening and then to verify functionality and port requirements. The embedded utility pipe connections in the cubicles were then opened inside a glovebag to verify the correct connection points, connection method for future embedded pipe fill material delivery system, radiological characterization, and air flow to show that the embedded utility pipes were not blocked and would not pressurize. The embedded pipe fill material and grout system was mocked up and run several times to verify methodology and functionality. The B-Cell Cubicles were then reentered and the embedded utility pipe fill was completed using a hand pump. External interferences at the core drill locations were removed using standard interference removal techniques. Internal interferences at the core drill locations were removed using a remote cutting tool that was controlled through the use of the B-Cell crane, remote cameras and remote lighting. The core drilling was mocked up two separate times, the project's purpose built 'Mock Up Facility' was core drilled to verify tolerances and methodology prior to subcontract award, the core drill subcontractor built a 'dummy wall' to train and practice on achieving the demanding tolerances, coordinated alignments between the cores, short term and long term dose shielding techniques, and contamination control techniques. A core drill template, and additional anchoring techniques were used to maximize accuracy and precision of the REA TS core drills. A 'Go/No-Go' gauge was built and installed at each of the four REA TS locations to verify that the core drill met tolerances. The core drill locations were visually inspected using a boroscope. The REA TS installation was mocked up at the projects 'Mock Up Facility' beginning with basic hazard controls, then with intermediate hazard controls, and finally with full occupational safety, industrial hygiene, and radiological controls. The REA TSs were installed and grouted into place. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Excavation Volume Growth Factors at Environmental Remediation Sites - 20318

The U.S. Army Corps of Engineers (USACE) manages numerous environmental remediation projects in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, otherwise known as CERCLA. These include projects for the Formerly Utilized Sites Remedial Action Program (FUSRAP). Utilizing the CERCLA framework to address these projects requires detailed cost estimates and a significant portion of costs are associated with the volume of material to be excavated and that material's final disposition. Accordingly, understanding the expected volumes and uncertainty associated with those volumes is vital to project cost estimating. These estimates are completed at various stages of the CERCLA process, thus the project team has varying degrees of information available from which to develop these estimates depending on how far along the project is. Understanding the factors contributing to volume growth (increase in volume of material from that originally estimated) is a crucial element to determining volume and cost uncertainty. This paper presents a case study of a FUSRAP site which involves excavation and offsite disposal of contaminated soils from complex commercial, industrial, and residential properties. Original volume estimates were compared to post excavation volumes on a property by property basis. Reasons for differences are determined along with magnitude of impacts to cost estimating. For both residential and commercial property types, volume estimating factors, uncertainty considerations, and methods to account for each are discussed with emphasis on volume growth considerations. Cost estimating model input considerations are discussed with specific emphasis on accounting for volume uncertainty at the Feasibility Study (FS) phase of CERCLA. Underestimating or overestimating costs at the FS phase has repercussions under CERCLA that may impact project close out or completion schedule. Discussions presented will be helpful to both reviewers and preparers of cost estimates involving excavations. Additionally, project planners may be able to use the information to plan for volume growth contingencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗