Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “UNITS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

SU-E-P-45: An Analytical Formula for Deriving Mechanical Iso-Center of Rotational Gantry Treatment Unit Rotational Gantry Treatment Unit

Purpose: To present an analytical formula for deriving mechanical isocenter (MIC) of a rotational gantry treatment unit. The input data to the formula is obtained by a custom-made device. The formula has been implemented and used in an operational proton therapy facility since 2005. Methods: The custom made device consisted of 3 mutually perpendicular dial indicators and 5 clinometers, to obtain displacement data and gantry angle data simultaneously. During measurement, a steel sphere was affixed to the patient couch, and the device was attached to the snout rotating with the gantry. The displacement data and angle data were obtained simultaneously at angular increments of less than 1 degree. The analytical formula took the displacement and angle as input and derived the positions of dial indicator tips (DIT) position in room-fixed coordinate system. The formula derivation presupposes trigonometry and 3-dimentional coordinate transformations. Due to the symmetry properties of the defining equations, the DIT position can be solved for analytically without using mathematical approximations. We define the mean of all points in the DIT trajectory as the MIC. The formula was implemented in computer code, which has been employed during acceptance test, commissioning, as well as routine QA practice in an operational proton facility since 2005. Results: It took one minute for the custom-made device to acquire the measurement data for a full gantry rotation. The DIT trajectory and MIS are instantaneously available after the measurement. The MIC Result agrees well with vendor’s Result, which came from a different measurement setup, as well as different data analysis algorithm. Conclusion: An analytical formula for deriving mechanical isocenter was developed and validated. The formula is considered to be absolutely accurate mathematically. Be analyzing measured data of radial displacements as function of gantry angle, the formula calculates the MI position in room coordinate.

60 APPLIED LIFE SCIENCES↗

On Mixed-Integer Programming Formulations for the Unit Commitment Problem

We provide a comprehensive overview of mixed-integer programming formulations for the unit commitment (UC) problem. UC formulations have been an especially active area of research over the past 12 years due to their practical importance in power grid operations, and this paper serves as a capstone for this line of work. We additionally provide publicly available reference implementations of all formulations examined. We computationally test existing and novel UC formulations on a suite of instances drawn from both academic and real-world data sources. Driven by our computational experience from this and previous work, we contribute some additional formulations for both generator production upper bounds and piecewise linear production costs. By composing new UC formulations using existing components found in the literature and new components introduced in this paper, we demonstrate that performance can be significantly improved—and in the process, we identify a new state-of-the-art UC formulation.

97 MATHEMATICS AND COMPUTING↗

Fukushima Daiichi Unit 1 ex-vessel prediction: Core melt spreading

Lower head failure and corium-concrete interaction were predicted to occur at Fukushima Daiichi Unit 1 (1F1) by several different system-level code analyses, including MELCOR v2.1 and MAAP5. Although these codes capture a wide range of accident phenomena, they do not contain detailed models for ex-vessel core melt behavior. However, specialized codes exist for analysis of ex-vessel melt spreading (e.g., MELTSPREAD) and long-term debris coolability (e.g., CORQUENCH). On this basis, an analysis has been carried out to further evaluate ex-vessel behavior for 1F1 using MELTSPREAD and CORQUENCH. Best-estimate melt pour conditions predicted by MELCOR v2.1 and MAAP5 were used as input. MELTSPREAD was then used to predict the spatially-dependent melt conditions and extent of spreading during relocation from the vessel. Lastly, this information was then used as input for the long-term debris coolability analysis with CORQUENCH that is reported in a companion paper.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Fukushima Daiichi Unit 1 Ex-Vessel Prediction: Core-Concrete Interaction

Lower head failure and corium-concrete interaction were predicted to occur at Fukushima Daiichi Unit 1 (1F1) by several different system-level code analyses, including MELCOR v2.1 and MAAP5. Although these codes capture a wide range of accident phenomena, they do not contain detailed models for ex-vessel core melt behavior. However, specialized codes exist for the analysis of ex-vessel melt spreading (e.g., MELTSPREAD) and long-term debris coolability (e.g., CORQUENCH). On this basis, in this paper an analysis was carried out to further evaluate ex-vessel behavior for 1F1 using MELTSPREAD and CORQUENCH. Best-estimate melt pour conditions predicted by MELCOR v2.1 and MAAP5 were used as input. MELTSPREAD was then used to predict the spatially dependent melt conditions and extent of spreading during relocation from the vessel. The results of the MELTSPREAD analysis are reported in a companion paper. This information was used as input for the long-term debris coolability analysis with CORQUENCH. For the MELCOR-based melt pour scenario, CORQUENCH predicted the melt would readily cool within 2.5 h after the pour, and the sumps would experience limited ablation (approximately 18 cm) under water-flooded conditions. Finally, for the MAAP-based melt pour scenarios, CORQUENCH predicted that the melt would cool in approximately 22.5 h, and the sumps would experience approximately 65 cm of concrete ablation under water-flooded conditions.

42 ENGINEERING↗

Reliability, Resilience and the Oncoming Wave of Retiring Baseload Units, Volume I: The Critical Role of Thermal Units During Extreme Weather Events

This study examines the cold weather event now known as the Bomb Cyclone that blanketed much of the eastern half of the United States from Dec 27, 2017 through Jan 8, 2018. Analyses focus on six areas of organized markets administered by independent system operators in the US Eastern Interconnection and Texas. This report finds: (1) Combined, fossil and nuclear energy plants provided 89% of electricity during peak demand across all the ISOs; (2) Coal provided the most resilient form of generation in PJM; (3) The value of fuel-based power generation resilience in PJM during this event was estimated at $3.5 billion; (4) Natural gas price spikes, increased demand, and pipeline constraints led to significant fuel oil burn in the US Northeast; (5) Renewables imposed a resilience penalty on the system as output decreased as demand increased; (6) Underestimation of coal and nuclear retirements could give rise to reliability concerns and an inability to meet projected electricity demand.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Method and apparatus for an insulating glazing unit and compliant seal for an insulating glazing unit

A Vacuum Insulating Glazing Unit (VIGU) comprises two or more glass lites (panes) spaced apart from one another and hermetically bonded to an edge seal assembly therebetween. The resulting cavity between the lites is evacuated to create at least one insulating vacuum cavity within which are disposed a plurality of stand-off members to maintain separation between the lites. The edge seal assembly is preferably compliant in the longitudinal (i.e., edgewise) direction to allow longitudinal relative motion between the two lites (e.g., from thermal expansion). The longitudinal compliance may be obtained by imprinting a three-dimensional pattern into the edge seal material. The edge seal assembly is preferably bonded to the lites with a first bond portion that is hermetic and a second bond portion that is load-resistant. Methods for producing VIGUs and/or compliant edge seal assemblies and VIGU and edge seal apparatus are disclosed.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Method and apparatus for an insulating glazing unit and compliant seal for an insulating glazing unit

A Vacuum Insulating Glazing Unit (VIGU) comprises two or more glass lites (panes) spaced apart from one another and hermetically bonded to an edge seal assembly therebetween. The resulting cavity between the lites is evacuated to create at least one insulating vacuum cavity within which are disposed a plurality of stand-off members to maintain separation between the lites. The edge seal assembly is preferably compliant in the longitudinal (i.e., edgewise) direction to allow longitudinal relative motion between the two lites (e.g., from thermal expansion). The longitudinal compliance may be obtained by imprinting a three-dimensional pattern into the edge seal material. The edge seal assembly is preferably bonded to the lites with a first bond portion that is hermetic and a second bond portion that is load-resistant. Methods for producing VIGUs and/or compliant edge seal assemblies and VIGU and edge seal apparatus are disclosed.

42 ENGINEERING↗

Method and apparatus for an insulating glazing unit and compliant seal for an insulating glazing unit

A vacuum insulating glazing unit (VIGU) comprises two or more glass lites (panes) spaced apart from one another and hermetically bonded to an edge seal assembly therebetween. The resulting cavity between the lites is evacuated to create at least one insulating vacuum cavity within which are disposed a plurality of stand-off members to maintain separation between the lites. The edge seal assembly is preferably compliant in the longitudinal (i.e., edgewise) direction to allow longitudinal relative motion between the two lites (e.g., from thermal expansion). The longitudinal compliance may be obtained by imprinting a three-dimensional pattern into the edge seal material. The edge seal assembly is preferably bonded to the lites with a first bond portion that is hermetic and a second bond portion that is load-resistant. Methods for producing VIGUs and/or compliant edge seal assemblies and VIGU and edge seal apparatus are disclosed.

Francis, William H.↗

Record of Technical Change 1 for Closure Report for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada, Revision 0

ROTC-1: Downgrade FFACO UR at CAU 543, CAS 06-07-01, Decon Pad to an Administrative UR. CAS 06-07-01, Decon Pad, is located at the Decontamination Facility in Area 6. The CAS consists of the effiuent collection and distribution systems for Buildings 6-605, 6-606, and 6-607, which include two 1,000-gallon (gal) septic tanks, two ground-level sumps and associated piping, the concrete foundation of Building 6-605, floor drains, drain trenches, and cleanouts. The Area 6 Decontamination Facility was built in 1971 and was designed to decontaminate vehicles, equipment, and clothing that had become radiologically contaminated during nuclear testing activities. Additionally, the facility managed mixed and radioactive waste generated from these decontamination processes. The Area 6 Decontamination Facility is located along the southwest edge of Yucca Lake in Area 6 of the NNSS. From 1971through1992, hazardous, radioactive, and sanitary wastes were generated within several buildings and originally discharged via process waste lines, septic systems, and sumps to the Area. 6 Decontamination Pond. The Area 6 Decontamination Facility remained operational until 2001, and is currently inactive and abandoned. Additionally, a portion of the facility yard was used as a contaminated materials storage area where equipment and materials awaited decontamination. As a result, portions of the facility yard are posted as "Contamination Areas" (NNSA/NSO, 2004d). During closure activities, the use-restricted area was fenced and posted, and a UR was implemented for PCBs and radioactivity. As best management practices (BMPs ), two septic tanks, two sumps, and their contents were removed and disposed of as mixed waste; sediment from the Building 6-605 floor drain trenches was removed and disposed of as mixed waste; the floor drain trenches, a diversion box, and seven cleanouts were grouted to grade; and numerous containers and other surface debris were segregated according to waste stream and disposed of appropriately as either low-level waste or sanitary waste (NNSA/NSO, 2008). ·

54 ENVIRONMENTAL SCIENCES↗

Closure Report for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada, Revision 0 with Errata Sheet and ROTCs 1-3

CAS 15-23-03, Contaminated Sump, Piping, is located approximately 875 ft south of the Building 15-06 foundation at the EPA Farm. The EPA Farm was constructed in Area 15 of the NNSS as a fully functional dairy to support various studies including the transport of radioiodine from the environment to man, the uptake by plants oflong-lived fission products, and metabolism studies. This CAS consists of a sump measuring approximately 25 by 25 by 6 ft deep, with concrete sides and an unlined bottom and approximately 60 ft of associated piping to the distribution box north of the sump. The sump and piping were installed in 1972 to ac~ept nonradioactive or low-level radioactive wastes from the metabolism and slaughter rooms inside Laboratory Building 15-06; CAS 15-23-03 received ~ effluents from the Laboratory Building (NNSA/NSO, 2004d). Video surveys were conducted inside approximately 60 ft of piping leading from the distribution box to the sump to identify any breaches or residual material in the piping, and to verify the presence and extent of piping. No breaches or residual material were identified in the piping (NNSA/NSO, 2005c ); therefore, the piping was left in place during closure activities. Closure activities at the CAS included removing and disposing of miscellaneous debris, filling the sump with native soil and compacting the soil, and posting UR signs around the perimeter of the sump (NNSA/NSO, 2008).

54 ENVIRONMENTAL SCIENCES↗

Validation of the first LiDAR wind resource assessment buoy system offshore the Northeast United States

The US offshore wind industry is maturing with several projects in various stages of development. These projects require site wind and environmental data before and during operation. Conventional techniques such as fixed-bottom meteorological towers present economical and permitting challenges for the US. Floating Light Detection and Ranging (LiDAR) buoys offer significant advantages including reduced costs, less permitting, and reusability. This paper presents the validation of the first floating LiDAR buoy in Northeast US waters. The buoy, named DeepCLiDAR, includes a LiDAR, ecological monitoring sensors, and metocean sensors. A three-phase LiDAR validation plan was executed, and its results are presented. The objective of the validation plan was to verify the accuracy of measurements made by the LiDAR buoy in wave environments against an unmoving reference wind measurement. Due to a lack of reference met masts, the use of a LiDAR on land as a baseline reference was implemented for validation. Comparison to a reference LiDAR instead of a traditional meteorological tower was a unique approach required in the Northeast US waters due to the absence of a reference fixed-bottom meteorological tower in the region at the time of this study. The testing included a comparison of wind speed measurements made by the buoy deployed 15 km offshore from the mainland and a land-based reference LiDAR located on a nearby island. This paper presents the methodology and results of this program, which indicate favorable agreement. This was the first such validation program in the Northeast USA which is now seeing rapid development of offshore wind.

17 WIND ENERGY↗