Ion Exchange Column Thermal Modeling: Prevention of Process Effluent Boiling - 18577

The Savannah River Site treats and disposes of legacy high-level waste, which resulted from 60 years of nuclear material production, medical research, and other nuclear related work. Complex mixtures of soluble and insoluble solids occupy tanks of which the South Carolina Department of Health and Environmental Control recognizes as the single largest environmental risk state-wide. The risk is reduced through removal, treatment, and solidification of decontaminated salt waste. Presently, SRS decontaminates the soluble salt component of the waste, a solution containing actinides and cesium, via implementation of the Actinide Removal Process and the Modular Caustic Side Solvent- Extraction Unit. Caustic solvent extraction is set to increase in scale by late 2018, with startup of the newly constructed Salt Waste Processing Facility. In conjunction with Salt Waste Processing Facility startup, Savannah River Remediation has been tasked by the Department of Energy to demonstrate modular ion exchange technology. The Tank Closure Cesium Removal project aims to demonstrate the feasibility of modular ion exchange processes for future Department of Energy applications. The Tank Closure Cesium Removal system is scheduled to begin operation in mid-2018. Dissolved salt solution, or influent, will be fed through a filter and ion exchange columns in lead-lag configuration, producing effluent. The effluent is fed to a separate high-level waste tank, for future disposition at Salt-stone Production Facility. Once the demonstration project is complete, the loaded ion exchange columns will be purged, dried, and placed in interim safe storage, awaiting final disposition. The ion exchange media selected for the Tank Closure Cesium Removal system is Honeywell UOP IONSIV{sup C} R-9120. The media is a prime candidate for separation of cesium from radioactive high-level waste. UOP R-9120{sup C} is inorganic and has high capacity, selectivity, and affinity for cesium. During operation, influent is fed to the ion exchange columns, contacting UOP R-9210{sup C} packed within the media vessel. Contact initiates loading of isotopes, and given ample time the solid phase (ion exchange media) and solution achieve thermodynamic equilibrium. UOP R-9120{sup C} is a prime candidate for separation of cesium and dissolved fission products. Although the properties of UOP R-9120{sup C} are favorable for separation, the same properties lead to accumulation of a heat source in the ion exchange bed. Cesium-137 and its daughter product, barium-137 m, generate a clear majority of heat (i.e. ∼ 94%). During operation salt solution flows through each column and transports heat from the ion exchange bed. Once operation is terminated, the effluent contained within the porous bed volume becomes essentially static. In the absence of engineering controls, the heat generated may boil the effluent. Rapid vaporization of aqueous salt solution would lead to bed over pressurization. Over pressurization and an associated release of high-level waste would result in adverse impacts to human health and the environment. This paper focuses on modeling the heat transfer associated with the Tank Closure Cesium Removal system ion exchange column. The model evaluates the maximum heat generation and the associated radionuclide loadings that prevent boiling within of the media vessel, under no flow conditions. A safety significant control, maintaining loadings less than the established loading limit ensures associated impacts to human health and the environment are prevented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

iDDS: intelligent distributed dispatch and scheduling for workflow orchestration

The intelligent distributed dispatch and scheduling (iDDS) service is a versatile workflow orchestration system designed for large-scale, distributed scientific computing. iDDS extends traditional workload and data management by integrating data-aware execution, conditional logic, and programmable workflows, enabling automation of complex and dynamic processing pipelines. Originally developed for the ATLAS experiment at the large hadron collider, iDDS has evolved into an experiment-agnostic platform that supports both template-driven workflows and a Function-as-a-Task model for Python-based orchestration. This paper presents the architecture and core components of iDDS, highlighting its scalability, modular message-driven design, and integration with systems such as PanDA and Rucio. We demonstrate its versatility through real-world use cases: fine-grained tape resource optimization for ATLAS, orchestration of large Directed Acyclic Graph (DAG) workflows for the Rubin Observatory, distributed hyperparameter optimization for machine learning applications, active learning for physics analyses, and AI-assisted detector design at the electron–ion collider. By unifying workload scheduling, data movement, and adaptive decision-making, iDDS reduces operational overhead and enables reproducible, high-throughput workflows across heterogeneous infrastructures. We conclude with current challenges and future directions, including interactive, cloud-native, and serverless workflow support.

97 MATHEMATICS AND COMPUTING↗

Personnel Certifications for the Design, Installation and Maintenance of Photovoltaic Systems. Final Technical Report

The North American Board of Certified Energy Practitioners (NABCEP) is the most respected, well-established, and widely recognized national certification organization for professionals in the field of renewable energy. NABCEP’s certifications were created to facilitate consumer protection, improve quality assurance, and help employers judge the skills of existing or potential employees. The certifications also allow individuals to differentiate themselves from others in their field and advance their careers while fostering increased recognition of the profession. Since NABCEP’s founding in 2002, all of its certification exams have been administered in paper-and-pencil format twice per year at 30 exam sites around the United States. The biannual test administration and relatively low number of exam sites make it challenging for many qualified renewable energy professionals to take NABCEP’s certification exams. The rigorous nature of the exam, which leads to many candidates failing the exam on their first and sometimes second attempts, combined with the low number of annual test administrations means that anyone who fails will need to wait another six months for the chance to retake the exam. These factors limited the potential growth of NABCEP’s certification programs and the resultant quality assurance within the renewable energy industry. Thanks to a generous grant by the Department of Energy’s Solar Training and Education for Professional (STEP) program, NABCEP recently began updating its Photovoltaic (PV) Installation Professional Exam and developing three new specialty certifications in PV design, PV installation, and PV commissioning & maintenance. One of the primary objectives of this STEP-funded project was to develop the exams using a computer-based testing (CBT) model to increase the number of exam administrations and available exam sites for NABCEP’s certification exams. To successfully complete this project, NABCEP partnered with Castle Worldwide, Inc. With more than 25 years of experience in test development, test administration, analysis of examinations, and has a staff of 70 experienced personnel, NABCEP was confident that Castle’s team was more than qualified to help NABCEP make the transition to CBT examinations. NABCEP and Castle Worldwide jointly developed a project management plan that included key deliverables, scope management, a work breakdown structure, roles and responsibilities, and a project schedule with milestones. The project schedule was carefully monitored to ensure that activities along the critical path were not delayed and, when deemed necessary, the project was crashed to add resources so that activities could occur in parallel. NABCEP and Castle Worldwide staff met weekly to discuss any potential schedule variances and activities which might delay the closing of the project. NABCEP also recruited 46 subject matter experts (SMEs) to work with Castle’s staff on this project. NABCEP staff, SME’s, and Castle staff worked together to develop the Job Task Analyses that form the basis for the certification exams, create new examination forms, conduct passing score studies, and complete a psychometrical analysis of potential exam items. NABCEP’s SMEs utilized Castle’s item development platform during face-to-face meetings, webinars, and remote item authoring to write, review, and approve exam items. Castle also used their software to psychometrically analyze existing exam items to confirm the reliability and validity of the NABCEP’s certification exams. On January 3rd, 2018, NABCEP’s began offering its PV Installation Professional certification exam via CBT. The exam was available at Castle’s nearly 600 exam sites in the United States. A large number of sites will help to ensure better access for solar professionals in rural and remote areas, which drives down the implicit costs of taking the certification exams. Thanks to the STEP grant and the robust partnership between NABCEP and Castle Worldwide, Inc., personnel certifications will be much more accessible and affordable for renewable energy professionals.

14 SOLAR ENERGY↗

Modelling the Liquid Waste Operation at the Savannah River Site

Modeling Successes Dounreay – Site Closure Optimization and Risk Reduction Re-structuring and streamlining a complex project plan to achieve site decommissioning in reduced time and at reduced cost, through automated task prioritization. Idaho AMWTP – Multi-stream Optimization Speeding up a complex facility with many process lines, by utilizing all of the process lines more efficiently and reducing overall plant downtime, by coordinating repairs and shutdowns. AWE –Waste Repackaging and Relocation Relocating schedule for waste material from an old storage facility to a new purpose-built one, safely, and in a timely fashion that removed the need to reassure the safety of the old facility. Sellafield – Effluent, Sludge and HAW Treatment Improving a wide range of chemical engineered processes including aqueous effluent treatment, chemically-reactive sludge management and waste vitrification processing. Strategic Petroleum Reserve – Cavern Management Linking chemistry models of petroleum prediction, through engineering cavern management to financial modeling of gasoline sales to benefit US government

Jung, Andrew W.↗

Development of Human and Technology Integration Guidance for Work Optimization and Effective Use of Information

Existing nuclear power contributes to roughly 20% of the total electricity generation, and consistently provides the highest capacity factor of any other electricity generating resource in the United States. Despite these advantages, the existing nuclear power plant fleet in the United States has been enduring significant challenges in providing electricity in a cost-competitive manner, which has ultimately threatened the long-term economic viability of these plants. A major contributor to these increased operating and maintenance costs has been the continued reliance of a large workforce who perform their work under an operating model that has largely remained unchanged since the commissioning of these nuclear power plants. Unfortunately, while this operating model has provided safe and reliable electricity, other industries have already began transforming their workforce through the use of advanced digital technology and automation that has reduced their operating and maintenance cost significantly. In order for the United States nuclear industry to remain economically viable, a similar transformation must be considered in which digital technologies and automation capabilities are brought in to support key plant functions across all work functions across plant operation, maintenance, and support. To effectively integrate digital technology and automation in the existing nuclear power plant operating model, a multidisciplinary approach is needed that addresses technological and sociotechnical (i.e., human and technology integration) considerations. This report describes an extension to the human and technology integration methodology, herein referred to as Human Integration and Technology Task Force for Work Management Optimization (HITT), to support the safe, reliable, and efficient use of proposed innovations with the intended users in their intended environment to perform their intended tasks. By effectively incorporating human and technology integration into a plant modernization effort by using HITT, we believe that a utility can significantly improve work performance and overall workforce quality of life. For instance, if HITT is performed to optimize work management, scheduling performance and scope stability can be improved by up to 10%. HITT enables these benefits through developing a rich understanding of the work being performed, the utility’s vision, and the opportunities that provide greatest value to optimize performance through a 10-step process illustrated below as a quick guide. The quick guide contains links in the righthand side of each step that allows for navigation to the detailed section (Section 4) of HITT in this technical report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Preliminary Planning of Radwaste Management for the Decommissioning of Chinshan NPP in Taiwan - 18201

The Chinshan NPP was the first commercially operated nuclear power plant in Taiwan since 1978. There are two BWR units in Chinshan NPP, which each unit has electrical output of 636 MWe. After 40 year's period of license, the final shutdown date of Unit No. 1 and Unit No. 2 will be in December, 2018 and in July, 2019, respectively. According to 'Nuclear Reactor Facilities Regulation Act' in Taiwan, decommissioning of nuclear reactor facilities should be implemented by the strategy of DECON (Decontamination followed by dismantling) within 25 years when the permission is approved by Atomic Energy Council (AEC). The decommissioning plan of Chinshan NPP has been permitted by AEC in the end of June, 2017. The implementation of Chinshan NPP decommissioning will be started while the Environmental Impact Assessment is approved by EPA. In this study, the Turbine Building in Chinshan NPP is selected as a case study for the preliminary planning of decommissioning. First, we thoroughly examine the inventory of all macro-components in the Turbine Building to estimate the waste amounts. Accordingly, the work breakdown structure (WBS) for dismantling of facilities is scheduled. Then, considering to minimize waste amounts, several suitable decontamination techniques, such as chemical and mechanical methods, which are developed by INER are considered to be adopted. As for the estimation of man hours of dismantling facilities, all events during the decommissioning tasks are classified into 16 work procedures and appropriative factors of corresponding team hours are gotten. In addition, the detailed methodology of the preliminary plan of decommissioning is also discussed. Finally, we hope the results of this planning can provide practical benefits to upcoming decommissioning work in Taiwan. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preparation of the Multi-Site Data Processing at the Vera C. Rubin Observatory

The Vera C. Rubin Observatory’s Legacy Survey of Space and Time (LSST) Camera is scheduled to start taking data in the summer of 2025. The Data Release Production will run the LSST Science Pipe software at data facilities in the US, France and the UK. The LSST Science Pipeline consists of complex directed acyclic graphs (DAGs) of tasks. Rubin will use the Production and Distributed Analysis (PanDA) workflow and workload management system to orchestrate this complex workflow and the distribution of workloads to the data facilities. When run end-to-end by a team of data production staff, this processing (the Science Pipelines, distributed by the workflow and workload management system) is referred to as a 'campaign'. This paper describes the central services and data facility specific services that support this multi-site data process model, including the service deployment infrastructure, the workload and workflow system, the Campaign Management tools, and connection to Rubin Data Management. This paper will also mention the experience of processing the Rubin Commissioning Camera data. All these are part of the effort to scale up the processing capabilities for the expected very large data volume from the LSST Camera.

Yang, Wei [SLAC]↗

Systemwide Planning with a Branch-and-Price Algorithm for Pavement-Marking Assessment Data Collection via the Mobile Retroreflectivity Unit Routing Model

The visibility of pavement markings is one of the most critical factors for traffic safety, and a periodical assessment plan is crucial for maintaining this function. Traditional assessment methods, such as visual windshield surveys or manual testing using handheld devices, are unsafe, time-consuming, and labor-intensive. In recent years, transportation agencies have begun to adopt the use of mobile retroreflectivity units (MRUs) for condition assessment of pavement markings. MRUs, different from other manual methods, can be utilized to collect large-scale retroreflectivity data in an efficient manner. However, no relevant research has yet proposed a mathematical optimization model for arranging the evaluation schedule and paths of MRUs. This study aims to propose a MRU routing model, and an efficient solution methodology. A branch-and-price algorithm, including column generation and branch-and-bound, was implemented. Computational experiments have been conducted based on actual tasks from the Florida MRU program for validation. In conclusion, results show that the proposed solution methodology with a set partitioning model in this study not only finds the optimal solution for problems with tasks less than 60, but also effectively narrows the solution gap to be within 1.0% for problems with tasks less than 131.

42 ENGINEERING↗

High-dimensional Data-driven Energy optimization for Multi-Modal Transit Agencies (HD-EMMA) (Final Technical Report)

Public bus transit services in the U.S. are responsible for at least 19.7 million metric tons of CO 2 emission annually. Electric vehicles (EVs) can have a much lower environmental impact than comparable internal combustion engine vehicles (ICEVs), especially in urban areas. Unfortunately, EVs are also much more expensive than ICEVs. As a result, many public transit agencies can afford only mixed fleets of transit vehicles, consisting of EVs, hybrids (HEVs), and ICEVs. Transit agencies that operate such mixed fleets of vehicles face a challenging optimization problem: these agencies need to decide which vehicles are assigned to serving which transit trips. Since the advantage of EVs over ICEVs varies depending on the route and time of day (e.g., the benefit of EVs is higher in slower traffic with frequent stops and lower on highways), the assignment can have a significant effect on energy use and, hence, environmental impact. Through this project, we have developed reference data about energy collections and constructed a set of machine learning models that can accurately predict the energy consumption for the whole fleet at the level of each trip. We have used these models to develop a scheduling and assignment strategy that can rotate the different vehicle types across the transit agencies’ routes. The optimization algorithm ensures that the vehicles are matched to trips considering weather patterns, expected congestion, and road gradients to minimize the overall energy usage. We list the key observations from our project for other practitioners below. Details are available in the report, and the list of source code and our publications are included in the appendix. 1. We have demonstrated the feasibility of collecting, merging and analyzing large volumes of high-resolution real-world telemetry data from a mixed vehicle fleet. To mitigate the inherent noise of the recorded GPS points, the team developed an algorithm that filters data and maps the points onto a street. The algorithm considers previous and subsequent location measurements and different characteristics of nearby streets to determine how likely the vehicle travels on them. Then, the team segmented the time series into disjoint contiguous samples based on adjacent road segments and repeated the outlier detection and removal. For each data point, the team added features corresponding to elevation changes within the samples, weather features, such as temperature, and traffic data, such as speed ratio between actual speed and free-flow speed. 2. We have developed two forms of machine learning models that be used to understand and analyze the energy operations of a mixed vehicle transit fleet. The micro prediction model provides estimates of instantaneous energy prediction for all types of buses (diesel, hybrid, and electric). Such a model is important in evaluating the energy impacts of real-time bus operation strategies, but it is challenging due to diversified driving cycles of transit buses. The model can help the drivers understand the impact of their driving behaviors and short-term congestions. The macro prediction models estimate average energy consumption across the whole trip considering the features: distance traveled, various road-type features, elevation change, day of the week, time of day, various weather features (temperature, humidity, etc.), and traffic features (speed ratio and jam factor). 3. We have demonstrated that it is possible to transfer the machine learning models we have developed in this project to other teams and cities by using inductive transfer learning. We also showed that the performance of the macro energy prediction models can be improved using a multi-task learning approach where the learning parameters are shared between the models being developed for different vehicle types. The advantage of this approach is improved learning performance as the models can exploit common spatio-temporal and environmental characteristics. 4. Finally, we have developed trip and vehicle assignment and scheduling algorithms that use the energy prediction models and develop a trip to vehicle type (diesel, electric, hybrid) assignment for the whole operation to reduce overall emissions and cost. We have shown through simulations that the proposed algorithms can save $\$$ 48,910 in energy costs and 175 metric tons of CO 2 emission annually for CARTA.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Automatic Imagery Data Analysis for Proactive Computer-Based Workflow Management during Nuclear Power Plant Outages

This report is being submitted for the task “Final Report” of DOE NEUP Project 15-8121 “Automatic Imagery Data Analysis for Proactive Computer-Based Workflow Management during Nuclear Power Plant Outages.” Typical nuclear power plant (NPP) outages always involve thousands of maintenance and refueling activities and a large number of workers in limited workspaces, while having tight schedules and zero-tolerance for accidents. During an outage, thousands of workers will be working in various workspaces across the NPP. High outage costs and expensive delays (approximately 1.5 million dollars of loss per day of delay) in NPP maintenance demand tight outage schedules. In packed workspaces, an automatic system that monitors human behaviors in real-time and provides insights about current and pending schedule deviations from the plan is critical for ensuring: 1) effective collaboration among workers and worker teams from different trades; 2) less waste of time and resources due to the lack of situational awareness; and 3) proactive outage project control. The overall goal of this project is to test the hypothesis that real-time imagery-based object tracking and spatial analysis, as well as human behavior modeling of outage participants, will significantly improve the efficiency of outage control while lowering the rates of accidents and incidents. Three objectives of this project are: 1) Establish real-time object tracking and spatiotemporal analysis methods that automatically assess the productivity of field activities and detect anomalous spatiotemporal relationships among activities that cause inefficiencies and risks; 2) Establish realtime human tracking and human factor modeling methods for automatically diagnosing unexpected actions of and interactions between outage participants, those which cause inefficient collaborations between Advanced Outage Control Center (AOCC), satellite outage centers, NPP workers, and maintenance service providers; and 3) Test the proposed automated object tracking, human behavior modeling, and spatiotemporal analysis methods in outage control case studies in order to characterize the effectiveness of automated imagery-data-driven methods in proactively improving the efficiency and safety of workflows in outage coordination and risk management. Recent studies of detailed human behavior monitoring on construction sites have examined the potential of applying advanced computer vision algorithms in detecting and tracking anomalous workers (i.e., workers who do not wear hard hats or safety vests) for ensuring job site safety. Some studies of human factor studies revealed the importance of modeling detailed interactions between individuals within and across teams in better understanding the impact of human in proactive project control. Other studies in the construction domain have developed computational simulation frameworks that formalize detailed spatiotemporal interactions between tasks in order to simulate the impacts of individual tasks on the performance of workflows. While integrated analyses that combine human factor assessment, as well as image processing and simulation, are in demand for effective decision-making, limited studies have examined the potential of such integrated analyses in NPP outage control. This research project has examined an automatic outage monitoring and control system that integrates human factor analysis, computer vision techniques, and simulation methods in order to enable engineers to better understand the interactions between humans, resources, and workflows during outage processes. The project aims at providing NPP maintenance agencies insights into more efficient use of limited resources in extending the life of a nuclear plant, as well as reducing waste while ensuring sufficient generation of electricity. This study is significant for the safety of nuclear plants, sustainable electricity generation for livable communities, and cost savings for maintaining electricity infrastructures in the United States.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Scaling Up Data-Parallel Analytics Platforms: Linear Algebraic Operation Cases

Linear algebraic operations such as matrix manipulations form the kernel of many machine learning and other crucial algorithms. Scaling up as well as scaling out such algorithms are key to supporting large scale data analysis that require efficient processing over millions of data samples. To this end, we present, ARION, a hardware acceleration based approach for scaling-up individual tasks of Spark, a popular data-parallel analytics platform. We support both linear algebraic operations of between two dense matrices, and between sparse and dense matrices in distributed environments. ARION provides a flexible control of acceleration according to matrix density, along with efficient scheduling based on runtime resource utilization. We demonstrate the benefit of our approach for general matrix multiplication operations over large matrices with up to four billion elements by using Gramian matrix computation that is commonly used in machine learning. Experiments show that our approach achieves more than 2× and 1.5× end-to-end performance speedups for dense and sparse matrices, respectively, and up to 57.04× faster computation compared to MLlib, a state of the art Spark-based implementation. This work is sponsored in part by the NSF under the grants: CNS-1565314, CNS-1405697, and CNS-1615411. The manuscript has been authored by UT-Battelle, LLC under Contract No. DE-AC05-00OR22725 with the U.S. Department of Energy. The United States Government retains and the publisher, by accepting the article for publication, acknowledges that the United States Government retains a non-exclusive, paid-up, irrevocable, world-wide license to publish or reproduce the published form of this manuscript, or allow others to do so, for United States Government purposes. The Department of Energy will provide public access to these results of federally sponsored research in accordance with the DOE Public Access Plan (http://energy.gov/downloads/doe-public-access-plan). This research used resources of the Oak Ridge Leadership Computing Facility at the Oak Ridge National Laboratory, which is supported by the Office of Science of the U.S. Department of Energy under Contract No. DE-AC05-00OR22725.

Xu, Luna↗

Wood-to-Fuel for California's Transportation Sector using Autothermal Pyrolysis (Progress Report for FRD-17-002)

Accomplishments this period: Subcontract with Frontline BioEnergy, LLC has been executed and is in place (Task 1). List of TAC members is awaiting input from the CEC including any additional members of their own choosing before we finalize confirmation with the listed individuals. This is also holding off on the documented TAC Member commitment, and the DRAFT TAC Meeting Schedule, as we need to know who is approved to be on the TAC before we get commitments and start setting meetings. We are awaiting input from the CEC as to a requested date for the CPR#1. It was originally set for the beginning of July (July 7th), but as the CEC needs to conduct this, we need their input on the revised date. The additional wood feed stock was sent to ISU for analysis of autothermal pyrolysis products on July 15. The Kern refinery continues to express interest in using the bio-oil produced from the demonstration in one or more of their plants. We believe this analysis information will be a critical component of what we share at our first Workshop later this summer

09 BIOMASS FUELS↗

Characterizing, Modeling, and Accurately Simulating Power and Energy Consumption of I/O-intensive Scientific Workflows

While distributed computing infrastructures can provide infrastructure-level techniques for managing energy consumption, application-level energy consumption models have also been developed to support energy-efficient scheduling and resource provisioning algorithms. In this work, we analyze the accuracy of a widely-used application-level model that has been developed and used in the context of scientific workflow executions. To this end, we profile two production scientific workflows on a distributed platform instrumented with power meters. We then conduct an analysis of power and energy consumption measurements. This analysis shows that power consumption is not linearly related to CPU utilization and that I/O operations significantly impact power, and thus energy, consumption. We then propose a power consumption model that accounts for I/O operations, including the impact of waiting for these operations to complete, and for concurrent task executions on multi-socket, multi-core compute nodes. We implement our proposed model as part of a simulator that allows us to draw direct comparisons between real-world and modeled power and energy consumption. Here, we find that our model has high accuracy when compared to real-world executions. Furthermore, our model improves accuracy by about two orders of magnitude when compared to the traditional models used in the energy-efficient workflow scheduling literature.

97 MATHEMATICS AND COMPUTING↗

LLNL IPD Tasks: ICSBEP and Pulsed Spheres Benchmark [Slides]

This lecture presented benchmark of the blank and polyethylene spheres at SINBAD in April 2023. In responding to comments about the building, we uncovered a large amount of additional detailed information about the building and experimental set up. We incorporated this new information into an even higher fidelity model and are working on uncertainty analysis at a low level. Scheduled to present at SINBAD meeting in April 2024.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Developing Flexible, Networked Lighting Control Systems That Reliably Save Energy in California Buildings

An important strategy to meet California's ambitious energy efficiency goals is to use innovative wireless communications, embedded sensors, data analytics and controls to significantly reduce lighting energy use in commercial buildings. This project developed a suite of networked lighting solutions to further this goal. The technologies include a platform for low-cost sensing, distributed intelligence and communications, the “PermaMote,” which is a self-powered sensor and controller for lighting applications. The project team also developed a task ambient daylighting system that integrates sensors with data-driven daylighting control using an open communication interface, called the “Readings-At-Desk” (RAD) system. To address the problem of building occupants being confused about how to operate traditional lighting control systems, the research team created content that could be the basis for a user interface standard for lighting controls. Finally, to address the difficulty of ensuring that advanced lighting control systems actually deliver their promised energy savings, the project team developed a new method for evaluating and specifying lighting systems’ performance. The research team validated these technologies in the laboratory, showing significant lighting energy savings, up to 73% for the PermaMote sensor system from occupancy control and daylight dimming features, compared to the same light source (LED replacement lamps) operated via simple on/off scheduling. The project team also developed a proposed standard lighting data model and user interface elements, which were contributed to the ANSI Lighting Systems Committee (C137) for standardization. Existing data models are incomplete and inconsistent, whereas the lighting-specific data model developed here is clear and comprehensive, to serve as a starting point for creating common, universally agreed upon semantic definitions of key lighting parameters, to promote interoperability. For the task on verifiable performance of lighting systems, the project team developed a more effective metric for capturing the actual energy impact of a lighting system over time — the energy usage intensity (kWh/ft2/year). Three commercial lighting systems were tested in FLEXLAB® using this new metric, and the tests show a wide range in the accuracy of the self-reported energy-use metric, from 0.5% to 28% error compared to direct measurement of lighting energy using dedicated submeters. Overall, the project team estimates that these advanced technologies can reduce California office lighting energy use by 20% (above and beyond normal advanced lighting controls mandated by Title 24), resulting in about 1,600 GWh/year in savings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Application of Deep Learning on Integrating Prediction, Provenance, and Optimization

In this research, we investigated two approaches to detect job anoma- lies and/or contention for large scale computing efforts: 1. Preemptive job scheduling using binomial classification long short-term memory networks 2. Forecasting intra-node computing loads from the active jobs and addi- tional job(s) For approach 1, we achieved a 14% improvement in computational resources utilization and an overall classification accuracy of 85% on real tasks executed in a High Energy Physics computing workflow. For this paper, we present the preliminary results used in second approach.

Anomaly Detection, Belle II Computing, data proven↗

Atrial Model Development and Prototype Simulations; Final Report for CRADA No. TC02224.0

This project was a collaborative effort between Lawrence Livermore National Security, LLC as manager and operator of Lawrence Livermore National Laboratory (LLNL) and Amgen, Inc. ("Amgen"), to develop a capability to computationally evaluate the importance and roles of different ion channels in atrial fibrillation. The first phase of this collaboration was to implement the atrial model, run prototype simulations, and analyze the results. Two No-Cost Time Extension (NCTE) requests were executed for this project. The first NCTE was executed on April 1, 2016, and extended the CRADA project for an additional two months to allow enough time to complete the tasks and deliverables, due to a delay in the start of the project. A second NCTE was executed on June 28, 2016, extending the project by three months, through November 3, 2016, to allow enough time to complete the final tasks and deliverables as well as negotiate a CRADA extension. The actual duration of this project was fourteen months. Amgen was unable to obtain budget approval to extend the CRADA past November 3, 2016. All of the deliverables for this CRADA project were successfully completed according to schedule.

59 BASIC BIOLOGICAL SCIENCES↗

Data Analytics Methods to Measure Plant Outage Resilience

Every 18 or 24 months nuclear power plants (depending on plant configuration, pressurized or boiling water reactor respectively) undergo a period of outage where the plant is taken offline and a large number of maintenance and surveillance activities (that cannot be performed while plant is running) are performed in typically 2–3 weeks. Planning of a plant outage is very challenging since all the activities are required to be performed in the shortest amount of time given available resources (typically contractor crews hired for the duration of the outage). Consequently, plant outages can be costly due the actual loss of power generation and crew costs and, because of it, there is a need to maximize resource usage in the outage planning phase and reduce the risk of outage delays. This paper is addressing these needs by providing a set of analytical methods designed to analyze plant outage schedule and identify critical elements based on available resources (time and crews). These methods are based on natural language processing and optimization algorithms. In this respect, two classes of methods have been developed: one that focuses on the time resource and how variability in the time to complete outage tasks may impact outage delays, and one that minimizes the risk of outage delays by integrating available resources to assess when daily activities should be performed.

97 - MATHEMATICS AND COMPUTING↗