QUALIFICATION OF PROCESSING BATCHES FOR TANK CLOSURE CESIUM REMOVAL THROUGH IN-TANK BATCH CONTACT TESTING
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The Savannah River Site (SRS) Tank Farms have 51 underground waste tanks used to store and process liquid nuclear waste materials. There are 4 different tank types, ranging in capacity from 2,840,000 to 4,920,000 L (750,000 to 1,300,000 Gal). Twenty-four of the tanks are older style and do not meet full secondary containment standards. The older style tanks are the initial focus of waste removal efforts for tank closure at SRS. Eight of these twenty-four tanks have completed waste removal and are filled with grout. Prior to salt dissolution, Tank 3 was a dry salt tank that contained 5.06 m (199.3 in) of salt and sludge waste. Additional salt waste was present on cooling coils above the salt layer up to approximately 5.59 m (220 in). Three mixing eductors were installed in Tank 3 to aid in dissolving salt waste in three tank riser access ports. A transfer pump was installed, and the transfer pump suction was located 25.4 cm (10 in) from the tank bottom. Well water was added to the tank through a downcomer until the dry bulk salt was covered with liquid. During the initial fill of Tank 3, approximately 242,000 L (64,000 Gal) of rain water were added from periodic F-Tank Farm (FTF) Catch Tank additions and approximately 17,000 L (4,500 Gal) of well water were added. Following liquid additions to cover the dry bulk salt, well water was added through the three mixing eductors in batches during each stage. Additionally, during the salt dissolution campaigns, the FTF Catch Tank was utilized to add rain water through a downcomer in the center tank riser access port as needed for volume relief in the FTF Catch Tank. Following liquid additions, the water was recirculated (internal to the tank) using the transfer pump, and a sample was pulled to confirm the target specific gravity (SpG) of the dissolved salt solution was achieved. The dissolved salt solution was then transferred to the receipt tank (Tank 7), and the mixing eductors were lowered as close to the new bulk salt layer as possible, to support subsequent dissolution campaigns. While the mixing jets were able to dissolve salt successfully in Tank 3, they did not do so in a completely uniform manner. Throughout dissolution, mounds were discovered under Riser 1, Riser 2, and the Center Riser. The mixing jets dissolved the salt around the edges of the tank well but were not as effective toward the center of the tank. FTF Catch Tank additions through the center tank riser access port downcomer were required to impact the mound under the center tank riser. FTF Catch Tank additions were sporadic as they were dependent on rainfall in the area. Additionally, all mixing jets were rarely able to be lowered to the same elevation, indicating some mounding in the bulk salt layer. Indexing of the mixing jets was also utilized to impact the salt mounds. Overall, Tank 3 salt dissolution was successful as approximately 1,476,000 L (390,000 Gal) of dissolved salt solution was transferred to Tank 7 over six stages. Slightly less than 852,000 L (225,000 Gal) of water were added to Tank 3. The original material balance prediction estimated that the bulk salt level in Tank 3 would be 3.88 m (152.8 in) after six salt dissolution stages. After six stages the actual bulk salt level was 3.38 m (133 in). This paper will discuss the salt removal strategy, each salt dissolution stage, and lessons learned for future salt dissolution. (authors)
The Department of Energy (DOE) requires that Savannah River Remediation LLC (SRR), the Liquid Waste contractor, maintain a robust and timely Structural Integrity Program for waste tanks that are leak-tight and for waste tanks that have leaked or are suspect. These requirements are promulgated in DOE Manual 435.1-1, Section II.Q.(2). A key aspect of SRR's implementation of these requirements is its annual tank inspection program. In 2018, the SRR Visual and In-Service Inspection Program used two visual imagery techniques to ascertain the integrity of the Savannah River Site (SRS) waste tanks: high resolution digital photography and closed-circuit television. The primary inspection method made use of direct photograph techniques, e.g., making a series of photographs providing detailed views of the tank and wide-angle photography for obtaining overviews of large areas. Closed-circuit television was then typically used to further investigate conditions found during the initial inspection. During 2018, a total of 4,853 photographs were taken and 47 video inspections were performed as part of this inspection program. Of the 51 waste tank systems at SRS that were designed, constructed, and placed into active service storing radioactive liquid waste, 43 remain in active service. Eight tanks have been cleaned, stabilized by filling with engineered grout, and removed from service (also known as operationally closed) -Tanks 5, 6, and 12 (Type I tanks); Tank 16 (Type II tank); and Tanks 17, 18, 19, and 20 (Type IV tanks). For the 43 waste tanks, inspections were successfully conducted in 2018 through all accessible annulus risers and inspection ports for nine Type I tanks, three Type II tanks, and 27 Type III/IIIA tanks; at least one inspection was made in the interior of four Type IV tanks (i.e., the tanks without annular spaces) above the liquid level in the tank. Rainwater continues periodically to be observed migrating into the annuli of some tanks. Evidence of this infiltration was primarily noted by observation of surface stains, and occasionally by calciferous deposits, changed configuration of salt deposits in the associated annulus, and mild surface corrosion. The conditions of the 43 tanks remained essentially unchanged from the conditions reported in 2017. The one key exception was the identification of eight new cracks in the Tank 15 primary tank wall. These newly identified cracks are located at 65, 67, 70, 76, 150, 152, 176 inches and 200 inches above the tank bottom. The identified cracks in Tank 15 do not constitute an impact on the structural integrity of the tank, as evaluated and confirmed in the referenced report, SRNS-STI-2008-00028, A Structural Impact Assessment of Flaws Detected During Ultrasonic Examination of Tank 15, and calculation, T-CLC-H-00890, Calculation of Critical Crack Lengths in HLW Tank 15. The 2018 inspection program confirmed the structural integrity and waste confinement capability of all 43 waste tanks.
This document identifies 241-BY Tank Farm (BY Farm) and 241-TY Tank Farm (TY Farm) leak causes and locations for the 100-series leaking tanks in BY and TY Farm. The leak causes and locations report for all of the 100-series single-shell leaking tanks is one of the targets (M-045-91-T04) in the Hanford Federal Facility Agreement and Consent Order milestone M-045-91F. The T04 target requires that the Department of Energy provide to State of Washington, Department of Ecology (Ecology) a report on the 100-series single-shell tanks which have been or will be identified as having leaked in RPP-32681, Rev. 0, Process to Assess Tank Farm Leaks in Support of Retrieval and Closure Planning, leak assessment reports. The leak assessment report for BY Farm, RPP-RPT-43704, Rev. 0A, Hanford BY-Farm Leak Assessments Report, lists one 100-series tank that either continues to be or is recommended to be classified as a leaking tank in BY Farm, 241-BY-103 (BY-103). The leak assessment report for TY Farm, RPP-RPT-42296, Rev, 0, Hanford TY-Farm Leak Assessments Report, lists four 100-series tanks that either continue to be or are recommended to be classified leaking tanks in TY Farm, 241-TY-103 (TY-103), 241-TY-104 (TY-104), 241-TY-105 (TY-105), and 241-TY-106 (TY-106). All of the other eleven 100-series tanks in BY Farm and two 100-series tanks in TY Farm are classified as “sound” or are identified in RPP-RPT-43704, Rev. 0A, and RPP-RPT-42296, Rev. 0, respectively, as requiring re-assessment of their classification per TFC-ENG-CHEM-D-42, Tank Leak Assessment Process. The TFC-ENG-CHEM-D-42 assessments are not part of the M-045-91-T04 target. This BY and TY Farm leak causes and locations document is part of a series of tank farm reports that identify leak causes and locations for 100-series leaking tanks. A summary and conclusions document will be issued, RPP-RPT-54909, Hanford Single-Shell Tank Leak Causes and Locations – Summary, that compiles the results from all of the leak causes and locations tank farm reports when they have been issued which will fulfill the T04 target requirements. The identification of four of the five leaking BY and TY Farm tank leak locations focused on the first indication of radiation detected in drywells as well as liquid level decreases as appropriate, with the exception of tank TY-104 which could not be identified. Leak detection laterals were not installed underneath the BY and TY Farm tanks. For TY Farm, direct pushes were installed in 2005 to further characterize the tank leaks which were used to collaborate with the drywell data. The BY and TY Farm leaking tanks were likely due to chemistry-corrosion from the storage of Tri-butyl phosphate (TBP) waste which is conducive to stress corrosion cracking and pitting. Thermal shock (rate of temperature rise) and tank construction conditions (cold weather ductile-to-brittle transition temperature impact effects) were also likely to have affected tank integrity. There appears to be very little contribution from tank design and liner bulging. However, some or all of the factors can act serially or together to contribute to tank liner failure. The leaking BY and TY Farm tanks all stored undiluted TBP waste whereas the sound tanks stored diluted TBP waste as well as other waste types.
A pressing need for the Double-Shell Tank Integrity Program at Hanford is of the ability to inspect the bottom of the tanks. Though the DSTs' annulus spaces (the space between the internal and external tank walls) have been inspected visually since 1992 and with Ultrasonic Testing (UT) since 1996, inspections of the tank bottoms have been able to be conducted due to limitations of available technology, omitting about 40 percent of the tank surface below the maximum fill level from routine inspection. Visual inspections of the tank annulus have been conducted up to five times in some DSTs and portions of the annulus space for all of the DSTs has been inspected twice with UT. This region includes the walls of the primary tank and secondary liner along with accessible portions of the secondary liner bottom. Due to this lack of technology, the degradation of the primary tank bottom in Tank AY-102 was undetected until the tank leaked into its annulus space, confirmed in 2012. Since that time, WRPS has been working with the nondestructive examination community and the Pacific Northwest National Laboratory, to evaluate potential technologies to conduct these challenging remote inspections. Recent work has included the development, testing, and deployment of several remote visual inspection technologies to observe the condition of the primary tank bottom of the DSTs by leveraging air distribution slots in the refractory pad on which it rests. Robotic solutions to conduct this inspection were developed with a detailed understanding of the physical configuration and operational logistics. Understanding and subsequent communication of these details to vendors within the robotics and nondestructive examination community was a critical component to the successful production of these new tools. Throughout the FY16-FY18 years, vendors from nondestructive examination community were solicited for ideas to meet the tank bottom inspection challenge. Two tank bottom visual inspection solutions were then pursued to meet that challenge. Both tools were successfully deployed at Tank AP-107, and provided valuable visuals, never before obtained from the under tank environment of a double-shell tank. While there are minor opportunities for improvement identified with each system, general outcomes were overwhelmingly positive. Both systems were successfully able to navigate the refractory air slot pattern from the outer edge to the tank center and record video footage. The micro-crawler provided high quality and very stable footage through the air slot pattern, but took longer to deploy into the slots and traverse through them than the alternative system. The push-pull tethered camera was able to navigate all seven of its target air slots in a matter of a few hours, which included deployment, movement between slot entrances, and complete removal of the system from the annulus environment. Through these air slots, new information was gained about the tank bottom and refractory pad condition of tank AP-107, AP-106, AP-108, and AN-102. While some debris was noted in the air slots, including sand, chipped refractory, and construction materials, the refractory was found to be structurally stable and adequately supporting the primary tank bottom through the full diameter of the tank. Primary tank bottom steel exterior was found to be in good condition, free of ongoing or aggressive corrosion conditions. Looking toward the future, robotic access to and visual inspection of refractory air slots and the primary tank bottom steel has now proven viable. Incorporating periodic air slot inspections as a regular practice within the Double-Shell Tank Integrity Program is the next step, allowing trending of any changes in condition. As ultrasonic testing infrastructure was leveraged to complete the initial system deployments described in this report, it makes sense to adopt that same strategy for ongoing periodic examinations and deploy these primary tank bottom inspection tools alongside ultrasonic testing operations. Development of visual inspection tools to evaluate the primary tank bottom region of the double-shell tanks was planned as the first stage of inspection. Continued development of volumetric sensors and incorporation of these inspection tools into Hanford's ongoing Double-Shell Tank Integrity Program are the next steps, seeking to continuously expand understanding of asset integrity and remaining useful life. (authors)
The Savannah River Site Tank Farms have 45 active underground waste tanks used to store and process nuclear waste materials. There are 4 different tank types, ranging in capacity from 2839 m 3 to 4921 m 3 (750,000 to 1,300,000 gallons). Eighteen of the tanks are older style and do not meet all current federal standards for secondary containment. The older style tanks are the initial focus of waste removal efforts for tank closure and are referred to as closure tanks. Of the original 51 underground waste tanks, six of the original 24 older style tanks have completed waste removal and are filled with grout. The insoluble waste fraction that resides within most waste tanks at SRS requires vigorous agitation to suspend the solids within the waste liquid in order to transfer this material for eventual processing into glass filled canisters at the Defense Waste Processing Facility (DWPF). SRS suspends the solid waste by use of recirculating mixing pumps. Older style tanks generally have limited riser openings which will not support larger mixing pumps, since the riser access is typically 58.4 cm (23 inches) in diameter. Agitation for these tanks has been provided by four long shafted standard slurry pumps (SLP) powered by an above tank 112KW (150 HP) electric motor. The pump shaft is lubricated and cooled in a pressurized water column that is sealed from the surrounding waste in the tank. Closure of four waste tanks has been accomplished utilizing long shafted pump technology combined with heel removal using multiple technologies. Newer style waste tanks at SRS have larger riser openings, allowing the processing of waste solids to be accomplished with four large diameter SLPs equipped with 224KW (300 HP) motors. These tanks are used to process the waste from closure tanks for DWPF. In addition to the SLPs, a 224KW (300 HP) submersible mixer pump (SMP) has also been developed and deployed within older style tanks. The SMPs are product cooled and product lubricated canned motor pumps designed to fit within available risers and have significant agitation capabilities to suspend waste solids. Waste removal and closure of two tanks has been accomplished with agitation provided by 3 SMPs installed within the tanks. In 2012, a team was assembled to investigate alternative solids removal technologies to support waste removal for closing tanks. The goal of the team was to find a more cost effective approach that could be used to replace the current mixing pump technology. This team was unable to identify an alternative technology outside of mixing pumps to support waste agitation and removal from SRS waste tanks. However, the team did identify a potentially lower cost mixing pump compared to the baseline SLPs and SMPs. Rather than using the traditional procurement using an engineering specification, the team proposed to seek commercially available submersible mixer pumps (CSMP) as alternatives to SLPs and SMPs. SLPs and SMPs have a high procurement cost and the actual cost of moving pumps between tanks has shown to be significantly higher than the original estimates that justified the reuse of SMPs and SLPs. The team recommended procurement of “off-the-shelf” industry pumps which may be available for significant savings, but at an increased risk of failure and reduced operating life in the waste tank. The goal of the CSMP program is to obtain mixing pumps that could mix from bulk waste removal through tank closure and then be abandoned in place as part of tank closure. This paper will present the development, progress and relative advantages of the CSMP.
The Savannah River Site Tank Farms have 45 active underground waste tanks used to store and process nuclear waste materials. There are 4 different tank types, ranging in capacity from 2839 m{sup 3} to 4921m{sup 3} (750,000 to 1,300,000 gallons). Eighteen of the tanks are older style and do not meet all current federal standards for secondary containment. The older style tanks are the initial focus of waste removal efforts for tank closure and are referred to as closure tanks. Of the original 51 underground waste tanks, six of the original 24 older style tanks have completed waste removal and are filled with grout. The insoluble waste fraction that resides within most waste tanks at SRS requires vigorous agitation to suspend the solids within the waste liquid in order to transfer this material for eventual processing into glass filled canisters at the Defense Waste Processing Facility (DWPF). SRS suspends the solid waste by use of recirculating mixing pumps. Older style tanks generally have limited riser openings which will not support larger mixing pumps, since the riser access is typically 58.4 cm (23 inches) in diameter. Agitation for these tanks has been provided by four long shafted standard slurry pumps (SLP) powered by an above tank 112 kW (150 HP) electric motor. The pump shaft is lubricated and cooled in a pressurized water column that is sealed from the surrounding waste in the tank. Closure of four waste tanks has been accomplished utilizing long shafted pump technology combined with heel removal using multiple technologies. Newer style waste tanks at SRS have larger riser openings, allowing the processing of waste solids to be accomplished with four large diameter SLPs equipped with 224 kW (300 HP) motors. These tanks are used to process the waste from closure tanks for DWPF. In addition to the SLPs, a 224 kW (300 HP) submersible mixer pump (SMP) has also been developed and deployed within older style tanks. The SMPs are product cooled and product lubricated canned motor pumps designed to fit within available risers and have significant agitation capabilities to suspend waste solids. Waste removal and closure of two tanks has been accomplished with agitation provided by 3 SMPs installed within the tanks. In 2012, a team was assembled to investigate alternative solids removal technologies to support waste removal for closing tanks. The goal of the team was to find a more cost effective approach that could be used to replace the current mixing pump technology. This team was unable to identify an alternative technology outside of mixing pumps to support waste agitation and removal from SRS waste tanks. However, the team did identify a potentially lower cost mixing pump compared to the baseline SLPs and SMPs. Rather than using the traditional procurement using an engineering specification, the team proposed to seek commercially available submersible mixer pumps (CSMP) as alternatives to SLPs and SMPs. SLPs and SMPs have a high procurement cost and the actual cost of moving pumps between tanks has shown to be significantly higher than the original estimates that justified the reuse of SMPs and SLPs. The team recommended procurement of 'off-the-shelf' industry pumps which may be available for significant savings, but at an increased risk of failure and reduced operating life in the waste tank. The goal of the CSMP program is to obtain mixing pumps that could mix from bulk waste removal through tank closure and then be abandoned in place as part of tank closure. This paper will present the development, progress and relative advantages of the CSMP. (authors)
Thermal Energy Storage (TES) is a fundamental component in concentrating solar power (CSP) plants to increase the plant's dispatchability, capacity factor, while reducing the levelized cost of electricity. In central receivers CSP plants, nitrate molten salts have been used for several years for operation temperatures of up to 565 degrees C. Despite many efforts to advance nitrate salt to higher operation temperatures (even considering a replacement with molten chloride salts) to achieve higher energy conversion efficiencies, the 565 degrees C temperature is currently considered the state-of-the art. Although molten salt tanks have been broadly deployed in commercial CSP plants worldwide, several failures have been reported in these tanks after a few months or years of operation, causing significant economic loss and mistrust in CSP technologies. Most of these failures are associated with the infancy of the technology and multiple issues related to tank design, fabrication, commissioning, and aggressive operation. A technical standard dedicated to the design and fabrication of molten nitrate TES tanks does not exist today. Current in-service molten salt tanks have been generally designed based on the American Petroleum Institute's (API) 650 and ASME Section II standards. The API 650 code provides guidelines for dimensions and fabrication for oil storage tanks up to 260 degrees C. The ASME standard provides allowable stress values for various materials at a range of temperatures and conditions. Both standards seem to be limited for molten salt TES tanks where high temperatures, thermal cycling, and transient conditions are expected. In 2020, NREL released the Concentrating Solar Power Best Practices Study (NREL/TP-5500-75763) that summarized multiple issues in CSP plants, along with potential alternatives and recommendations to address those issues based on information collected from participants representing about 80% of operating CSP plants in the world. One of the recommendations from this study was the development of accurate and validated models to evaluate the plant's transient operation, capable of capturing the effect of short-term clouds and operator response, while being flexible in being adapted to various spatial and temporal resource data. The "Failure Analysis for Molten Salt Thermal Energy Tanks for In-Service CSP Plants" project was inspired on this recommendation and was focused on (1) the development and validation of a physics-based model for a representative, commercial-scale molten salt tank, (2) performing simulations to evaluate the behavior of the tank as a function of typical plant operation conditions, (3) understanding tank failures mechanisms, (4) determining the residual stress and distortion in the tank floor after welding fabrication and evaluating their impact in the stresses developed in the tank during operation, (5) assessing the impact of key operation parameters on the temperature and stress distribution, (6) conduct a preliminary evaluation of design features to reduce stress and improve tank's reliability, and (7) estimate the tank's service life based on the stress developed under diverse operation scenarios. From the analysis conducted in the project and presented in this report, it was found that maximum stresses surpassing the yield strength point of the stainless steel (SS) 347H are developed on the tank floor near the perimeter. These large stresses are strongly influenced by the initial residual stresses and distortion of the tank floor after welding fabrication. During operation, large stresses are developed in the tank floor at high operation temperatures with large salt inventory levels during transient operation. High stresses are also related to elevated temperature gradients in the tank floor that could be attributed to insufficient mixing within the salt inflow and the salt inventory. Based on the analysis, creep is the predominant failure mechanism. However, the large stress levels could favor the plastic deformation into buckles, and crack formation due to stress relaxation cracking during cycle operation. A lifetime below 3 years was estimated for the typical plant operation conditions and a specific initial residual stress and deformation distribution of the tank floor. The estimated life agrees with the service time to failure reported in several commercial molten salt tanks. Desing and operation guidelines can be extracted from the analysis presented in this report, which could be adopted by tank manufacturers and CSP operators to advance toward an ultimate solution for tank failures by reducing residual and operational stresses to achieve a tank service life of more than 30 years. Addressing failures in molten salt TES tanks is fundamental for the CSP industry's survivability, but it is also important for other industrial and power generation applications using this technology, including nuclear and concentrating solar thermal.
The Savannah River Site (SRS) Liquid Waste System (LWS) safely manages, stores, treats, and dispositions liquid radioactive waste. The LWS consists of 51 underground waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities, known as the Defense Waste Processing Facility (DWPF) and Saltstone Production Facility (SPF). One of the waste storage tanks, Tank 26, was placed into service in 1980 as an F Tank Farm (FTF) Evaporator Feed Tank. From 1980 to 2013, Tank 26 received F Canyon receipts and dilute supernate that was then transferred to the 242-16F FTF Evaporator for volume reduction. In 2013, the steam tube bundle failed in the FTF Evaporator, and the decision was made not to repair/resume evaporator operation. During operation of Tank 26, solids built up to a level of 2.03 m in the tank with a volume of 1062.9 kL. Due to the evaporator failure and subsequent shutdown, the solids in Tank 26 were selected to feed Sludge Batch 10, which is collected and prepped prior to being sent to DWPF for final disposition. To accomplish solids removal, Commercial Submersible Mixer Pumps (CSMPs) were selected to slurry the solids in preparation to be sent to Tank 51. Four CSMPs were installed in Tank 26 with each one installed in a separate quadrant of Tank 26. This work would mark the first deployment of CSMPs in an SRS waste tank. The CSMPs were developed in response to operational issues from previous mixing pumps and budgetary constraints. The CSMPs use the concept of modifying commercially available equipment for nuclear waste applications. The CSMPs consist of a 230-horsepower submersible mixing pump (manufactured by GPM, Inc.) joined to a mast fabricated at SRS. For this application, Savannah River Remediation (SRR) design services was challenged to provide a mast design that required no steel superstructure support system on top of Tank 26. Also, SRR design services provided a simplified Tank 26 riser interface that did not require extensive machine parts to adjust height of the suction screen of the CSMP within the tank. Other design improvements include no requirements for tank top radiation monitors and no requirements for flushing of the CSMPs during startup/shutdown operations. The CSMPs were operated at an initial height of 2.29 m above the Tank 26 bottom for 10 days. After sludge sounding, the CSMPs were lowered to a height of 1.52 m with no issues due to proper work planning and the simplified riser interface. With the CSMPs lowered to a level of 1.52 meters above the tank bottom, the CSMPs were operated for 12 days and another sounding was performed. The sounding level came back matching the disturbance depth results of the first pump run. Chemistry samples were analyzed while the tank was left to settle. The analysis revealed enough weight percent solids to provide good feed to Sludge Batch 10. Also, the results revealed the supernate within the mixture would provide good salt solution feed to Salt Waste Processing Facility (SWPF) Salt Batch 3. So, the plan was modified to let the disturbed solids settle and decant the salt solution for addition to SWPF Salt Batch 3. Then water will be added back to Tank 26, and the CSMPs run in order to wash the solids to decrease settling time prior to being sent to Tank 51 for Sludge Batch 10. Utilizing CSMPs for waste removal in an SRS Tank has provided a cost-effective means for further waste removal efforts. In addition, the CSMPs are easier to operate by utilizing a robust and simplified design. The CSMPs performed quite well with no process shutdown or delays during operation. As a result, CSMPs are integral to the future of removing radioactive waste from storage tanks at SRS. (authors)
The Tank Closure Cesium Removal (TCCR) system uses ion exchange columns filled with crystalline silicotitanate (CST) media to process radioactive waste solutions for the removal of ¹³⁷Cs. TCCR currently focuses on dissolving Savannah River Site (SRS) radioactive tank waste (primarily sodium saltcake solids) within Tank 10H followed by at-tank ion exchange column treatment. Two supernate batches from Tank 10H have been processed through the TCCR unit and processing of a third batch is expected soon. After processing of this supernate batch, plans are to replace the CST columns and process dissolved salt solution from Tank 9H through Tank 10H and then through the new CST columns installed in the TCCR unit. The new columns are expected to contain either a media similar to an archived CST batch (IE-911) or the R9120-B CST media used in the current TCCR columns (the two materials are fundamentally the same; just different specifications, product names, and preconditioning steps). Samples of Tank 9H dissolved saltcake were received at the Savannah River National Laboratory (SRNL) and characterized. The Tank 9H supernate contained a high sodium concentration (~9.6 M Na⁺) and will require dilution to near 6 M [Na⁺] prior to processing through the TCCR unit. The cesium concentration in Tank 9H is currently significantly higher than was observed with Tank 10H. Three dilutions of the Tank 9H supernate were conducted to mimic possible dilutions that could be conducted in the tank farm prior to TCCR processing using inhibited water, sodium hydroxide, and sodium nitrate solutions. Dilution #1 was prepared by diluting the Tank 9H supernate by a factor of 1.6 with inhibited water, Dilution #2 was prepared by diluting the Tank 9H supernate by a factor of 3.7 with a mixed sodium hydroxide/sodium nitrate diluent, and Dilution #3 was prepared by also diluting by a factor of 3.7 but with sodium hydroxide only. All three dilutions have similar Na⁺ concentrations (~6 M), but Dilutions #2 and #3 contain significantly less cesium. Major and key minor components of the diluted Tank 9H supernate samples are provided in Table ES-1. Batch contact equilibrium tests were conducted with the Tank 9H dilutions and the two different CST media batches being considered for use in the new TCCR columns. Results are summarized in Table ES-2 and compared to ZAM model predictions. The highest cesium distribution coefficient and percent removal were observed with Dilution #3. IE-911 CST (an archived CST media batch) was more effective at removing cesium than the more recently prepared R9120-B CST media, though both media samples removed >88% of the cesium and the differences may not be statistically different considering the overall uncertainty. Based on the results, maximum cesium loadings were calculated for each CST media type and Tank 9H dilution. In general, maximum cesium loadings from dilutions of this supernate batch are quite high (approaching 0.1 mmol total Cs⁺/g CST for Dilution #1). The highest calculated maximum ¹³⁷Cs loading for the Tank 9H dilutions using the ZAM model with input of the tank compositions and batch contact results was 207 Ci/kg CST (Dilution #1 with IE-911 CST). In all cases, higher maximum cesium loading values were predicted for IE-911 CST versus R9120-B, although the differences varied considerably between the dilutions. The maximum loading value for IE-911 CST with Tank 9H Dilution #1 was only 7% higher than the maximum loading for R9120-B. The maximum loading value for IE-911 CST with Dilution #3 was 24% higher than the maximum loading for R9120-B. Dilution #2 was intermediate between these values. Note that these maximum loading values are the theoretical calculated values, and actual operating conditions will cause differences. A CST binder dilution (correction) factor near 0.7 (relative to pure powder CST) was required for each batch contact test with IE-911 engineered CST using the three Tank 9H dilutions. Correction factors calculated for R9120-B CST ranged from 0.56 to 0.66 for the three dilutions. Following the batch contact tests, the CST samples were isolated from the Tank 9H solution, washed, dried, and digested in acid following established procedures. The analysis results are provided in Table ES-3. Total cesium loading values determined by CST digestion were similar to the calculated loading values based on solution analysis (Table ES-2) for all samples. In addition, the CST was observed to load calcium (R9120-B sample only), iron, strontium, lead, uranium, and plutonium after contact with the waste supernate, as has been observed previously.
Hanford stores millions of gallons of radioactive and chemically hazardous waste from the production of weapon materials in tank farms consisting of underground carbon-steel storage tanks surrounded by reinforced concrete. Six of these Hanford tank farms use double-shell storage tanks (DSTs). The DST farms were constructed from 1968 to 1986 with a planned 40–50 year design life, so some are already operating beyond their initial life expectancy. Ultrasonic testing (UT) has indicated significant thinning on the bottom of the secondary (outer) liner of these tanks, believed to arise from groundwater intrusion driving concrete side corrosion. There is no direct access to the steel/concrete interface between the tank and the concrete pad, making it difficult to apply a chemical-based mitigation strategy or to conduct repairs, but cathodic protection (CP) is a possible method to inhibit further concrete-side corrosion. Hanford already uses CP to protect below grade steel piping within the tank farms and connected to the tanks, but this system was not designed to protect the tank bottoms. CP design must account for the structures surrounding the DSTs, including the steel reinforcing bars (rebar) within the concrete pad and vault, various process lines, and the existing CP system. In this study, finite element analysis (FEA) modeling was carried out to simulate CP protection of 1) a single tank and CP anode to develop options for modeling the rebar and to compare to a simpler circuit model and 2) the entire Hanford AN tank farm as a representative example consisting of seven tanks, associated piping, and both existing and new CP anodes. Both circuit and FEA models predict that significant protective current could be delivered to the bottoms of the tanks with the addition of tank-protection anodes below the depth of the tanks. Simulations with only the existing pipe-protection anodes active confirmed that only a very small current to the tank bottoms is predicted under present conditions. Multiple simplified representations of the dome and wall rebar were tested to reduce the computational complexity of the tank-farm simulations, resulting in modeling the rebar as edge elements with a prescribed effective circumference that matches the real rebar surface area. The geometry of the rebar is also simplified into horizontal hoops around the tank walls and radial rebar over the dome with increased effective circumference to retain the target surface area. This simplification was found to greatly reduce the complexity and solution time of the models without large changes in current distributions, especially to the tank bottom. A range of values were tested for model parameters such as soil and concrete resistivities and polarization resistance to investigate their impact on the current and electric potential distributions. Depending on the parameters used, FEA simulations predict some risk of overprotection, particularly on the piping system; since overprotection can also lead to surface damage associated with hydrogen gas generation at the interface (e.g. hydrogen embrittlement or damage to coatings), this needs to be considered when refining the design of the new CP system. Comparison between the FEA models and the circuit model representation demonstrated that the circuit model could not match the predicted FEA current distribution, even when using the exact same surface areas. This discrepancy appeared to be at least partly attributable to the impact of the relative positions of the tank components and anodes to each other and to the ground surface. The FEA model accounts for the relative positions since it solves the governing equations in three dimensions, but the circuit model cannot account for the positioning. In particular, the circuit model underpredicts the current to the tank bottom and overpredicts the current to the dome compared to FEA for the baseline geometry. The FEA models omitted the electrically isolated rebar in the bottom concrete slab. However, a circuit based stray current model estimated that only 2.1% of the total current through the slab would stray into the rebar, corresponding to ~0.21 A for a target current density of 2 mA/ft2 to the tank bottom. The estimated corrosion driven by this amount of stray current is predicted to yield a lifetime of >400 years for the minimum rebar diameter, assuming an acceptable cross-section area loss of 10%.
Although there are several methods for determining liquid level in a tank, there are no proven methods to quickly gauge the amount of propellant in a tank while it is in low gravity or under low-settling thrust conditions where propellant sloshing is an issue. Having the ability to quickly and accurately gauge propellant tanks in low-gravity is an enabling technology that would allow a spacecraft crew or mission control to always know the amount of propellant onboard, thus increasing the chances for a successful mission. The Radio Frequency Mass Gauge (RFMG) technique measures the electromagnetic eigenmodes, or natural resonant frequencies, of a tank containing a dielectric fluid. The essential hardware components consist of an RF network analyzer that measures the reflected power from an antenna probe mounted internal to the tank. At a resonant frequency, there is a drop in the reflected power, and these inverted peaks in the reflected power spectrum are identified as the tank eigenmode frequencies using a peak-detection software algorithm. This information is passed to a pattern-matching algorithm, which compares the measured eigenmode frequencies with a database of simulated eigenmode frequencies at various fill levels. A best match between the simulated and measured frequency values occurs at some fill level, which is then reported as the gauged fill level. The database of simulated eigenmode frequencies is created by using RF simulation software to calculate the tank eigenmodes at various fill levels. The input to the simulations consists of a fairly high-fidelity tank model with proper dimensions and including internal tank hardware, the dielectric properties of the fluid, and a defined liquid/vapor interface. Because of small discrepancies between the model and actual hardware, the measured empty tank spectra and simulations are used to create a set of correction factors for each mode (typically in the range of 0.999 1.001), which effectively accounts for the small discrepancies. These correction factors are multiplied to the modes at all fill levels. By comparing several measured modes with the simulations, it is possible to accurately gauge the amount of propellant in the tank. An advantage of the RFMG approach of applying computer simulations and a pattern-matching algorithm is that the Although there are several methods for determining liquid level in a tank, there are no proven methods to quickly gauge the amount of propellant in a tank while it is in low gravity or under low-settling thrust conditions where propellant sloshing is an issue. Having the ability to quickly and accurately gauge propellant tanks in low-gravity is an enabling technology that would allow a spacecraft crew or mission control to always know the amount of propellant onboard, thus increasing the chances for a successful mission. The Radio Frequency Mass Gauge (RFMG) technique measures the electromagnetic eigenmodes, or natural resonant frequencies, of a tank containing a dielectric fluid. The essential hardware components consist of an RF network analyzer that measures the reflected power from an antenna probe mounted internal to the tank. At a resonant frequency, there is a drop in the reflected power, and these inverted peaks in the reflected power spectrum are identified as the tank eigenmode frequencies using a peak-detection software algorithm. This information is passed to a pattern-matching algorithm, which compares the measured eigenmode frequencies with a database of simulated eigenmode frequencies at various fill levels. A best match between the simulated and measured frequency values occurs at some fill level, which is then reported as the gauged fill level. The database of simulated eigenmode frequencies is created by using RF simulation software to calculate the tank eigenmodes at various fill levels. The input to the simulations consists of a fairly high-fidelity tank model with proper dimensions and including internal tank harare, the dielectric properties of the fluid, and a defined liquid/vapor interface. Because of small discrepancies between the model and actual hardware, the measured empty tank spectra and simulations are used to create a set of correction factors for each mode (typically in the range of 0.999 1.001), which effectively accounts for the small discrepancies. These correction factors are multiplied to the modes at all fill levels. By comparing several measured modes with the simulations, it is possible to accurately gauge the amount of propellant in the tank. An advantage of the RFMG approach of applying computer simulations and a pattern-matching algorithm is that the
On orbit transfer of cryogenic liquids is necessary for many future space missions. The techniques required to transfer cryogens in micro gravity are quite different from ground system applications. In normal gravity, cryogenic tanks are usually filled from the bottom at nearly atmospheric pressure. The vapor generated due to heat transfer from warm tank walls, is allowed to vent from the top of the tank while the tank is being filled. If the normal gravity technique is used on orbit, the uncertainty of liquid and vapor distributions in unsettled condition may result in dumping of large amounts of liquid propellant overboard. The Vented Chill and No Vent Fill (VCNVF) process is a methodology [1] used to reduce propellant loss by holding the vent valve open during initial wall chilldown, preventing over-pressurization of the tank and stalling of the incoming flow, but closing the tank vent valve after chilling the tank wall sufficiently. An accurate simulation of no vent tank chill and fill is necessary to estimate the amount of propellant necessary to chill the tank, determine the maximum sustainable flowrate to fill the tank without stalling, and establish a timeline for the filling process. Numerical modeling of filling a cryogenic tank is complex because the flow is two-phase and the process involves both boiling and condensation with heat transfer between solid and fluid. In recent years, progress has been made to develop a numerical modeling technique [2,3,4] that has been verified by comparing with the test data from a small flight tank using liquid nitrogen [5]. The purpose of the present paper is to apply this technique in a larger tank with liquid hydrogen and compare with the test data of Chato [1]. The K-site Test Facility [1], shown in Figure 1, consists of a Test Tank, spray system, instrumentation, and the vacuum chamber. The test tank selected was ellipsoidal with an 87 inch major diameter and a 1.2 to 1 major to minor axis ratio. The two ends are joined by a short 1.5 inch cylindrical section. The tank is made of 2219 aluminum chemically milled to a nominal thickness of 0.087 inches. The tank weighs 329.25 pounds, and the tank volume is 175 ft 3 . The GFSSP model of the Test Tank is shown in Figure 2. Node 13 is a boundary node that represents the supply tank which is supplying liquid hydrogen at a given pressure and temperature. The total measured flowrate is evenly distributed through Branches 131 through 139. Nodes 1 through 9 represent the test tank and they are connected with metal solid nodes 14 through 22 through fluid-to-solid conductors that allow convective heat transfer between the solid and fluid nodes. The predicted tank pressure, filling rate, wall temperature and fluid temperature will be compared with test data.
Architectures for extended duration missions often include an on-orbit replenishment of the space vehicle's cryogenic liquid propellants. Such a replenishment could be accomplished via a tank-to-tank transfer from a dedicated tanker or a more permanent propellant depot storage tank. Minimizing the propellant loss associated with transfer line and receiver propellant tank thermal conditioning is essential for mass savings. A new methodology for conducting tank-to-tank transfer while minimizing such losses has been demonstrated. Charge-Hold-Vent is the traditional methodology for conducting a tank-to-tank propellant transfer. A small amount of cryogenic liquid is introduced to chill the transfer line and propellant tank. As the propellant absorbs heat and undergoes a phase change, the tank internal pressure increases. The tank is then vented to relieve pressure prior to another charge of cryogenic liquid being introduced. This cycle is repeated until the transfer lines and tank are sufficiently chilled and the replenishment of the propellant tank is complete. This method suffers inefficiencies due to multiple chill and vent cycles within the transfer lines and associated feed system components. Additionally, this system requires precise measuring of cryogenic fluid delivery for each transfer, multiple valve cycling events, and other complexities associated with cycled operations. To minimize propellant loss and greatly simplify on-orbit operations, an alternate methodology has been designed and demonstrated. The Vented Chill / No Vent Fill method is a simpler, constant flow approach in which the propellant tank and transfer lines are only chilled once. The receiver tank is continuously vented as cryogenic liquid chills the transfer lines, tank mass and ullage space. Once chilled sufficiently, the receiver tank valve is closed and the tank is completely filled. Interestingly, the vent valve can be closed prior to receiver tank components reaching liquid saturation temperature. An incomplete fill results if insufficient energy is removed from the tank's thermal mass and ullage space. The key to successfully conducting the no vent fill is to assure that sufficient energy is removed from the system prior to closing the receiver tank vent valve. This paper will provide a description of the transfer methodology and test article, and will provide a discussion of test results.
Underground storage tanks at the Hanford Site, in southeastern Washington State, hold radioactive waste generated from four decades of plutonium production. The 149 single-shell tanks and the 28 double-shell tanks have all exceeded their initial design life of approximately 25 years. At least 67 tanks are assumed to have leaked in the past, resulting in radioactive releases into the vadose zone. Gamma ray logging within dry monitoring wells is currently the primary method for tracking the migration of leaked tank waste through the vadose zone. While this approach provides an accurate assessment of radioactive contamination, that information is only provided near (within ~1m) the borehole, leaving most of the vadose zone unmonitored, particularly the important region directly beneath the tank. This report describes a numerical study that investigates the feasibility and performance of time-lapse 3D electrical resistivity tomography (ERT) for long-term monitoring of a hypothetical tank waste location and migration through the vadose zone. ERT is a method of remotely imaging the bulk electrical conductivity (EC) of the subsurface, which is significantly impacted by the presence of conductive solid and liquid tank waste. The release of liquid tank wastes increases subsurface fluid conductivity and saturation over time, creating a target to use time-lapse ERT for long-term monitoring. Although the presence of metallic infrastructure can cause ERT interference, recent advancements in ERT data processing enable the deleterious effects of buried metallic infrastructure (e.g. pipes, wellbore casings, tanks) to be removed to better determine the liquid tank waste migration over time. Three hypothetical realistic scenarios were simulated in the ERT evaluation. The first two scenarios assume the same leak amount and rate (i.e., between 1/1/1951 and 12/31/1951 at the rate of 347 m 3 per year) but different leaky tanks. Scenario 1 assumes leaks under tank B-102, which is located on the edge of the B-tank farm and surrounded by a few metallic infrastructure including cased pipes/wells/tanks. Scenario 2 assumes leaks under tank B-108, which is located near the center of the B-tank farm and surrounded by larger amount of metallic infrastructure than B-102. Scenario 3 assumes the same metallic infrastructure as B-102, with a more recent contaminant leak that was simulated to have occurred between 1/1/2018 and 12/31/2023 at a rate of 1.89 m 3 per year. The leak time in Scenarios 1 and 2 corresponds to a historical overfill event in 1951 and Scenario 3 corresponds to a recent found tank leak in 2019. In each scenario, a “true” bulk EC model vs. time reflecting contaminant migration was generated. ERT data was simulated from these “true” bulk EC models and a time-lapse ERT inversion produced “imaged” bulk EC vs. time. Three electrode configurations in two, four and eight boreholes surrounding the leak tank were used in the ERT simulations in each scenario. These borehole configurations were considered logistically feasible and cost-effective for monitoring. The hypothetical ERT boreholes are assumed to have non-metallic casing. By comparing the “imaged” bulk EC with the “true” bulk EC, it was demonstrated that the three configurations of wells used (two, four, and eight wells) were able to successfully monitor the migration of tank leaks through the vadose zone, with bulk EC resolution increasing with the number of down borehole ERT arrays for all scenarios. Therefore, the use of eight boreholes to perform ERT monitoring beneath the tanks provided the best spatiotemporal information.
Cementitious grout will be used to close Tanks 18-F and 19-F. The functions of the grout are to: 1) physically stabilize the final landfill by filling the empty volume in the tanks with a non-compressible material; 2) provide a barrier for inadvertent intrusion into the tank; 3) reduce contaminant mobility by a) limiting the hydraulic conductivity of the closed tank and b) reducing contact between the residual waste and infiltrating water; and 4) providing an alkaline, chemically reducing environment in the closed tank to control speciation and solubility of selected radionuclides. The objective of this work was to identify a single (all-in-one) grout to stabilize and isolate the residual radionuclides in the tank, provide structural stability of the closed tank and serve as an inadvertent intruder barrier. This work was requested by V. A. Chander, High Level Waste (HLW) Tank Engineering, in HLW-TTR-2011-008. The complete task scope is provided in the Task Technical and QA Plan, SRNL-RP-2011-00587 Revision 0. The specific objectives of this task were to: 1) Identify new admixtures and dosages for formulating a zero bleed flowable tank fill material selected by HLW Tank Closure Project personnel based on earlier tank fill studies performed in 2007. The chemical admixtures used for adjusting the flow properties needed to be updated because the original admixture products are no longer available. Also, the sources of cement and fly ash have changed, and Portland cements currently available contain up to 5 wt. % limestone (calcium carbonate). 2) Prepare and evaluate the placement, compressive strength, and thermal properties of the selected formulation with new admixture dosages. 3) Identify opportunities for improving the mix selected by HLW Closure Project personnel and prepare and evaluate two potentially improved zero bleed flowable fill design concepts; one based on the reactor fill grout and the other based on a shrinkage compensating flowable fill mix design. 4) Prepare samples for hydraulic property measurements for comparison to the values in the F- and H- Tank Farm Performance Assessments (PAs). 5) Identify a grout mix for the Tanks 18-F and 19-F Grout Procurement Specification. Results for two flowable zero bleed structural fill concepts containing 3/8 inch gravel (70070 Series and LP#8 Series) and a sand only mix (SO Series) are provided in this report. Tank Farm Engineering and SRNL Project Management selected the 70070 mix as the base case for inclusion in Revision 0 of the Tanks 18-F and 19-F grout procurement specification and requested admixture recommendations and property confirmation for this formulation. Lower cementitious paste mixes were formulated because the 70070 mix is over designed with respect to strength and generates more heat from hydration reactions than is desirable for mass pour application. Work was also initiated on a modification of the recommended mix which included shrinkage compensation to mitigate fast pathways caused by shrinkage cracking and poor physical bonding to the tank and ancillary equipment. Testing of this option was postponed to FY12. Mix, LP#8-16 is recommended for inclusion in the specification for furnishing and delivering tank closure grout for Tanks 18-F and 19-F. A shrinkage compensating variation of this mix, LP#16C, has not been fully developed and characterized at this time.