Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TENNESSEE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Cost Effectiveness of ASHRAE Standard 90.1-2013 for the State of Tennessee

Moving to the ASHRAE Standard 90.1-2013 (ASHRAE 2013) edition from Standard 90.1-2010 (ASHRAE 2010) is cost-effective for the State of Tennessee. The table below shows the state-wide economic impact of upgrading to Standard 90.1-2013 in terms of the annual energy cost savings in dollars per square foot, additional construction cost per square foot required by the upgrade, and life-cycle cost (LCC) per square foot. These results are weighted averages for all building types in all climate zones in the state, based on weightings shown in Table 4. The methodology used for this analysis is consistent with the methodology used in the national cost-effectiveness analysis. Additional results and details on the methodology are presented in the following sections. The report provides analysis of two LCC scenarios: Scenario 1, representing publicly-owned buildings, considers initial costs, energy costs, maintenance costs, and replacement costs—without borrowing or taxes. Scenario 2, representing privately-owned buildings, adds borrowing costs and tax impacts.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Assessing the Costs and Benefits of Resilience Investments: Tennessee Valley Authority Case Study

This report describes a general approach for assessing climate change vulnerabilities of an electricity system and evaluating the costs and benefits of certain investments that would increase system resilience. It uses Tennessee Valley Authority (TVA) as a case study, concentrating on the Cumberland River basin area on the northern side of the TVA region. The study focuses in particular on evaluating risks associated with extreme heat wave and drought conditions that could be expected to affect the region by mid-century. Extreme climate event scenarios were developed using a combination of dynamically downscaled output from the Community Earth System Model and historical heat wave and drought conditions in 1993 and 2007, respectively.

54 ENVIRONMENTAL SCIENCES↗

Y-12 Groundwater Protection Program Monitoring Optimization Plan for Groundwater Monitoring Wells at the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. The plan describes the technical approach that is implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 that provide the most useful hydrologic and groundwater quality monitoring data. The technical approach is based on the GWPP status designation for each well. Under this approach, wells granted “active” status are used by the GWPP for hydrologic monitoring and/or groundwater quality sampling, whereas wells granted “inactive” status are not used for either purpose. The status designation also defines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP. Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans.

54 ENVIRONMENTAL SCIENCES↗

Department of Energy Air Emissions Annual Report Oak Ridge Reservation, Oak Ridge, Tennessee 40 Code of Federal Regulations (CFR) 61, Subpart H Calendar Year 2016

As defined in the preamble of the final rule, the entire DOE facility on the Oak Ridge Reservation (ORR) must meet the 10 mrem/yr ED standard.1 In other words, the combined ED from all radiological air emission sources from Y-12 National Security Complex (Y-12 Complex), Oak Ridge National Laboratory (ORNL), East Tennessee Technology Park (ETTP), Oak Ridge Institute for Science and Education (ORISE) and any other DOE operation on the reservation must meet the 10 mrem/yr standard. Compliance with the standard is demonstrated through emission sampling, monitoring, calculations and radiation dose modeling in accordance with approved EPA methodologies and procedures. DOE estimates the ED to many individuals or receptor points in the vicinity of ORR, but it is the dose to the maximally exposed individual (MEI) that determines compliance with the standard.

54 ENVIRONMENTAL SCIENCES↗

Conceptual Model of Primary Mercury Sources, Transport Pathways, and Flux at the Y-12 Complex and Upper East Fork Poplar Creek, Oak Ridge, Tennessee

The interactions between the key processes that control the fate and transport of mercury in the sediments, groundwater, and stream water within the Y-12 National Security Complex in Oak Ridge, Tennessee are extremely complicated, and many aspects are not well understood. In complex environments such as that at the Y-12 Complex, conceptual models are frequently developed to aid in visualization and understanding of the dynamic nature of the hydrologic, geochemical, and physical environment. These conceptual models represent the attempt of scientists to integrate known data in an internally consistent manner to understand processes that control the fate and transport of contaminants. Over the many years of environmental investigation at Y-12, a number of conceptual models have been developed to identify and define various technical processes at a variety of scales. Many of these models have value today as a historical summary of previous modeling efforts and are provided in Appendix A of this report. The main purpose of the activity described in this report was to develop a conceptual model that delineates the location of mercury sources, transport pathways, and flux based on the most recent data and knowledgeable scientific interpretation.

54 ENVIRONMENTAL SCIENCES↗

Natural Resource Assessment for the Proposed Environmental Management Disposal Facility (EMDF), Oak Ridge, Tennessee

A major contributor to the success of decommissioning, demolition, and remediation activities at the East Tennessee Technology Park by the U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (OREM) has been the availability of an onsite Low-Level Waste (LLW) landfill. However, the existing LLW landfill is near capacity, with cleanup of excess facilities at the Y-12 National Security Complex (Y-12) and Oak Ridge National Laboratory (ORNL) pending. Timely provision of additional disposal capacity on the Oak Ridge Reservation (ORR) is required to remedy the threats to human health and the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recordation of Buildings 9207 and 9210: The Oak Ridge National Laboratory Biology Complex, Located at the Y-12 National Security Complex, Oak Ridge, Tennessee

In the summer of 2018, Cultural Resource Analysts, Inc. (CRA) prepared this recordation package for two World War II-era buildings (Buildings 9207 and 9210) located within what is now known as the Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This recordation also briefly addresses Buildings 9767-6, 9767-7, and 9207A: two small utilities buildings and an annex to Building 9207, each of which was constructed in the 1960s. Completed at the request of UT-Battelle, LLC (UT-B) on behalf of the U.S. Department of Energy (DOE), this document has been prepared to document the history and current conditions of Buildings 9207 and 9210, which had previously been determined eligible for listing in the National Register of Historic Places (NRHP).

99 GENERAL AND MISCELLANEOUS↗

Characterization Report for ORISE South Campus Building SC-13, Oak Ridge, Tennessee

Building SC-13, located on the Oak Ridge Institute for Science and Education’s South Campus (SC) on Bethel Valley Road in Oak Ridge, Tennessee, is slated for demolition in the near future. Characterization data for the building was collected to verify that, if present, contamination levels do not exceed concentration limitations set forth by the Toxic Substances Control Act (TSCA), Resource Conservation and Recovery Act (RCRA), or Oak Ridge Reservation (ORR) Landfills’ waste acceptance criteria so that disposal of building materials associated with the demolition of Building SC-13 can be accepted at the landfills.

42 ENGINEERING↗

Integrated Energy System Investigation for the Eastman Chemical Company, Kingsport, Tennessee Facility

The industrial manufacturing industry is looking to implement new methods of energy production to ensure a consistent energy supply while reducing economic costs and environmental impacts. Much of the manufacturing industry relies on fossil fuels—primarily coal and natural gas—of which there are finite resources subject to price volatility due to an inelastic demand. These resources also come with significant negative environmental impacts related to emissions. While complete independence from fossil fuels is not immediately realistic, options are available to significantly reduce dependency on fossil fuel supplies, including integrated energy systems (IESs) which tightly couple nuclear energy source generators with energy consumers (i.e., industrial factories) to fulfill power and energy requirements. Once realized, optimized IESs may yield significant economic and environmental benefits over traditionally isolated generator and consumer facilities. This report presents a feasibility study for siting an IES to meet the steam and electricity needs of Eastman Chemical Company’s facility in Kingsport, Tennessee. This study explored reactor technology options, evaluation, and optimization, with a focus on meeting the facility’s operational and reliability requirements. This work is part of an ongoing effort by Eastman to be good environmental stewards and meet the demands of their customers by shifting to more environmentally sustainable solutions for their energy needs. Outcomes of this report are also of general interest and value to any design or development team seeking to deploy an IES, as many topics described herein are generally applicable to any nuclear power facility.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Oak Ridge National Laboratory Roane and Anderson Counties, Tennessee Historic Architectural Resource Survey June 2018

From February through September 2017, Cultural Resource Analysts, Inc. personnel completed a historic architectural resource survey of the Oak Ridge National Laboratory in Roane and Anderson Counties, Tennessee. The survey was completed at the request of UT-Battelle, LLC, the private not-for-profit company that manages and operates Oak Ridge National Laboratory for the U.S. Department of Energy. The purpose of the survey was to assist the Department of Energy in complying with the National Historic Preservation Act of 1966, as amended, by providing updated recommendations regarding the National Register of Historic Places eligibility of historic architectural resources at Oak Ridge National Laboratory. The survey included the entirety of Oak Ridge National Laboratory’s main campus that occupies approximately 1,100 acres in Bethel and Melton Valleys and on Chestnut Ridge. Based on Facilities Information Management System data and guidance provided by UT-Battelle, LLC, preservation and modernization staff, the survey team developed a list of resources for inclusion in the survey. The list included all substantial buildings constructed in or before 1980 in order to provide sufficient coverage of buildings that will turn 50 years of age within the next decade. Only those buildings with recorded area over 100 sq ft were included in the survey. Additionally, the UT-Battelle team identified 15 buildings for more intensive survey because such buildings are central to Oak Ridge National Laboratory’s future mission needs and are expected to undergo renovations in the foreseeable future. These building were subject to both exterior and interior documentation with particular focus on identifying character-defining features, and thus were subject to more detailed analysis than the other resources included in the survey. The findings of this historic resource survey build on the conclusions of the 1994 survey by DuVall & Associates, Inc., as well as the survey updates completed by Thomason and Associates in 2004 and 2015 in support of the Oak Ridge National Laboratory Historic Preservation Plan. Within 12 distinct areas of Oak Ridge National Laboratory, as well as outlying areas, the survey recorded 195 buildings and structures constructed in or before 1980. In consideration of the role and significance of each area and each individual resource within the context of Oak Ridge National Laboratory, and in light of their current integrity and condition, each recorded resource was evaluated to determine if it is eligible for listing in the National Register of Historic Places.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

This report contains the groundwater and surface water monitoring data obtained during calendar year (CY) 2019 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12. The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system, shown as Plant North. The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. Background information in Section 2 of this report outlines the hydrogeologic framework for groundwater and surface water quality monitoring at Y-12 and includes an overview of the groundwater contamination in each hydrogeologic regime. Section 3 provides details regarding the groundwater and surface water sampling and analysis activities implemented under the Y-12 GWPP, including sampling locations and frequency, sample collection and handling, field measurements and laboratory analytes, quality assurance (QA)/quality control (QC) sampling, data management, and data quality assessment (DQA). However, the equivalent QA/QC or DQA information for the groundwater and surface water data associated with the monitoring programs implemented by UCOR are not included in this report and instead are deferred to referenced programmatic plans and reports issued by OREM and UCOR. Section 4 of this report presents a summary evaluation of the CY 2019 monitoring data with regard to the respective objectives of surveillance monitoring and exit pathway/perimeter monitoring. The evaluation is based primarily on the analytical results for the following principal groundwater contaminants at Y-12: nitrate, uranium, gross alpha activity, gross beta activity, and volatile organic compounds (VOCs). Section 5 summarizes the most significant findings with respect to the principal contaminants along with recommendations for any proposed changes to the ongoing groundwater and surface water quality monitoring performed under the Y-12 GWPP. Technical reports and plans cited in the narrative sections of the report are listed in Section 6. Narrative sections of this report reference several appendices. Figures (maps and diagrams) and data tables (excluding data summary tables incorporated in the narrative sections) are in Appendix A and Appendix B, respectively. Appendix C contains construction details for each well sampled during CY 2019 by either the Y-12 GWPP or UCOR, along with schematic diagrams for wells equipped with Westbay™ multiport sampling equipment or Barcad® pump systems. Appendix D supports the background summary discussion in Section 2 and provides more detailed information about the hydrogeologic framework for groundwater and surface water monitoring at Y-12, including the primary sources of groundwater contamination in each hydrogeologic regime. Results for all field measurements and laboratory analyses obtained by the Y-12 GWPP and UCOR are presented in Appendix E, which also includes the sample numbers for the QA/QC samples associated with groundwater and surface water monitoring performed by the Y-12 GWPP.

54 ENVIRONMENTAL SCIENCES↗

Conceptual Model Update of Mercury Sources and Flux at Y-12 and Upper East Fork Poplar Creek, Oak Ridge,Tennessee

The interactions between the key processes that control the fate and transport of mercury (Hg) in the sediments, groundwater, and stream water within the Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee are complex, and many aspects are not well understood. In contaminated environments such as Y-12, conceptual models are frequently developed to aid in visualizing and understanding the dynamic nature of the hydrologic, geochemical, and physical environment. These conceptual models integrate data in an internally consistent manner to understand processes that control the fate and transport of contaminants. Over the past few decades of environmental investigation at Y-12, a number of conceptual models have been developed to identify and define various technical processes at various scales. The main purpose of the activities described in this report is to update the 2011 conceptual model for Upper East Fork Poplar Creek using the most recent Hg concentration and flux data and informed scientific interpretation. Emphasis was placed on improving the previous model by implementing a more detailed spatial and temporal approach to visualize transport pathways in the watershed and trends in flux and concentration over time, and to compare baseflow and stormflow system dynamics. Detailed descriptions of historical and current Hg sources and transport pathways are also provided for the east and west ends of the facility. This conceptual model will allow the US Department of Energy to evaluate past and present remedial activities and provide a strong technical basis for prioritizing and optimizing remedial responses in a cost-effective and efficient manner. Twenty years ago, Hg flux from Outfall (OF) 200 at the headwaters of East Fork Poplar Creek represented approximately 20% of the overall flux leaving Y-12. By the time of the 2011 conceptual model report, that percentage had increased to 70%–80%. Flux estimates compiled for this report using data from 2009 to 2018 show that OF200 accounted for roughly 60% of the flux leaving Y-12. The relative role of the four storm drain conduits to OF200 appeared similar to 2011, with OF163 being the greatest contributor to downstream flux. An increase in Hg concentrations and flux occurred throughout and downstream of west end storm drains in 2011 in response to a storm drain cleanout. Leading up to the 2011 storm drain cleanout, annual baseflow flux was higher at OF200A6 than at Station 17. From 2011 to 2018, the trend reversed with concentrations and flux being higher at Station 17 than at OF200A6. A spike in concentrations occurred in July 2018, potentially due to a one-time influx of Hg that occurred during COLEX decontamination and decommissioning activities at Y-12. This report includes recommendations for improving our conceptual understanding of Hg sources, transport pathways, and flux at Y-12. Important recommendations include further evaluation of transport pathways, concurrent measurement of Hg concentration and flux under baseflow and stormflow conditions at multiple sites, and research to understand the connections among periphyton and methylmercury concentration, bioavailability, and bioaccumulation. Ongoing facility decontamination and decommissioning efforts, site characterization, remedial actions, and research are facilitating the collection of new Hg data at Y-12. The conceptual model update provided herein takes advantage of the extensive recent Hg sampling to provide an updated assessment of Hg mass balance and support a refined understanding of Hg behavior at or near Y-12. This assessment should assist in future environmental management decisions and in mitigating the impacts of Hg on the surrounding environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Section 106 Recordation, Interpretation, and Documentation for the Demolition of Buildings 9201-5 and 9204-4, Y-12 National Security Complex, Oak Ridge, Tennessee

In 2019 and 2020, Cultural Resource Analysts, Inc. (CRA), began preparing recordation packages for 18 World War II and Cold War Era buildings slated for demolition at the request of Consolidated Nuclear Security, LLC (CNS), on behalf of the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA). The recordations for these 18 buildings, which are located within what is now known as the Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee, were prepared and submitted in two separate packages. The first report (EC-NP-004) was prepared as a mitigation measure to address adverse effects that will result from the proposed demolition of 16 support and ancillary buildings. The current report is the second of the two packages and addresses the last two of the 18 buildings slated for demolition (9201-5 and 9204-4), which are two of the large process buildings located at Y-12. All 18 of these buildings have previously been determined eligible for listing in the National Register of Historic Places (NRHP). The two buildings, Building 9201-5 and Building 9204-4, are located south of Bear Creek Road and west of the main Y-12 entrance gate. Both buildings were constructed as uranium enrichment facilities in support of the Manhattan Project, a top-secret World War II mission to develop the world’s first nuclear weapons. Building 9201-5, completed in October 1944, is the Alpha-5 process facility and Building 9204-4, completed in Fall 1945, is the Beta-4 process facility. Over the years, these facilities were repurposed for a number of different functions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

East Tennessee Technology Park Biological Monitoring and Abatement Program (2023 Fiscal Year Report)

In FY 2023, the East Tennessee Technology Park’s (ETTP’s) Biological Monitoring and Abatement Program (BMAP) consisted of two tasks that reflected different but complementary approaches to evaluating the effects of ETTP effluents on the ecological integrity of waters near ETTP. These tasks included (1) fish and clams bioaccumulation monitoring and (2) fish and benthic macroinvertebrate species richness and density monitoring. The sampling and analysis requirements for the ETTP BMAP in FY 2023 are outlined in the sampling and analysis plan (UCOR 2023).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NUCLEI (SciDAC-4) effort at The University of Tennessee, Knoxville

This Report summarizes the accomplishments of NUCLEI researchers at The University of Tennessee, Knoxville (UTK) and those supported via subcontracts at the University of North Carolina at Chapel Hill (UNC) and Iowa State University (ISU). The SciDAC-4 NUCLEI collaboration had the goal to advance the computation of atomic nuclei and to make reliable predictions including uncertainty estimates for observables of interest. These goals were achieved by developing improved nuclear interactions and currents that are input to the computations, and by advancing the algorithms and techniques used for computing nuclear observables of interest. The computed results advanced our understanding of how nuclei work; they helped to guide and interpret experiments at existing low-energy nuclear physics facilities, the Facility for Rare Isotope Beams, Jefferson Laboratory, and neutrino experiments. In addition, predictions were made that await confrontation with experimental results.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

East Tennessee Technology Park Biological Monitoring and Abatement Program - 2024 Fiscal Year Report

In FY 2024, the East Tennessee Technology Park’s (ETTP’s) Biological Monitoring and Abatement Program (BMAP) consisted of two tasks that reflect different but complementary approaches to evaluating the effects of ETTP effluents on the ecological integrity of waters near ETTP. These tasks included (1) fish and clam bioaccumulation monitoring and (2) fish and benthic macroinvertebrate species richness and density monitoring. The sampling and analysis requirements for the ETTP BMAP in FY 2024 are outlined in the sampling and analysis plan (UCOR 2023).

54 ENVIRONMENTAL SCIENCES↗

East Tennessee Technology Park Biological Monitoring and Abatement Program 2024 Calendar Year Report

The East Tennessee Technology Park (ETTP) Biological Monitoring and Abatement Program (BMAP) consists of three tasks that reflect different but complementary approaches to evaluating the ecological integrity of waters near ETTP. These tasks include (1) bioaccumulation monitoring of fish and clams, (2) benthic macroinvertebrate species richness and density monitoring, and (3) fish community monitoring. The sampling and analysis requirements for the ETTP BMAP in calendar year 2024, covering in part both FY 2024 and FY 2025, are outlined in the respective FY sampling and analysis plans (UCOR 2023, 2024). Sampled water bodies and locations for the ETTP BMAP are shown in Figures 1 and 2. This ETTP BMAP report presents the CY 2024 results and provides context with results from previous years. The report also includes Oak Ridge National Laboratory (ORNL)–generated biological monitoring data collected for other US Department of Energy programs, including the UCOR Water Resources Restoration Program (WRRP) off-site fish bioaccumulation data (UCOR 2023) and select Y-12 National Security Complex (Y-12) BMAP fish bioaccumulation data. Historical data collected for the ETTP BMAP and other programs in the nearby Poplar Creek and Clinch River are provided where appropriate. This progress report provides an update on the biological monitoring activities supporting the ETTP UCOR Environmental Compliance organization, which sponsors the ETTP BMAP. In addition to this internal reporting, ETTP BMAP results are provided in the annual remediation effectiveness reports and the annual site environmental reports, both of which are publicly available. BMAP data are also available to the public via the Oak Ridge Environmental Information System (https://ucor.com/oak-ridge-environmental-information-system-oreis/).

54 ENVIRONMENTAL SCIENCES↗

East Tennessee Technology Park Biological Monitoring and Abatement Program—2025 Fiscal Year Report

In FY 2025, the East Tennessee Technology Park’s (ETTP’s) Biological Monitoring and Abatement Program (BMAP) consisted of two tasks that reflect different but complementary approaches to evaluating the effects of ETTP effluents on the ecological integrity of waters near ETTP. These tasks included (1) fish and clam bioaccumulation monitoring and (2) fish and benthic macroinvertebrate species richness and density monitoring. The sampling and analysis requirements for the ETTP BMAP in FY 2025 are outlined in the sampling and analysis plan (UCOR 2024). Major sampling sites for the BMAP are shown in Figure 1 and Figure 2.

54 ENVIRONMENTAL SCIENCES↗