Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Steam Generator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Cummins R-SOFC System Development

The overall purpose of this project was to reduce the Reversible-Solid Oxide Fuel Cell (R-SOFC) system cost by developing two technologies, an improved cell design and the incorporation of an ejector in the fuel recycle loop instead of a blower. A Simulink model of the baseline SOFC system was developed and calibrated with experimental test data. The R-SOFC system model was built by integrating GT Suite developed models of the steam generation components into the baseline Simulink SOFC system model. The ability to run the stack in SOEC operating mode was also added to the model. The system model was used to explore the ability of the R-SOFC system to meet operational constraints on Steam/Carbon ratio and H2 concentration on the fuel side electrode. A CFD ejector model was developed and used to explore a range of ejector design parameters, leading to the final ejector design that was prototyped for testing. A prototype steam ejector was first tested in a laboratory environment using room temperature air. The steam ejector was subsequently tested using the full hot recycle loop with all relevant heat exchangers and steam generation components. The test conditions utilized temperatures, pressures, and flow rates expected in an R-SOFC application. Throughout the experimental testing work, ejector performance test data was used to improve and then validate the CFD ejector model. A CFD cell model was developed and used to optimize thermal gradients, voltage, and cost of a new cell substrate design. A CFD comparison of co-flow and cross-flow cell designs informed the decision to use a co-flow design for the new cell substrate. Multiple rounds of CFD simulation were used to improve the cell design to minimize the variation in air and fuel distribution across cell channels and to minimize the variation in air and fuel distribution across different cells in the stack. A few prototypes of the new cell substrate design were produced and validated in a laboratory environment by thermally spraying and verifying that they met established manufacturing specifications. The cell manufacturing process was adjusted in order to bring these metrics within acceptable tolerances. Cummins’ internal calculations show that the new cell design reduces cost ~50% compared to the baseline cell, while the ejector + superheater/boiler concept reduces cost of the recycle loop by ~40%. The impact of these cost reductions on the cost of producing H2 will depend on the specific system where they are applied. Therefore, a Techno-Economic Analysis was completed using system cost as a variable, and showing how the NREL Current and Future system costs translate into H2 production cost.

Henrichsen, Lars↗

Dynamic Approach to Dependency Analysis in Human Reliability Analysis: Application in a Stream Generator Tube Rupture Scenario

Dependency analysis in human reliability analysis (HRA) is a method of adjusting the failure probability of a given action by considering the impact of the action preceding it. It plays a role in reasonably accounting for human actions in the context of probabilistic safety assessments (PSAs), preventing PSA results from being estimated too optimistically based on the HRA results. Nevertheless, the existing dependency methods present a couple of challenges in that the quantification approaches rarely explain the adjustment of human error probabilities (HEPs). For this reason, the authors’ previous research has pointed out challenges of the existing dependency approaches and conceptually, theoretically proposed a performance shaping factor (PSF)-based dynamic dependency analysis method for HRA in order to complement the existing dependency methods. The current paper explores the latest version of the method and guidance for applying it to a steam generator tube rupture (SGTR) scenario.

99 GENERAL AND MISCELLANEOUS↗

Atomic Origins of Water-Vapour-Promoted Alloy Oxidation

The presence of water vapor, intentional or unavoidable, is crucial to many materials applications, such as steam generator, turbine engine, fuel cell, catalyst, and corrosion 1-6. Phenomenologically, water vapor has been noticed to accelerate oxidation of metals/alloys 7,8, however, the atomistic mechanisms remain elusive. Herein, through direct in situ atomic-scale transmission electron microscopy observation and density functional theory calculation, we reveal that water vapor enhanced oxidation of Ni-Cr alloy is associated with proton dissolution promoted vacancy formation, migration and clustering. Protons derived from water dissociation occupy interstitial position in the oxide lattice, which consequently leads to the lowering of both vacancy formation energy and the cation diffusion barrier. The atomic scale observations reveal a water vapor derived proton mediated oxide growth mechanism, which provides insights for reckoning many technological processes concerning materials in moist environment at elevated temperatures.

Luo, Langli (ORCID:000000026311051X)↗

Improving Unit Flexibility Utilizing Plasma Ignitors

Coal fired steam generation operators face increasing market challenges, including competition from low cost generation, renewables, and regulatory pressure. These market conditions are forcing utilities to operate their coal assets in a more flexible mode, including more frequent starts and stops, faster ramp rates, frequent cycling, and extended operation at the lowest possible loads. Without upgrades to firing and control systems, pressure parts, and auxiliary systems, CAPEX and OPEX costs will increase significantly. Typically, expensive support fuels (Oil or Gas) are required to maintain safe, stable coal ignition when operating below 25% to 35% MCR (Maximum Continuous Rating). The exact minimum load without support fuel differs depending upon unit design specifications and fuel being burned. Frequent starts also increase the use of support fuels. The firing and burner control systems must be designed to allow for proper operation over the unit’s load range, ensuring that all mechanical components operate properly, and proper control of air and fuel streams can be maintained. To address the need for frequent starts and the need for stable low load operation on coal fired steam generators, this paper discusses options available, including, Firing Systems upgrades, Digital solutions, and pressure part upgrades. Several case studies are included that highlight options available allowing units to stay in operation and reduce CAPEX and OPEX costs.

01 COAL, LIGNITE, AND PEAT↗

Economic viability of using thermal energy storage for flexible carbon capture on natural gas power plants

Fossil fuel-based power plants generate 80% of the electricity in the United States and provide a reliable generation source for both base and peak power demands. These plants are expected to adapt to changes in environmental policies that will require carbon management with carbon capture and storage (CCS) representing a possible solution. Current solvent-based CCS has a detrimental impact on a power plant's performance due to large heat loads required for carbon capture solvent regeneration. This parasitic load restricts the power plant's output and operation flexibility. Therefore, this study evaluates the feasibility of using thermal storage technologies for natural gas combined cycle (NGCC) power plants coupled with CCS to minimize the impact of solvent regeneration and enable the plant to operate at peak power output. Thermal storage can minimize the impact of CCS on the power plant by providing the heat load required for solvent regeneration during times of peak demand which will allow the plant to operate unrestricted and at full power. In total, fifteen unique thermal storage configurations were evaluated from three thermal storage categories: Brayton cycle heat pump, vapor compression heat pump, and heat recovery steam generator steam extraction for storage. The viability of these systems was determined by evaluating each configuration on thousands of real-world Locational Marginal Pricing (LMP) profiles from the New York Independent System Operator and California Independent System Operator electricity markets using a techno-economic analysis. Afterwards, results were compared to the performance of a base power plant (NGCC with CCS and no thermal storage) to determine the impact of thermal storage on power plant economics. Overall, six of the thermal storage configurations performed better than base CCS enabled power plant on between 11.5% and 38.7% of the LMP signals evaluated. The best performing configuration was a vapor compression heat pump that used flue gas as the working fluid and had both hot and cold thermal storage units. This configuration performed better than the base CCS power plant on 38.7% of the LMP profiles. The results of this study show thermal storage can mitigate the economic impact of carbon capture solvent regeneration on NGCC power plants. Discussion focuses on the impact of electricity pricing on the optimal thermal storage system, the advantages and disadvantages of the systems evaluated, and identifies limitations with the study.

25 ENERGY STORAGE↗

An Overview of the State-of-the-Art Reactor Consequence Uncertainty Assessment Accident Progression Insights

The U.S. Nuclear Regulatory Commission (NRC) with Sandia National Laboratories (Sandia) have completed three uncertainty analyses (UAs) as part of the State-of-the-Art Reactor Consequence Analyses (SOARCA) program. The SOARCA UAs included an integrated evaluation of uncertainty in accident progression, radiological release, and offsite health consequence projections. The UA for Peach Bottom, a boiling-water reactor (BWR) with a Mark I containment located in the State of Pennsylvania, analyzed the unmitigated long-term station blackout SOARCA scenario. The UA for Sequoyah, a 4-loop Westinghouse pressurized-water reactor (PWR) located in the State of Tennessee, analyzed the unmitigated short-term station blackout SOARCA scenario, with a focus on issues unique to the ice condenser containment and the potential for early containment failure due to hydrogen deflagration. The UA for Surry, a 3-loop Westinghouse PWR with a sub-atmospheric large dry containment located in the State of Virginia, analyzed the unmitigated short-term station blackout SOARCA scenario including the potential for thermally-induced steam-generator tube rupture. These three UAs are currently documented in three NUREG/CR reports. This report provides input to planned NRC documentation on the insights and findings from the SOARCA UA program. The purpose of the summary report is to provide a useful reference for regulatory applications that require the evaluation of offsite consequence risk from beyond design basis event severe accidents. This report focuses on the accident progression and source term insights developed from the MELCOR analyses. MELCOR is the NRC's best-estimate, severe accident computer code used in the SOARCA UAs. In anticipation of the SOARCA UA insights work, NRC and Sandia benchmarked the response of the Peach Bottom model to selected reference calculations from the Peach Bottom SOARCA UA. Peach Bottom was the first SOARCA UA performed and was completed in 2015 using the MELCOR 1.8.6 code. The PWR SOARCA UAs evolved the original methodology and utilized the updated MELCOR 2.2 computer code. The Peach Bottom model has been systematically updated for other NRC research efforts and has been updated to MELCOR 2.2. computer code. The findings from the new reference calculations using the updated model with the MELCOR 2.2 code are also integrated into the report. A second objective is an assessment of the applicability of the results to the other nuclear reactors in the U.S. As the key findings are reviewed, judgments are presented on the applicability of the results to other U.S. nuclear power plants. An important objective of the SOARCA program relied on high- fidelity plant-specific modeling. However, the nature of the insights and conclusions allowed judgements to be made on the applicability of the various insights to the same general classification of plant (i.e., BWR or PWR) or the entire fleet of plants. Finally, the results from the SOARCA UA accident progression calculations contain a wealth of information not previously documented in the NUREG/CRs. This report includes new but related information that can be used to benchmark past or support future regulatory decisions related to severe accidents. The new work includes a benchmark of the NUREG-1465 licensing source term definitions, the variability of key accident progression events and timing to radionuclide release, and an improved understanding of the timing and source terms from consequential steam generator tube ruptures. iii ACKNOWLEDGEMENTS The Sandia authors gratefully acknowledge the significant technical and programmatic contributions from the NRC SOARCA team which are reflected throughout the report. Dr. Tina Ghosh has been involved throughout the SOARCA UAs, providing the primary managerial and technical oversight. The long lists of NRC and Sandia contributors from the SOARCA UAs are cited in the three NUREG/CRs and are also gratefully acknowledged by the small team of authors compiling the results of their efforts. Significant technical contributions, advice, and reviews were provided by Dr. Hossein Esmaili, Dr. Alfred Hathaway, and Dr. Edward Fuller (retired) of the NRC. Dr. Randal Gauntt (retired), Mr. Patrick Mattie, Mr. Joseph Jones (retired), and Dr. Doug Osborn from Sandia are recognized as the SOARCA UA managers guiding the past efforts. There is a comparable list of project managers at the NRC including Ms. Patricia Santiago, Dr. Salman Haq, and Mr. Jon Barr. Sadly, we have lost Mr. Charlie Tinkler and Mr. Robert Prato, who were important contributors to the original SOARCA project. Finally, Mr. Kyle Ross and Mr. Mark Leonard have also retired but were significant technical contributors. Mr. Kyle Ross was the technical lead on all three SOARCA UAs and the original pressurized water reactor SOARCA study. Mr. Leonard was the technical lead on the original boiling water reactor SOARCA study and a key contributor to the first Peach Bottom SOARCA UA. iv

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Performance tests of helium circulator under abnormal cooling conditions - 18523

Helium circulator is one of the key equipment of High-temperature Gas-cooled Reactor Pebble-bed Module (HTR-PM) and the unique rotating equipment of primary loop. It transports heat generated by fission reactions from reactor core to steam generator by forcing helium circulating in primary loop. As the study on the characteristics of helium circulator in HTGR was limited and the advanced designs integrated with many new technologies, a prototype of helium circulator was manufactured. It was supported by Active Magnetic Bearings (AMBs), and was assembled in a pressure vessel. The prototype was tested in Engineering Test Facility - Helium Circulator (ETF-HC), which is a full scale, rated flow rate and power, engineering test loop. Although performance tests under normal operation condition were successfully fulfilled, the complete features and performance still need further verification, especially for abnormal cooling conditions. Thus performance tests under abnormal cooling operation conditions were carried out. Tests such as temporary coolant loss of motor and AMBs cooler and abnormal high-temperature cooling water condition were fulfilled. All performance tests results showed that helium circulator met the entire requirement of HTR-PM plant under abnormal cooling conditions and validated its safety and reliability. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Modification of the ECAS reference steam power generating plant to comply with the EPA 1979 new source performance standards

Detailed capital cost estimates for the ECAS and modified reference plants in mid-1978 dollars for both 250 and 175 F (394 and 353 K) stack gas reheat temperatures based on the cost estimates developed for the ECAS study are presented. The scope of the work included technical assessment of sulfur dioxide scrubber system design, on site calcination versus purchased lime, reheat of stack gas, effect of sulfur dioxide scrubber on particulate emission, and control of nitrogen oxides.

Fogelson, S. A.↗

System for the highly autonomous operation of a modular liquid-metal reactor with steam cycle

The invention relates to a nuclear plant in which the power of a nuclear reactor is controlled via demand of a connected electric grid. A naturally circulating nuclear reactor coolant loop is linked to a water/steam loop by means of a steam generator. The water/steam loop consists of an electric power generating unit and a water recirculating and steam control system. The generator is coupled to an external power grid. As power requirements of the grid change, a controller linked to the generator and a three way valve divides steam flow between the expansion turbine and a feedwater heater to boost or retard the power output. Altering the steam flow changes the pressure and temperature in the water/steam system and thus the coolant flow rate. The change in coolant flow allows the reactor core to regulate its reactivity to reach a state of equilibrium to the demand for electric power.

Vilim, Richard B.↗

The Cires facility in Morvilliers: from a VLL waste disposal facility to the development of industrial activities - 15252

The disposal facility of CIRES for very low level wastes was designed to provide safe and cost effective services to waste generators, in particular for decommissioning works. The facility could significantly increase waste annual deliveries to meet waste generators' needs and accommodate large disused components as PWR steam generators after decontamination. However an anticipated saturation of its capacity is foreseen as needs for disposal has doubled since its start-up. The geometry of the cells was optimized and the technical capacity of the repository is presently by 40% above its licensed capacity. Saturation has been delayed; however a new facility will be necessary by 2030 and other waste management options are to be considered as recycling of metallic wastes or crushed concrete rubble. CIRES facility also became Andra's industrial platform for the management of institutional wastes. A grouping and a storage facility have been built and a new processing facility should start up in 2016. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydrogen Storage for Load-Following and Clean Power: Duct-firing of Hydrogen to Improve the Capacity Factor of NGCC Plants (Final Report, Phase II Pre-Front End Engineering Design Study)

GTI Energy (GTI) and team members Southern Company Services (SCS), Pacific Gas & Electric (PG&E) and the Electric Power Research Institute (EPRI) performed a Phase II Pre-Feed Study under contract DE-FE0032008 for Hydrogen Storage for Load-Following and Clean Power. The configuration of the proposed system consists of subsystems for on-site H 2 production, on-site H 2 storage (up to 54 MWth in commercial vessels) and H 2 combustion in a duct burner in a Heat Recovery Steam Generator (HRSG) integrated with an existing fossil asset. Here, the firing rate of the duct burner is varied to let the plant respond to fluctuations of electrical load and H 2 production is relatively constant by storing H 2 . The proposed system is an improvement over alternate low carbon dispatchable power options. Technoeconomic analyses show H 2 produced with GTI’s patented Compact Hydrogen Generator (CHG) with inherent carbon capture will be lower cost (Levelized Cost of Hydrogen, LCOH) relative to hydrogen produced with a Steam Methane Reformer (SMR) with an amine system for carbon capture. This lower cost hydrogen enables our integrated system to deliver electricity (Levelized Cost of Electricity, LCOE) at 17.4% lower cost relative to a SMR sourced H 2 -fired HRSG (with an amine system for carbon capture) – Steam Turbine Generator (STG). Our analysis using EPRI’s US REGEN macroeconomic model shows our system will have significant demand in the power market and therefore require significant capacity expansion (CHG plants built to deliver hydrogen) to deliver low cost, low carbon power. In Phase II, our Team has completed a detailed system definition including the development of process models, definition of battery limits, Process Flow Diagrams (PFDs), Piping and Instrumentation Drawings (P&IDs), and a plant layout. A preliminary design for the key components of the CHG was developed including component lists & specifications. An evaluation of environmental and permitting considerations was completed and included the development of an Environmental Information Volume (EIV). The duct burners, which are flexible and can burn hydrogen and/or natural gas, were defined and initial CFD analyses were completed.

03 NATURAL GAS↗

Synchronous Machine Governor Upgrade

Conventional generation sources play a critical role in the stability and reliability of the electrical grid, particularly as we transition towards more renewable energy sources. To understand and accurately emulate their behavior for optimizing grid operations and ensuring seamless integration with renewable technologies, it is essential to better emulate the grid- and plant-level impacts of conventional generation sources, such as natural gas (NG) driven heat recovery steam generators (HRSGs) and combustion turbines (CTs). Therefore, a governor model is developed in a programmable logic controller (PLC) to investigate the performance of the conventional generator under various dynamic operating conditions and to identify the impact on grid stability in a controlled environment. The governor model aims to enable the hardware-in-the-loop (HIL) based emulation of these conventional generation sources using the existing 2 MVA synchronous machine/generator that is driven by a flexible 2.5 MW variable speed drive. This setup will allow us to replicate the dynamic characteristics and response behaviors of NG-driven HRSGs and CTs. The controls for the emulated conventional plants follow the industry standard and are adjustable, ensuring they accurately reflect the operational capabilities and limitations of real-world systems. These controls include load-following capabilities, ramp rates, startup and shutdown sequences, and emissions characteristics. By incorporating these adjustable controls, we aim to capture the nuanced impacts of conventional generation, such as their ability to provide ancillary services like frequency regulation, voltage support, and spinning reserve. In this report, we simulate two types of dynamic operations: grid-connected and islanding. For each dynamic operation, representative starting sequences are tested, including turbine purge, ignition, speed ramping up, generator excitation and synchronizing, and breaker close. The HIL based tests provides insights for field deployment, specifically the high-fidelity governor model provides results to predict the potential stability and reliability risk and suggest possible integration measures (e.g., generation and load balancing, tuning of governor control parameters). Ultimately, this enhanced emulation capability will be integrated into our Advanced Research on Integrated Energy Systems (ARIES), enabling us to conduct comprehensive studies on the interactions between conventional and renewable energy sources. By better understanding these interactions, we can develop strategies to optimize the overall performance and reliability of the grid. This will support the deployment of advanced grid management techniques, such as demand response, grid-forming inverters, and energy storage systems. The main contributions are summarized as follows: (1) This report introduces a PLC-based governor model for gas turbines. This model accurately simulates the dynamic behavior of conventional generation sources under various operational scenarios; (2) The model is integrated with an HIL testbed that includes a 2.5 MW variable speed drive and a 2 MVA synchronous machine. This setup enables realistic, real-time emulation of conventional power plants, particularly NG driven HRSGs and CTs; (3) The developed model is adaptable to various gas turbine configurations and allows for precise control over parameters such as MW ramp rates. This flexibility makes it a valuable tool for future research and industry collaboration; and (4) By incorporating the model into the National Renewable Energy Laboratory's Advanced Research on Integrated Energy Systems, the report lays the groundwork for future studies on interactions between conventional and renewable energy sources, enhancing the ability to develop advanced grid management strategies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Methods of Heat-Exchange Intensification in NPP Equipment

The aims and problems of research on the means for intensifying heat exchange in the equipment of nuclear power plants are examined: nuclear reactors, steam generators, turbine condensers, heat-exchangers of dry water cooling towers, intermediate separators-steam superheaters of turbines, heat-exchange apparatus of safety systems, turbo-electro-generators, oil coolers, feed-water heaters. Methods of identifying heat-exchange are analyzed: different types of finning, turbulence generators and swirlers of one- and two-phase flows, coating on heating surfaces, systems with mixed flow. Computational recommendations are made for determining the intensity of heat emission from promising types of heat-exchange surfaces: bundles of lowfinned tubes and spiral coils.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Competitiveness Assessment of Decarbonizing Electricity and Process Heat Supply to a Campus with a Small Nuclear Reactor

This paper analyzes the competitiveness of siting a small nuclear reactor to support decarbonization of sites requiring tens of MW of electricity and/or process heat to support centralized heating and cooling system. This paper focuses on campuses as representative of sites with collections of buildings and research facilities with decarbonization needs represented by buildings heating, and electricity consumption by electrical loads which may include cooling via chilled water (e.g., for air conditioning and to cool down computer clusters). A nuclear reactor can be considered to decarbonize a site’s high-temperature steam generation used mostly for building heating needs, climate control, and hot water, by supplying process heat capabilities, while electricity decarbonization would be achieved mostly by the grid. However, a secondary application can be considered to maximize reactor utilization and avoid ramping down the reactor if the steam demand varies significantly throughout the year. Chilled water generation through steam-driven systems was identified as an attractive secondary option for the site analyzed, due to potential for plant design simplification, while electricity generation could be considered as well to reduce electricity purchases for a wider range of site applications. For a campus with peak 60MW thermal power demand, a small nuclear reactor with similar thermal power rating would almost eliminate CO2 emissions from steam generation and reduce electricity imports for chilled water production. A preliminary techno-economic feasibility study shows that a small nuclear reactor design that is optimized to support process heat can represent an economically feasible option when compared with other decarbonization alternatives.

Stauff, Nicolas E.↗

The hydrogen behavior analysis in the water-ingress accident of the 250 MW pebble-bed modular high temperature gas-cooled reactor - 18639

The demonstration power plant of Chinese 250 MW high temperature gas-cooled reactor pebbled-bed module (HTR-PM) which is being under construction in the Shidao Bay of Shandong province has made breakthrough in all of the critical technologies, and is willing to operate in 2017. HTR-PM does not have the risk of large amount of hydrogen generation resulted from the zirconium water reaction due to its special design of graphite core structure and helium coolant of the primary circuit, however, considering that the HTR-PM has a small containment and does not design the deliberate ignitions which is the main hydrogen management measure in light water reactors, it is still necessary to study the hydrogen behavior in the water-ingress accident in which hydrogen will probably be generated. In this paper, the hydrogen generation amount and its distribution in the HTR-PM containment are analyzed with the TINTE code and GASFLOW code respectively in the water ingress accident caused by the steam generator heating tubes rupture. The calculation results indicate that there are total about 16.6 kg and 21 kg hydrogen produced due to graphite corrosion in the typical design basis water ingress accident and beyond design basis accident. The containment sub-pressure ventilation system makes sure the hydrogen concentration in the containment is less than 0.2% during the accident. There is no hydrogen explosion risk in the HTR-PM. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Planning for Plume Diagnostics for Ground Testing of J-2X Engines at the SSC

John C. Stennis Space Center (SSC) is the premier test facility for liquid rocket engine development and certification for the National Aeronautics and Space Administration (NASA). Therefore, it is no surprise that the SSC will play the most prominent role in the engine development testing and certification for the J-2X engine. The Pratt & Whitney Rocketdyne J-2X engine has been selected by the Constellation Program to power the Ares I Upper Stage Element and the Ares V Earth Departure Stage in NASA s strategy of risk mitigation for hardware development by building on the Apollo program and other lessons learned to deliver a human-rated engine that is on an aggressive development schedule, with first demonstration flight in 2010 and human test flights in 2012. Accordingly, J-2X engine design, development, test, and evaluation is to build upon heritage hardware and apply valuable experience gained from past development and testing efforts. In order to leverage SSC s successful and innovative expertise in the plume diagnostics for the space shuttle main engine (SSME) health monitoring,1-10 this paper will present a blueprint for plume diagnostics for various proposed ground testing activities for J-2X at SSC. Complete description of the SSC s test facilities, supporting infrastructure, and test facilities is available in Ref. 11. The A-1 Test Stand is currently being prepared for testing the J-2X engine at sea level conditions. The A-2 Test Stand is currently being used for testing the SSME and may also be used for testing the J-2X engine at sea level conditions in the future. Very recently, ground-breaking ceremony for the new A-3 rocket engine test stand took place at SSC on August 23, 2007. A-3 is the first large - scale test stand to be built at the SSC since the A and B stands were constructed in the 1960s. The A-3 Test Stand will be used for testing J-2X engines under vacuum conditions simulating high altitude operation at approximately 30,480 m (100,000 ft). To achieve the simulated altitude environment, chemical steam generators using isopropyl alcohol, LOX, and RELEASED - Printed documents may be obsolete; validate prior to use. water would run for the duration of the test and would generate approximately 2096 Kg/s of steam to reduce pressure in the test cell and downstream of the engine. The testing at the A-3 Test Stand is projected to begin in late 2010, meanwhile the J-2X component testing on A-1 is scheduled to begin later this year.

SaintCyr, William W.↗

Altitude Testing of Large Liquid Propellant Engines

The National Aeronautics and Space Administration entered a new age on January 14, 2004 with President Bush s announcement of the creation the Vision for Space Exploration that will take mankind back to the Moon and on beyond to Mars. In January, 2006, after two years of hard, dedicated labor, engineers within NASA and its contractor workforce decided that the J2X rocket, based on the heritage of the Apollo J2 engine, would be the new engine for the NASA Constellation Ares upper stage vehicle. This engine and vehicle combination would provide assured access to the International Space Station to replace that role played by the Space Shuttle and additionally, would serve as the Earth Departure Stage, to push the Crew Excursion Vehicle out of Earth Orbit and head it on a path for rendezvous with the Moon. Test as you fly, fly as you test was chosen to be the guiding philosophy and a pre-requisite for the engine design, development, test and evaluation program. An exhaustive survey of national test facility assets proved the required capability to test the J2X engine at high altitude for long durations did not exist so therefore, a high altitude/near space environment testing capability would have to be developed. After several agency concepts the A3 High Altitude Testing Facility proposal was selected by the J2X engine program on March 2, 2007 and later confirmed by a broad panel of NASA senior leadership in May 2007. This facility is to be built at NASA s John C. Stennis Space Center located near Gulfport, Mississippi. 30 plus years of Space Shuttle Main Engine development and flight certification testing makes Stennis uniquely suited to support the Vision For Space Exploration Return to the Moon. Propellant handling infrastructure, engine assembly facilities, a trained and dedicated workforce and a broad and varied technical support base will all ensure that the A3 facility will be built on time to support the schedule needs of the J2X engine and the ultimate flight of the first Ares I vehicle. The A3 facility will be able to simulate pre-ignition altitude from sea-level to 100,000 feet and maintain it up to 650 seconds. Additionally the facility will be able to accommodate initial ignition, shutdown and then restart test profiles. A3 will produce up to 5000 lbm/sec of superheated steam utilizing a Chemical Steam generation system. Two separate inline steam ejectors will be used to produce a test cell vacuum to simulate the 100,000 ft required altitude. Operational capability will ensure that the facility can start up and shutdown without producing adverse pressure gradients across the J2X nozzle. The facility will have a modern thrust measurement system for accurate determination of engine performance. The latest advances in data acquisition and control will be incorporated to measure performance parameters during hotfire testing. Provisions are being made in the initial design of the new altitude facility to allow for testing of other, larger engines and potential upper stage launch vehicles that might require vacuum start testing of the engines. The new facility at Stennis Space Center will be complete and ready for hotfire operations in late 2010.

Maynard, Bryon T.↗

High temperature ultrasonic transducers for the generation of guided waves for non-destructive evaluation of pipes

Applications for non-destructive evaluation and structural health monitoring of steam generators require ultrasonic transducers capable of withstanding the high temperatures of the pipes and heat exchangers. These applications require a strong coupling of the transducer to the heat exchanger’s complex geometry at the elevated temperatures. Our objective is to use spray-on piezo-electrics for depositing comb transducers onto the curved surfaces. This paper shows results for composite transducers such as lead zirconate titanate/ bismuth titanate and bismuth titanate/ lithium niobate. The comb transducers were prepared by precision laser ablation. The feasibility of producing second harmonic waves in rods with these spay-on comb transducers was demonstrated and paves the way toward measuring material degradation early-on before crack initiation occurs.

42 ENGINEERING↗