Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Solar Plus”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

SolarAPP+ Pilot Analysis: Performance and Impact of Instant, Online Solar Permitting

The National Renewable Energy Laboratory (NREL) led a collaborative effort to develop the Solar Automated Permit Processing Plus (SolarAPP+), a no-cost solar permitting software solution to address residential solar photovoltaic (PV) permitting resource constraints and streamline solar adoption processes among authorities having jurisdiction (AHJs). The SolarAPP+ is an online portal that automates permit plan review, enabling an instant permit approval process for code-compliant residential PV systems. Based on national model building, electrical, and fire codes, the SolarAPP+ automatically performs a compliance check of permit inputs against code requirements and produces an inspection checklist that can be used to verify installation practices, workmanship, and adherence to the approved design. NREL conducted a two-phase pilot with five participating AHJs and 16 solar contractors, spanning from November 2020 through December 2021, evaluating the ability of SolarAPP+ to deliver instant permits and its impact on four critical areas within each AHJ: permit review timelines; solar adoption timelines; AHJ time saved; and inspection results. The pilot confirmed that SolarAPP+ reduced permit review times to less than one day, reduced solar adoption timelines by an average of 12 days, saved an estimated 2,067 staff hours, and had comparable inspection results to those found in traditional permitting. The pilot further identified key lessons for improving SolarAPP+, including ways to streamline SolarAPP+ adoption, development of training resources, and expansion of supported products.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Best Practices Case Study: John Wesley Miller Companies - Armory Park Del Sol, Tucson, AZ

Case study of John Wesley Miller Companies, who built two net zero energy homes plus 97 other solar homes in Tucson, AZ. Masonry block walls with rigid foam exterior sheathing, rigid foam over the roof deck plus R-38 in the attic, ducts in conditioned space, 4.2 kW and 5.7 kW photovoltaics and solar water heating yielded HERS scores of 0 on the two homes.

Building America↗

Solar Automated Permit Processing Software for Distributed PV (Cooperative Research and Development Final Report, CRADA Number CRD-19-00825)

NREL and its project partners built and commercialized the novel Solar Automated Permitting Processing Plus (SolarAPP+) software platform that delivers instant residential rooftop solar permits. The tool provides installers with a standard portal for entering permit information for residential solar systems across all Authorities Having Jurisdiction (AHJs) using SolarAPP+, thereby providing a streamlined plan review form, transparency into permitting timelines, and required specifications. The project has proven to reduce permitting timelines from as many as 20 business days to zero, delivering solar projects faster in the four participating AHJs using the platform. Streamlining permitting timelines, all else equal, results in consumers installing their systems and reducing their electricity bills faster. The continued expansion of SolarAPP+ features and adoption nationwide will expand the benefits of the SolarAPP+ beyond the current user base.

14 SOLAR ENERGY↗

Impacts of Dispatch Strategies and Forecast Errors on the Economics of Behind-the-Meter PV-Battery Systems

To assess the economic value of batteries in hybrid PV-battery systems, one must create a dispatch profile for the battery. Many analyses of battery value assume perfect forecasts of PV generation and load, determining an upper limit on the value of the battery. Prior work that accounts for forecast uncertainty often does so in the context of a single dispatch algorithm, which does not provide a baseline for comparison. Furthermore, when multiple dispatch algorithms are assessed with uncertainty, the benefits considered are for diesel generation in a microgrid, not retail rate savings. This work addresses the gaps in the literature by comparing the performance of both heuristic and optimal dispatch algorithms for retail rate savings under forecast uncertainty, and provides comparisons of the robustness of these algorithms and their associated estimates of economic value. We find that using a perfect forecast can overestimate the value of hybrid PV-battery systems between 1% and 8% compared to the reality of using a day-ahead forecast, depending on the dispatch algorithm used. Thus, accounting for forecast uncertainty in system design and analysis will significantly improve the accuracy of modeled system values.

batteries↗

SolarAPP+ Performance Review: Final Technical Report

The National Renewable Energy Laboratory (NREL) and its project partners have developed the novel Solar Automated Permit Processing plus (SolarAPP+) software platform that provides a flexible, web-based PV-permitting tool for residential systems that can be integrated with existing and complementary software platforms. The main objective of this research is to analyze the implementation of SolarAPP+. Analysis was conducted by identifying the benefits, tradeoffs, and overall performance of SolarAPP+, including achieving its goals of delivering automated, code compliant systems, influencing permitting cycle times, and improving application submittals and/or inspection performance. The NREL team published the results of this analysis in annual SolarAPP+ Performance Review technical reports.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Spaced out: An economic framework to explore the impacts of PV panel spacing on large-scale farming in Colorado

CONTEXT Agrivoltaic systems co-locate solar technologies with agricultural operations on an integrated plot of land and potentially provide benefits to both energy and agricultural systems. To date, large-scale (>5-MW) agrivoltaic projects in the United States have been limited to grazing and ecovoltaic applications, raising questions about the impact and scalability of agrivoltaic crop systems. Many agrivoltaic designs raise the height of the solar panels to accommodate agricultural practices while keeping energy density high. However, raising the panels results in increased photovoltaic (PV) development costs, which often are higher than the economic returns of crop production underneath the panels. This leads to unfavorable project economics and the need for other agrivoltaic solutions than raising panels. OBJECTIVE To explore other solutions, we perform an initial feasibility analysis for an agrivoltaic solution that can integrate with large-scale farming practices by increasing the row spacing in between panels. Increased PV row spacing is a low-cost approach for scaling agrivoltaics to accommodate crop production and this spacing can be tailored to required crop equipment for different regions. Increasing row spacing will reduce the power density (PV installed per acre), but in areas that are not land limited, these agrivoltaic designs could be economically feasible. Our analysis establishes a framework for a feasibility analysis for where and with what crops spaced out panel agrivoltaic solutions might be economical. METHODS Using a case study for large-scale agriculture crops in Colorado, we establish a framework for wide-row agrivoltaic economic feasibility analysis. We utilized the System Advisor Model to calculate technoeconomic metrics to compare different row spacing solutions and capture tradeoffs of these system designs. RESULTS AND CONCLUSIONS We find that, in some circumstances, wider row agrivoltaic solutions that allow for continued mechanized crop production can provide economic benefits over a traditional utility-scale PV system. For most crops examined in this analysis, roughly $\$$200/acre in agricultural profit justified spacing out the panels to at least 31.7 ft. to accommodate agrivoltaic configurations versus PV only configurations. Additionally, opportunities for increased agricultural revenue with agrivoltaic systems allow PV project economics to tolerate a larger range of CAPEX variability while remaining economically viable relative to the PV only configurations. SIGNIFICANCE This framework can be adapted for a wide variety of crops and regions and allows for examination of economically favorable sites for future agrivoltaic systems that utilize different configuration and expand opportunities for agrivoltaics.

14 SOLAR ENERGY↗

SOLAR INTERACTING PROTONS VERSUS INTERPLANETARY PROTONS IN THE CORE PLUS HALO MODEL OF DIFFUSIVE SHOCK ACCELERATION AND STOCHASTIC RE-ACCELERATION

With the first observations of solar γ-rays from the decay of pions, the relationship of protons producing ground level enhancements (GLEs) on the Earth to those of similar energies producing the γ-rays on the Sun has been debated. These two populations may be either independent and simply coincident in large flares, or they may be, in fact, the same population stemming from a single accelerating agent and jointly distributed at the Sun and also in space. Assuming the latter, we model a scenario in which particles are accelerated near the Sun in a shock wave with a fraction transported back to the solar surface to radiate, while the remainder is detected at Earth in the form of a GLE. Interplanetary ions versus ions interacting at the Sun are studied for a spherical shock wave propagating in a radial magnetic field through a highly turbulent radial ray (the acceleration core) and surrounding weakly turbulent sector in which the accelerated particles can propagate toward or away from the Sun. The model presented here accounts for both the first-order Fermi acceleration at the shock front and the second-order, stochastic re-acceleration by the turbulence enhanced behind the shock. We find that the re-acceleration is important in generating the γ-radiation and we also find that up to 10% of the particle population can find its way to the Sun as compared to particles escaping to the interplanetary space.

79 ASTRONOMY AND ASTROPHYSICS↗

Installed Cost Benchmarks and Deployment Barriers for Residential Solar Photovoltaics with Energy Storage: Q1 2016

In this report, we fill a gap in the existing knowledge about PV-plus-storage system costs and value by providing detailed component- and system-level installed cost benchmarks for residential systems. We also examine other barriers to increased deployment of PV-plus-storage systems in the residential sector. The results are meant to help technology manufacturers, installers, and other stakeholders identify cost-reduction opportunities and inform decision makers about regulatory, policy, and market characteristics that impede solar plus storage deployment. In addition, our periodic cost benchmarks will document progress in cost reductions over time. To analyze costs for PV-plus-storage systems deployed in the first quarter of 2016, we adapt the National Renewable Energy Laboratory's component- and system-level cost-modeling methods for standalone PV. In general, we attempt to model best-in-class installation techniques and business operations from an installed-cost perspective. In addition to our original analysis, model development, and review of published literature, we derive inputs for our model and validate our draft results via interviews with industry and subject-matter experts. One challenge to analyzing the costs of PV-plus-storage systems is choosing an appropriate cost metric. Unlike standalone PV, energy storage lacks universally accepted cost metrics, such as dollars per watt of installed capacity and lifetime levelized cost of energy. We explain the difficulty of arriving at a standard approach for reporting storage costs and then provide the rationale for using the total installed costs of a standard PV-plus-storage system as our primary metric, rather than using a system-size-normalized metric.

14 SOLAR ENERGY↗

Cross-scale observations of the 2015 St. Patrick's day storm: THEMIS, Van Allen Probes, and TWINS

In this paper, we present cross-scale magnetospheric observations of the 17 March 2015 (St. Patrick's Day) storm, by Time History of Events and Macroscale Interactions during Substorms (THEMIS), Van Allen Probes (Radiation Belt Storm Probes), and Two Wide-angle Imaging Neutral-atom Spectrometers (TWINS), plus upstream ACE/Wind solar wind data. THEMIS crossed the bow shock or magnetopause 22 times and observed the magnetospheric compression that initiated the storm. Empirical models reproduce these boundary locations within 0.7 R E . Van Allen Probes crossed the plasmapause 13 times; test particle simulations reproduce these encounters within 0.5 R E . Before the storm, Van Allen Probes measured quiet double-nose proton spectra in the region of corotating cold plasma. About 15 min after a 0605 UT dayside southward turning, Van Allen Probes captured the onset of inner magnetospheric convection, as a density decrease at the moving corotation-convection boundary (CCB) and a steep increase in ring current (RC) proton flux. During the first several hours of the storm, Van Allen Probes measured highly dynamic ion signatures (numerous injections and multiple spectral peaks). Sustained convection after ~1200 UT initiated a major buildup of the midnight-sector ring current (measured by RBSP A), with much weaker duskside fluxes (measured by RBSP B, THEMIS a and THEMIS d). A close conjunction of THEMIS d, RBSP A, and TWINS 1 at 1631 UT shows good three-way agreement in the shapes of two-peak spectra from the center of the partial RC. A midstorm injection, observed by Van Allen Probes and TWINS at 1740 UT, brought in fresh ions with lower average energies (leading to globally less energetic spectra in precipitating ions) but increased the total pressure. Finally, the cross-scale measurements of 17 March 2015 contain significant spatial, spectral, and temporal structure.

79 ASTRONOMY AND ASTROPHYSICS↗

AN ASTEROID BELT INTERPRETATION FOR THE TIMING VARIATIONS OF THE MILLISECOND PULSAR B1937+21

Pulsar timing observations have revealed companions to neutron stars that include other neutron stars, white dwarfs, main-sequence stars, and planets. We demonstrate that the correlated and apparently stochastic residual times of arrival from the millisecond pulsar B1937+21 are consistent with the signature of an asteroid belt having a total mass {approx}< 0.05 M{sub Circled-Plus }. Unlike the solar system's asteroid belt, the best fit pulsar asteroid belt extends over a wide range of radii, consistent with the absence of any shepherding companions. We suggest that any pulsar that has undergone accretion-driven spin-up and subsequently evaporated its companion may harbor orbiting asteroid mass objects. The resulting timing variations may fundamentally limit the timing precision of some of the other millisecond pulsars. Observational tests of the asteroid belt model include identifying periodicities from individual asteroids, which are difficult; testing for statistical stationarity, which becomes possible when observations are conducted over a longer observing span; and searching for reflected radio emission.

79 ASTRONOMY AND ASTROPHYSICS↗

SolarAPP+ Performance Review (2022 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have those specifications automatically reviewed for code compliance, and receive instant approval for code-compliant systems. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to authorities having jurisdiction (AHJs) at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through conventional AHJ permitting processes. As of the end of 2022, the National Renewable Energy Laboratory (NREL) had contacted over 1,500 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 607 AHJs had at least expressed interest in the platform. 16 AHJs had begun piloting the platform and 15 of these had publicly launched the platform by the end of 2022. In 2022, 206 installers submitted 11,092 permits through the SolarAPP+ platform, including 708 permits for solar+storage systems. SolarAPP+ permits accounted for around 37% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 8 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved between 3,500 and 13,900 hours of AHJ staff time in 2022. Finally, we find evidence that SolarAPP+ may improve inspection outcomes, with SolarAPP+ projects failing inspections about 28% less frequently than traditional projects.

14 SOLAR ENERGY↗

SolarAPP+ Performance Review (2024 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2024, 799 AHJs had expressed interest in the platform, with 264 fully adopting (215) or piloting (49) the platform. In 2024, 861 installers submitted 37,393 permits through the SolarAPP+ platform, including 27,375 permits for PV+storage systems. SolarAPP+ permits accounted for around 43% of all permits issued in all participating AHJs, and more than 60% of all permits in several participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 12 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 18,400 hours of AHJ staff time in 2024. Finally, we estimate that SolarAPP+ eliminated over 100,000 business days in permitting-related delays in 2024.

14 SOLAR ENERGY↗

Considerations for Implementing PV Plus Storage Systems at Federal Buildings and Campuses

Federal agencies have a long history of using solar photovoltaics and battery storage (PV plus storage) systems at remote sites where the technologies can offset costly diesel fuel. However, recent declines in lithium-ion battery costs, along with changes in net metering policies and utility rate structures, are opening up opportunities for PV plus storage to be deployed cost-effectively at grid-connected sites.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NREL Benchmarks the Installed Cost of Residential Solar Photovoltaics with Energy Storage for the First Time

Fact sheet summarizing technical report TP-7A40-67474. New National Renewable Energy Laboratory research fills a gap in the existing knowledge about barriers to PV-plus-storage systems by providing detailed component- and system-level installed cost benchmarks for systems in the first quarter of 2016. The report is meant to help technology manufacturers, installers, and other stakeholders identify cost-reduction opportunities and inform decision makers about regulatory, policy, and market characteristics that impede PV-plus-storage deployment.

14 SOLAR ENERGY↗

Study of hybrid power system potential to power agricultural water pump in mountain area

As industry and Indonesian economy grow fast, there are a lot of agricultural land has changed into housing and industrial land. This causes the agricultural land moves to mountain area. In mountainous agricultural area, farmers use the water resources of small rivers in the groove of the mountain to irrigate the farmland. Farmers use their power to lift up water from the river to their land which causes inefectivity in the work of the farmers. Farmers who have capital utilize pump to raise water to their land. The only way to use pump in mountain area is by using fuel energy as there is no electricity, and the fuel price in mountain area is very expensive. Based on those reasons it is wise to consider the exploration of renewable energy available in the area such as solar energy, wind energy and hybrid energy. This study analyses the potential of the application of hybrid power plant, which is the combination of solar and wind energy, to power agricultural pump. In this research, the data of wind speed and solar radiation are collected from the measurement of BMKG SMPK Plus Sare. Related to the solar energy, the photovoltaic output power calculation is 193 W with duration of irradiation of 5 hours/day. While for the wind energy, the output power of the wind turbine is 459.84 W with blade diameter of 3 m and blow duration of 7 hours/day. The power of the pump is 558 W with 8 hours of usage, and the water capacity is 2.520 liters/hour for farmland with the area of 15 ha. Based on the analysis result, the designed system will generate electricity of 3.210 kW/year with initial investment of US$ 14,938.

17 WIND ENERGY↗

SolarAPP+ Performance Review: 2021 Data

Accelerating rooftop solar photovoltaic (PV) deployment has strained the capacity of local authorities responsible for permitting, inspection, and interconnection (PII). Given the ongoing expansion of rooftop PV, a growing number of authorities having jurisdiction (AHJs) and utilities are reforming PII processes to reduce delays. AHJs could significantly reduce PII timelines through reforms such as expedited reviews for small-scale systems, online customer portals, and over-the-counter permitting. However, independent reforms do not resolve issues associated with PII variability across AHJs, and many AHJs lack the resources to implement reforms. In response to these challenges, the National Renewable Energy Laboratory (NREL) developed the Solar Automated Permit Processing Plus (SolarAPP+) platform, in collaboration with local governments, code development organizations, and industry stakeholders. This report shows SolarAPP+ performance in 2021 across AHJs.

14 SOLAR ENERGY↗

The Impact of City-level Permitting Processes on Residential Photovoltaic Installation Prices and Development Times: An Empirical Analysis of Solar Systems in California Cities

Business process or “soft” costs account for well over 50% of the installed price of residential photovoltaic (PV) systems in the United States, so understanding these costs is crucial for identifying PV cost-reduction opportunities. Among these costs are those imposed by city-level permitting processes, which may add both expense and time to the PV development process. Building on previous research, this study evaluates the effect of city-level permitting processes on the installed price of residential PV systems and on the time required to develop and install those systems. The study uses a unique dataset from the U.S. Department of Energy’s Rooftop Solar Challenge Program, which includes city-level permitting process “scores,” plus data from the California Solar Initiative and the U.S. Census. Econometric methods are used to quantify the price and development-time effects of city-level permitting processes on more than 3,000 PV installations across 44 California cities in 2011. Results indicate that city-level permitting processes have a substantial and statistically significant effect on average installation prices and project development times. The results suggest that cities with the most favorable (i.e., highest-scoring) permitting practices can reduce average residential PV prices by $0.27–$0.77/W (4%–12% of median PV prices in California) compared with cities with the most onerous (i.e., lowest-scoring) permitting practices, depending on the regression model used. Though the empirical models for development times are less robust, results suggest that the most streamlined permitting practices may shorten development times by around 24 days on average (25% of the median development time). These findings illustrate the potential price and development-time benefits of streamlining local permitting procedures for PV systems.

14 SOLAR ENERGY↗