Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Siting Lab”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Final Design for Thermal/Epithermal eXperiments (TEX) with Chloride Absorbers to Provide Validation Benchmarks for Y-12 Electrorefining Facility

Uranium electrorefining operations at Y-12 require validation for chlorine absorption and reflection. Plutonium chloride solution operations at Los Alamos National Laboratory require chlorine absorption validation. The growing need for chlorine validation is evident to the wider criticality safety community, with multiple attendees at the recent TEX 2.0 meeting at Lawrence Livermore National Laboratory (May 2023) requesting validation for chlorine (Idaho National Laboratory (INL), Institute de radioprotection et de surete nucleaire (IRSN), Savannah River Nuclear Site (SRNS), LANL, and Y-12). Los Alamos National Laboratory has recently performed, and benchmarked, an experiment titled Chlorine Worth Study (CWS) for the internal operations at the lab, but due to the difficulties in precisely characterizing the material compositions of the chlorine absorbers it is advantageous to perform a complimentary study with a different chlorine-based absorber material. Furthermore, having a uranium-based vs plutonium-based experiment provides a separate and important validation basis for criticality safety and nuclear data evaluation. The original final design report for the study of chlorine absorption using the TEX-HEU experimental base was presented in 2022, but used the same chlorine-bearing materials that were found to be difficult to characterize in the LANL benchmark. A complete redesign of the experiment has been performed looking at alternative absorber materials in various forms to produce an experiment that is fully characterizable. This report presents five novel chlorine experiments using the TEX-HEU test bed which provides direct comparison to the Y-12 and INL/Terrapower application needs, utilizing sodium chloride (NaCl) absorber plates. The absorber plates will consist of granulated NaCl (≥99.5% pure), which will be fully encapsulated in aluminum tins, providing a simple but effective chlorine-based absorber material that can be completely characterized. Of the five configurations presented in this report, it is expected that two or three configurations will be down selected for the actual experiment, with the other configurations being alternates. Three of the configurations are in the standard configuration, where the absorber is placed directly on the HEU fuel plates, and two in the sandwich configuration, where the absorber is surrounded by polyethylene moderators to force additional neutron thermalization prior to reaching the absorber. There are two thicknesses of NaCl absorber plates: 3/16” and 1/4” active thicknesses (i.e. not including the encapsulation). Both variations of the absorbers have an active absorber radius of 6” and a total radius of 7.5” to match the diameter of the HEU plates, with the outer 1.5” being aluminum encapsulation. The high-density polyethylene (HDPE) moderators are of the thicknesses: 27/16”, 7/4”, 1/8”, 11/16”, and 3/4”. The final configurations have six (one sandwich and one standard configuration), eight (one sandwich and one standard configuration), and 18 total fuel layers (standard configuration). The standard and sandwich configurations were designed such that the differences in moderator thicknesses are 1” HDPE, which were already procured for the original CED-2. The proposed configurations were precisely tuned to closely match the sensitivity profiles and neutron spectra of the Y-12 upset cases and were also compared to the INL/Terrapower upset cases. The assessment of experimental uncertainties of the non-absorber components was predicted to be 0.00114 Δk eff . The assessment of uncertainties resulting from the absorbers was predicted to be 0.00029 Δk eff . This results in a total uncertainty of 0.00118 Δk eff . Many of the largest uncertainties, namely the moderator densities, may be reduced with precision dimensional inspection of the components. The 1” HDPE moderators as well as the HDPE reflectors from the original CED-2 were incorporated in the final designs presented here. Additional HDPE moderator plates must be fabricated to complete the configurations. NaCl absorber plates will by fabricated at LLNL. The total additional cost is expected to be $\$$54,250 for the remaining components. Precise inspection, including dimensional, mass, density, and impurity, is recommended for all components. LLNL estimates that these costs are around $\$$12,000. It is expected, based on previous TEX-HEU experiments, that three weeks of experimental facility time is needed to complete the experiments.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Lawrence Berkeley National Lab Building 59

The building management system in Building 59 is monitoring and archiving building-level electricity usage, HVAC and lighting system states (e.g., setpoint, temperature, flow rate, pressure), indoor environmental conditions (air temperature, relative humidity, CO2), on-site weather (air temperature, relative humidity), and especially occupant counts as well as other metrics such as Wi-Fi signal. This dataset could support multiple use cases, such as model predictive control and occupant related demand management.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Toward Solar Photovoltaic Storm Resilience: Learning from Hurricane Loss and Rebuilding Better

The General Service Administration (GSA) suffered extensive damage to its solar arrays located throughout the Caribbean from Hurricanes Irma and Maria in 2017. While the damage that occurred was unfortunate, there are excellent lessons learned that can be gained and utilized on new systems. A site on St. Croix provides a particularly high-value opportunity for lessons learned due to the innovative rebuilding process utilized by GSA managers and the in-depth analysis performed by the project engineers. This case study focuses on the rebuild of a 469-kW ground array located at the Almeric L. Christian Federal Building in Christiansted, St. Croix in the U.S. Virgin Islands. This array was destroyed by Hurricane Maria. The entire process of planning and subsequent rebuilding that the GSA managers undertook was highly successful. Notably, GSA managers conducting the rebuild effort obtained an independent assessment of failure modes from U.S. Department of Energy (DOE) national labs and then retained a consulting engineering firm to develop design and construction guidance for the rebuild effort. This design and construction guidance was then provided to the engineering, procurement, and constructing firm to implement while rebuilding the site.

14 SOLAR ENERGY↗

Enhanced Water Interaction at Dual Cu Sites Within the Defects on a Copper Sulfide Layer

Electrochemical transformations of stable molecules and water into fuels and value-added chemicals require efficient catalyst surfaces. Introducing controlled defects at atomic scales can offer promising routes to enhance catalyst performance. In this study, we found novel dual copper site (-Cu-Cu-) defects within a copper sulfide (Cu-S) layer supported on Cu(111). Using scanning tunneling microscopy (STM) and density functional theory (DFT), we found these dual copper sites enhance molecular adsorption strength, specifically for water molecules, compared to intact Cu-S layer or pristine copper surfaces. This discovery highlights the potential of engineered dual-site copper defects to advance electrochemical catalytic materials, particularly for reactions involving water activation.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

The plant endoplasmic reticulum: an organized chaos of tubules and sheets with multiple functions

The endoplasmic reticulum is a fascinating organelle at the core of the secretory pathway. It is responsible for the synthesis of one third of the cellular proteome and, in plant cells, it produces receptors and transporters of hormones as well as the proteins responsible for the biosynthesis of critical components of a cellulosic cell wall. The endoplasmic reticulum structure resembles a spider-web network of interconnected tubules and cisternae that pervades the cell. The study of the dynamics and interaction of this organelles with other cellular structures such as the plasma membrane, the Golgi apparatus and the cytoskeleton, have been permitted by the implementation of fluorescent protein and advanced confocal imaging. In this review,we report on the findings that contributed towards the understanding of the endoplasmic reticulum morphology and function with the aid of fluorescent proteins, focusing on the contributions provided by pioneering work from the lab of the late Professor Chris Hawes.

59 BASIC BIOLOGICAL SCIENCES↗

The National Solar Radiation Database Final Report: Fiscal Years 2022-2024

The National Solar Radiation Database (NSRDB) is the leading public source of high-resolution solar resource data in the United States, with more than 400,000 users annually. This database represents the state of the art in the satellite-based estimation of solar resource information and uses a unique physics-based modeling approach that enables improvements in accuracy with the deployment of the next-generation geostationary satellites. Making the highest-quality, state-of-the-art, regularly updated datasets available on a timely basis for users reduces costs of solar deployment by providing accurate information for siting studies and system output prediction and thereby reduces project financing costs and risks.

14 SOLAR ENERGY↗

Roadmap to 100 GWDC: Scientific and supply chain challenges for CdTe photovoltaics

This roadmap highlights pathways to expand the CdTe module manufacturing capacity per year to 100 GW DC by 2030 by improving Te extraction from existing supply chains, minimizing Te usage in modules by leveraging thinner absorbers, and focusing research efforts in key areas to improve module efficiencies. Both scientific and supply chain innovations will be necessary to maintain the high compound annual growth rate of the CdTe photovoltaic (PV) industry and cement its role as a key technology for multi-TW-scale PV deployment.

14 SOLAR ENERGY↗

2 Kelvin helium distribution system for the Electron Ion Collider’s 10 o’clock satellite refrigerator

The Electron-Ion Collider (EIC) at Brookhaven National Laboratory (BNL) will involve superfluid helium cooling of superconducting magnets and Superconducting Radio Frequency (SRF) cavities at several sites around the existing Relativistic Heavy Ion Collider (RHIC) accelerator tunnel. While the majority of the cooling power for these loads is provided by BNL’s central cryogenic plant, Jefferson Lab is designing satellite equipment which augments the central plant and enables 2 Kelvin operation. The 2 K cryogenic distribution system for the collider’s 10 o’clock location (Interaction Region 10 or IR10) includes all necessary interfaces to the IR10 Satellite Refrigerator, to the overall EIC cryogenic distribution system, and to 12 SRF cryomodules for the electron and hadron storage rings. In addition to providing the required cooling capacities in all operating modes, the IR10 2 K cryogenic distribution system also stabilizes the supply temperature and enables safe connection and disconnection of individual IR10 cryomodules. Moreover, the layout of the IR10 2 K cryogenic distribution system copes with challenging spatial constraints and adapts to the process configuration and routing of existing RHIC cryogenic distribution components which will be re-used for EIC. This paper gives a full overview of the IR10 satellite cryogenic distribution system design, and highlights some of the challenges encountered.

Laverdure, Nathaniel [Thomas Jefferson National Ac↗

H2@Scale - Validating an Electrolysis System with High Output Pressure: Cooperative Research and Development Final Report, CRADA Number CRD-18-00741

Electrolysis has been a commercially available product for a while and electrolyzers have been a proven capability to provide additional benefits (e.g. controllable load for grid services) in addition to production of hydrogen. The hydrogen output is typically compressed for storage and dispensing. Compression adds cost and decreases system reliability. Honda’s electrolyzer systems have been developed to include electrochemical compression to leverage the production system itself for at least partial compression. In this project, the team will evaluate Honda’s PEM based electrochemical compression system. The system is capable of compressing hydrogen up to 70 MPa electrochemically. Validation testing is the next step to accelerate this technology into the marketplace, as the validation will provide needed data under a variety of operation conditions and controls. These operating conditions and controls are based on over a decade of NLR research and development with low-temperature electrolysis. The validation testing will include preparing NLR’s site for third party evaluation, benchmark testing of Honda’s stack and system, and simulating operation connected to renewables or in a grid service profile. NLR’s Energy System Integration Lab will be the location for the electrolyzer validation research and integrated into the Hydrogen Infrastructure Test & Research Facility (HITRF). This will build into the existing retail style hydrogen fueling station for a fully integrated experimental setup.

08 HYDROGEN↗

Repository of HydroSMADE: Hydropower Site-level Monthly Availability Data Ensemble for 1950-2100 at Existing and Potential Global Sites

This repository presents HydroSMADE—Hydropower Site-level Monthly Availability Data Ensemble, a new open dataset that provides monthly hydropower availability for 1,593 existing and 124,333 potential sites worldwide over the period 1950–2100. The dataset is generated by using a global hydrologic model (Xanthos) with explicit representation of hydropower operation. Specifically, HydroSMADE distinguishes between storage and diversion sites, applies optimized operating rules, and incorporates site-specific characteristics such as generation capacity, maximum turbine flow, and reservoir storage. Driven by bias-corrected meteorological inputs, the data is provided for 30 alternative future scenarios. The scenarios consist of the full factorial combination of three standard CMIP6 atmospheric forcing pathways (SSP1-2.6, SSP3-7.0, and SSP5-8.5) and ten CMIP6 General Circulation Models (GCMs): GFDL-ESM4, IPSL-CM6A-LR, MPI-ESM1-2-HR, MRI-ESM2-0, EC-Earth3, CanESM5, MIROC6, CNRM-ESM2-1, UKESM1-0-LL, and CNRM-CM6-1. The repository contains a total of 122 files: a text file (readme.txt) containing a brief description of the included data, a CSV file containing site attributes, and the remaining 120 files (in CSV) containing site-level monthly hydropower availability. Example Jupyter Notebooks to explore the HydroSMADE dataset are available on GitHub at https://github.com/kamal0013/HydroSMADE More details on the methods and technical validation of HydroSMADE are available in the following paper by the same authors: Chowdhury, A. K., Abeshu, G. W., Zhao, M., Wild, T. B., Hassan, N., Ying, Z., Kim, G. J., Matthew, B., Jonathan, L., & Li, H.-Y. (Submitted). Hydropower Site-level Monthly Availability Data Ensemble for 1950-2100 at Existing and Potential Global Sites.

Existing and Potential Sites↗

AmeriFlux US-Hsm Hill Slough Marsh

This is the AmeriFlux version of the carbon flux data for the site US-Hsm Hill Slough Marsh. Site Description - The site is currently a diked marsh - upland ecotone located at the northern Suisun Marsh. It will undergo tidal restoration in Fall 2021. Restoration work is done by Ducks Unlimited Inc. and will cover an area of 649 acres. After levee breaches, the site tower will be in a high marsh system. Water level at high tide is estimated to be 0.5-1 m above the soil. Ducks Unlimited, Inc. and the Berkeley Biometeorology lab are working together to evaluate the effects of the proposed tidal marsh restoration project.

Kyle_Delwiche, Kyle_Delwiche↗

AmeriFlux FLUXNET-1F US-Hsm Hill Slough Marsh

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-Hsm Hill Slough Marsh. This is the FLUXNET version of the carbon flux data for the site US-Hsm Hill Slough Marsh produced by applying the standard ONEFlux (1F) software. Site Description - The site is currently a diked marsh - upland ecotone located at the northern Suisun Marsh. It will undergo tidal restoration in Fall 2021. Restoration work is done by Ducks Unlimited Inc. and will cover an area of 649 acres. After levee breaches, the site tower will be in a high marsh system. Water level at high tide is estimated to be 0.5-1 m above the soil. Ducks Unlimited, Inc. and the Berkeley Biometeorology lab are working together to evaluate the effects of the proposed tidal marsh restoration project.

Kyle_Delwiche, Kyle_Delwiche [University of Califo↗

NM 502 Road Safety Audit Report

The Texas A&M Transportation Institute (TTI) and the Los Alamos National Laboratory - Parking and Transportation Services (LANL) have been working in close collaboration to seek solutions for parking, traffic operations, traffic safety, and transit issues facing LANL. NM 502 is a main route for employee traffic entering the lab as well as traffic in and out of the Los Alamos Townsite. The section of roadway in the vicinity of Camino Entrada is of particular interest as it was the site of two very serious crashes involving the extended LANL family, and it is also the entry point onto NM 502 for Los Alamos County Operations to include the school district and transit vehicles.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Session 059 - Panel: Small Business Procurement and Contracting Opportunities within the US DOE Complex and USACE FUSRAP Sites (R1.7)

This panel session focused on small business procurement and contracting opportunities within the DOE Complex and USACE FUSRAP Sites. The federal government encourages prime contractors to obtain goods and services from small and disadvantaged businesses (Tier 2) and often tie these goals to contract award fee. Goods and services being considered for these procurements include decontamination and decommissioning, remediation, transportation and disposal of radioactive waste, health physics, emergency response planning and training, lab services, R and D products, waste treatment, maintenance, A/E and professional consulting. Panelists with presentations: Small Business Procurement and Contracting Opportunities within the US DOE Complex and USACE FUSRAP Program (Aaron Deckard; Subcontracting Opportunities with the DOE Primes (William Badger); Bechtel National, Inc. Small Business Opportunities (Lisa Tribuce-Leoung Tat); Small Business Procurement and Contracting Opportunities (Gina Joiner); Small Business Procurement and Contracting Opportunities - Flour (Katy Burnau); Environmental WORK, Formerly Utilized Sites Remedial Action Program (FUSRAP) (John Busse)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EGS Collab Experiment 2: Continuous Broadband Seismic Waveform Data

Two broadband seismometers were installed on the 4100 level and recorded for the duration of EGS Collab Experiment #2. Inspired by published data from similar instruments installed in the Aspo Hard Rock Lab, these long-period instruments aimed to measure the tilting of the drift in response to the injection of fluid into the testbed. One instrument was installed underneath the wellheads in Site A (aka the "battery" alcove) and the other was installed along the east wall of the drift, south of Site B. Due to the feet of gravel (ballast) laid along the floor of the drift, we were unable to anchor the sensors directly to the rock. As a result, the coupling of the sensors to the experiment rock volume is likely poor. In addition, there are a number of noise sources that complicate the interpretation of the data. For example, sensor BBB is installed adjacent (within 3 ft) to the rail line that runs towards the Ross shaft. Trains (motors) run along this line almost daily and produce a large signal in these data. Careful extraction of periods of interest, as well as filtering for specific signals, is necessary. The sensors are Nanometrics Trillium Compact Posthole seismometers, sensitive down to 120 seconds period. They were installed as close to the drift wall and as deep as we could manually excavate (only about 1 ft or so). The holes were leveled with sand and the sensors were placed on a paver before backfilling with sand. The hole was then covered by a bucket filled with insulation to improve the sensor's isolation from daily temperature variations, which are minor but present due to drift ventilation from the surface. Data were recorded on Nanometrics Centaur digitizers at 100 Hz. The full response information is available in the StationXML file provided here, or by querying the sensors through the IRIS DMC (see links below). These instruments were provided free of charge through the IRIS PASSCAL instrument center. The network code is XP and the station codes are BBA and BBB. The waveform data can be queried through the IRIS FDSN server using any method the user likes. One convenient option is to use the Obspy python package: https://docs.obspy.org/packages/obspy.clients.fdsn.html

15 GEOTHERMAL ENERGY↗

Molecular and Microstructural Bases for Understanding Microplastic Origin, Transport, and Fate

The formation of micro and nanoplastics from parent plastics is one of the most challenging ecological threats since plastic pollution reaches even the most desolate places on earth and is expected to double by 2030. The goal of this project is to understand physico-chemical properties on microplastics formation, transport, and fate by analyzing the microplastics found in environmentally collected samples at SRS, supported by lab-based experiments. An initial assessment found and identified microplastics and micronizing plastics in Fourmile Branch and the Savannah River. Fourmile Branch also carried trace-level radioactive contaminants associated with the Site’s legacy missions, which may incorporate into entrained microplastics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Kinetic model development for single step ethanol to butene rich olefin process over Cu-Y/Beta catalysts

Here, this study presents the first intrinsic kinetic model for the single-step conversion of ethanol to butene-rich olefins over bifunctional Cu-Y/Beta catalysts, addressing a critical gap in the design and scale-up of Sustainable Aviation Fuel (SAF) processes. The reaction network comprises ten global steps involving dehydrogenation, aldol condensation, hydrogenation, and dehydration reactions, distributed across Cu and rare-earth (Y) active sites. The model incorporates dual-site functionality (Cu and Y site) and explicitly accounts for key intermediates such as crotonaldehyde and butanal. Reaction rates are formulated using Langmuir–Hinshelwood–Hougen–Watson (LHHW) kinetics. Kinetic parameters are extracted by fitting the model to lab-scale packed-bed reactor data across a wide range of temperatures and space velocities, demonstrating strong agreement in ethanol conversion and product selectivity. The reaction kinetics developed in this work provide a foundational basis for constructing reactor models that enable process optimization and scale-up of ethanol-to-jet fuel technologies.

Cu-Y/Beta catalyst↗

NNSA/CEA Workflow Workshop Report 2021

Researchers from three NNSA labs plus CEA recently met for a half-day workshop on scientific and engineering workflows in March of 2021. Tools, projects and use cases from each institution were described. A wide range of unique capabilities and requirements were represented. The workshop highlights the fact that the CEA/NNSA workflows space mirrors the broader open science workflows community, with multiple technologies under development in a number of science domains and under a number of funding streams, with differing capabilities and focuses. Despite the number of tools, presentations and discussions have shown that these tools cover specific mission spaces at the four labs, each with distinctive capabilities that do not completely overlap with each other. We believe there is a strong interest in the short term for sharing lessons learned and collaborating on benchmarks and site evaluation of projects. This report, prepared by the NNSA/CEA Workflows Working Group, briefly summarizes the presentations in the areas of domain specific workflows, end user environments, data management, job and resource management, and infrastructure, and then identifies six broad areas for potential collaboration. A key finding is that users could benefit from greater interoperability, compatibility, and composability of the workflow technologies under development and that point-to-point collaboration opportunities should be identified to explore these aspects.

97 MATHEMATICS AND COMPUTING↗