Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Shared Assurance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Software development infrastructure for the HYBRID modeling and simulation project

One of the goals of the HYBRID modeling and simulation project is to assess the economic viability of hybrid systems in a market that contains renewable energy sources like wind. The idea is that it is possible for the nuclear plant to sell non-electric energy cushions, which absorb (at least partially) the volatility introduced by the renewable energy sources. This system is currently modeled in the Modelica programming language. To assess the economics of the system, an optimization procedure is trying to find the minimal cost of electricity production. The RAVEN code is used as a driver for the whole problem. It is assumed that at this stage, the HYBRID modeling and simulation framework can be classified as non-safety “research and development” software. The associated quality level is Quality Level 3 software. This imposes low requirements on quality control, testing and documentation. The quality level could change as the application development continues.Despite the low quality requirement level, a workflow for the HYBRID developers has been defined that include a coding standard and some documentation and testing requirements. The repository performs automated unit testing of contributed models. The automated testing is achieved via an open-source python script called BuildingsP from Lawrence Berkeley National Lab. BuildingsPy runs Modelica simulation tests using Dymola in an automated manner and generates and runs unit tests from Modelica scripts written by developers. In order to assure effective communication between the different national laboratories a biweekly videoconference has been set-up, where developers can report their progress and issues. In addition, periodic face-face meetings are organized intended to discuss high-level strategy decisions with management. A second means of communication is the developer email list. This is a list to which everybody can send emails that will be received by the collective of the developers and managers involved in the project. Thirdly, to exchange documents quickly, a SharePoint directory has been set-up. SharePoint allows teams and organizations to intelligently share, and collaborate on content from anywhere.

97 MATHEMATICS AND COMPUTING↗

Direct Feed Low Activity Waste Program Integration - 16638

The mission of Program Integration is to champion and steer the development and implementation of common and consistent programs between the Tank Operating Contract (TOC) contractor and the Waste Treatment Plant (WTP) contractor. TOC is managed by Washington River Protection Solutions LLC (WRPS) and WTP is managed by Bechtel National, Inc. (BNI). The DOE Office of River Protection (DOE ORP) is the Program Owner. WRPS has been actively managing the TOC at the Hanford Site Tank Farms (TF) since 2008. Programs are already developed, verified, and in use for the TOC, whereas WTP is still in the construction phase. WTP Programs are established for construction only, but not developed for commissioning and future operations. An extensive effort is underway at WTP to develop commissioning programs. In order to drive consistency and minimize differences in program requirements between TF, which will feed the tank waste, and WTP, which will receive and treat the tank waste, DOE-ORP requires the two contractors to integrate and collaborate in program development. Advantages of integration are: - Achieves cost and time savings as WTP is able to review existing TOC programs as starting points in development of its programs. - Promotes interfaces with industry counterparts to share experiences, issues, and lessons learned. ? Minimizes difference in program requirements between the companies. - Helps prepare for and ultimately succeed in Operational Readiness Reviews (ORR). Program Integration is a priority for TOC and WTP, and in order to maintain the focus and drive to this effort, a unified One System Program Integration Council (OSPIC) was created in 2012. Membership of the OSPIC consists of senior managers from both companies and the OSPIC chair's report directly to their respective President. Thirty (30) programs are subject to integration, including but not limited to Conduct of Operations, Worker Safety and Health, Quality Assurance, Contractor Assurance, and Environmental Management. Progress of program development and integration efforts are tracked and monitored, and barriers to integration are resolved in a collaborative fashion within both companies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Autonomous Information Unit for Fine-Grain Data Access Control and Information Protection in a Net-Centric System

As communication and networking technologies advance, networks will become highly complex and heterogeneous, interconnecting different network domains. There is a need to provide user authentication and data protection in order to further facilitate critical mission operations, especially in the tactical and mission-critical net-centric networking environment. The Autonomous Information Unit (AIU) technology was designed to provide the fine-grain data access and user control in a net-centric system-testing environment to meet these objectives. The AIU is a fundamental capability designed to enable fine-grain data access and user control in the cross-domain networking environments, where an AIU is composed of the mission data, metadata, and policy. An AIU provides a mechanism to establish trust among deployed AIUs based on recombining shared secrets, authentication and verify users with a username, X.509 certificate, enclave information, and classification level. AIU achieves data protection through (1) splitting data into multiple information pieces using the Shamir's secret sharing algorithm, (2) encrypting each individual information piece using military-grade AES-256 encryption, and (3) randomizing the position of the encrypted data based on the unbiased and memory efficient in-place Fisher-Yates shuffle method. Therefore, it becomes virtually impossible for attackers to compromise data since attackers need to obtain all distributed information as well as the encryption key and the random seeds to properly arrange the data. In addition, since policy can be associated with data in the AIU, different user access and data control strategies can be included. The AIU technology can greatly enhance information assurance and security management in the bandwidth-limited and ad hoc net-centric environments. In addition, AIU technology can be applicable to general complex network domains and applications where distributed user authentication and data protection are necessary. AIU achieves fine-grain data access and user control, reducing the security risk significantly, simplifying the complexity of various security operations, and providing the high information assurance across different network domains.

Chow, Edward T.↗

Transition of Site Programs and Implementation of Decommissioning Agent Oversight - 18653

San Onofre Nuclear Generating Station (SONGS), acting as the Decommissioning Agent (DA), retained its NRC License and contracted a Decommissioning General Contractor (DGC) to manage plant programs and execute the Demolition and Dismantlement (D and D) of the site. To support this effort, over twenty-one programs transitioned to the DGC, including Occupational Health and Safety, Radiation Protection, Maintenance, and Engineering. In addition, SONGS effected a cultural shift from an operating station performing work to one of overseeing it. The framework and road map for this kind of D and D model is new to the industry. This presentation shares the SONGS' experience and lessons learned associated with this transition. SONGS and the DGC entered an Agreement that established the contractual requirements and responsibilities of the parties, the Scope of Work, and the mechanisms to ensure effective transition of DA programs. As a part of defining the Scope of Work, the contract established functional areas and divisions of responsibilities divided into the roles of Governance, Oversight, Support, and Performance (GOSP). SONGS, as the site licensee, retained the Oversight Role, with exception of those areas that, as the licensee, would be considered 'non-transferrable'. Examples of those programs were Quality Assurance, Regulatory Affairs and the Employee Concerns Program. While the Company retained responsibility for those programs the DGC developed their own 'parallel' programs that the Company provided Oversight for. In 2017, SONGS completed program transition within one-year following the notice-to-proceed. The overall strategy was driven by three high-level principles: - Allow the DGC the most unfettered execution of the Scope of Work with limited interference and maximum self-governance. With the overriding principle that transitioned programs have a direct link to a basis in regulation or law. - Identify safety and compliance risks, and then bridge the transition of programs from the SONGS to the DGC such that identified risks are minimized and/or mitigated. - Allow the SONGS organization to transition from a Performance role to a primarily Oversight role as the DA. Working collaboratively with the DGC, programs were strategically grouped and sequenced for turnover. Central to the success of transition was fostering a collaborative environment with the DGC, facilitating knowledge transfer, applying schedule rigor, and keeping the team horizontally and vertically aligned to management expectations. SONGS achieved this alignment by embedding the formal process with management expectations for review and acceptance of proposed programs. SONGS' transitioned core programs to a general contractor and transition from a 'perform' organization to an 'oversight' organization. Lessons learned from this experience may benefit other nuclear generating station owners currently evaluating options for site D and D. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Metrics for Operator Situation Awareness, Workload, and Performance in Automated Separation Assurance Systems

A research consortium of scientists and engineers from California State University Long Beach (CSULB), San Jose State University Foundation (SJSUF), California State University Northridge (CSUN), Purdue University, and The Boeing Company was assembled to evaluate the impact of changes in roles and responsibilities and new automated technologies, being introduced in the Next Generation Air Transportation System (NextGen), on operator situation awareness (SA) and workload. To meet these goals, consortium members performed systems analyses of NextGen concepts and airspace scenarios, and concurrently evaluated SA, workload, and performance measures to assess their appropriateness for evaluations of NextGen concepts and tools. The following activities and accomplishments were supported by the NRA: a distributed simulation, metric development, systems analysis, part-task simulations, and large-scale simulations. As a result of this NRA, we have gained a greater understanding of situation awareness and its measurement, and have shared our knowledge with the scientific community. This network provides a mechanism for consortium members, colleagues, and students to pursue research on other topics in air traffic management and aviation, thus enabling them to make greater contributions to the field

Strybel, Thomas Z.↗

Definition of International GPM GV Research Program

The Global Precipitation Measurement (GPM) Mission will consist of a constellation of rain-measuring satellites, the main member of which (the core satellite) will serve as the measurement reference to the other members of the constellation. The core satellite is being developed jointly by the National Aeronautics and Space Administration (NASA) and the newly-named Japan Aerospace Exploration Agency (JAXA -- previously NASDA) along with its government partner, the Communications Research Laboratory (CRL). The GPM mission was proposed as a follow-up mission to the Tropical Rainfall Measuring Mission (TRMM) by both NASA and NASDA based on the unparalleled scientific success of TRMM, and has recently been joined by the European Space Agency (ESA) via its formulation of the European GPM mission (i.e., EGPM). GPM is an ambitious mission designed to produce accurate and frequent global observations of precipitation (both rain and snow) made possible by replacing the TRMM satellite with the new core satellite carrying an advanced radar-radiometer system, and serving as the centerpiece for the constellation of some eight (8) additional satellites being provided through international cooperation. The core satellite is to be flown up to high latitudes (inclined some 65-70 degrees), and will carry a Ku/Ka-band, nadir-scanning, dual-frequency precipitation radar (DPR) that is being developed by JAXA and CRL, along with a large aperture, extended frequency-range, conically-scanning passive microwave radiometer being developed by NASA and its industrial partners. Each constellation satellite will also carry some type of multi-channel passive microwave radiometer (as well as a multi-beam Ka-band radar in the case of EGPM) whose rain estimates will be calibrated and referenced to those made by the core satellite, producing for the first time fully-global, continuous, and bias-free precipitation datasets. GPM data will be delivered in near-realtime, taking a major step toward the operational use of precipitation information for model initialization and data assimilation in a number of application areas such as hazardous weather forecasting, flood warning, fresh water resource assessment, and crop growth prediction. In addition, GPM data will complement the now-existing global temperature record, allowing for improved assessments of climate change, particularly those processes in which the global water cycle both forces and responds to climatic drifts in global temperature conditions. A foremost element of this international constellation mission is a parallel international ground validation (GV) network. This GV network is needed to determine uncertainties in the rain retrievals, critical for application of the retrieval information in weather and hydrometeorological modeling and climate diagnostics, as well as assurances that the satellite retrievals of surface rainfall are consistent with those actually measured at the surface. The key aspects of this network is that it must be worldwide and created through the GPM partnership process. Therefore the network will consist of a confederation of government agencies, academic organizations, private institutions, and individual scientists from a collection of nations who have initiated the process by gathering in Abingdon to develop the fundamentals of the international GPM GV research programme. Therefore in keeping with our responsibilities as the front-runners of the programme, the main objectives of this workshop are: (1) to present and share opinions on interests, perspectives, and concerns about GPM GV research; (2) to examine the conceptual and/or planned GPM GV site templates from NASA, NASDA, ESA, and other partners; (3) to define the main scientific objectives of the international GPM GV research programme; (4) to formulate a preliminary set of international GPM GV science and measurement requirements; and (5) to convene a Steering Committee to aid the organization of the GPM GV program, to document its science implementation plans, and to aid planning for follow-up GPM GV meetings.

Smith, Eric A.↗

OFDM inspired waveforms for 5G

As the standardization activities are being formed to lay the foundation of 5G wireless networks, there is a common consensus on the need to replace the celebrated OFDM by a more effective air interface that better serves the challenging needs of 5G. The main reason that has made OFDM popular in the past is related to the fact that information symbols are carried over a number of pure tones/sinusoidal signals. Moreover, with the use of cyclic prefix (CP), it is assured that the information carrying tones are only affected by the channel (complex) gains at the respective frequencies. Accordingly, the channel effect can be trivially compensated for (equalized) in the frequency domain through a single complex tap per subcarrier. However, as network air interfaces become more complex and the demand for multiuser services grows, OFDM is found to be incapable of handling the inevitable loss of synchronization among users. In the recent past, two novel waveforms (namely, GFDM and C-FBMC) have been discussed in the literature to overcome this and other drawbacks of OFDM. Interestingly, and at the same time not surprising, these methods share a common fundamental property with OFDM: each data packet is made up of a number of tones that are modulated by information symbols. In this tutorial article, we build a common framework based on the said OFDM principle and derive GFDM and C-FBMC waveforms from this point of view. This derivation provides a new prospective that facilitates straightforward understanding of channel equalization and the application of these new waveforms to MIMO channels. As a result, it also facilitates derivation of new structures for more efficient synthesis/analysis of these waveforms than those that have been reported in the literature.

99 GENERAL AND MISCELLANEOUS↗

Automating linear accelerator quality assurance

Purpose: The purpose of this study was 2-fold. One purpose was to develop an automated, streamlined quality assurance (QA) program for use by multiple centers. The second purpose was to evaluate machine performance over time for multiple centers using linear accelerator (Linac) log files and electronic portal images. The authors sought to evaluate variations in Linac performance to establish as a reference for other centers. Methods: The authors developed analytical software tools for a QA program using both log files and electronic portal imaging device (EPID) measurements. The first tool is a general analysis tool which can read and visually represent data in the log file. This tool, which can be used to automatically analyze patient treatment or QA log files, examines the files for Linac deviations which exceed thresholds. The second set of tools consists of a test suite of QA fields, a standard phantom, and software to collect information from the log files on deviations from the expected values. The test suite was designed to focus on the mechanical tests of the Linac to include jaw, MLC, and collimator positions during static, IMRT, and volumetric modulated arc therapy delivery. A consortium of eight institutions delivered the test suite at monthly or weekly intervals on each Linac using a standard phantom. The behavior of various components was analyzed for eight TrueBeam Linacs. Results: For the EPID and trajectory log file analysis, all observed deviations which exceeded established thresholds for Linac behavior resulted in a beam hold off. In the absence of an interlock-triggering event, the maximum observed log file deviations between the expected and actual component positions (such as MLC leaves) varied from less than 1% to 26% of published tolerance thresholds. The maximum and standard deviations of the variations due to gantry sag, collimator angle, jaw position, and MLC positions are presented. Gantry sag among Linacs was 0.336 ± 0.072 mm. The standard deviation in MLC position, as determined by EPID measurements, across the consortium was 0.33 mm for IMRT fields. With respect to the log files, the deviations between expected and actual positions for parameters were small (<0.12 mm) for all Linacs. Considering both log files and EPID measurements, all parameters were well within published tolerance values. Variations in collimator angle, MLC position, and gantry sag were also evaluated for all Linacs. Conclusions: The performance of the TrueBeam Linac model was shown to be consistent based on automated analysis of trajectory log files and EPID images acquired during delivery of a standardized test suite. The results can be compared directly to tolerance thresholds. In addition, sharing of results from standard tests across institutions can facilitate the identification of QA process and Linac changes. These reference values are presented along with the standard deviation for common tests so that the test suite can be used by other centers to evaluate their Linac performance against those in this consortium.

60 APPLIED LIFE SCIENCES↗

Web Based Tool for Mission Operations Scenarios

A conventional practice for spaceflight projects is to document scenarios in a monolithic Operations Concept document. Such documents can be hundreds of pages long and may require laborious updates. Software development practice utilizes scenarios in the form of smaller, individual use cases, which are often structured and managed using UML. We have developed a process and a web-based scenario tool that utilizes a similar philosophy of smaller, more compact scenarios (but avoids the formality of UML). The need for a scenario process and tool became apparent during the authors' work on a large astrophysics mission. It was noted that every phase of the Mission (e.g., formulation, design, verification and validation, and operations) looked back to scenarios to assess completeness of requirements and design. It was also noted that terminology needed to be clarified and structured to assure communication across all levels of the project. Attempts to manage, communicate, and evolve scenarios at all levels of a project using conventional tools (e.g., Excel) and methods (Scenario Working Group meetings) were not effective given limitations on budget and staffing. The objective of this paper is to document the scenario process and tool created to offer projects a low-cost capability to create, communicate, manage, and evolve scenarios throughout project development. The process and tool have the further benefit of allowing the association of requirements with particular scenarios, establishing and viewing relationships between higher- and lower-level scenarios, and the ability to place all scenarios in a shared context. The resulting structured set of scenarios is widely visible (using a web browser), easily updated, and can be searched according to various criteria including the level (e.g., Project, System, and Team) and Mission Phase. Scenarios are maintained in a web-accessible environment that provides a structured set of scenario fields and allows for maximum visibility across the project. One key aspect is that the tool was built for a scenario process that accounts for stakeholder input, review, comment, and concurrence. By creating well-designed opportunities for stakeholder input and concurrence and by making the scenario content easily accessible to all project personnel, we maximize the opportunities for stakeholders to both understand and agree on the concepts for how their mission is to be carried out.

Boyles, Carole A.↗

An investigation of signal performance enhancements achieved through innovative pixel design across several generations of indirect detection, active matrix, flat-panel arrays

Active matrix flat-panel imager (AMFPI) technology is being employed for an increasing variety of imaging applications. An important element in the adoption of this technology has been significant ongoing improvements in optical signal collection achieved through innovations in indirect detection array pixel design. Such improvements have a particularly beneficial effect on performance in applications involving low exposures and/or high spatial frequencies, where detective quantum efficiency is strongly reduced due to the relatively high level of additive electronic noise compared to signal levels of AMFPI devices. In this article, an examination of various signal properties, as determined through measurements and calculations related to novel array designs, is reported in the context of the evolution of AMFPI pixel design. For these studies, dark, optical, and radiation signal measurements were performed on prototype imagers incorporating a variety of increasingly sophisticated array designs, with pixel pitches ranging from 75 to 127 {mu}m. For each design, detailed measurements of fundamental pixel-level properties conducted under radiographic and fluoroscopic operating conditions are reported and the results are compared. A series of 127 {mu}m pitch arrays employing discrete photodiodes culminated in a novel design providing an optical fill factor of {approx}80% (thereby assuring improved x-ray sensitivity), and demonstrating low dark current, very low charge trapping and charge release, and a large range of linear signal response. In two of the designs having 75 and 90 {mu}m pitches, a novel continuous photodiode structure was found to provide fill factors that approach the theoretical maximum of 100%. Both sets of novel designs achieved large fill factors by employing architectures in which some, or all of the photodiode structure was elevated above the plane of the pixel addressing transistor. Generally, enhancement of the fill factor in either discrete or continuous photodiode arrays was observed to result in no degradation in MTF due to charge sharing between pixels. While the continuous designs exhibited relatively high levels of charge trapping and release, as well as shorter ranges of linearity, it is possible that these behaviors can be addressed through further refinements to pixel design. Both the continuous and the most recent discrete photodiode designs accommodate more sophisticated pixel circuitry than is present on conventional AMFPIs - such as a pixel clamp circuit, which is demonstrated to limit signal saturation under conditions corresponding to high exposures. It is anticipated that photodiode structures such as the ones reported in this study will enable the development of even more complex pixel circuitry, such as pixel-level amplifiers, that will lead to further significant improvements in imager performance.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A Blockchain Case Study for Urban Air Mobility Operational Intent

To realize the potential of Urban Air Mobility (UAM), an assurance of cybersecurity is critical for public acceptance. UAM is a concept that proposes to develop short-range, point-to-point transportation systems in metropolitan areas using vertical takeoff and landing (VTOL) aircraft to overcome increasing surface congestion. The growth in the development of UAM systems, and the associated data exchange and service interactions will be at risk due to numerous types of cybersecurity attacks. The intent of this work is to leverage a permissioned blockchain to simulate secure data exchange and storage for the UAM operational intent use case. In this case study, two vehicle operators are operating in the same airspace. Their intent is to fly vehicles that land at a shared vertiport, securely.

Urban Air Mobility↗

Managing a Safe and Successful Multi-User Spaceport

Encouraged by the creation of the Office of Commercial Space Transportation within the U.S. Federal Aviation Administration (FAA) in 1984 and the Commercial Space Act of 1998, the National Aeronautics and Space Administration (NASA) now relies on an extensive network of support from commercial companies and organizations. At NASA's Kennedy Space Center (KSC), this collaboration opens competitive opportunities for launch providers, including repurposing underutilized Shuttle Program resources, constructing new facilities, and utilizing center services and laboratories. The resulting multi-user spaceport fosters diverse activity, though it engenders risk from hazards associated with various spaceflight processing activities. The KSC Safety & Mission Assurance (S&MA) Directorate, in coordination with the center's Spaceport Integration and Center Planning & Development organizations, has developed a novel approach to protect NASA's workforce, critical assets, and the public from hazardous, space-related activity associated with KSC's multi-user spaceport. For NASA KSC S&MA, the transformation to a multi-user spaceport required implementing methods to foster safe and successful commercial activity while resolving challenges involving: Retirement of the Space Shuttle program; Co-location of multiple NASA programs; Relationships between the NASA programs; Complex relationships between NASA programs and commercial partner operations in exclusive-use facilities; Complex relationships between NASA programs and commercial partner operations in shared-use facilities. NASA KSC S&MA challenges were met with long-term planning and solutions involving cooperation with the Spaceport Integration and Services Directorate. This directorate is responsible for managing active commercial partnerships with customer advocacy and services management, providing a dedicated and consistent level of support to a wide array of commercial operations. This paper explores these solutions, their relevance to the current commercial space industry, and the challenges that continue to drive improvement with a focus on areas of safety management and risk assessment that have been crucial in KSC's evolution into a multi-user spaceport. These solutions may be useful to government entities and private companies looking to partner with the commercial space industry.

Range↗

The Hyper-X Flight Systems Validation Program

For the Hyper-X/X-43A program, the development of a comprehensive validation test plan played an integral part in the success of the mission. The goal was to demonstrate hypersonic propulsion technologies by flight testing an airframe-integrated scramjet engine. Preparation for flight involved both verification and validation testing. By definition, verification is the process of assuring that the product meets design requirements; whereas validation is the process of assuring that the design meets mission requirements for the intended environment. This report presents an overview of the program with emphasis on the validation efforts. It includes topics such as hardware-in-the-loop, failure modes and effects, aircraft-in-the-loop, plugs-out, power characterization, antenna pattern, integration, combined systems, captive carry, and flight testing. Where applicable, test results are also discussed. The report provides a brief description of the flight systems onboard the X-43A research vehicle and an introduction to the ground support equipment required to execute the validation plan. The intent is to provide validation concepts that are applicable to current, follow-on, and next generation vehicles that share the hybrid spacecraft and aircraft characteristics of the Hyper-X vehicle.

Redifer, Matthew↗

Magnetic Gears: The Key to Robust, Cost-Effective Hydropower Drivetrains

Based on previous demonstrated success at fabricating 5 and 10 kW scale magnetic gearbox (MGB) prototypes, Emrgy and its partners (the project team) proposed to design and construct a 100 kW scale MGB with a 30:1 gear ratio for the low-head hydro applications. The Statement of Project Objectives included tasks covering: 1) Market Applicability; 2) Technical Metrics; 3) Design (initial); 4) Electromagnetic (EM) Load and Structural Analysis; 5) Modal Analysis; 6) Sealing Design and 7) Final Design during Budget Period 1. Budget Period 2 included tasks covering: 1) Materials Procurement and Test Plan Development; 2) Assembly; and 3) Testing. The Market Applicability study (Task 1) led to a clear conclusion and recommendation toward “Low Head” technologies for maximum market share of both New Stream Reach development as well as powering Non-Powered Dams. The findings of this study also identified the opportunity for a larger scale magnetic gearbox-based drive train as a function of increased torque, as opposed to increased speed. The Technical Metrics Study (Task 2) concluded a horizontal orientation was preferred, examined potential loss mechanisms, concluded that a Halbach Array magnetic design was preferred, established a 30:1 gear ratio as optimal, and established a power rating of 100 kW as optimal. The subsequent initial and final detailed design process included electro-magnetic (EM) load and structural analysis (Task 4), a Modal analysis (for vibration) (Task 5), and a sealing design (Task 6) to assure water impermeability. The final design package (Task 7) included 729 individual parts, 117 unique part numbers, and 15 assemblies. In order to facilitate procurement, the full bill of materials was broken down into several sub-components: 1) custom magnetic parts; 2) custom machined parts; 3) custom casted parts; and 4) commercial off the shelf (COTS) parts. The casted parts were fabricated by Oak Ridge National Laboratory (ORNL) via a Cooperative Research and Development Agreement (CRADA) with Emrgy and funded by the Advanced Manufacturing Office (AMO). The procurement effort (Task 8) ultimately covered three time periods based on challenges encountered in meeting the budgeted cost for the prototype. Following the first effort in the early stages of Budget Period 2 in 2017, a no-cost time extension was granted to seek alternative fabrication and procurement options. The project was re-booted in 2020 based on the new ORNL CRADA that would focus on five (5) of the more difficult and expensive parts using their advanced manufacturing expertise. Procurement efforts for the other custom machined parts resulted in quotations that still exceeded the budget by more than $\$$100k. This was, in part, also due to the concurrent COVID-19 pandemic that caused both supply chain disruptions and labor shortages. As the project continued, pricing and availability degraded further. In Q2 FY’22, it was decided to not proceed with the fabrication of the prototype (Task 9) based on budgetary limitations. Outcomes included a full and detailed design of a 100 kW magnetic gearbox and associated indented bill of materials (BOM) and CAD drawings, a full assembly instruction manual with an associated BOM for materials necessary to support assembly, the fabrication of the double Halbach magnetic array for the rotor/stator system, fabrication of five (5) sand-casted/machined parts (via CRADA with ORNL) and an initial draft of a comprehensive testing plan. The most significant non-outcome was the actual fabrication and testing of the prototype gearbox based on budget limitations. Lessons learned included the need for an Application / Design / Cost trade analysis to better elucidate the cost potential of the MGB in the projected volumes anticipated for future demand. This would better establish the efficacy of the original cost target ($\$$0.80/Watt) and/or the need for reconsideration of designs and applications. Likewise, additional consideration of the prototype nature of the gearbox – single use, short lifetime, etc. - either as a separate exercise or in place of the design process completed, to reduce the cost of the demonstration prototype device. Additionally, project continuity was cited as a significant risk based on the loss of the primary design engineering firm after Budget Period 1. A design analysis exercise was conducted at the conclusion of the project to identify potential areas for cost reduction. One concept considered was the removal of the inner ring of magnets (with associated changes in the outer ring magnets) to enable a horizontal collapse of the design. It was estimated this could reduce cost by 10-25% without impacting performance.

13 HYDRO ENERGY↗

Efforts to enhance reproducibility in a human performance research project

Background: Ensuring the validity of results from funded programs is a critical concern for agencies that sponsor biological research. In recent years, the open science movement has sought to promote reproducibility by encouraging sharing not only of finished manuscripts but also of data and code supporting their findings. While these innovations have lent support to third-party efforts to replicate calculations underlying key results in the scientific literature, fields of inquiry where privacy considerations or other sensitivities preclude the broad distribution of raw data or analysis may require a more targeted approach to promote the quality of research output. Methods: We describe efforts oriented toward this goal that were implemented in one human performance research program, Measuring Biological Aptitude, organized by the Defense Advanced Research Project Agency's Biological Technologies Office. Our team implemented a four-pronged independent verification and validation (IV&V) strategy including 1) a centralized data storage and exchange platform, 2) quality assurance and quality control (QA/QC) of data collection, 3) test and evaluation of performer models, and 4) an archival software and data repository. Results: Our IV&V plan was carried out with assistance from both the funding agency and participating teams of researchers. QA/QC of data acquisition aided in process improvement and the flagging of experimental errors. Holdout validation set tests provided an independent gauge of model performance. Conclusions: In circumstances that do not support a fully open approach to scientific criticism, standing up independent teams to cross-check and validate the results generated by primary investigators can be an important tool to promote reproducibility of results.

59 BASIC BIOLOGICAL SCIENCES↗

SAFSTOR and License Renewal: Making Them Coexist

The Indian Point Energy Center is located on the eastern shore of the Hudson River in the town of Buchanan, New York. It lies approximately thirty miles north of New York City, and thus, holds the distinction of being the closest nuclear facility to a major metropolitan area. Units 1 and 2 were constructed and operated by Consolidated Edison and Unit 3 was owned and operated by the New York State Power Authority. All three units are now owned and operated by Entergy Nuclear- Northeast. Indian Point Unit 1 was powered by a pressurized water reactor which operated with an authorized maximum steady state power level of 615 thermal megawatts until October 31, 1974. On June 19, 1980, the Commission issued an order revoking authority to operate the facility. Although 244 spent fuel assemblies were successfully shipped offsite to a spent fuel reprocessing facility, 160 assemblies remain in the Unit 1 spent fuel pool awaiting relocation to dry cask storage. Units 2 and 3 are also pressurized water reactors which each produce slightly in excess of 1,000 MWe. Since 1974, Unit 1 has been maintained in a Safe Store Mode (SAFSTOR). For the purposes of this document, the term 'SAFSTOR' is intended to mean 'Custodial SAFSTOR' as described in section 2.4.3 of NUREG 0586 (Final Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities (GEIS) as follows: 'Custodial SAFSTOR requires a minimum cleanup and decontamination effort initially, followed by a period of continuing care with the active protection systems (principally the ventilation system) kept in service throughout the storage period. Full-time onsite surveillance by operating and security forces is required to carry out radiation monitoring, to maintain the equipment, and to prevent accidental or deliberate intrusion into the facility and the subsequent exposure to radiation or the disposal of radioactivity beyond the confines of the facility'. The decision to enter SAFSTOR was based upon the immediate proximity of Unit 1 to the operating units and the fact that a number of Unit 1 systems are shared with Unit 2. Over the past few decades, additional Unit 1 space (primarily within the turbine building) has been cleaned out and is being used to support the operating Units. The original plan to maintain Unit 1 in a SAFSTOR condition until it could be safely dismantled along with Unit 2 at the end of the Unit 2 operating license in 2012, requires some level of re-thinking now that Units 2 and 3 are applying for renewal of their licenses with the desire to continue operation until the 2033 time frame. The remainder of this paper summarizes the inspections and assessments undertaken by Entergy to investigate and document the condition of Indian Point Unit 1 and the resulting steps taken to assure that it would not pose a threat to the license extension efforts being under taken by Units 2 and 3. In conclusion: the Entergy Indian Point management team has systematically undertaken an effort to ensure the Unit 1 SAFSTOR condition and has implemented programs and procedural controls which will assure that it will continue to be safely maintained and will not impact the continued safe operation of Units 2 and 3 during their license renewal period.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Building Stronger State Partnerships With the US Dept. Of Energy (Energy Assurance)

From 2007 until 2011, the National Association of Regulatory Utility Commissioners (NARUC) engaged in a partnership with the National Energy Technology Lab (NETL) to improve State-Federal coordination on electricity policy and energy assurance issues. This project allowed State Public Utility Commissioners and their staffs to engage on the most cutting-edge level in the arenas of energy assurance and electricity policy. Four tasks were outlined in the Statement of Performance Objectives: Task 1 - Training for Commissions on Critical Infrastructure Topics; Task 2 - Analyze and Implement Recommendations on Energy Assurance Issues; Task 3 - Ongoing liaison activities & outreach to build stronger networks between federal agencies and state regulators; and Task 4 - Additional Activities. Although four tasks were prescribed, in practice these tasks were carried out under two major activity areas: the critical infrastructure and energy assurance partnership with the US Department of Energy's Infrastructure Security and Emergency Response office, and the National Council on Electricity Policy, a collaborative which since 1994 has brought together State and Federal policymakers to address the most pressing issues facing the grid from restructuring to smart grid implementation. On Critical Infrastructure protection, this cooperative agreement helped State officials yield several important advances. The lead role on NARUC's side was played by our Committee on Critical Infrastructure Protection. Key lessons learned in this arena include the following: (1) Tabletops and exercises work - They improve the capacity of policymakers and their industry counterparts to face the most challenging energy emergencies, and thereby equip these actors with the capacity to face everything up to that point as well. (2) Information sharing is critical - Connecting people who need information with people who have information is a key success factor. However, exposure of critical infrastructure information to bad actors also creates new vulnerabilities. (3) Tensions exist between the transparency-driven basis of regulatory activity and the information-protection requirements of asset protection. (4) Coordination between states is a key success factor - Because comparatively little federal authority exists over electricity and other energy infrastructure, the interstate nature of these energy grids defy centralized command and control governance. Patchwork responses are a risk when addressed at a state-by-state level. Coordination is the key to ensuring consistent response to shared threats. In Electricity Policy, the National Council on Electricity Policy continued to make important strides forward. Coordinated electricity policy among States remains the best surrogate for an absent national electricity policy. In every area from energy efficiency to clean coal, State policies are driving the country's electricity policy, and regional responses to climate change, infrastructure planning, market operation, and new technology deployment depend on a forum for bringing the States together.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Distributed Trajectory-Oriented Approach to Managing Traffic Complexity

In order to handle the expected increase in air traffic volume, the next generation air transportation system is moving towards a distributed control architecture, in which ground-based service providers such as controllers and traffic managers and air-based users such as pilots share responsibility for aircraft trajectory generation and management. While its architecture becomes more distributed, the goal of the Air Traffic Management (ATM) system remains to achieve objectives such as maintaining safety and efficiency. It is, therefore, critical to design appropriate control elements to ensure that aircraft and groundbased actions result in achieving these objectives without unduly restricting user-preferred trajectories. This paper presents a trajectory-oriented approach containing two such elements. One is a trajectory flexibility preservation function, by which aircraft plan their trajectories to preserve flexibility to accommodate unforeseen events. And the other is a trajectory constraint minimization function by which ground-based agents, in collaboration with air-based agents, impose just-enough restrictions on trajectories to achieve ATM objectives, such as separation assurance and flow management. The underlying hypothesis is that preserving trajectory flexibility of each individual aircraft naturally achieves the aggregate objective of avoiding excessive traffic complexity, and that trajectory flexibility is increased by minimizing constraints without jeopardizing the intended ATM objectives. The paper presents conceptually how the two functions operate in a distributed control architecture that includes self separation. The paper illustrates the concept through hypothetical scenarios involving conflict resolution and flow management. It presents a functional analysis of the interaction and information flow between the functions. It also presents an analytical framework for defining metrics and developing methods to preserve trajectory flexibility and minimize its constraints. In this framework flexibility is defined in terms of robustness and adaptability to disturbances and the impact of constraints is illustrated through analysis of a trajectory solution space with limited degrees of freedom and in simple constraint situations involving meeting multiple times of arrival and resolving a conflict.

Idris, Husni↗