Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Scheduling and planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 114: Area 25 EMAD Facility Nevada National Security Site, Nevada

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 114, Area 25 EMAD Facility, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 114 comprises the following corrective action sites (CASs) located in Area 25 of the Nevada National Security Site: • 25-41-03, EMAD Facility (Building 3900) • 25-99-23, Manned Control Car (MCC) and Engine Installation Vehicle (EIV) • 25-33-05, Building 3901, Engine Transport System Maintenance Building (Train Shed) This plan provides the methodology for field activities needed to gather the necessary information for closing CAU 114. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 114 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective actions for CAU 114. It is anticipated that the results of the field investigation and implementation of corrective actions will support a defensible recommendation that no further corrective action is necessary. The purpose of the corrective action investigation will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. If specific conditions or findings fall outside the bounds of the conceptual site model, such as an unanticipated release, the Nevada Division of Environmental Protection (NDEP) will be consulted to determine the path forward before proceeding. Upon completion of SAFER activities, a closure report (CR) will be prepared and submitted to NDEP for review and approval. The schedule for completion of the CR will be established in consultation with NDEP.

54 ENVIRONMENTAL SCIENCES↗

In silico trials predict that combination strategies for enhancing vesicular stomatitis oncolytic virus are determined by tumor aggressivity

Background Immunotherapies, driven by immune-mediated antitumorigenicity, offer the potential for significant improvements to the treatment of multiple cancer types. Identifying therapeutic strategies that bolster antitumor immunity while limiting immune suppression is critical to selecting treatment combinations and schedules that offer durable therapeutic benefits. Combination oncolytic virus (OV) therapy, wherein complementary OVs are administered in succession, offer such promise, yet their translation from preclinical studies to clinical implementation is a major challenge. Overcoming this obstacle requires answering fundamental questions about how to effectively design and tailor schedules to provide the most benefit to patients. Methods We developed a computational biology model of combined oncolytic vaccinia (an enhancer virus) and vesicular stomatitis virus (VSV) calibrated to and validated against multiple data sources. We then optimized protocols in a cohort of heterogeneous virtual individuals by leveraging this model and our previously established in silico clinical trial platform. Results Enhancer multiplicity was shown to have little to no impact on the average response to therapy. However, the duration of the VSV injection lag was found to be determinant for survival outcomes. Importantly, through treatment individualization, we found that optimal combination schedules are closely linked to tumor aggressivity. We predicted that patients with aggressively growing tumors required a single enhancer followed by a VSV injection 1 day later, whereas a small subset of patients with the slowest growing tumors needed multiple enhancers followed by a longer VSV delay of 15 days, suggesting that intrinsic tumor growth rates could inform the segregation of patients into clinical trials and ultimately determine patient survival. These results were validated in entirely new cohorts of virtual individuals with aggressive or non-aggressive subtypes. Conclusions Based on our results, improved therapeutic schedules for combinations with enhancer OVs can be studied and implemented. Our results further underline the impact of interdisciplinary approaches to preclinical planning and the importance of computational approaches to drug discovery and development.

60 APPLIED LIFE SCIENCES↗

The ICF National Diagnostic Plan (NDP) September 2020

This documents the National Diagnostic Plan as of September 2020. The major changes in this version compared to the NDP document issued in 2019 are the new schedules and the text for the national transformative diagnostics - section III, and a new transformational diagnostic is being added hCMOS. The many local diagnostics for our three Inertial Confinement Fusion (ICF) facilities; NIF, Z and OMEGA are updated and captured in section V.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The National Diagnostic Plan(NDP)for HED Science: September 2021

This report documents the National Diagnostic Plan as of September 2021. The major changes in this version compared to the NDP document issued in 2020 are the new schedules and the text for the national transformative diagnostics–section III. The many local diagnostics for our three Inertial Confinement Fusion (ICF) facilities, NIF, Z, and OMEGA, are updated and captured in section V.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The National Diagnostic Plan (NDP) for HED Science September 2022

This documents the National Diagnostic Plan as of September 2022. The major changes in this version compared to the NDP document issued in 2021 are the new schedules and the text for the national transformative diagnostics - section III. The many local diagnostics for our three Inertial Confinement Fusion (ICF) facilities; NIF, Z and OMEGA are updated and captured in section V.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

LLNL ES&H Analytical Services and Instrumentation Analytical Laboratory (ALAB) (CY2022 Management Review Report)

"An annual review shall be conducted of the analytical activities to ensure continuing suitability, adequacy, and effectiveness." (ALAB-01 Rev 6 ALQAP section 6.11.2) "The laboratory management shall review its management system at planned intervals, in order to ensure its continuing suitability, adequacy and effectiveness..."(ISO/IEC 17025:2017 Section 8.9.1) "In accordance with a predetermined schedule and procedure, the laboratory's top management shall periodically conduct a review of the laboratory's management system and testing and/or calibration activities to ensure their continuing suitability and effectiveness, and to introduce necessary changes or improvements. "(TNI Standard EL-V1M2-2016-Rev2.1:Quality Systems General Requirements)

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

The National Diagnostic Plan (NDP) for HED Science September 2023

This documents the National Diagnostic Plan as of September 2023. The major changes in this version compared to the NDP document issued in 2021 are the new schedules and the text for the national transformative diagnostics - section III. The many local diagnostics for our three Inertial Confinement Fusion (ICF) facilities; NIF, Z and OMEGA are updated and captured in section V.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Secure Distributed Energy Resource Communications (sDERC)

The slides will be presented at a DOE CESER Peer Review for the Risk Management Tools and Technology (RMT) that provide an overview of the sDERC project. The slides discuss the project plan for this new project and how the results will be demonstrated at the conclusion of this project. The peer review is scheduled for August 27-29.

Chavez, Adrian R.↗

The National Diagnostic Plan (NDP) for HED Science September 2025

This documents the National Diagnostic Plan as of September 2025. The major changes in this version compared to the NDP document issued in 2024 are the new schedules and the text for the national transformative diagnostics - section III. The many local diagnostics for our three Inertial Confinement Fusion (ICF) facilities; NIF, Z and OMEGA are also updated and captured in section V.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Autonomous Energy Management Software System for Small Commercial Buildings in Support of Decarbonization (Abstract)

The primary goal for the project is to develop and validate an autonomous energy management software (AEMS) system that will continuously optimize small commercial building operations by minimizing energy consumption and cost, providing a solution for maximizing decarbonization benefits from electrification of buildings. The work will leverage vast experience of Pacific Northwest National Laboratory (PNNL) research and development staff who have over two decades of experience in developing and successfully transferring software technologies to the private sector. This solution will be jointly developed with Intellimation LLC who plans to use it to scale their building energy efficiency offering. The project plan will include collaboratively working with Intellimation to package a set of solutions into the AEMS system, validate and demonstrate their capability, and value proposition through field demonstrations. If the deployment of the AEMS system optimizes RTUs’ set points, schedules, setbacks and optimal start and results in energy consumption reduction of 20%, the technical potential savings is approximately 675 trillion Btus of site energy savings and 2,000 trillion Btus of source energy. It will also result in carbon reductions of approximately 2.4 MMTCO2 and contribute to the climate change mitigation plans of many cities and states across the United States. Additional cost savings and emissions reduction are possible from management of peak electricity demand. The primary outcome will be an AEMS system that can be deployed at scale on small commercial buildings to improve operating efficiency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optimal Managed Fast-Charging Model for Electric Vehicle Fleets with High Utilization and Multiple Charge-Acceptance Curves

A predictive control/scheduling optimization model is proposed for managed charging of an electric vehicle (EV) fleet - under time-of-use energy and demand prices, high vehicle utilization frequency (short dwell times), multiple charge- acceptance curves (configurable charging rates), and flexible vehicle demand. This context is particularly relevant for flight schools (small electric aircraft) or other commercial facilities where an EV fleet performs multiple operating and fast-charging sessions on the same day. The proposed model performs both the operational and charging scheduling of the vehicles, which is not typically done for residential managed charging and significantly increases problem complexity. The problem is formulated as a MILP model and a case study of a small fast-charging station is presented. Results demonstrate a significant reduction in operating cost, mainly from peak shaving during high demand price periods, achieved by coordinating the operation of different vehicles, chargers and charging rates.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Economic Risk-Informed Maintenance Planning and Asset Management (Final Report)

The proposed work will provide a holistic framework for cost-minimizing risk-informed maintenance planning, including inspection, in light water reactors (LWRs). Specifically, we develop a two-tier framework that (a) coarsely minimizes the total maintenance cost during the remaining normal operating cycle of the plant prior to the next scheduled outage (long-term), subject to safety requirements, and (b) uses the outputs of the first model to develop a secondary optimization model to finely schedule maintenance activities to maximize the financial impact of these activities in the next week (short-term).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Communication system and method for applying security for a time sensitive network

A method includes identifying power connections between plural components of a time sensitive network (TSN) that are interconnected via a predetermined connection plan. The method also includes determining a topology of the components of the TSN based on the power connections. Also, the method includes scheduling flows for the TSN based on the topology determined based on the power connections.

Bush, Stephen Francis↗

Microgrid Assisted Design for Remote Areas

In this work, we present a three-stage multiobjective mixed-integer linear programming (MILP) for the optimal expansion planning and operation of isolated multienergy microgrids in remote areas. By selecting the optimal distributed generators (DGs) and energy storage systems (ESSs) mix selection, siting, sizing, and scheduling in the remote microgrid, the proposed model is targeted to minimize the annualized total cost of microgrids while enhancing the performance of the system, i.e., minimizing the voltage deviations and line power loss. To represent the electricity and heat flow between generation resources and various electrical, heating, and cooling loads in the isolated microgrid, linearized power flow, and heat flow constraints are employed in the proposed optimization model. The available capacity of DGs and ESSs are modeled as discrete constants instead of continuous variables for practical purpose. Numerical simulation results on a remote microgrid consisting of DGs, ESSs, and various loads validate the proposed method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High-Resolution Synthetic Solar Irradiance Sequence Generation: An LSTM-Based Generative Adversarial Network

The rapid growth of renewable energy resources penetration is bringing more challenges to power system planning and operation. Relevant renewable energy integration studies, such as the capability and dynamic performance of inverter-based resources' primary frequency response and fast frequency response, require high-resolution renewable generation output data that are representative of renewable energy resources. This paper focuses on creating synthetic but realistic solar irradiance data and proposes a long short-term memory-based generative adversarial network to generate high-resolution (second-level) solar irradiance sequences from low-resolution (minute-level) measurements. Combined with a classifier to recognize the solar irradiance patterns, the proposed model is trained using multi-loss functions to accurately capture the temporal correlations among both high-resolution and low-resolution sequences. Verification of the proposed approach is performed on the data set of the Oahu Solar Measurement Grid collected through the National Renewable Energy Laboratory. The results of the case studies demonstrate the proposed approach's capability to capture the statistical characteristics of different solar irradiance patterns and to generate high-quality synthetic solar irradiance sequences in high resolution.

dynamic scheduling↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2023

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 201 measurement and verification (M&V) reports covering 191 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2023, between October 1, 2022 and September 30, 2023, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Radiological Recovery Logistics Tool - 20161

Argonne is building and testing a tool, the Radiological Recovery Logistics Tool (RRLT), that can be used during the response and recovery from a radiological or nuclear incident to effectively allocate appropriate commercial and public works equipment to mitigate, remove, and contain radiological contamination. The requirements for this tool - as well as development of the resulting software - is overseen by a steering committee of stakeholders from DHS's National Urban Security Technology Laboratory (NUSTL), the Federal Emergency Management Agency (FEMA), and the Environmental Protection Agency (EPA). One essential requirement is for RRLT to support the efficient and appropriate allocation of resources for a radiological response. Subsequent discussions between ANL and stakeholders have solidified the nature of this support to include identification of the types of resources to be allocated. The study reported in this paper has both factored fundamental concepts and connections out of this identification process and created a Knowledge Base detailing support goals, response scenarios, and efficacy information on dozens of equipment types. In short, RRLT will dynamically apply these findings to situational conditions surrounding contamination incidents. RRLT's Domain, the model of elements, ideas and relationships with which the tool will work, draws concepts from technical reports and stakeholder vocabularies to connect response goals and scenarios to types of equipment that offer utility towards those goals in those scenarios. RRLT's Knowledge Base will contain details on dozens of equipment types and facilitate the operator's discovery and consumption of these details most pertinent to a dynamically selected subset of goals. The core of its Domain Model is based on a report authored by this team. This report [1] contains a comprehensive list of proposed equipment to accomplish various missions or scenarios that might arise after a large-scale radiological contamination incident in an urban environment or critical infrastructure. The report divides potential response and recovery efforts into five support goals: Survey and monitoring of the contaminated area; Mitigation of received dose to first responders: Decontamination (gross and final) of buildings, vehicles, roadways, parks, and other surfaces: Waste management of solid waste generated during recovery operations: and Containment of wastewater and other waste generated during the response and recovery phases. RRLT's development is driven by use cases. A use case is an intention with which a user approaches the software. Use cases are grouped into delivery increments to schedule development, testing, and presentation to stakeholders. This model partitions the system into seven increments: User Arrival and Authentication, Search and Navigation, Equipment Recommendation, Plan Management, Content Management, and Expanded Access. Once a user 15 authenticated, RRLT will present the user with a dashboard that allows them to explore or search RRLT's content. The dashboard will also include a 'Plan' panel for collecting decisions and relevant observations about an incident at hand to facilitate development of an equipment list. RRLT will offer three general modes of access to items in the knowledge base: - Keyword search for direct discovery of items, - Navigation along predetermined paths from recovery goal towards equipment types, and - Interactive guidance towards equipment types by an autonomous software agent: the Equipment Recommendation Wizard. This presentation will detail progress in the development of the RRLT and also discuss opportunities for those interested in providing feedback on its content and functionality. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Management Project Success - Regulatory Assurance Systems - 20118

Waste management (WM) and remediation projects are essential within a restorative environmental culture. Despite years of experience, challenges and obstacles associated with efficient and effective WM project execution remain. Although some obstacles are project specific, a common challenge is navigating the regulatory landscape from planning through execution, particularly with first of a kind (FOAK) and first in a while (FIAW) projects. The absence of a comprehensive regulatory assurance strategy places significant hurdles in the path of project success. To clear a path for the successful execution of increasingly complex WM projects, this paper focuses on development of a comprehensive regulatory assurance strategy and implementation plan that effectively engages stakeholders, agencies, and performers to produce project plans that fully and cost effectively integrate applicable regulatory requirements. The most reliable way to align regulatory processes and decisions needed for mission success is through a regulatory assurance system. This system establishes a healthy interface with regulatory decision makers, to work in a collaborative manner, to create a common vision for regulatory decisions on an agreed upon schedule. A regulatory assurance system consists of several elements. Although the mission may vary from cleanup to site closure to nuclear component production, the elements of a regulatory assurance system remain essentially constant and must include: 1) identifying a common vision or end state, 2) developing a long-term, integrated strategy and schedule, 3) establishing a regulatory partnering team consisting of key decision-makers, 4) regular and frequent communication with decision-makers, 5) ensuring consistent surveillance for early identification of issues and changes that may impact the project, 6) quick resolution of emerging issues to prevent schedule impact, 7) identifying core compliance functions, 8) periodically assessing progress of the project as it relates to regulatory assurance and, 9) providing constructive feedback to improve the process. A regulatory assurance system provides a living, multi-faceted approach to planning, visioning, communicating and tracking to avoid surprises and ensure smooth and timely progress to the project. The overall success measures will be whether the system produces common sense regulatory decisions supporting the vision on time without appeal. Effective regulatory frameworks rarely happen on their own. Balanced, common-sense regulatory decisions stem from teams that are trained to work together to achieve shared goals. In this paper, particular attention is placed on the importance of starting with a shared vision for a regulatory assurance and execution strategy that leverages experience to establish optimal approaches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗