Rigorous Two-Step Activation for Fusion Systems with PyNE - Paper 127

In fusion systems, high energy neutrons activate system components. After shutdown, the biological dose rate from photons emitted from these components must be estimated as a function of position and time for maintenance planning. High resolution results can be obtained using the mesh-based Rigorous Two-Step (R2S) method. A neutron transport simulation provides mesh-based neutron fluxes. Using these fluxes and an appropriate irradiation scenario, a nuclear inventory analysis code is used to determine the photon source density within each mesh volume element at any decay time after shutdown. The photon source density mesh is used as a source for photon transport. Photon fluxes are tallied at positions of interest and flux-to-dose rate conversion factors are used to estimate the biological dose rate. Previous work by the authors involved the creation of R2S-ACT, an open source R2S workflow, using the Direct Accelerated Geometry Monte Carlo (DAGMC) version of MCNP5 (DAG-MCNP5) for both transport steps and the ALARA nuclear inventory analysis code. Various use cases may require different combinations of transport and activation codes, and nearly all of the capabilities of R2S-ACT have broader utility. For these reasons, the individual components of R2S-ACT were reimplemented within PyNE. PyNE is a collaborative, trans-institutional, open source project consisting of Python, Cython, and C++ code pertinent to nuclear simulations and analysis. This work involved additions to the PyNE mcnp, mesh, material, alara, dagmc, and sampling modules. A lightweight r2s module was then added to connect the code from these modules. The r2s and sampling modules, together with DAG-MCNP5 and ALARA form a complete R2S workflow for obtaining shutdown dose rate results. Mesh operations, geometry discretization, physics code input/output parsing, and mesh-based source sampling capabilities have been added to PyNE generically, eliminating the need to duplicate this effort across multiple applications. The PyNE r2s module uses these capabilities to couple MCNP and ALARA to form an R2S workflow, which has been validated with the FNG shutdown dose rate benchmark. Future work will involve benchmarking the workflow using tetrahedral mesh and also non-analog sampling options. added so that they can be used interchangeably. This will allow for comparisons between results obtained by different physics codes with minimal human effort. Work will also be done to create and implement an importance sampling method for biasing neutron transport towards regions of phase space of high importance to photon dose rate tallies. This will improve the efficiency of obtaining shutdown dose rate results in large, highly-attenuating geometries. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Development and experimental qualification of novel disruption prevention techniques on DIII-D

Novel disruption prevention solutions spanning a range of control regimes are being developed and tested on DIII-D to enable ITER success. First, a new real-time control algorithm has been developed and tested for regulating nearness to stability limits and maintaining safety-margins. Its first application has been for reliable prevention of vertical displacement events (VDEs) by adjusting plasma elongation (κ) and the inner-gap between the plasma and inner-wall in response to real- time open-loop VDE growth rate (γ) estimators. VDEs were robustly prevented up to average open-loop growth rates of 800 rad/s with initial tunings, with only applying shape modification when near safety limits. Second, the disruption risk during fast, emergency shutdown after large tearing and locked modes can be significantly improved by transitioning to a limited topology during shutdown. More than 50% of emergency limited shutdowns after locked modes reach a final normalized current I_N < 0.3 before terminating, scaling to the 3 MA ITER requirement. Furthermore, this is in contrast to diverted shutdowns, the majority of which disrupt at I_N > 0.8. Despite improvements, these results highlight the critical importance of early prevention. Third, a novel emergency shut down method has been developed which excites instabilities to form a warm, helical core post-thermal quench. The current quench extends to ~100ms and avoids VDEs and runaway electron generation. Novel real-time machine learning disruption prediction has been integrated with the DIII-D proximity controller, and a real- time compatible multi-mode MHD spectroscopy technique has been developed. Results presented here were enabled by a focused effort, the Disruption Free Protocol, in DIII-D’s 2019-20 campaign to complement disruption prevention experiments with a large piggy-back program. In addition to testing novel techniques, it is estimated to have helped avoid 32 potential disruptions in piggyback operations with rapid, early shutdowns after large rotating n=1 or locked modes.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Development and experimental qualification of novel disruption prevention techniques on DIII-D

Novel disruption prevention solutions spanning a range of control regimes are being developed and tested on DIII-D to enable ITER success. First, a new real-time control algorithm has been developed and tested for regulating nearness to stability limits and maintaining safety-margins. Its first application has been for reliable prevention of vertical displacement events (VDEs) by adjusting plasma elongation (κ) and the inner-gap between the plasma and inner-wall in response to real- time open-loop VDE growth rate (γ) estimators. VDEs were robustly prevented up to average open-loop growth rates of 800 rad/s with initial tunings, with only applying shape modification when near safety limits. Second, the disruption risk during fast, emergency shutdown after large tearing and locked modes can be significantly improved by transitioning to a limited topology during shutdown. More than 50% of emergency limited shutdowns after locked modes reach a final normalized current I N < 0.3 before terminating, scaling to the 3 MA ITER requirement. This is in contrast to diverted shutdowns, the majority of which disrupt at I N > 0.8. Despite improvements, these results highlight the critical importance of early prevention. Third, a novel emergency shut down method has been developed which excites instabilities to form a warm, helical core post-thermal quench. The current quench extends to ~100ms and avoids VDEs and runaway electron generation. Novel real-time machine learning disruption prediction has been integrated with the DIII-D proximity controller, and a real- time compatible multi-mode MHD spectroscopy technique has been developed. Results presented here were enabled by a focused effort, the Disruption Free Protocol, in DIII-D’s 2019-20 campaign to complement disruption prevention experiments with a large piggy-back program. In addition to testing novel techniques, it is estimated to have helped avoid 32 potential disruptions in piggyback operations with rapid, early shutdowns after large rotating n=1 or locked modes.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Analysis of Second Target Station Target Removal Dose Rates

The Second Target Station (STS) project at Oak Ridge National Laboratory’s spallation neutron source is a crucial initiative for maintaining U.S. leadership in neutron sciences. The STS aims to create the world’s brightest pulsed cold neutron source, enabling cutting-edge research across various scientific disciplines. To ensure safe and efficient maintenance operations, understanding the effects of shutdown dose rates from activated components within the STS target systems is essential. This study establishes a computational framework for calculating decay gamma sources and subsequent shutdown dose rates utilizing advanced methods to account for all activation channels, including high-energy interactions down to thermal neutron capture. This study describes a novel integration of multiple tools and provides an effective means of analyzing activation and shutdown dose rates at spallation neutron facilities. A custom-developed script automates the decay gamma source generation process, ensuring proper sampling during the variance reduction phase, which is critical for accurate predictions of shutdown dose rates.

Transmutation↗

Supercritical carbon dioxide cycle control analysis.

This report documents work carried out during FY 2008 on further investigation of control strategies for supercritical carbon dioxide (S-CO{sub 2}) Brayton cycle energy converters. The main focus of the present work has been on investigation of the S-CO{sub 2} cycle control and behavior under conditions not covered by previous work. An important scenario which has not been previously calculated involves cycle operation for a Sodium-Cooled Fast Reactor (SFR) following a reactor scram event and the transition to the primary coolant natural circulation and decay heat removal. The Argonne National Laboratory (ANL) Plant Dynamics Code has been applied to investigate the dynamic behavior of the 96 MWe (250 MWt) Advanced Burner Test Reactor (ABTR) S-CO{sub 2} Brayton cycle following scram. The timescale for the primary sodium flowrate to coast down and the transition to natural circulation to occur was calculated with the SAS4A/SASSYS-1 computer code and found to be about 400 seconds. It is assumed that after this time, decay heat is removed by the normal ABTR shutdown heat removal system incorporating a dedicated shutdown heat removal S-CO{sub 2} pump and cooler. The ANL Plant Dynamics Code configured for the Small Secure Transportable Autonomous Reactor (SSTAR) Lead-Cooled Fast Reactor (LFR) was utilized to model the S-CO{sub 2} Brayton cycle with a decaying liquid metal coolant flow to the Pb-to-CO{sub 2} heat exchangers and temperatures reflecting the decaying core power and heat removal by the cycle. The results obtained in this manner are approximate but indicative of the cycle transient performance. The ANL Plant Dynamics Code calculations show that the S-CO{sub 2} cycle can operate for about 400 seconds following the reactor scram driven by the thermal energy stored in the reactor structures and coolant such that heat removal from the reactor exceeds the decay heat generation. Based on the results, requirements for the shutdown heat removal system may be defined. In particular, the peak heat removal capacity of the shutdown heat removal loop may be specified to be 1.1 % of the nominal reactor power. An investigation of the oscillating cycle behavior calculated by the ANL Plant Dynamics Code under specific conditions has been carried out. It has been found that the calculation of unstable operation of the cycle during power reduction to 0 % may be attributed to the modeling of main compressor operation. The most probable reason for such instabilities is the limit of applicability of the currently used one-dimensional compressor performance subroutines which are based on empirical loss coefficients. A development of more detailed compressor design and performance models is required and is recommended for future work in order to better investigate and possibly eliminate the calculated instabilities. Also, as part of such model development, more reliable surge criteria should be developed for compressor operation close to the critical point. It is expected that more detailed compressor models will be developed as a part of validation of the Plant Dynamics Code through model comparison with the experiment data generated in the small S-CO{sub 2} loops being constructed at Barber-Nichols Inc. and Sandia National Laboratories (SNL). Although such a comparison activity had been planned to be initiated in FY 2008, data from the SNL compression loop currently in operation at Barber Nichols Inc. has not yet become available by the due date of this report. To enable the transient S-CO{sub 2} cycle investigations to be carried out, the ANL Plant Dynamics Code for the S-CO{sub 2} Brayton cycle was further developed and improved. The improvements include further optimization and tuning of the control mechanisms as well as an adaptation of the code for reactor systems other than the Lead-Cooled Fast Reactor (LFR). Since the focus of the ANL work on S-CO{sub 2} cycle development for the majority of the current year has been on the applicability of the cycle to SFRs, work has started on modification of the ANL Plant Dynamics Code to allow the dynamic simulation of the ABTR. The code modifications have reached the point where a transient simulation can be run in steady state mode; i.e., to determine the steady state initial conditions at full power without an initiating event. The results show that the steady state solution is maintained with minimal variations during at least 4,000 seconds of the transient. More SFR design specific modifications to the ANL Plant Dynamics Code are required to run the code in a full transient mode, including models for the sodium pumps and their control as well as models for reactivity feedback and control of the reactor power.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development and Implementation of a Comprehensive Program to Deal with Canada's Nuclear Legacy Liabilities

The Government of Canada nuclear legacy liabilities have resulted from 60 years of nuclear research and development (R and D) carried out on behalf of Canada by the National Research Council (1944 to 1952) and Atomic Energy of Canada Limited (AECL, 1952 to present). These liabilities are largely located at AECL research sites, and consist of shutdown research buildings (including several prototype and research reactors), a wide variety of buried and stored wastes, and contaminated lands. The shutdown buildings and contaminated lands need to be safely decommissioned to meet federal regulatory requirements, and long-term solutions need to be developed and implemented for management of the wastes. More than half of the liabilities are the result of Cold War activities during the 1940's, 50's and early 60's. The remaining liabilities stem from R and D for medical isotopes and nuclear reactor technology, as well as national science programs. About 70 percent of the liabilities are located at AECL's Chalk River Laboratories (CRL) in Ontario, and a further 20 percent are located at AECL's shutdown Whiteshell Laboratories in Manitoba. The remaining 10 percent relate largely to three shutdown prototype reactors in Ontario and Quebec, which were key to the developmental stage of Canada's CANDU reactor technology. The inventory of legacy waste includes spent fuel, high-level, intermediate-level and low-level solid and liquid radioactive waste, and wastes (largely contaminated soils) from site clean-up work across Canada. Most of the wastes are in raw, unconditioned form, and limited characterization information is available for the wastes generated in past decades. In many cases unique and potentially costly solutions will be required to recover, handle and process the wastes. In conclusion: the Government of Canada has initiated a program to deal with nuclear legacy liabilities dating back to the Cold War and the birth of nuclear technologies and medicine in Canada. The 5-year start-up phase will address immediate health, safety and environmental priorities, as well as provide the facilities, studies and plans required for subsequent phases. Over the next few years, the long-term strategy will be further developed and refined, and public consultations are planned to inform this work and decisions on the next phase of the strategy.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Phenix Decommissioning Project - Overview

The first heading of your manuscript must be 'Introduction'. Phenix is the only remaining French fast breeder reactor after the shutdown of Superphenix (1999) and Rapsodie (1983). Phenix is located inside the Marcoule nuclear site along the Rhone river near Bagnols-sur-Ceze in southeastern France. Phenix is one of the facilities belonging the French Atomic Energy Commission (CEA) on the Marcoule site. It is a fast breeder reactor (FBR) developed at the end of the 1960's. that has been in operation since 1973 and was connected to the power grid in 1974. It is a second generation prototype developed while the first generation FBR, Rapsodie, was still in operation. Phenix is a 250 electrical MW power plant. During the first 20 years of operation, its main aim was to demonstrate the viability of sodium-cooled FBRs. Since the 1991 radioactive waste management act, Phenix has become an irradiation tool for the actinide transmutation program. To extend its operating life for 6 additional cycles, it was necessary to refurbish the plant; this involved major work performed from 1999 to 2003 at a total cost of about 250 M??. Today, with a realistic expectation, the final shutdown is planned for the beginning of 2009. The main objective of the Phenix dismantling project is to eliminate all the process equipment and clean all the building to remove all the radioactive zones. To reach this objective, three main hazards must be eliminated: Fuel (criticality hazard), Sodium, Radioactive equipment. The complexity of decommissioning a facility such as Phenix is increased by: - the lack of storage facility for high radioactive material, - the decision to treat all the radioactive sodium and sodium waste inside the plant, - the very high irradiation of the core structures due to the presence of cobalt alloys. On the other hand, Phenix plant is still under operating with a qualified staff and the radioactivity coming from structural activation is well known. After the final shutdown, the first operations will be conducted by the same staff under the same safety report. Another interesting fact is that the decommissioning funds project exist and are available. The CEA decided to begin the dismantling phase without waiting because after a period of decay it is not really cheaper or easier to work. This approach needs interim storage facilities not long after the final shutdown. For the low- and intermediate-level radioactive waste there are national storage centers but for the high-level wastes, each operator must manage its waste until a suitable disposal site is available. At Marcoule a new storage facility is now being designed and scheduled to begin operating after 2013-2014. After removal of the fuel and core elements, the primary sodium will be drained and eliminated by a carbonation process. To ensure biological shielding, the reference scenario calls for filling the primary vessel with water. The most radioactive structures (dia-grid and core support) will be cut up with remote tools, after which the rest of the structure will be cut up manually. Phenix contains about 1450 metric tons of sodium. The CEA initially planned to build ATENA, a new facility for all radioactive sodium waste from R and D and FBR facilities. For various reasons, but mainly to save money, the CEA decided to treat all radioactive sodium and sodium waste in the framework of the Phenix dismantling project. There are no real difficulties in the dismantling schedule because of the advanced state of development of the processes selected for the ATENA project. Because of the knowledge already obtained, the issues concern project management, waste management and human resources reduction more than technical 0014challe.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Stranded Fuel, Orphan Sites, Dead Plants: Transportation Planning Considerations After the BRC Report - 13393

The author explores transportation, packaging and storage questions related to a primary recommendation of the Blue Ribbon Commission on America's Nuclear Future; i.e., that fuel from shutdown plants be removed to consolidated storage as soon as possible to enable final decommissioning and beneficial re-use of those sites. The paper discusses the recommendations of the BRC, the implications and challenges that implementing those recommendations present, and provides recommended solutions for beginning the multi-year planning, coordination, material acquisition, and communications processes that will be needed to move fuel from shutdown plants when a destination site becomes available. Removal of used nuclear fuel from shutdown reactor sites (which are serving no other purpose other than storing SNF and GTCC, at considerable expense) was a central recommendation of the BRC, for a number of reasons. This recommendation was one of the most widely acclaimed that the Commission put forward. However, there are significant challenges (such as availability of fuel canister overpacks, lack of infrastructure, handling constraints and others) that will need to be addressed, apart from the critically important identification of a suitable and workable storage destination site. Resolving these logistical challenges will need to begin even before a destination site is identified, given the long lead-times required for planning and procurement. Based on information available today, it is possible to make informed predictions about what will be needed to modify existing contractual arrangements with utilities, address equipment and infrastructure needs, and begin working with states, tribes and local governments to start initial preparation needs. If DOE, working with industry and other experienced parties, can begin planning and acquisition activities in the near term, overall schedule risk can be reduced and potential cost avoidance achieved. The most immediate benefit will accrue to the operators of the shutdown plants, but beginning to accept fuel as required under the NWPA will reduce the liability to the federal government, and also offer some assurance to other utilities and the public that DOE (or another entity if one is established) is capable of meeting its obligations under the NWPA. The indirect benefits, therefore, will be quite broad. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Regulatory Framework for Permanent Shut-down and Decommissioning of Nuclear Power Plant in Korea - 18101

Kori Unit 1, the first commercial NPP in Korea which was commissioned in 1978, was put on permanent shutdown for decommissioning on June 2017, after 40 years of operation. For permanent shutdown of the Kori Unit 1, an operation change permit was submitted in 2016 prior to the expiration since the NSA (Nuclear Safety Act) recognizes permanent shutdown as one of the operation stage. In preparation for the decommissioning of Kori Unit 1, the NSA related to decommissioning was revised and promulgated in 2015. The lower statues including Enforcement Decree and Regulation of the NSA, etc. were promptly revised to reflect decommissioning related requirements and procedures accordingly. For new NPPs, preliminary decommissioning plan is submitted and is being reviewed in the course of license review. Operating NPPs are also planning to submit the decommissioning plan by 2018 and receive approvals from Nuclear Safety and Security Commission. In case that an operator intends to decommission a nuclear installation, the operator shall apply for decommissioning and receive an approval from the NSSC. As discussed, framework for permanent shutdown and decommissioning of nuclear facilities have been well formatted by successful revision of NSA in Korea. Further detailed technical standards and regulatory guides on decommissioning will be developed to facilitate the relevant activities and ensure the nuclear safety. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Unsteady State Gas Transport Model in Matrix Laboratory (MATLAB) for PWR Gas Management

Reactor Coolant System (RCS) hydrogen gas management can be a challenge at Pressurized Water Reactors (PWRs) during shutdown, startup, and steady state operation. Poor hydrogen control can result in higher general corrosion rates for RCS components and increases in critical path time for shutdown or startup. Also, performance indicator penalties may be accrued by entry into Electric Power Research Institute (EPRI) Action Level conditions or by accrual of Chemistry Effectiveness Index (CEI) penalties established by the Institute of Nuclear Power Operations (INPO). Furthermore, poor hydrogen control may increase industrial safety risk due to the creation of an explosive environment. Part of the hydrogen management difficulty arises from the interaction of several phenomena that require complex simulations to fully understand. While hydrogen gas transport models have been developed, the application of these models is limited by the computational intensity required to accurately model the dynamism inherent in plant shutdown or startup. Subsequently, a gas transport model is developed in a suitable computational program to meet these needs and provide input to an optimized RCS hydrogen management strategy for all operational modes. The gas transport model is used to model RCS hydrogen behavior for an example PWR during an End of Cycle (EOC) Forced Outage (FO) startup, a refueling outage (RFO) shutdown, and during nominal steady state operation. The computational software selected is Matrix Laboratory (MATLAB{sup R})

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Applying AI/ML Techniques to U.S. Nuclear Operating Experience Program

Idaho National Laboratory (INL) has provided technical assistance to the U.S. Nuclear Regulatory Commission (NRC) in reliability and risk analysis including the operating experience (OpE) program since the 1980s. The U.S. nuclear OpE program provides input parameters to the NRC Standardized Plant Analysis Risk models and the industry probabilistic risk assessment (PRA) models. While earlier PRA focuses were on at-power, internal event analysis, the risks from external hazards and during low power shutdown (LPSD) operation could be significant and the needs to develop LPSD PRA and external hazards PRA are on the rise. One issue in developing LPSD PRA is the reasonable estimation of shutdown initiative event (SDIE) frequencies. INL has developed and is maintaining an SDIE database for the NRC. However, this database is based on the reviewing of Licensee Event Reports (LERs), which is believed to be only a subset of “actual” shutdown initiating events occurred in the industry. This paper investigates a new approach to identify and characterize shutdown initiating events from the Institute of Nuclear Power Operations (INPO) industry database using machine learning techniques. The main process in this approach is to find out the relationship between key words in event descriptions and the SDIE categories as in the NRC SDIE database. The relationship can then be applied to the INPO database and search for SDIEs.

99 GENERAL AND MISCELLANEOUS↗

Decommissioning of the High Flux Beam Reactor at Brookhaven Lab

The High Flux Beam Reactor at the Brookhaven National Laboratory was a heavy water cooled and moderated reactor that achieved criticality on October 31, 1965. It operated at a power level of 40 mega-watts. An equipment upgrade in 1982 allowed operations at 60 mega-watts. After a 1989 reactor shutdown to reanalyze safety impact of a hypothetical loss of coolant accident, the reactor was restarted in 1991 at 30 mega-watts. The HFBR was shutdown in December 1996 for routine maintenance and refueling. At that time, a leak of tritiated water was identified by routine sampling of ground water from wells located adjacent to the reactor’s spent fuel pool. The reactor remained shutdown for almost three years for safety and environmental reviews. In November 1999 the United States Department of Energy decided to permanently shutdown the HFBR. The decontamination and decommissioning of the HFBR complex, consisting of multiple structures and systems to operate and maintain the reactor, were complete in 2009 after removing and shipping off all the control rod blades. The emptied and cleaned HFBR dome which still contains the irradiated reactor vessel is presently under 24/7 surveillance for safety. Details of the HFBR cleanup conducted during 1999-2009 will be described in the paper.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

A Method for Projecting Cloud Shadows Onto a Central Receiver Field to Predict Receiver Damage

This work demonstrates methods of mapping high-spatial-resolution direct normal irradiance (DNI) data from satellites, Total Sky Imagers (TSIs), and analogous data sources onto a heliostat field for characterizing the spatial and temporal variation of the incident flux on a central receiver tower during cloud transient events. The mapping methods are incorporated into an optical software module that interfaces with CoPylot–SolarPILOT’s python API– to provide computationally efficient optical simulation of the heliostat field and the solar power tower. Eventually, this optical model will be incorporated into optimization models whereby a plant operator can understand the effects of cloud transient events on overall power production and receiver lifetime due to creep-fatigue damage and therefore make better informed decisions about receiver shutdown events. By more accurately modelling the effects of cloud events on receiver flux maps, this work may determine the magnitude and frequency of thermal cycling on receiver tubes and panels using actual or realistic cloud shapes instead of averaged DNI values–which may undercount the total cycle number. This work may also prevent unnecessary plant shutdowns due to overly precautionary control strategies and characterize the relative impact of various cloud types on receiver life. We plan to eventually integrate this methodology into the System Advisor Model (SAM) to improve performance model accuracy during periods of cloudiness. In this paper, we demonstrate generating DNI maps and mapping them to a solar field in CoPylot using 10 m resolution data from publicly available Sentinel-2 satellite data over the Crescent Dunes plant.

Mullin, Matthew↗

Integrated Solutions for Interim Used Fuel Management: From Pool Unloading to Safe Delivery to Recycling or Repository Facilities - 17235

Safe management of used nuclear fuel (UNF) is key to the survival of the nuclear industry. That is why it is more important than ever to have a consent-based, practical, credible, and sustainable roadmap for managing the back-end of the nuclear cycle. Worldwide UNF Light Water Reactors (LWR) inventories are currently around 200,000 tons and are estimated to grow to more than 350,000 tons by 2030, and operating nuclear reactors in the U.S. continue to discharge UNF every 18 to 24 months. International experience has demonstrated that the development of a permanent geological repository can be a multi-decade process, especially in the face of public acceptance challenges. Meanwhile, the solution for permanent disposal of UNF in the U.S. is moving at a glacial pace. As a result, industrial stakeholders have been forced to find practical interim UNF storage solutions in order to continue safely operating their reactors. Among those interim solutions are the cask- or canister-based dry storage systems that have dramatically increased in the last 10 years as they provide flexibility for expansion with a low up-front investment. With interim dry storage in place for more than 30 years, our industry is entering a new phase as we are forced to prepare for a few more decades before geological repositories begin operating. Consequently, interim dry storage has to be extended for 80 years or more. Thus, new considerations have to be taken into account to ensure the safety of this stored used fuel: - Interim storage systems are aging; - High burn-up fuel behavior overtime is uncertain; - Used fuel is losing its self-protection; - The number of shutdown sites without a fuel transfer facility, such as a pool, is increasing; - Some owners of Independent Spent Fuel Storage installation (ISFSI) at shutdown sites are not nuclear operators anymore. With increasing uncertainties, AREVA TN -- based on its long expertise with used fuel transportation and interim storage systems -- is adapting its portfolio to develop integrated and flexible solutions that will remove the burden of interim used fuel management from nuclear operators. AREVA TN is developing comprehensive solutions to reduce risks including the continued supply of proven safe high-performance dry storage systems; on-site services to safely transfer used fuel from pool to pad; the optimization of fuel heat load in the storage pool and pad; innovative aging management services including inspection, monitoring and repair; a realistic solution for consolidated interim storage with a priority to remove Used Nuclear Fuel stored in dry storage systems from shutdown sites; world-class transport and logistics services to safely move the used fuel from nuclear reactor sites to consolidated storage and repository or recycling as applicable, and turnkey management of shutdown ISFSIs. Due to the lack of an available path for transporting used fuel away from reactors, nuclear operators are faced with many challenges and growing uncertainties. Our presentation will describe the practical solutions developed and being developed in order to manage used fuel on behalf of nuclear operators and allows them to continue focusing on the important job of producing carbon-free clean energy. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A New Consolidated Storage Facility for Used Nuclear Fuel in Andrews County, Texas - 16418

On February 6, 2015, Waste Control Specialists LLC (WCS) announced its plan to file a license application with the U.S. Nuclear Regulatory Commission (NRC) to construct and operate a Consolidated Interim Storage Facility (CISF). Upon issuance of the license, WCS would be authorized to receive Used Nuclear Fuel (UNF) and reactor related Greater Than Class C Low Level Radioactive Waste (referred hence forth as UNF) at the CISF in late 2020. WCS based its decision to license a CISF based on strong support from the State of Texas and the local community's willingness to host such a facility in Andrews County, Texas. WCS' decision to license a CISF in a supportive community is consistent with the consent-based licensing approach recommended by the Blue Ribbon Commission on America's Nuclear Future. WCS intends to use existing technology developed by AREVA and NAC International that have already been approved by the NRC to transport UNF from existing commercial nuclear reactors across the nation for interim storage at its 14,000 acre site in Andrew County, Texas. In the pre-application licensing meetings held with the NRC, WCS underscored that UNF would be removed first from the shutdown decommissioned reactor sites and transported to the CISF. Approximately eighty percent of the UNF currently residing at the shutdown decommissioned reactor sites can be safely placed into the storage systems developed by AREVA and NAC International that are currently licensed by the NRC. WCS plans to store up to 40,000 Metric Tons of Heavy Metal (MTHM) at the CISF that would be constructed in eight phases over the next 20 years. WCS intends to submit its license application for the CISF to the NRC by April 2016. The license application will request authorization to possess up to 5,000 MTHM of UNF for Phase One which can accommodate storing the fuel located at over ten shutdown decommissioned reactor sites. As discussed with the NRC, the license application will be developed following NRC regulatory guidance to comply with the technical requirements specified in Title 10 of the Code of Federal Regulations (CFR) Part 72, Licensing Requirements for the Independent Storage of Spent Nuclear Fuel, High-Level Radioactive Waste, and Reactor-Related Greater Than Class C Waste. In addition, to filing the license application, WCS is also seeking legislative changes to the Nuclear Waste Policy Act of 1982 requiring the U.S. Department of Energy (DOE) to take title of the UNF at the commercial nuclear reactor sites. Under such legislative changes, the DOE would also be responsible for the transport of UNF to the CISF. In addition to preparing the CISF License Application, WCS and its partners AREVA and NAC International are prepared to work with DOE to facilitate the development of the UNF transportation infrastructure in the timeframe needed to support CISF operations. The WCS site and technical approach give it several advantages which uniquely position it to become the first successful commercial CISF in the U.S. These advantages include: broad consent-based support at the local, state, and Congressional level; an operating waste disposal site with an existing transportation infrastructure; and the use of already licensed systems to address 80% of the UNF currently in dry storage at shutdown sites in the U.S. WCS firmly believes this initiative will provide an economically viable option for consolidated interim storage of UNF until a permanent geologic repository becomes available. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RBMK Neutron-Physical Characteristics and Nuclear Safety

The neutron-physical characteristics of RBMK at the Kursk, Leningradskaya, and Smolensk NPPs for 2015–2017, as determined from calculations of more than 6000 actual states at nominal power, are presented. The results of computational modeling of shutdown regimes upon actuation of the shutdown systems of the emergency protection and fast power reduction are presented. It is shown that the physical characteristics, efficiency, and fast response of the shutdown systems of the emergency protection and fast power reduction ensure the nuclear safety of RBMK. The effect of repair of the graphite stack with a sharp graphite blocks on the neutron-physical characteristics of the reactor is determined. It is shown that the removal of some of the graphite during the repair of 500–600 graphite columns results in a reduction of the steam coefficient of reactivity and partial or complete removal of additional absorbers from the core while maintaining the neutronic characteristics and nuclear safety of RBMK.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Preliminary analysis of loss-of-coolant accident in Fukushima nuclear accident

Loss-of-Coolant Accident (LOCA) in Boiling Water Reactor (BWR) especially on Fukushima Nuclear Accident will be discussed in this paper. The Tohoku earthquake triggered the shutdown of nuclear power reactors at Fukushima Nuclear Power station. Though shutdown process has been completely performed, cooling process, at much smaller level than in normal operation, is needed to remove decay heat from the reactor core until the reactor reach cold-shutdown condition. If LOCA happen at this condition, it will cause the increase of reactor fuel and other core temperatures and can lead to reactor core meltdown and exposure of radioactive material to the environment such as in the Fukushima Dai Ichi nuclear accident case. In this study numerical simulation has been performed to calculate pressure composition, water level and temperature distribution on reactor during this accident. There are two coolant regulating system that operational on reactor unit 1 at this accident, Isolation Condensers (IC) system and Safety Relief Valves (SRV) system. Average mass flow of steam to the IC system in this event is 10 kg/s and could keep reactor core from uncovered about 3,2 hours and fully uncovered in 4,7 hours later. There are two coolant regulating system at operational on reactor unit 2, Reactor Core Isolation Condenser (RCIC) System and Safety Relief Valves (SRV). Average mass flow of coolant that correspond this event is 20 kg/s and could keep reactor core from uncovered about 73 hours and fully uncovered in 75 hours later. There are three coolant regulating system at operational on reactor unit 3, Reactor Core Isolation Condenser (RCIC) system, High Pressure Coolant Injection (HPCI) system and Safety Relief Valves (SRV). Average mass flow of water that correspond this event is 15 kg/s and could keep reactor core from uncovered about 37 hours and fully uncovered in 40 hours later.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Extension of the Supercritical Carbon Dioxide Brayton Cycle to Low Reactor Power Operation: Investigations using the Coupled ANL Plant Dynamics Code-SAS4A/SASSYS-1 Liquid Metal Reactor Code System

Significant progress has been made on the development of a control strategy for the supercritical carbon dioxide (S-CO 2 ) Brayton cycle enabling removal of power from an autonomous load following Sodium-Cooled Fast Reactor (SFR) down to decay heat levels such that the S-CO 2 cycle can be used to cool the reactor until decay heat can be removed by the normal shutdown heat removal system or a passive decay heat removal system such as Direct Reactor Auxiliary Cooling System (DRACS) loops with DRACS in-vessel heat exchangers. This capability of the new control strategy eliminates the need for use of a separate shutdown heat removal system which might also use supercritical CO 2 . It has been found that this capability can be achieved by introducing a new control mechanism involving shaft speed control for the common shaft joining the turbine and two compressors following reduction of the load demand from the electrical grid to zero. Following disconnection of the generator from the electrical grid, heat is removed from the intermediate sodium circuit through the sodium-to-CO 2 heat exchanger, the turbine solely drives the two compressors, and heat is rejected from the cycle through the CO 2 -to-water cooler. To investigate the effectiveness of shaft speed control, calculations are carried out using the coupled Plant Dynamics Code-SAS4A/SASSYS-1 code for a linear load reduction transient for a 1000 MWt metallic-fueled SFR with autonomous load following. No deliberate motion of control rods or adjustment of sodium pump speeds is assumed to take place. It is assumed that the S-CO 2 turbomachinery shaft speed linearly decreases from 100 to 20% nominal following reduction of grid load to zero. The reactor power is calculated to autonomously decrease down to 3% nominal providing a lengthy window in time for the switchover to the normal shutdown heat removal system or for a passive decay heat removal system to become effective. However, the calculations reveal that the compressor conditions are calculated to approach surge such that the need for a surge control system for each compressor is identified. Thus, it is demonstrated that the S-CO 2 cycle can operate in the initial decay heat removal mode even with autonomous reactor control. Because external power is not needed to drive the compressors, the results show that the S-CO 2 cycle can be used for initial decay heat removal for a lengthy interval in time in the absence of any off-site electrical power. The turbine provides sufficient power to drive the compressors. Combined with autonomous reactor control, this represents a significant safety advantage of the S-CO 2 cycle by maintaining removal of the reactor power until the core decay heat falls to levels well below those for which the passive decay heat removal system is designed. The new control strategy is an alternative to a split-shaft layout involving separate power and compressor turbines which had previously been identified as a promising approach enabling heat removal from a SFR at low power levels. The current results indicate that the split-shaft configuration does not provide any significant benefits for the S-CO 2 cycle over the current single-shaft layout with shaft speed control. It has been demonstrated that when connected to the grid the single-shaft cycle can effectively follow the load over the entire range. No compressor speed variation is needed while power is delivered to the grid. When the system is disconnected from the grid, the shaft speed can be changed as effectively as it would be with the split-shaft arrangement. In the split-shaft configuration, zero generator power means disconnection of the power turbine, such that the resulting system will be almost identical to the single-shaft arrangement. Without this advantage of the split-shaft configuration, the economic benefits of the single-shaft arrangement, provided by just one turbine and lower losses at the design point, are more important to the overall cycle performance. Therefore, the single-shaft configuration shall be retained as the reference arrangement for S-CO 2 cycle power converter preconceptual designs. Improvements to the ANL Plant Dynamics Code have been carried out. The major code improvement is the introduction of a restart capability which simplifies investigation of control strategies for very long transients. Another code modification is transfer of the entire code to a new Intel Fortran complier; the execution of the code using the new compiler was verified by demonstrating that the same results are obtained as when the previous Compaq Visual Fortran compiler was used.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗