Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Relays”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

A review on protection challenges of Transmission Lines connected to Inverter Based Resources

The increased penetration of inverter-based resources (IBRs) connected to transmission grids is challenging how traditional electric power systems operate. Such systems were originally designed based on the dominant presence of synchronous generators. Some main challenges include the increased concerns about system stability due to the reduced system inertia caused by IBRs and the reduced protection reliability caused by the non-deterministic fault current response of IBRs. The protection relays’ algorithms have been designed and validated based on well-known fault current characteristics of synchronous generations, while the short-circuit responses of IBRs heavily depend on their vendor-specific control schemes, which are mainly set to protect inverter semiconductor switches and DC components. The magnitude of short current that IBRs contribute is typically between 1.1–1.5 times the rated current that may behave unstably and incoherently with the voltages. The control scheme of the IBRs also controls the active (P) and reactive (Q) support during system voltage sag and swell conditions. These characteristics challenge not only protective relay schemes but also existing short-circuit software tools to correctly model IBRs for fault studies and protection coordination analyses.

14 SOLAR ENERGY↗

Fermilab PIP-II CDS & CM Cryogenic Controls System

Details on Final design for Cryogenic Electrical & Controls System for Fermilab' s next-gen particle accelerator PIP-II. Electrical Controls System includes instrumentation and controls of Cryogenics Distribution System and Cryomodules. Design includes Siemens PCS7 Controls System with 26 Remote IO Rittal Cabinets and 48 Relay Racks for Temperature Readouts, Valve Positioners, Level, Heater Controls etc. Electrical Drawings and Design have been completed with focus now on fabrication of the 26 Rittal Cabinets and 48 Relay Racks. All materials have been procured. EPICS will be used as a SCADA system communicating to S7 Controllers via OPC UA.

Patel, Pratik [Fermilab]↗

Real-Time Testbed for Smart Grid Recloser Controller

The growing need for a low voltage recloser has become apparent due to the rise in requirements for a smart grid. This includes more detailed management of power flow forward (towards load) and backward (towards generation), source synchronization in real time, more indepth fault responses, and the use of green energy. The SEL-651R-2 relay is a device that can manage these needs, especially in fault response and synchronization, and is commonly used in systems called microgrids. Microgrids are distribution level systems that are able to operate separated from the main grid, are typically installed much closer to the load(s), and are fed by distributed energy resources (DERs), such as wind, solar or diesel generators. The SEL-651R-2 is normally used in the field with presets operative settings, but the Western Michigan University (WMU) Center for Interdisciplinary Research on Secure, Efficient and Sustainable Energy Technology (WMU InterEnergy Center) wished to test this device in its range of capabilities for microgrid application. A Hardware-In-the-Loop (HIL) testbed was implemented and used through the Real Time Digital Simulator (RTDS) using the RSCAD software to test the SEL-651R-2's use cases and functions. The testbed includes a microgrid with interconnection to a larger main grid, and the relay is meant to control the recloser at the point of common coupling (PCC) between the main grid and microgrid. The testbed shows how basic protections, reclosing, and synchronization checks function when handling faults that affect both the microgrid and the main grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Real-Time Testbed for Transmission Line Protection

Hardware in the loop (HIL) testing is crucial for designing and managing electric power grids. These grids are becoming larger and more complex. The importance for students to have safe and intuitive ways to interact with the devices associated with the power grids has never been more crucial. Since most of these tests involve high voltages, this can be a deterrent for instructors and students in undergraduate programs. HIL testing is a solution to these common issues. This method has become one of the most popular methods for testing these power systems. With the use of Western Michigan University’s (WMU) Real-Time Digital Simulator (RTDS) and SEL-421-7 protection relay, a HIL testbed has been created. These devices were interconnected using the communication protocol known as Generic Object-Oriented Substation Event (GOOSE). A simulated transmission line system was modeled in an RTDS software RSCAD as the basis for this testbed. This model simulated different types of faults that could occur in a transmission line while in operation. The SEL-421-7 relay is connected to the RSCAD simulation via GOOSE to protect our simulated transmission line. This testbed was set up to give students a clear understanding of how distance protection works as well as how the SEL-421-7 will react to various kinds of faults, in addition to how useful the RTDS can be when testing different power systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Medium-Voltage Testbed for Comparing Advanced Power Line Sensors vs. Measurement Transformers with Electrical Grid Events

Electrical utilities have relied upon potential transformers (PTs) and current transformers (CTs) for very accurate metering and to provide reliable signals for protective relays. Less expensive alternative sensing technologies offer the possibility of wider deployment, particularly in grids that employ distributed energy resources. In this work, the performance of an advanced medi-um-voltage sensor is compared with a reference PT and CT and experimentally evaluated for different power grid scenarios on an advanced outdoor power line sensor testbed at the US De-partment of Energy’s Oak Ridge National Laboratory. The sensor is based on a capacitive divider for voltage monitoring and a Rogowski coil with integrator for current monitoring. The advanced outdoor power line sensor testbed has a real-time simulator that was used to generate transient scenarios (e.g., electrical faults, capacitor bank operation, service restoration), while the analog signals were recorded by the same high resolution power meter. The behavior of analog signals, harmonic components, total harmonic distortion, and crest factors were assessed for this power line sensor compared with the reference PT/CT, because of the absence for testing standards for advanced outdoor power line sensors.

Piesciorovsky, Emilio↗

A Systematic Framework for Tuning Open-Source Multifunctional IBR Models To Emulate OEM Black-Box Fault Dynamics

This paper presents a systematic framework to tune a generic IBR EMT model to match with an OEM provided balckbox inverter model based on the fault current responses. The key learnings and findings are summarized as follows: The tunable key parameters include inner control loops and current limiters to align the fault current magnitude, sequence content, and phase trajectories with the OEM models across diverse fault type and locations. The tuned model's fidelity is validated through comparative analysis with an OEM blackbox model, assessing both the fault current response and the responses of multiple relay elements. The results demonstrate the tuned generic model can trigger relay decision logic that is identical or near identical to that of the OEM model, thus generating very good match model for fault studies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluating Protection System Performance for a Real-World Weak Grid Area With High Inverter-Based Resources

This paper evaluates an existing protection scheme implemented in a real-world weak grid area with a high penetration of inverter-based resources (IBRs). The study aims to assess the reliability and adequacy of protection schemes originally designed for traditional synchronous machine systems and determine whether they can continue to operate reliably in systems with high levels of IBRs. Hardware relays are tested using a controller-hardware-in-the-loop setup. PSCAD electromagnetic transient simulation with an IBR original equipment manufacturer black-box model is used to perform fault studies and generate COMTRADE data, which are replayed by a realtime digital simulator (RTDS) to feed input to the hardware relays. Three scenarios are analyzed: normal operation, an N-1 contingency, and an IBR-only scenario. The evaluation results reveal the following: 1) the protection scheme remains reliable under normal conditions and N-1 contingencies and 2) in IBRonly scenarios, differential protection (87L) continues to operate reliably, whereas local protection elements, such as distance and directional elements, fail because of the lack of regulated negative sequence current contributed by IBRs. These findings provide utilities with valuable insights for improving their protection systems in high-IBRs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Preconceptual Designs of Coupled Power Delivery between a 4-Loop PWR and 100-500 MWe HTSE Plants

This study develops a preconceptual design for the integration between a large-scale high-temperature electrolysis facility and a NPP. Two hydrogen facility sizes are considered: 100 MWnom and 500 MWnom. Both steam supply designs use cold reheat steam extraction as a heat source. A reboiler inside the protected area of the power plant transfers steam heat to the demineralized water supply for the hydrogen plant. After the heat transfer, the extracted steam condenses and returns to the condenser while the process steam routes out of the protected area to the electrolyzers. Electrical power is tapped off from the high voltage side of the GSU transformer, where it is then transported via a 345-kV transmission line to the hydrogen facility. Circuit breakers and disconnects are located at both ends of the transmission line. Step down transformers and miscellaneous switchgear/buses are located at the end of the transmission line inside the HTEF boundary. Control capabilities for the steam interfacing equipment and electrical dispatch are accessible from the Main Control Room, and protective relays for the transmission line are located inside the Relay Room. Computer modeling was performed for the thermal and electrical designs. PEPSE analysis provided the steady-state parameters for thermal extraction from the turbine cycle. These parameters were used to inform transients and size equipment in combination with Applied Flow Technology (AFT) Arrow and AFT Fathom modeling for steam and water piping, respectively. Electrical transients were analyzed using PSCAD. An ETAP model was used to evaluate power flow and short circuit, which enabled the sizing of transformers and protective equipment. A cost estimate was developed for both integration designs when considering plant separation distances of 250 m and 500 m. From these estimates, the modifications for thermal and electrical interfacing of a first-of-a-kind nuclear-integrated hydrogen facility are anticipated to cost between $60–250/kWnom., where the subscript “nom” refers to the nominal size of the hydrogen plant. On a thermal power basis, the thermal power has a cost of approximately $8/MWth for a 500 MWnom high temperature electrolysis plant located 500 m distant from the NPP. That value decreases to approximately $7.5/MWth for a 250 m separation distance between the hydrogen plant and the NPP. This value is lower than previous estimates of the cost of heat extracted from NPPs primarily because in this work the steam is extracted from cold reheat instead of the main steam line, which reduces the cost of the dispatched steam by approximately $3.5/MWth. Nuclear steam extraction can provide a profit avenue for many plants and is not restricted to hydrogen production. Ammonia production, oil refining, and paper production, among other industrial processes all require thermal energy, which can be provided by NPPs. Future work should look further at the details of thermal extraction for a variety of use cases. This can include increased levels of extraction and multiple simultaneous users. Additionally, site-specific studies should be performed to develop industry experience and improve cost accuracy.

08 HYDROGEN↗

SVM-Based Synchronized Fault Detection for 100% Renewable Microgrids: Preprint

Traditional protection schemes face significant challenges when applied to microgrids with high penetrations of renewables with inverter-based resources (IBRs). The proliferation of advanced sensing and communication technologies has generated copious data, offering an opportunity to overcome these limitations using data-driven machine learning approaches. This work proposes a novel approach based on a support vector machine (SVM) for detecting faults within a 100% renewable microgrid. The approach encompasses a systematic offline training stage for the development of a linear SVM-based fault detection algorithm. This process covers offline data collection from the microgrid under study, the extraction of features such as positive- and negative-sequence components and the total harmonic distortion of the voltage and current measurements of the relays, and the design of the linear SVM-based classifier. During the online implementation, however, different classifiers can exhibit asynchronicity in detecting the fault inception at different subcycle-to-cycle period-level delays. To circumvent this asynchronicity issue, a separate algorithm is developed for each relay to estimate the fault inception time as close to the real fault time. The performance of the proposed SVM-based synchronized fault detection method is evaluated using online time-domain simulation studies on a microgrid test system. The results corroborate the reliability of the fault detection scheme when tested under various fault cases (fault types, locations, and impedances) and non-fault cases during both grid-tied and islanded operation modes.

100% microgrid↗

A Review on Protection Challenges of Transmission Lines Connected to Inverter-Based Resources

The increased penetration of inverter-based resources (IBRs) connected to transmission grids is challenging how traditional electric power systems operate. Such systems were originally designed based on the dominant presence of synchronous generators. Some main challenges include the increased concerns about system stability due to the reduced system inertia caused by IBRs and the reduced protection reliability caused by the non-deterministic fault current response of IBRs. The protection relays’ algorithms have been designed and validated based on well-known fault current characteristics of synchronous generations, while the short-circuit responses of IBRs heavily depend on their vendor-specific control schemes, which are mainly set to protect inverter semiconductor switches and DC components. The magnitude of short current that IBRs contribute is typically between 1.1–1.5 times the rated current that may behave unstably and incoherently with the voltages. The control scheme of the IBRs also controls the active (P) and reactive (Q) support during system voltage sag and swell conditions. These characteristics challenge not only protective relay schemes but also existing short-circuit software tools to correctly model IBRs for fault studies and protection coordination analyses

14 SOLAR ENERGY↗

Fermilab PIP-II CDS and CM Cryogenic Controls System

Details on Final design for Cryogenic Electrical & Controls System for Fermilab' s next-gen particle accelerator PIP-II. Electrical Controls System includes instrumentation and controls of Cryogenics Distribution System and Cryomodules. Design includes Siemens PCS7 Controls System with 26 Remote IO Rittal Cabinets and 48 Relay Racks for Temperature Readouts, Valve Positioners, Level, Heater Controls etc. Electrical Drawings and Design have been completed with focus now on fabrication of the 26 Rittal Cabinets and 48 Relay Racks. All materials have been procured. EPICS will be used as a SCADA system communicating to S7 Controllers via OPC UA.

Patel, Pratik [Fermilab]↗

Evaluating Protection System Performance for a Real-World Weak Grid Area With High Inverter-Based Resources: Preprint

This paper evaluates an existing protection scheme implemented in a real-world weak grid area with a high penetration of inverter-based resources (IBRs). The study aims to assess the reliability and adequacy of protection schemes originally designed for traditional synchronous machine systems and determine whether they can continue to operate reliably in systems with high levels of IBRs. Hardware relays are tested using a controller-hardware-in-the-loop setup. PSCAD electromagnetic transient simulation with an IBR original equipment manufacturer black-box model is used to perform fault studies and generate COMTRADE data, which are replayed by a real-time digital simulator (RTDS) to feed input to the hardware relays. Three scenarios are analyzed: normal operation, an N-1 contingency, and an IBR-only scenario. The evaluation results reveal the following: 1) the protection scheme remains reliable under normal conditions and N-1 contingencies and 2) in IBR-only scenarios, differential protection (87L) continues to operate reliably, whereas local protection elements, such as distance and directional elements, fail because of the lack of regulated negative sequence current contributed by IBRs. These findings provide utilities with valuable insights for improving their protection systems in high-IBRs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Protection schemes used in North American microgrids

This study reviewed existing conventional and nonconventional protection schemes for grid-connected and islanded mode operations in North American microgrid projects. The microgrid projects investigated in this study used different types of distributed energy resources (DERs) and integrated hydropower/diesel generators, gas/steam/wind turbines, and photovoltaic systems with energy storage. In this work, conventional protection schemes were defined as those within the IEEE Standard C37.2-2008, whereas nonconventional schemes were those not defined within this standard. The pros and cons of conventional and nonconventional protection schemes were discussed in detail. The overvoltage, undervoltage, and frequency elements were the most common conventional protection schemes applied in microgrid projects in North America. These protection elements were used to detect the islanded conditions and faults that could not be sensed by overcurrent relays because of small fault currents contributed by low-inertia DERs and power-electronic sources. Directional overcurrent elements were used to distinguish between external (grid) and internal (microgrid) faults. Adaptive protection was the most popular nonconventional protection scheme applied to the microgrid projects. In conclusion, different types of DERs and operational modes must be considered in order to address the protection and control challenges of each microgrid and to obtain the best technical and economical solution.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A generic method for interfacing IEDs using low voltage interfaces to real-time simulators with hardware in the loop

This study presents an interface method (IM) to interconnect real-time simulators (RTSs) without amplifiers for different intelligent electronic devices (IEDs), such as protective relays, smart meters, and other devices. It is a significant topic for the power systems protection community because there are many protection devices with different requirements. These protection devices have pinouts that measure bus voltages/currents and breaker pole states and generate trip/close pulse signals. Most of the emulation test beds with RTSs and HIL need amplifiers to connect IEDs from different product manufacturers because the low-voltage interface levels are not available in some instruction manuals. Additionally, commercial amplifiers have cutoff frequency limitations and have an excessive cost when several IEDs are wired onto test beds. Then, the validation of protection and control systems with RTSs and IEDs in the loop from different vendors without amplifiers results in an unfeasible alternative. In this paper, the IM was based on using an interface box, power source, and RTS to identify IED inputs/outputs. Here, the sequence to recognize IED pinouts and calculate the current/voltage scaling factors is described. The IM was validated satisfactorily with RTS and a protection device (with unknown pinouts) in the loop.

42 ENGINEERING↗

A requirement for an active proton delivery network supports a compound I-mediated C–C bond cleavage in CYP51 catalysis

CYP51 enzymes (sterol 14α-demethylases) are cytochromes P450 that catalyze multistep reactions. The CYP51 reaction occurs in all biological kingdoms and is essential in sterol biosynthesis. It removes the 14α-methyl group from cyclized sterol precursors by first forming an alcohol, then an aldehyde, and finally eliminating formic acid with the introduction of a Δ14–15 double bond in the sterol core. The first two steps are typical hydroxylations, mediated by an electrophilic compound I mechanism. The third step, C–C bond cleavage, has been proposed to involve either compound I (i.e. FeO 3+ ) or, alternatively, a proton transfer-independent nucleophilic ferric peroxo anion (compound 0, i.e. Fe 3+ O 2 – ). In this work, using comparative crystallographic and biochemical analyses of WT human CYP51 (CYP51A1) and its D231A/H314A mutant, whose proton delivery network is destroyed (as evidenced in a 1.98-Å X-ray structure in complex with lanosterol), we demonstrate that deformylation of the 14α-carboxaldehyde intermediate requires an active proton relay network to drive the catalysis. These results indicate a unified, compound I-based mechanism for all three steps of the CYP51 reaction, as previously established for CYP11A1 and CYP19A1. We anticipate that our approach can be applied to mechanistic studies of other P450s that catalyze multistep reactions, such as C–C bond cleavage.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Adaptive Load Shedding for Grid Emergency Control via Deep Reinforcement Learning

Emergency control, typically such as under-voltage load shedding (UVLS), is broadly used to grapple with low voltage and voltage instability issues in real-world power systems under contingencies. However, existing emergency control schemes are rule-based and cannot be adaptively applied to uncertain and floating operating conditions. Here, we propose an adaptive UVLS algorithm for emergency control via deep reinforcement learning (DRL) and expert systems. We first construct dynamic components for picturing the power system operation as the environment. The transient voltage recovery criteria, which poses time-varying requirements to UVLS, is integrated into the states and reward function to advise the learning of deep neural networks. The proposed method has no tuning issue of coefficients in reward functions, and this issue was regarded as a deficiency in the existing DRL-based algorithms. Case studies illustrate that the proposed method outperforms the traditional UVLS relay in both the timeliness and efficacy for emergency control.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dynamic Interference Management for UAV-Assisted Wireless Networks

Here, we investigate a transmission mechanism aiming to improve the data rate between a base station (BS) and a user equipment (UE) through deploying multiple relaying UAVs. We consider the effect of interference incurred by another established communication network, which makes our problem challenging and different from the state of the art. We aim to design the 3D trajectories and power allocation for the UAVs to maximize the data flow of the network while keeping the interference on the existing communication network below a threshold. We utilize the mobility feature of the UAVs to evade the (un)-intended interference caused by (un)-intentional interferers. To this end, we propose an alternating-maximization approach to jointly obtain the 3D trajectories and the UAVs transmission powers. We handle the 3D trajectory design by resorting to spectral graph the power allocation through convex optimization techniques. We also approach the problem from the intentional interferer’s perspective where smart jammers chase the UAVs to effectively degrade the data flow of the network. We also extend our work to the case for multiple UEs. Finally, we demonstrate the efficacy of our proposed method through extensive simulations.

42 ENGINEERING↗