Assessment of operational availability for the PIP-II Superconducting Radio Frequency linear accelerator facility
Operational availability is a critical performance measure for an accelerator facility in modern time. A high availability enables the facility to serve a wide range of users simultaneously. Consequently, besides pure accelerator physics considerations, newly proposed accelerator facilities account for the availability and reliability aspects in the design phases. It allows incorporation of appropriate mitigation strategies for the most vulnerable systems in the machine and therefore, minimizes unscheduled interruptions during the operation. This report lays out a methodology for the availability assessment of the complete particle accelerator facility and presents an initial assessment of the availability of the newly proposed Proton Improvement Plan-II (PIP-II) accelerator facility at Fermilab. The paper describes a comprehensive reliability model of the PIP-II facility that comprises not only 800 MeV linear accelerator (linac) system but also essential utility systems in the form of cryogenic, water, power and air systems. The paper details estimations of the availability of the PIP-II facility for two operational modes i.e. the nominal operational mode featuring 800 MeV beam and critical operational mode involving operation with the lowest objective beam energy of 600 MeV.