At least 163 records · Page 9

Lessons Learned from Hanford's Purex Tunnel 2 Structural Stabilization Project - 20509

In 2019, U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC) completed structurally stabilizing the Plutonium Uranium Extraction Plant (Purex) waste storage Tunnel 2 with engineered grout. This action significantly reduced risk to Hanford workers, the surrounding community and environment by preventing future collapse of the tunnel and possible release of radioactive materials. Decades of plutonium production at the Purex facility required construction of two large underground tunnels for storage of highly contaminated plutonium processing equipment that had failed during the operation of Purex and other facilities across the Hanford Site. Following the partial collapse of Purex Tunnel 1 on May 9, 2017, DOE and CHPRC took immediate action to safely stabilize the collapsed section of the tunnel. The hole in the tunnel was filled the next day as a temporary stabilization measure, and no contamination was detected as a result of the partial collapse of the tunnel. Workers then stabilized Tunnel 1 in its entirety by filling with engineered grout, which also encapsulated the radioactive equipment and railcars within the tunnel. Grouting eliminated the risk of further collapse and stabilized the tunnel contents, all while not precluding future remedial actions or final closure decisions. While conducting an integrity analysis of Tunnel 1 by using construction drawings, photos and other historical documents, project teams also analyzed the much larger Purex Tunnel 2. The analysis found Tunnel 2 did not meet current codes for structural integrity, and it may not be able to bear the weight of the soil above the tunnel. Therefore, it was determined that Tunnel 2 was also at risk of collapse. DoE's independent panel of experts determined grouting to be the best choice for stabilizing Tunnel 2 because it provides the highest level of stability and protection, and does not preclude future remedial actions. DOE authorized CHPRC to commence work and the Purex Tunnel 2 Structural Stabilization Project was launched in December of 2017. The paper will discuss the process of recognizing the following critical aspects and risks associated with stabilizing Tunnel 2, and the actions taken by the project team to mitigate these risks, including: - Tunnel investigation and data collection to assist with future remediation; - On-site batching and mock-ups to provide the large quantity of grout required for stabilizing the tunnel; - Workforce involvement and innovative actions that mitigated the project's most significant potential hazards, including traffic control; - Project team high level of execution translated into successful project execution. Sharing lessons learned from this critical risk-reduction effort can enhance the safety and efficiency of other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Model Package Report: Geoframework Model of the Hanford Site 100 Area

The purpose of the 100 Area Geoframework Model (GFM) is to provide a reasonable, consistent, and defensible three dimensional representation of the hydrostratigraphic units below the River Corridor at the Hanford Site to support contaminant fate and transport models. The GFM is a three dimensional representation of the subsurface geologic structure. From this, three dimensional geologic model-exported results, in the form of points or surfaces, are used as inputs to populate and assemble the various numerical model architectures. The objective of this report is to define the process used to produce a hydrostratigraphic model for the hydrostratigraphic units beneath the Hanford Site 100 Area. The GFM may support several other CH2M HILL Plateau Remediation Company project needs and objectives, including providing geologic information to support remedial investigations and actions and as a tool to present River Corridor geology and contaminant extents. The GFM was constructed based on information through 2019 available in the Integrated Data Management System, Hanford Environmental Information System, and the Hanford Site geologic contacts (GeoContacts) datasets. Revisions to the 100 Area GFM may occur to incorporate new data and information. Each version will be maintained in configuration control using date stamps for identifying supporting databases, figures, and interpretations. Supporting data include the final three dimensional geoframework surfaces, two dimensional structure and isopach maps, and all the geologic contact inputs and interpreted geologic log data. These final products provide a supporting set of geologic information that together allow the creation of the GFM. This information is managed, updated, and maintained via CH2M HILL Plateau Remediation Company under the Environmental Model Management Archive.

58 GEOSCIENCES↗

Automation of Vulnerability and Patch Management: Information Extraction, Association, and Optimization

Vulnerability and patch management is an integral part of a robust cybersecurity program, yet it grows increasingly complex due to the sheer amount of data that must be analyzed. Particularly in Operational Technology (OT) environments, analysis must be done manually because of the lack of automated solutions. Additionally, there are many steps in this process, from the initial discovery of the vulnerability to the implementation of its remediation, and each step in the process requires different data in order to be performed effectively. In this work, we provide approaches and strategies to assist operators in industrial or OT environments throughout the vulnerability management cycle. Security advisories provide key information about mitigation strategies, or actions that can be taken when a patch is unavailable or cannot be installed. Details of these strategies are not shared in public vulnerability databases and must be found manually. We approach this problem by designing a solution to automatically identify that information within vendor security advisories and retrieve it for operator use. We start with an approach that requires domain-specific knowledge of certain frequently-seen reference websites. Next, an approach that can work on an arbitrary website but relies on certain keywords. Finally, an approach that uses Natural Language Processing (NLP) methods and does not require specific knowledge or keywords. Each of these approaches is more general than its predecessor; we demonstrate high accuracy for all approaches Advisories also often contain details of affected products in non-standard or natural language formats. While this information can be easily understood when read by an operator, the non-standard format acts as a barrier to effective automation. We provide an approach for the first step in this process: identifying vendors in security advisories and mapping them to a standard framework for representing digital assets and software products. We evaluate five established string similarity algorithms, plus one of our own design that combines string similarity and information theory, on the task of mapping vendors to their corresponding entries in the Common Platform Enumeration (CPE) repository. Our results show that our proposed metric outperforms all others. Due to the constraints on time, finances, and personnel for organizations, Large Language Models (LLMs) may seem like attractive opportunities for security operators to speed up information gathering; however, it is still not clear whether LLMs can handle vulnerability management tasks well. To answer this question, we perform an empirical study of LLMs’ ability to provide consistent, accurate information about vulnerabilities in order to guide organizations in their adoption of LLMs. We observe poor performance for all models tested, suggesting that these models are not well-suited to the consistent retrieval of accurate vulnerability information. Finally, once vulnerabilities have been identified and any additional information has been obtained, operators must decide which remediation actions to implement based on their available resources. This already-complex problem becomes even more so when we consider that a vulnerability may have multiple avenues for remediation. We formulate this scenario as two knapsack problems and provide solutions, which we then compare against several existing strategies for vulnerability prioritization seen in real operational environments.

McClanahan, Kylie↗

Uranium Mill Tailings Radiation Control Act Title II DOE Due Diligence and Lessons Learned from a Previous Site Transfer - 20352

Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) established that a government agency will provide perpetual care for closed uranium and thorium ore-processing sites that were operating under an NRC source material license in 1978 or were licensed thereafter. Commercial owners (licensees) operating under an NRC or agreement state specific license when UMTRCA was passed are responsible for conducting reclamation of any byproduct material remaining from uranium-ore processing operations in accordance with an NRC or agreement state approved reclamation plan. Reclamation includes both surface and groundwater remedies. Upon completion of reclamation and approval by NRC, the site is required to be transferred to either the host state or the DOE for long-term surveillance and maintenance. Since UMTRCA's enactment, six Title II sites have been transferred to DOE; an additional 24 Title II sites are anticipated to be transferred before 2050. DoE's role mandated under UMTRCA Title II as the long-term care custodian is to perform 'monitoring, maintenance, and emergency measures necessary to protect the public health and safety.' UMTRCA requires that the licensee pay a long-term surveillance charge 'sufficient to cover the annual costs of site surveillance.' However, at some sites such as the Bluewater, New Mexico, Disposal Site, this mandate has required additional effort and expense by DOE, beyond the originally anticipated and intended scope within UMTRCA, but within the authority of DOE under UMTRCA. In 1997, the Bluewater site became the second UMTRCA Title II site to be transferred to DOE. The site was the location of a uranium mill operated from 1953 until 1982. The specific licensee began site reclamation in 1991, and by 1995 all tailings and contaminated materials were encapsulated in two tailings disposal cells and other disposal areas. In addition to surface contamination, milling activities impacted groundwater in the two upper aquifers. In 1989, the specific licensee attempted active groundwater remediation; however, no significant reduction in contaminant concentrations was observed. As a result, the specific licensee applied to NRC for alternate concentration limits (ACLs) in 1990, which were approved in 1996 as being protective, after additional corrective actions were performed. Since transfer of the Bluewater site to DOE, unforeseen challenges have occurred, requiring additional actions. The first challenge is the occurrence of surface depressions located on the northern section of the main tailings disposal cell. The depressions were first observed during DoE's initial inspection in 1998; however, evidence of these can be observed on satellite images taken prior to transfer. Since being first observed, the depressions have continued to grow both in depth and areal extent. Due to the design of the main tailings disposal cell, the depressions impede storm water from being effectively shed off the 101- hectare (250-acre) top slope of the main tailings disposal cell. Instead, storm water accumulates in the depressions, forming a large ephemeral pond that has stored up to 16.3 x 10{sup 6} liters (4.3 million gallons) of stormwater. The ponding poses a potential risk to the integrity of the main tailings disposal cell in the case of a large storm event, with the potential to cause the pond to overtop and erode the cover material and underlying waste. DOE has taken a number of short-term actions to monitor, measure, and reduce the ponding and is currently working with the US Army Corps of Engineers to design and construct a repair. Additional challenges are associated with groundwater at the Bluewater site. Nine wells were present on the 1335-hectare (3300-acre) site upon transfer. Groundwater compliance was called into question after the State of New Mexico reduced its uranium groundwater standard from 5.0 to 0.03 milligrams per liter in 2004, and when an ACL for uranium was exceeded in a site monitoring well in 2010. Acquiring historical groundwater data and subsequent evaluations as well as additional DOE groundwater monitoring led to installing 10 new monitoring wells and performing additional site hydrogeology recharacterization. DOE continues to evaluate groundwater conditions at the site and works with the NRC to determine regulatory requirements and a path forward. As a result of lessons learned at the Bluewater site and other Title II sites, improved processes have been implemented at a programmatic level to increase due diligence before site transfer and prevent similar issues from occurring at other UMTRCA Title II sites under long-term management. DoE's due diligence process is documented in the Process for Transition of UMTRCA Title II Disposal Sites to DOE for Long-Term Surveillance and Maintenance and is designed to ensure that DOE has no technical or compliance concerns with regulatory decisions that might compromise protectiveness following site transfer to DOE. Implementation of the due diligence process has increased DoE's role prior to site transfer and has been effective in identifying potential issues. Actions by NRC and specific licensees, in response to enhanced due diligence efforts by DOE, are expected to minimize, if not totally prevent, the need for unanticipated actions by DOE pertaining to the surface and groundwater remedies after site transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vertical Characterization of Flow and Contaminant Concentration in New Hanford Extraction Wells

Effective groundwater remediation should focus on high-concentration, low-permeability zones within the aquifer, as these areas often present significant challenges to contaminant removal. Characterizing the vertical distribution of contamination in an aquifer is therefore critical for optimizing and monitoring pump-and-treat (P&T) systems to meet target cleanup timelines. Flow patterns driven by hydraulic gradients and variations in permeability are described to provide insight into contaminant mass removal from long-screened wells. The objective of this multi-phase work is to provide actionable recommendations for improving remedy performance monitoring and P&T operations, which ongoing evaluations will address. This report summarizes the preliminary results of vertical flow and contaminant distribution monitoring in new extraction wells at the Hanford Site.

54 ENVIRONMENTAL SCIENCES↗

Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan

The Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan has been developed in accordance with the requirements identified in the: • Interagency Agreement for the Pantex Superfund Site, Article 8.5 Work to be Performed, • Compliance Plan Provision of Hazardous Waste Permit No. 50284, and • Record of Decision for Groundwater, Soil, and Associated Media, Pantex Plant. A Long‐Term Monitoring System Design has been designed to monitor conditions in the perched groundwater including changes in the perched aquifer as a result of implementing the response actions. Monitoring is required for verifying the effectiveness of perched groundwater response actions (i.e., conditions in the perched aquifer are being affected as intended) and for confirming that the perched aquifer and Ogallala Aquifer characterization as defined in the Resource Conservation and Recovery Act Facility Investigation Report and the Corrective Measure Studies/Feasibility Study remains accurate. If monitoring results obtained through the monitoring network identify an unexpected condition or deviation, contingent actions will be considered and implemented as necessary to ensure continued protection of the Ogallala Aquifer and human health and the environment. Potential deviations to expected technology performance may be encountered for each of the four primary response actions that compose the selected remedy for perched groundwater; Playa 1 Pump and Treat System, Southeast Area Pump and Treat System, Southeast Area In‐Situ Bioremediation System (comprised of the Southeast In‐Situ Bioremediation System Original System, Southeast Area In‐Situ Bioremediation System Extension System, Offsite In‐Situ Bioremediation System, Perchlorate/Chromium ISB, Northeast ISB and County Road 8 ISB), and Zone 11 In‐Situ Bioremediation System. Monitoring will also be conducted to determine if there are deviations to the expected characterization, e.g., contaminants not expected as a result of the RCRA Facility Investigation characterization. Deviations to expected conditions in the Ogallala Aquifer could also be encountered if the response actions in the perched groundwater are not performing as expected, i.e., preventing contaminants from migrating to the Ogallala Aquifer. Currently, Pantex has begun investigation of detections of high explosives above groundwater protection standards in wells on the Texas Tech University property and a plume that is moving to the northeast from that area. Due to those detections, this Plan recognizes the fact that future detections in the Ogallala will be focused on first‐ time detections of analytes. After a remedy is determined, this Plan will require modification to address-deviations and contingent actions. This Plan was developed to identify the contingent actions necessary to mitigate impacts resulting from deviations to site conditions or response action performance. The Plan defines the environmental problem being addressed by the response actions, clarifies the expected conditions and objectives of the response actions, and identifies the potential deviations to the response actions (due to site conditions or technology performance) that could be encountered. The deviations were evaluated to determine the likelihood of occurrence, potential impact, and time to respond to avoid impact. The Plan also identifies the monitoring outlined in the Long‐Term Monitoring System Design Report (Consolidated Nuclear Security, 2024) and Sampling Analysis Plan (PanTeXas Deterrence, 2024) that will be used to detect the deviations. Lastly, the Plan specifies the contingent actions that could be implemented in response to the deviations. Because each response focuses on a discrete portion of the perched aquifer and contaminant plume, each response action has a different set of expected conditions, and therefore differing impacts from deviations to the site and technology expectations. As a result, the contingent actions are identified for each response action and potential deviation including specific constituents, location, and conditions. If deviations are encountered that impact the ability of the response action to meet performance objectives, the contingent actions will be focused on ensuring the response action can meet the performance objective. Contingent actions may be implemented as interim actions (ISMs/removal actions) in accordance with the Record of Decision, Interagency Agreement, and Hazardous Waste Permit‐50284, if warranted by the specific circumstances. For deviations to site characterization expected conditions, the contingent action will focus on determination of the source of the deviation, determination of the appropriate response, and evaluation of additional work to be completed. However, if the deviation to characterization impacts the performance of the response action, the contingent action will again focus on ensuring performance objectives can be met. Early source term removals and cleanup actions have been implemented to protect the Ogallala Aquifer. Because of these actions and based on modeling results, the expected conditions in the Ogallala Aquifer are that constituents of concern will not be detected above the Groundwater Protection Standards (GWPSs) nor will they reach potential points of exposure above the GWPS. The primary deviation of concern for the Ogallala is if constituents are detected in the Ogallala Aquifer near or above GWPSs. If it occurs, this change in expected conditions would require further evaluation of site and contaminant characteristics to determine an appropriate course of action. The evaluation would include additional monitoring, source identification, implementation of interim protective measures (if necessary), and delineation of extent. These evaluations are necessary to determine an appropriate response action for the Ogallala. The primary goal of the Plan is to provide for the continued protection of the Ogallala Aquifer and the health of its consumers. In recognition, this Plan presents a flexible and rational approach for making future decisions associated with confirming the change in perched and Ogallala aquifer conditions and identifying a response (technical activities, changes to response actions, regulatory oversight, and public involvement).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mercury methylation potential and bioavailability in the sediments of two distinct aquatic systems

Here, this study explored mercury (Hg) methylation potential in two distinct aquatic systems. Fourmile Creek (FMC) was historically polluted with Hg effluents from groundwater as it is a typical gaining stream, where organic matter and microorganisms in streambed are continuously winnowed. The H02 constructed wetland only receives atmospheric Hg and is rich in organic matter and microorganisms. Both systems receive Hg from atmospheric deposition now. Surface sediments were collected from FMC and H02, spiked with inorganic Hg, and cultivated in an anaerobic chamber to stimulate microbial Hg methylation reactions. Total mercury (THg) and methylmercury (MeHg) concentrations were measured at each spiking stage. Mercury methylation potential (MMP, %MeHg in THg) and Hg bioavailability were assessed with the deployment of diffusive gradients in thin films (DGTs). During the methylation process and at the same incubation stage, FMC sediment showed faster increasing rates of %MeHg and higher MeHg concentrations than H02, demonstrating a stronger MMP in the FMC sediment. Similarly, higher Hg bioavailability was observed in FMC sediment compared to the H02 as indicated by DGT-Hg concentrations. In conclusion, the H02 wetland with high levels of organic matter and microorganisms presented low MMP. But the Fourmile Creek as a gaining stream and a historical site of Hg pollution showed strong MMP and high Hg bioavailability. A related study on microbial community activities characterized the microorganisms between FMC and H02, which is attributed to be the main reason for their different methylation capabilities. Our study further brought up the considerations on remediated sites from Hg contamination: Hg bioaccumulation and biomagnification can still be elevated and higher than the surrounding environment due to lagged changes in microbial community structures. This study supported the sustainable ecological modifications of legacy Hg contamination and raised the necessity of long-term monitoring actions even after executing a remediation plan.

54 ENVIRONMENTAL SCIENCES↗

Integrated modeling framework (FVCOM-ICM/Toxi) to simulate the fate and transport of polychlorinated biphenyls in urban estuaries–Case study for Puget Sound, WA

Puget Sound is an urban estuary that exhibits persistent polychlorinated biphenyls (PCBs) contamination despite years of remediation efforts. For robust management actions, determining the timing, location, and magnitude of PCB loading sources and transport pathways using field data alone is challenging due to complex water circulation and biogeochemical processes. Here, this study aims to develop an integrated modeling framework that couples complex estuarian circulation with biogeochemical processes and associated interactions with PCB kinetics. The model simulates PCB accumulation in the lower tropic food web, demonstrating PCB intrusion into primary producers and its biomagnification in pelagic consumers. The PCB data from a new field survey was used to calibrate/validate the new PCB modeling framework for Puget Sound. The software program of the modeling framework is available to the user community for the applications of toxic contaminants transport in marine waters.

54 ENVIRONMENTAL SCIENCES↗

Essence2.0 Development and Deployment (Final Report)

The objective of the project was to take two core technologies that have been developed under the Recipient’s solid laboratory products and integrate them into a single CyberPhysical awareness platform and complete development on current field-tested prototypes that will extend the integrated capability of the platform. During the final development phase, the Recipient development team and its selected industry partners tested and hardened the platform to ensure resilient and secure operation of the integrated platform. The team also executed substantial field testing and established the framework for defining the organization and/or commercial infrastructure needed to sustain operations and provide readiness for a national scale deployment. The focus of the project was (1) the improvement, refinement, and deployment of technology for the detection of cyber-attacks on utility operational technology (OT) and information technology (IT) networks and assets, including Supervisory Control and Data Acquisition Systems (SCADA) systems; and (2) support for containment and remediation of adversarial threats and actions against those systems and environments.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ISR Restoration Methods and Applicability to Groundwater Remediation at Abandoned Uranium Mills - 20342

There are numerous abandoned uranium mining and mill sites in the southwestern US. Surface remediation was undertaken in the 1980's and 90's to cover mill tailings and minimize infiltration of meteoric precipitation into the subsurface These actions have reduced the availability of tailings contaminants but many of these sites have persistent groundwater contamination, primarily due to the disposal of tailings and process fluids in unlined impoundments during the mill's operational life. Active in situ recovery (ISR) uranium mining and wellfield restoration practices are examined to determine the factors that contribute to the success of groundwater restoration. Hydrologic characteristics, geochemistry, ore body quality, regulatory requirements and the aboveground components of uranium production and water treatment are considered. While there is no such thing as a typical abandoned mill site, the potential use of ISR restoration methods is evaluated for viability as a remedial alternative to mine and mill sites that have residual contaminated groundwater plumes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of a Soil Flushing Treatability Test for Hanford Site Hexavalent Chromium Removal - 20446

U.S. Department of Energy contractor CH2M Hill Plateau Remediation Company has made significant progress remediating hexavalent chromium in groundwater near the Columbia River through the operation of pump and treat facilities and source removal activities. To mitigate risks associated with hexavalent chromium contamination, which was identified in a CERCLA interim action record of decision as the primary groundwater contaminant of concern for the 100-KR-4 Operable Unit from discharging to the Columbia River, three ion-exchange pump and treat systems were installed between 1997 and 2009. Between 2010 and 2016, operation of the K West pump and treat system, located near the former 105K West plutonium production reactor, reduced concentrations below the groundwater remediation target for hexavalent chromium. In 2016, a rebound study was performed to evaluate the effectiveness of the pump and treat remedy and assess the potential for any residual hexavalent chromium sources continuing to contribute to groundwater contamination. As a result of the rebound study, a source of continued groundwater contamination was identified. To address this condition, a soil flushing treatability test was written and approved by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The test included saturating about a 1-acre area of soil with treated water with the goal of forcing the residual hexavalent chromium to groundwater where existing extraction wells could remove it for treatment, accelerating the cleanup process. In spring and summer 2019, CH2M Hill Plateau Remediation Company installed and began operating a shallow underground leach system to support the treatability test. Preliminary sampling data show the test was effective in removing the residual contamination. Following further evaluation and analysis from the initial test, the process will be considered for implementation elsewhere on the Hanford Site, particularly at locations where there is a known or suspected continuing contamination source in the soil column. The paper will cover the goals of the study, as well as more details about the following: - Overview of pump and treat exit strategy (using U.S. Environmental Protection Agency guidance); - The design and installation of the soil flushing technology in the 100-K Area; - The testing process and results of sampling data; - Post-study evaluation and potential for implementation in other locations at the Hanford Site. Innovative solutions for cleanup, such as the soil flushing technology, have resulted in substantial progress in the removal of groundwater contaminants at the Hanford Site, potentially shortening the time frame required to meet cleanup goals and resulting in significant cost savings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Interactive Visualizations for Communicating Compliance and Sustainability Statements in Annual Site Environmental Reports - 20419

The annual reports of organizations are a recurring type of public disclosure that communicates what an organization has done and/or plans to do. Worldwide, organizations use annual reports as powerful instruments for communication that is rich in narrative content and visuals. From the perspective of the leadership of an organization, statutory annual reports are communication devices to stakeholders. By analogy, from the perspective of stakeholders, the annual reports are learning devices that presents stakeholders with contents to generate knowledge about an organization. We have chosen the online accessible U.S. Department of Energy (DOE) Annual Site Environmental Reports (ASERs) as a collection of resources for communicating and learning the environmental management strategies on environmental compliance and environmental sustainability. Environmental Compliance 'consists of regulatory compliance and monitoring programs that implement federal, state, and local requirements, agreements, and permits.' Environmental Sustainability 'promotes and integrates initiatives such as energy and natural resource conservation, waste minimization, green remediation, and the use of sustainable products and services.' Interactive visualizations of textual data designed with visual analytics software can allow stakeholders to interact with statements on the environmental management strategies by performing diverse actions that promote learning. These actions include annotating, comparing, filtering, navigating, selecting and sharing relevant statements. We expect that the possibility of these multiple actions in an interactive manner help stakeholders to learn more effectively about the environmental strategies at U.S. DOE sites. The current case study for the project is a collection of 1,894 annotated (value-added) statements (sentence text) from the eight chapters of the 2017 Savanah River Site (SRS) annual site environmental report. The preliminary interactive visualizations are available online. (authors)

54 ENVIRONMENTAL SCIENCES↗

The Value of Diversity in the Renewable Energy Industry and Research Community

Part of creating a successful solar industry is developing a capable workforce. It has been repeatedly shown that organizations and companies are more productive when they have diverse and inclusive cultures. The solar industry in the U.S. performs well in some aspects (non-white workforce, positive work environment) but drastically under-performs in many others. We discuss these metrics and how this impacts the renewable energy industry and the solar research community. We highlight some initial actions which are necessary to begin to remediate these deficiencies, such as demographic tracking, recruiting strategies, and mentoring. We also present the historical and ongoing efforts to improve the diversity and inclusion of the Photovoltaic Specialists Conference, particularly through the work of this year’s Diversity and Inclusion (D&I) oversight committee. This year’s D&I committee is implementing diversity tracking, a women’s lunch, a diversity lunch, childcare resources, pronouns on badges, gender-neutral restrooms, addressing accessibility issues, and publishing a diversity statement and code of conduct to the PVSC website.

diversity↗

Issue Resolution During the Development of the Performance Assessment for the Savannah River Site Saltstone Disposal Facility - 20125

In 2019, Savannah River Remediation developed a revision to the performance assessment (PA) on behalf of the U.S. Department of Energy (DOE) Savannah River Operations Office (SR) for the near-surface disposal of low-level waste at the Savannah River Site (SRS) Saltstone Disposal Facility (SDF). Soluble waste from SRS Tank Farms undergoes salt processing to remove cesium and other high-activity constituents. The low-activity decontaminated salt solution (DSS) is then immobilized by mixing it into a cementitious waste form known as saltstone. After mixing, the saltstone is poured into leak-tight concrete vaults, known as saltstone disposal units (SDUs), where the waste form cures. By the time of facility closure, the SDF is expected to consist of 15 SDUs with a combined capacity of 1.06 E+09 L (280 Mgal) of cured saltstone. The facility operates under a Disposal Authorization Statement from DOE and a permit from the South Carolina Department of Health and Environmental Control (SCDHEC). Since the start of operations in 1990, the SDF has received almost 6.7 E+07 L (18 Mgal) of DSS, resulting in the safe disposal of 2.7 E+16 Bq (7.3 E+05 Ci) of activity. Due to the radioactive decay of short-lived contaminants, the total remaining activity in the disposed waste is estimated to be approximately 1.4 E+16 Bq (3.9 E+05 Ci), as of September 2018. The Disposal Authorization Statement requires a demonstration that the system of engineered and natural features of the disposal facility will limit releases from the facility and be protective of human health and the environment for at least the next 1,000 years. The long-term performance of the facility was evaluated under the requirements of the DoE's Radioactive Waste Management Manual (US DOE Manual 435.1-1). Simulations were performed to demonstrate that the disposal facility would meet performance objectives specified in the manual. The evaluation was based on numerical models that simulate the releases of contaminants from the saltstone waste form. Contaminants were transported through groundwater and air pathways to points of assessment to evaluate compliance (i.e., 100 m from the SDUs). In addition, the potential consequences of an inadvertent human intrusion (IHI) were also evaluated. A number of issues were overcome during the development of these simulations. These issues were identified as part of internal technical reviews. Simulations are developed by people and people make mistakes, so the internal technical review process is a vital step in PA development. Specific examples of resolved issues include a unit-conversion error, an inappropriate definition for a model boundary condition, a model time-stepping issue, and an error in the calculation for the buildup of contaminants in soil. Actions taken to address these issues resulted in an improved product with a better supported technical basis and more defensible results. The identification and correction of these issues are discussed. By understanding these issues, model developers and technical reviewers working on PAs in the future may avoid repeating these types of mistakes. Transparency with respect to these mistakes builds trust between waste management sites, regulators, and stakeholders. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Future of Energy Efficiency for U.S. Buildings - Drivers and Market Scenarios

This paper identifies likely drivers of building efficiency over the next ten years and expectations for how efficiency markets may evolve over this period. To prepare these predictions, we conducted an extensive literature review, interviewed 22 experts, reviewed legislation and executive orders in 12 states, and implemented a detailed questionnaire completed by 41 efficiency practitioners. The two most important drivers revealed by our research are (1) public policies and regulations, particularly those associated with climate change mitigation and adaptation and (2) the cost of energy relative to the cost of delivering efficiency. Other important drivers are technology changes, economic conditions, social priorities, and industry (including utility) business practices for increasing the uptake of efficiency in buildings. Our research indicates that efficiency markets will increasingly focus on supporting building decarbonization and enabling demand flexibility through the use of controls in grid-interactive efficient buildings and communities. Efficiency improvements for specific technologies (e.g., heat pumps, controls, and windows) and technological advances not specific to energy technologies (e.g., interoperability, artificial intelligence, and universal internet access) will improve the efficacy of efficiency measures and actions. Marketing of efficient products and services will increasingly focus on grid services, decarbonization, non-energy benefits for consumers, and integration with other distributed energy resources (DERs). We anticipate increased investment in disadvantaged and historically underserved communities, recognizing the social, health, and safety benefits of efficient energy usage and remediating historical biases. Lastly, we predict that while state and local government actions will vary, jurisdictions will increase their efficiency goals overall.

Schiller, Steven R↗

2019 Groundwater Monitoring Report Project Shoal Area: Subsurface Corrective Action Unit 447

The Project Shoal Area is a site in Nevada where an underground nuclear test was conducted in 1963. It later came to be known as the Shoal, Nevada, Site. Surface contamination at the site has been remediated, but investigation of groundwater contamination resulting from the test is still in the corrective action process. Annual sampling and water-level monitoring are conducted as part of the subsurface corrective action strategy, which has focused on revising the site conceptual model and evaluating the adequacy of the monitoring well network. It has also included enhancements to the monitoring well network to address uncertainties in the groundwater flow direction and the cause of rising water levels in site wells west of the shear zone since the first hydrologic characterization (HC) wells were installed in 1996. Revisions to the site conceptual model and enhancements to the monitoring strategy were provided to Nevada Division of Environmental Protection (NDEP) in the Addendum to: Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for the Subsurface Corrective Action Unit 447 Shoal, Nevada, Site. NDEP approved the addendum to the CADD/CAP, which included an expanded contaminant boundary and compliance boundary for the site.

54 ENVIRONMENTAL SCIENCES↗

Optimum concentration of fly ash nanoparticles to stabilize CO 2 foams for aquifer and soil remediation

Contamination caused by non-aqueous phase liquids (NAPLs) in aquifers and soil is an important challenge that requires effective remediation techniques. One potential approach is through the use of CO 2 foams to displace NAPLs from permeable media. CO 2 foams generated only by surfactants are not stable enough for the efficient removal of NAPLs contamination. This shortcoming may be alleviated via the use of nanoparticles (NPs)-surfactant mixtures as a stabilizing agent. This work focuses on the evaluation of the optimum concentration of fly ash nanoparticles for stabilizing CO 2 foam with the combined action of the surfactant. The performance of this foam is evaluated in remediating a contaminated 41 mm × 36 mm surrogate permeable medium in a microfluidic device. Mixtures of fly ash, a by-product of coal-burning power plants, and alpha-olefin sulfonate (AOS) and lauramidopropyl betaine (LAPB) surfactants are used to generate stable foams. The results show that a 1000 mg/L AOS-LAPB surfactant solution along with 1000 mg/L of fly ash NPs produces the best performance. Formation of deposits in the matrix is observed. These deposits, which are more prominent at higher NP concentrations, appear to adversely affect displacement, displacement efficiency and remediation of the medium. This study demonstrates that using fly ash nanoparticles and optimizing their concentration can effectively stabilize CO 2 foams and improve the displacement efficiency for aquifer and soil remediation.

54 ENVIRONMENTAL SCIENCES↗