Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RECONNAISSANCE SPACECRAFT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Radar Reconnaissance of Near-Earth Asteroids

Groundbased radar observations of NEAs can help identify space resources with commercial potential and can dramatically reduce the cost and risk of the initial spacecraft missions to those objects. The near Earth asteroid (NEA) population is thought to contain approx. 1500 objects as large as a kilometer, approx. 300,000 as large as 100 meters, and more than 100,000,000 as large as 10 meters. More than 10% of the NEAs are more accessible in terms of mission delta-V (i.e., fuel required) than the Moon, Mars, or the moons of Mars. Fewer than 1000 NEAs have been found, but the discovery rate is increasing rapidly. Once an asteroid is discovered (necessarily by wide-field optical telescopes), radar can provide otherwise unavailable information about its size, shape, spin state, and surface properties if it approaches within the range of the Goldstone (California) or Arecibo (Puerto Rico) radar telescopes. Asteroids generally appear as unresolved points through groundbased optical telescopes, but radar measurements of the distribution of echo power in time delay (range) and Doppler frequency (radial velocity) can yield images with resolution as fine as a decameter. Image sequences that furnish adequate orientational coverage can be inverted to construct geologically detailed 3-D models, to define the rotation state precisely, and to constrain the object's internal density distribution. Estimates of radar scattering properties characterize the surface's cm-to-m-scale roughness as well as its bulk density, which for asteroids depends primarily on porosity and metal concentration. A useful spin-off of radar detection is orbit refinement that simplifies navigation of flyby and rendezvous spacecraft.

Ostro, S. J.↗

Building Lunar Maps for Terrain Relative Navigation and Hazard Detection Applications

Terrain Relative Navigation (TRN) systems localize a spacecraft with respect to a map of the surface by comparing descent imagery to that reference map. The spacecraft position estimates can only be as accurate as the reference map itself. Accurate map products that are based on orbital reconnaissance data must be validated for navigation applications to ensure that all relevant error sources are minimized. Currently available map products have been generated for scientific applications, so the need for accurate TRN maps remains a gap to be filled for upcoming lunar lander missions, in particular missions to the South Pole region. Additionally, representative high-resolution maps that contain lander-scale features are needed for successful development and testing of Hazard Detection (HD) systems. This paper describes one of NASA’s current efforts to develop benchmark data sets that can be used for developing and testing TRN and HD algorithms as well as suggested processes and metrics for generating and validating lunar maps that can be used for navigation and hazard detection.

Lunar Maps↗

Pattern-Recognition System for Approaching a Known Target

A closed-loop pattern-recognition system is designed to provide guidance for maneuvering a small exploratory robotic vehicle (rover) on Mars to return to a landed spacecraft to deliver soil and rock samples that the spacecraft would subsequently bring back to Earth. The system could be adapted to terrestrial use in guiding mobile robots to approach known structures that humans could not approach safely, for such purposes as reconnaissance in military or law-enforcement applications, terrestrial scientific exploration, and removal of explosive or other hazardous items. The system has been demonstrated in experiments in which the Field Integrated Design and Operations (FIDO) rover (a prototype Mars rover equipped with a video camera for guidance) is made to return to a mockup of Mars-lander spacecraft. The FIDO rover camera autonomously acquires an image of the lander from a distance of 125 m in an outdoor environment. Then under guidance by an algorithm that performs fusion of multiple line and texture features in digitized images acquired by the camera, the rover traverses the intervening terrain, using features derived from images of the lander truss structure. Then by use of precise pattern matching for determining the position and orientation of the rover relative to the lander, the rover aligns itself with the bottom of ramps extending from the lander, in preparation for climbing the ramps to deliver samples to the lander. The most innovative aspect of the system is a set of pattern-recognition algorithms that govern a three-phase visual-guidance sequence for approaching the lander. During the first phase, a multifeature fusion algorithm integrates the outputs of a horizontal-line-detection algorithm and a wavelet-transform-based visual-area-of-interest algorithm for detecting the lander from a significant distance. The horizontal-line-detection algorithm is used to determine candidate lander locations based on detection of a horizontal deck that is part of the lander.

Huntsberger, Terrance↗

Requirements and Capabilities for Planetary Missions: Mariner Encke Ballistic Flyby 1980

This mission will provide a broad-based fast reconnaissance of comet Encke, building a data base for subsequent more detailed comet investigations, including rendezvous. After a 3 month flight, the spacecraft will encounter the comet at a nominal range of about 500 km. Flyby velocity will be 7 to 28 km/sec depending on choice of arrival data (0 to 35 days before Encke perihelion) and launch vehicle. The spacecraft will be similar to the MVM 73 spacecraft, with scan platform and 117 kbps encounter data rate, and designed to survive the thermal environment of 0.34 to 0.8 AU.

Ball, G. G.↗

Stray Light Lessons Learned from the Mars Reconnaissance Orbiter's Optical Navigation Camera

The Optical Navigation Camera (ONC) is a technical demonstration slated to fly on NASA"s Mars Reconnaissance Orbiter in 2005. Conventional navigation methods have reduced accuracy in the days immediately preceding Mars orbit insertion. The resulting uncertainty in spacecraft location limits rover landing sites to relatively safe areas, away from interesting features that may harbor clues to past life on the planet. The ONC will provide accurate navigation on approach for future missions by measuring the locations of the satellites of Mars relative to background stars. Because Mars will be a bright extended object just outside the camera"s field of view, stray light control at small angles is essential. The ONC optomechanical design was analyzed by stray light experts and appropriate baffles were implemented. However, stray light testing revealed significantly higher levels of light than expected at the most critical angles. The primary error source proved to be the interface between ground glass surfaces (and the paint that had been applied to them) and the polished surfaces of the lenses. This paper will describe troubleshooting and correction of the problem, as well as other lessons learned that affected stray light performance.

stray lights↗

A Low Cost Spacecraft Architecture for Robotic Lunar Exploration Projects

A program of frequent, capable, but affordable lunar robotic missions prior to return of humans to the moon can contribute to the Vision for Space Exploration (VSE) NASA is tasked to execute. The Lunar Reconnaissance Orbiter (LRO) and its secondary payload are scheduled to orbit the moon, and impact it, respectively, in 2008. It is expected that the sequence of missions occurring for approximately the decade after 2008 will place an increasing emphasis on soft landed payloads. These missions are requited to explore intrinsic characteristics of the moon, such as hydrogen distribution in the regolith, and levitated dust, to demonstrate the ability to access and process in-situ resources, and to demonstrate functions critical to supporting human presence, such as automated precision navigation and landing. Additional factors governing the design of spacecraft to accomplish this diverse set of objectives are: operating within a relatively modest funding profile, the need tb visit multiple sites (both polar and equatorial) repeatedly, and to use the current generation of launch vehicles. In the US, this implies use of the Evolved Expendable Launch Vehicles, or EELVs, although this design philosophy may be extended to launch vehicles of other nations, as well. Many of these factors are seemingly inconsistent with each other. For example, the cost of a spacecraft usually increases with mass; therefore the desire to fly frequent, modestly priced spacecraft seems to imply small spacecraft (< 1 Mt, injected mass). On the other hand, the smallest of the EELVs will inject approx. 3 Mt. on a Trans Lunar Injection (TLI) trajectory md would therefore be wasteful or launching a single, small spacecraft. Increasing the technical capability of a spacecraft (such as autonomous navigation and soft landing) also usually increases cost. A strategy for spacecraft design that meets these conflicting requirements is presented. Taken together, spacecraft structure and propulsion subsystems constitute the majority of spacecraft mass; saving development and integration cost on these elements is critical to controlling cost. Therefore, a low cost, modular design for spacecraft structure and propulsion subsystems is presented which may be easily scaled up or down for either insertion into lunar orbit or braking for landing on the lunar surface. In order to effectively use the approx.3 Mt mass-to-TLI of the EELV, two low cost spacecraft will be manifested on the same launch. One spacecraft will be located on top of the other for launch and the two will have to be released in sequence in order to achieve all mission objectives. The two spacecraft could both be landers, both orbiters, or one lander and one orbiter. In order to achieve mass efficiency, the body of the spacecraft will serve the dual purposes of carrying launch loads and providing attachment points for all the spacecraft subsystems. In order to avoid unaffordable technology development costs, small liquid propulsion components and autonomous, scene-matching navigation cameras may be adapted from military missile programs in order to execute precision soft landings.

Lemke, Lawrence G.↗

The Mars Reconnaissance Orbiter Mission: 2018 Status

The Mars Reconnaissance Orbiter (MRO) continues its dual-mode mission of scientific exploration and programmatic support. Now in its 13th year of flight (and its 12th year in its low-altitude, sun-synchronous orbit around Mars), the spacecraft continues in its normal flight mode and its science instruments continue to acquire a treasure trove of data which is being used to study the Martian environment (surface, sub-surface, and atmosphere). To date (July 2018), more than 333 TB of scientific data have been returned to Earth. Building onto the 2017 IAC paper: “The Mars Reconnaissance Orbiter Mission: Continuing a Record of Exploration from Mars Orbit,” [1] this paper provides a 2018 status update on the MRO Mission. A signature event since the 2017 writing is the onset and evolution of a planet-encircling dust event (PEDE), the first such event since 2007. Additional recent science highlights for MRO include the discovery of mid-latitude ice cliffs, polar cap characterization, daily global mapping of the 2018 PEDE dust activity and the atmospheric thermal response, further characterization of the tantalizing recurring slope lineae (RSL), and continued detection of surface changes. Programmatically, UHF relay support for the Mars Science Laboratory (MSL) rover Curiosity and the Mars Exploration Rover (MER) rover Opportunity continues at a pace that provides the engineers and scientists operating those surface vehicles timely information to support their mission planning and science analysis. Most of the landing site characterization requests for the NASA Mars 2020 rover and the ESA ExoMars Rover/Surface Platform (RSP) missions have been completed, with final acquisitions delayed due to the obscuring dust haze from the current PEDE. In parallel, the flight team has faced new engineering challenges as the spacecraft has aged. The team has developed and is implementing actions that are aimed at stretching spacecraft battery life. A new all-stellar capability using the spacecraft’s star trackers now allows for normal spacecraft operations without IMUs. In addition to its current relay duties, MRO will be synchronized to provide critical communications support for the InSight Entry, Descent, and Landing (EDL) event on November 26, 2018, and will be readied to support InSight’s critical commissioning phase with UHF relay support and environmental characterization. A new split-pass relay capability has been developed which will allow MRO to relay with two surface vehicles in “close proximity” on the same overflight, i.e. the InSight lander and the Curiosity rover. Extended for another year of operations by NASA, this paper will highlight recent scientific progress and describe actions that will extend MRO’s life well into the 2020’s as a key element of the Mars Exploration Program.

Zurek, Richard W.↗

Probabilistic Risk Assessment (PRA): A Practical and Cost Effective Approach

The Lunar Reconnaissance Orbiter (LRO) is the first mission of the Robotic Lunar Exploration Program (RLEP), a space exploration venture to the Moon, Mars and beyond. The LRO mission includes spacecraft developed by NASA Goddard Space Flight Center (GSFC) and seven instruments built by GSFC, Russia, and contractors across the nation. LRO is defined as a measurement mission, not a science mission. It emphasizes the overall objectives of obtaining data to facilitate returning mankind safely to the Moon in preparation for an eventual manned mission to Mars. As the first mission in response to the President's commitment of the journey of exploring the solar system and beyond: returning to the Moon in the next decade, then venturing further into the solar system, ultimately sending humans to Mars and beyond, LRO has high-visibility to the public but limited resources and a tight schedule. This paper demonstrates how NASA's Lunar Reconnaissance Orbiter Mission project office incorporated reliability analyses in assessing risks and performing design tradeoffs to ensure mission success. Risk assessment is performed using NASA Procedural Requirements (NPR) 8705.5 - Probabilistic Risk Assessment (PRA) Procedures for NASA Programs and Projects to formulate probabilistic risk assessment (PRA). As required, a limited scope PRA is being performed for the LRO project. The PRA is used to optimize the mission design within mandated budget, manpower, and schedule constraints. The technique that LRO project office uses to perform PRA relies on the application of a component failure database to quantify the potential mission success risks. To ensure mission success in an efficient manner, low cost and tight schedule, the traditional reliability analyses, such as reliability predictions, Failure Modes and Effects Analysis (FMEA), and Fault Tree Analysis (FTA), are used to perform PRA for the large system of LRO with more than 14,000 piece parts and over 120 purchased or contractor built components.

Lee, Lydia L.↗

Strong Temporal Variation Over One Saturnian Year: From Voyager to Cassini

Here we report the combined spacecraft observations of Saturn acquired over one Saturnian year (approximately 29.5 Earth years), from the Voyager encounters (1980-81) to the new Cassini reconnaissance (2009-10). The combined observations reveal a strong temporal increase of tropic temperature (approximately 10 Kelvins) around the tropopause of Saturn (i.e., 50 mbar), which is stronger than the seasonal variability (approximately a few Kelvins). We also provide the first estimate of the zonal winds at 750 mbar, which is close to the zonal winds at 2000 mbar. The quasi-consistency of zonal winds between these two levels provides observational support to a numerical suggestion inferring that the zonal winds at pressures greater than 500 mbar do not vary significantly with depth. Furthermore, the temporal variation of zonal winds decreases its magnitude with depth, implying that the relatively deep zonal winds are stable with time.

Cassini↗

Prediction of Lunar Reconnaissance Orbiter Reaction Wheel Assembly Angular Momentum Using Regression Analysis

This study determines the feasibility of creating a tool that can accurately predict Lunar Reconnaissance Orbiter (LRO) reaction wheel assembly (RWA) angular momentum, weeks or even months into the future. LRO is a three-axis stabilized spacecraft that was launched on June 18, 2009. While typically nadir-pointing, LRO conducts many types of slews to enable novel science collection. Momentum unloads have historically been performed approximately once every two weeks with the goal of maintaining system total angular momentum below 70 Nms; however flight experience shows the models developed before launch are overly conservative, with many momentum unloads being performed before system angular momentum surpasses 50 Nms. A more accurate model of RWA angular momentum growth would improve momentum unload scheduling and decrease the frequency of these unloads. Since some LRO instruments must be deactivated during momentum unloads and in the case of one instrument, decontaminated for 24 hours there after a decrease in the frequency of unloads increases science collection. This study develops a new model to predict LRO RWA angular momentum. Regression analysis of data from October 2014 to October 2015 was used to develop relationships between solar beta angle, slew specifications, and RWA angular momentum growth. The resulting model predicts RWA angular momentum using input solar beta angle and mission schedule data. This model was used to predict RWA angular momentum from October 2013 to October 2014. Predictions agree well with telemetry; of the 23 momentum unloads performed from October 2013 to October 2014, the mean and median magnitude of the RWA total angular momentum prediction error at the time of the momentum unloads were 3.7 and 2.7 Nms, respectively. The magnitude of the largest RWA total angular momentum prediction error was 10.6 Nms. Development of a tool that uses the models presented herein is currently underway.

LRO↗

Jet Propulsion Laboratory: Annual Report 2006

Nothing is as gratifying in space exploration as when we are surprised by the unexpected. Much of our work progresses in an orderly way, from concept to plan to creation to finding. But now and then we are caught off-guard by something startlingly new, and it is these moments that make our hearts race and leave us with many of our most compelling memories. And 2006 was an exceptional year for the unforeseen. One of our orbiters shocked many with stark proof that liquid water, the seemingly long-gone force that reshaped so much of the scenery of Mars, still flows there today,at least in occasional bursts. Another spacecraft caught us by surprise with photos of Yellowstone-like geysers on one of Saturn's seemingly nondescript moons, Enceladus. A spaceborne observatory created to plumb the life histories of stars and galaxies showed off a completely unexpected talent when it revealed the day and night faces of a fire and ice planet far beyond our solar system 40 light-years away. A newly launched Earth observer revealed that the clouds that decorate our own planet are not what we thought them to be in many ways. Of course, not all of the high points of the year arrived on our doorstep in such unexpected ways. There was also great drama when missions came off exactly as planned, such as when Stardust's sample return capsule made a flawless landing in the Utah desert, bringing home samples of cometary and interstellar dust. Mars Reconnaissance Orbiter slipped into orbit around the red planet exactly as planned. Numerous other missions and technology programs likewise made great achievements during the year. In all, 17 spacecraft and six instruments were stationed across the solar system, studying our own world, other planets, comets and the deeper universe. All of these achievements were enabled by many teams and systems at the Laboratory. The Deep Space Network of communications complexes across three continents supported all of NASA's solar system missions, and several from our international partners, while looking ahead to reinvent itself for the future. Technologists were at work creating innovations both for NASA missions and terrestrial uses. JPL's community of scientific researchers was equally busy coordinating the science activities of our missions and pursuing independent investigations. None of this would be possible without the support of business and administrative teams dedicated to making the Laboratory's institutional environment as world-class as its technical face, or the public engagement specialists who bring the experience of space to the country's diverse publics. All of our missions in one way or another support our nation's Vision for Space Exploration, which envisages a gradually widening robotic and human presence across the solar system in the years ahead.

National Aeronautics and Space Administration (NAS↗

Gimbals Drive and Control Electronics Design, Development and Testing of the LRO High Gain Antenna and Solar Array Systems

Launched June 18, 2009 on an Atlas V rocket, NASA's Lunar Reconnaissance Orbiter (LRO) is the first step in NASA's Vision for Space Exploration program and for a human return to the Moon. The spacecraft (SC) carries a wide variety of scientific instruments and provides an extraordinary opportunity to study the lunar landscape at resolutions and over time scales never achieved before. The spacecraft systems are designed to enable achievement of LRO's mission requirements. To that end, LRO's mechanical system employed two two-axis gimbal assemblies used to drive the deployment and articulation of the Solar Array System (SAS) and the High Gain Antenna System (HGAS). This paper describes the design, development, integration, and testing of Gimbal Control Electronics (GCE) and Actuators for both the HGAS and SAS systems, as well as flight testing during the on-orbit commissioning phase and lessons learned.

Chernyakov, Boris↗

Demonstration of Orbit Determination for the Lunar Reconnaissance Orbiter Using One-Way Laser Ranging Data

We used one-way laser ranging data from International Laser Ranging Service (ILRS) ground stations to NASA's Lunar Reconnaissance Orbiter (LRO) for a demonstration of orbit determination. In the one-way setup, the state of LRO and the parameters of the spacecraft and all involved ground station clocks must be estimated simultaneously. This setup introduces many correlated parameters that are resolved by using a priori constraints. More over the observation data coverage and errors accumulating from the dynamical and the clock modeling limit the maximum arc length. The objective of this paper is to investigate the effect of the arc length, the dynamical and modeling accuracy and the observation data coverage on the accuracy of the results. We analyzed multiple arcs using lengths of 2 and 7 days during a one-week period in Science Mission phase 02 (SM02,November2010) and compared the trajectories, the post-fit measurement residuals and the estimated clock parameters. We further incorporated simultaneous passes from multiple stations within the observation data to investigate the expected improvement in positioning. The estimated trajectories were compared to the nominal LRO trajectory and the clock parameters (offset, rate and aging) to the results found in the literature. Arcs estimated with one-way ranging data had differences of 5-30 m compared to the nominal LRO trajectory. While the estimated LRO clock rates agreed closely with the a priori constraints, the aging parameters absorbed clock modeling errors with increasing clock arc length. Because of high correlations between the different ground station clocks and due to limited clock modeling accuracy, their differences only agreed at the order of magnitude with the literature. We found that the incorporation of simultaneous passes requires improved modeling in particular to enable the expected improvement in positioning. We found that gaps in the observation data coverage over 12h (approximately equals 6 successive LRO orbits) prevented the successful estimation of arcs with lengths shorter or longer than 2 or 7 days with our given modeling.

Bauer, S.↗

Autonomous Aerobraking Development Software: Phase One Performance Analysis at Mars, Venus, and Titan

When entering orbit about a planet or moon with an appreciable atmosphere, instead of using only the propulsion system to insert the spacecraft into its desired orbit, aerodynamic drag can be used after the initial orbit insertion to further decelerate the spacecraft. Several past NASA missions have used this aerobraking technique to reduce the fuel required to deliver a spacecraft into a desired orbit. Aerobraking was first demonstrated at Venus with Magellan in 1993 and then was used to achieve the science orbit of three Mars orbiters: Mars Global Surveyor in 1997, Mars Odyssey in 2001, and Mars Reconnaissance Orbiter in 2006. Although aerobraking itself reduces the propellant required to reach a final low period orbit, it does so at the expense of additional mission time to accommodate the aerobraking operations phase (typically 3-6 months), a large mission operations staff, and significant Deep Space Network (DSN) coverage. By automating ground based tasks and analyses associated with aerobraking and moving these onboard the spacecraft, a flight project could save millions of dollars in operations staffing and DSN costs (Ref. 1).

Maddock, Robert W.↗

Mars Reconnaissance Orbiter Ka-band (32 GHz) Demonstration: Cruise Phase Operations

The X-band (8.41 GHz) frequency currently used for deep space telecommunications is too narrow (50 MHz) to support future high rate missions. Because of this NASA has decided to transition to Ka-band (32 GHz) frequencies. As weather effects cause much larger fluctuations on Ka-band than on X-band, the traditional method of using a few dBs of margin to cover these fluctuations is wasteful of power for Ka-band; therefore, a different operations concept is needed for Ka-band links. As part of the development of the operations concept for Ka-band, NASA has implemented a fully functioning Ka-band communications suite on its Mars Reconnaissance Orbiter (MRO). This suite will be used during the primary science phase to develop and refine the Ka-band operations concept for deep space missions. In order to test the functional readiness of the spacecraft and the Deep Space Network's (DSN) readiness to support the demonstration activities a series of passes over DSN 34-m Beam Waveguide (BWG) antennas were scheduled during the cruise phase of the mission. MRO was launched on August 12, 2005 from Kennedy Space Center, Cape Canaveral, Florida, USA and went into Mars Orbit on March 10, 2006. A total of ten telemetry demonstration and one high gain antenna (HGA) calibration passes were allocated to the Ka-band demonstration. Furthermore, a number of "shadow" passes were also scheduled where, during a regular MRO track over a Ka-band capable antenna, Ka-band was identically configured as the X-band and tracked by the station. In addition, nine Ka-band delta differential one way ranging ((delta)DOR) passes were scheduled. During these passes, the spacecraft and the ground system were put through their respective paces. Among the highlights of these was setting a single day record for data return from a deep space spacecraft (133 Gbits) achieved during one 10-hour pass; achieving the highest data rate ever from a planetary mission (6 Mbps) and successfully demonstrating Ka-band DDOR. In addition, DSN performed well. However, there are concerns with the active pointing of the Ka-band antennas as well as delivery of the monitor data from the stations. The spacecraft also presented challenges not normally associated with planetary missions mostly because of its very high equivalent isotropic radiated power (EIRP). This caused problems in accurately evaluating the in-flight EIRP of the spacecraft which led to difficulties evaluating the quality of the HGA calibration data. These led to the development of additional measurement techniques that could be used for future high-power deep space missions.

Mars Reconnaissance Orbiter (MRO)↗

3-μm Spectroscopy of Phobos and Deimos

The origin of the Martian moons Phobos and Deimos is still not well understood and two scenarios have been proposed for their formation: in-situ and captured asteroid[1]. The in-situ scenario suggested that Phobos and Deimos were formed from Martian materials by co-accretion with Mars[2] or re-accretion of Mars (e.g.,[3],[4],[5]). The captured asteroid scenario proposed that Phobos and Deimos were formed from captured primitive materials originating from the outer solar system[6, 7]. Previous telescopic data have revealed significant information about Phobos’ and Deimos’ spectral properties [8,9,10,11]. Additionally, spacecraft and spec-trometers such as Observatoire pour la Mineralogie, L’Eau, Les Glaces et l’Activité (OMEGA) onboard Mars Express and the Compact Reconnaissance Imaging Spectrometer for Mars (CRISM) onboard Mars Reconnaissance Orbiter (MRO) collected visible to near-infrared imaging spectroscopic data of both Phobos and Deimos [12, 13,14,15]. Results from these investigations show that the two moons are moderately low albedo objects with no significant diagnostic absorptions of common ferrous minerals such as olivine and pyroxene. All these ground-and space-based spectroscopic studies of Phobos and Deimos included a spectral range that did not go beyond ~3.5 μm. Here we present spectra of Phobos and Deimos that cover the ~0.7-4 μmrange to search for signatures of hydrated minerals, organics, and carbonates.

D Takir↗

25th Space Simulation Conference. Environmental Testing: The Earth-Space Connection

Topics covered include: Methods of Helium Injection and Removal for Heat Transfer Augmentation; The ESA Large Space Simulator Mechanical Ground Support Equipment for Spacecraft Testing; Temperature Stability and Control Requirements for Thermal Vacuum/Thermal Balance Testing of the Aquarius Radiometer; The Liquid Nitrogen System for Chamber A: A Change from Original Forced Flow Design to a Natural Flow (Thermo Siphon) System; Return to Mercury: A Comparison of Solar Simulation and Flight Data for the MESSENGER Spacecraft; Floating Pressure Conversion and Equipment Upgrades of Two 3.5kw, 20k, Helium Refrigerators; Affect of Air Leakage into a Thermal-Vacuum Chamber on Helium Refrigeration Heat Load; Special ISO Class 6 Cleanroom for the Lunar Reconnaissance Orbiter (LRO) Project; A State-of-the-Art Contamination Effects Research and Test Facility Martian Dust Simulator; Cleanroom Design Practices and Their Influence on Particle Counts; Extra Terrestrial Environmental Chamber Design; Contamination Sources Effects Analysis (CSEA) - A Tool to Balance Cost/Schedule While Managing Facility Availability; SES and Acoustics at GSFC; HST Super Lightweight Interchangeable Carrier (SLIC) Static Test; Virtual Shaker Testing: Simulation Technology Improves Vibration Test Performance; Estimating Shock Spectra: Extensions beyond GEVS; Structural Dynamic Analysis of a Spacecraft Multi-DOF Shaker Table; Direct Field Acoustic Testing; Manufacture of Cryoshroud Surfaces for Space Simulation Chambers; The New LOTIS Test Facility; Thermal Vacuum Control Systems Options for Test Facilities; Extremely High Vacuum Chamber for Low Outgassing Processing at NASA Goddard; Precision Cleaning - Path to Premier; The New Anechoic Shielded Chambers Designed for Space and Commercial Applications at LIT; Extraction of Thermal Performance Values from Samples in the Lunar Dust Adhesion Bell Jar; Thermal (Silicon Diode) Data Acquisition System; Aquarius's Instrument Science Data System (ISDS) Automated to Acquire, Process, Trend Data and Produce Radiometric System Assessment Reports; Exhaustive Thresholds and Resistance Checkpoints; Reconfigurable HIL Testing of Earth Satellites; FPGA Control System for the Automated Test of MicroShutters; Ongoing Capabilities and Developments of Re-Entry Plasma Ground Tests at EADS-ASTRIUM; Operationally Responsive Space Standard Bus Battery Thermal Balance Testing and Heat Dissipation Analysis; Galileo - The Serial-Production AIT Challenge; The Space Systems Environmental Test Facility Database (SSETFD), Website Development Status; Simulated Reentry Heating by Torching; Micro-Vibration Measurements on Thermally Loaded Multi-Layer Insulation Samples in Vacuum; High Temperature Life Testing of 80Ni-20Cr Wire in a Simulated Mars Atmosphere for the Sample Analysis at Mars (SAM) Instrument Suit Gas Processing System (GPS) Carbon Dioxide Scrubber; The Planning and Implementation of Test Facility Improvements; and Development of a Silicon Carbide Molecular Beam Nozzle for Simulation Planetary Flybys and Low-Earth Orbit.

Packard, Edward↗

The World Is Not Enough (WINE) - Space Mining Robot with Steam Propulsion

The World Is Not Enough (WINE) is a concept for a new generation of spacecraft that takes advantage of In-Situ Resource Utilization (ISRU) to explore space. WINE mines to extract water from planetary regolith, capturing the water as ice in a cold trap and heating it to create steam for propulsion. By propulsively "hopping" from location to location, WINE can explore Solar System bodies as well as individual bodies (e.g. WINE could cover much greater distances on Europa or the Moon than a rover, and can reach otherwise inaccessible regions). And by refueling itself as it goes, WINE's range is not limited by consumables. This makes WINE particularly well suited to prospecting and reconnaissance missions. A prototype of WINE was designed, fabricated and tested in a large vacuum chamber. The vehicle was used to demonstrate several of the primary operations that would be required of the WINE spacecraft including: mining and heating regolith to extract water; capturing water as ice in a cold trap; reorienting the vehicle to allow for further mining; pushing captured water into a propulsion tank; and heating propellant to create steam for thrust. All systems demonstrated are fully functional. All tests are conducted with regolith simulant in a vacuum chamber.

Propulsion↗