Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “REACTOR VESSELS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Progress in the development of the neutron flux monitoring system of the French GEN-IV SFR: simulations and experimental validations [ANIMMA--2015-IO-392]

France has a long experience of about 50 years in designing, building and operating sodium-cooled fast reactors (SFR) such as RAPSODIE, PHENIX and SUPER PHENIX. Fast reactors feature the double capability of reducing nuclear waste and saving nuclear energy resources by burning actinides. Since this reactor type is one of those selected by the Generation IV International Forum, the French government asked, in the year 2006, CEA, namely the French Alternative Energies and Atomic Energy Commission, to lead the development of an innovative GEN-IV nuclear- fission power demonstrator. The major objective is to improve the safety and availability of an SFR. The neutron flux monitoring (NFM) system of any reactor must, in any situation, permit both reactivity control and power level monitoring from startup to full power. It also has to monitor possible changes in neutron flux distribution within the core region in order to prevent any local melting accident. The neutron detectors will have to be installed inside the reactor vessel because locations outside the vessel will suffer from severe disadvantages; radially the neutron shield that is also contained in the reactor vessel will cause unacceptable losses in neutron flux; below the core the presence of a core-catcher prevents from inserting neutron guides; and above the core the distance is too large to obtain decent neutron signals outside the vessel. Another important point is to limit the number of detectors placed in the vessel in order to alleviate their installation into the vessel. In this paper, we show that the architecture of the NFM system will rely on high-temperature fission chambers (HTFC) featuring wide-range flux monitoring capability. The definition of such a system is presented and the justifications of technological options are brought with the use of simulation and experimental results. Firstly, neutron-transport calculations allow us to propose two in-vessel regions, namely the above-core and under-core structures. We verify that they comply with the main objective, that is the neutron power and flux distribution monitoring. HTFC placed in these two regions can detect an inadvertent control rod withdrawal that is a postulated initiating event for safety demonstration. Secondly, we show that the HTFC reliability is enhanced thanks to a more robust physical design and the fact that it has been justified that the mineral insulation is insensitive to any increase in temperature. Indeed, the HTFC insulation is subject to partial discharges at high temperature when the electric field between their electrodes is greater than about 200 V/mm or so. These discharges give rise to signals similar to the neutron pulses generated by a fission chamber itself, which may bias the HTFC count rate at start-up only. However, as displayed in Figure 1, we have experimentally verified that one can discriminate neutron pulses from partial discharges using online estimation of pulse width. Thirdly, we propose to estimate the count rate of a HTFC using the third order cumulant of its signal that is described by a filtered Poisson process. For such a statistic process, it is known that any cumulant, also called cumulative moment, is proportional to the process intensity that is here the count rate of a fission chamber. One recalls that the so-called Campbelling mode of such a detector is actually based on the signal variance, which is the second-order cumulant as well. The use of this extended Campbelling mode based on the third-order cumulant will permit to ensure the HTFC response linearity over the entire neutron flux range using a signal processing technique that is simple enough to satisfy design constraints on electric devices important for nuclear safety. We also show that this technique, named high order Campbelling method (HOC), is significantly more robust than another technique based on the change in the HTFC filling gas, which consists in adding a few percent of nitrogen. Finally, we also present an experimental campaign devoted to the required calibration process of the so-called HOC method. The Campbelling results show a good agreement with the simple pulse counting estimation at low count rates. It is also shown that the HOC technique provides a linear estimation of the count rates at higher power levels as well.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Next Generation Nuclear Plant Reactor Pressure Vessel Materials Research and Development Plan (PLN-2803)

The U.S. Department of Energy (DOE) has selected the High-Temperature Gas-cooled Reactor (HTGR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for electricity and hydrogen production, with an outlet gas temperature in the range of 750°C, and a design service life of 60 years. The reactor design will be a graphite-moderated, helium-cooled, prismatic, or pebble bed reactor and use low-enriched uranium, Tri-Isotopic (TRISO)-coated fuel. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. Selection of the technology and design configuration for the NGNP must consider both the cost and risk profiles to ensure that the demonstration plant establishes a sound foundation for future commercial deployments. The NGNP challenge is to achieve a significant advancement in nuclear technology while setting the stage for an economically viable deployment of the new technology in the commercial sector soon after 2020. This technology development plan details the additional research and development (R&D) required to design and license the NGNP RPV, assuming that A 508/A 533 is the material of construction. The majority of additional information that is required is related to long-term aging behavior at NGNP vessel temperatures, which are somewhat above those commonly encountered in the existing database from LWR experience. Additional data are also required for the anticipated NGNP environment. An assessment of required R&D for a Grade 91 vessel has been retained from the first revision of the R&D plan in Appendix B in somewhat less detail. Considerably more development is required for this steel compared to A 508/A 533 including additional irradiation testing for expected NGNP operating temperatures, high-temperature mechanical properties, and extensive studies of long-term microstructural stability.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Chooz A, First Pressurized Water Reactor to be Dismantled in France - 13445

Nine commercial nuclear power plants have been permanently shut down in France to date, of which the Chooz A plant underwent an extensive decommissioning and dismantling program. Chooz Nuclear Power Station is located in the municipality of Chooz, Ardennes region, in the northeast part of France. Chooz B1 and B2 are 1,500 megawatt electric (MWe) pressurized water reactors (PWRs) currently in operation. Chooz A, a 305 MWe PWR implanted in two caves within a hill, began operations in 1967 and closed in 1991, and will now become the first PWR in France to be fully dismantled. EDF CIDEN (Engineering Center for Dismantling and Environment) has awarded Westinghouse a contract for the dismantling of its Chooz A reactor vessel (RV). The project began in January 2010. Westinghouse is leading the project in a consortium with Nuvia France. The project scope includes overall project management, conditioning of the reactor vessel (RV) head, RV and RV internals segmentation, reactor nozzle cutting for lifting the RV out of the pit and seal it afterwards, dismantling of the RV thermal insulation, ALARA (As Low As Reasonably Achievable) forecast to ensure acceptable doses for the personnel, complementary vacuum cleaner to catch the chips during the segmentation work, needs and facilities, waste characterization and packaging, civil work modifications, licensing documentation. The RV and RV internals will be segmented based on the mechanical cutting technology that Westinghouse applied successfully for more than 13 years. The segmentation activities cover the cutting and packaging plan, tooling design and qualification, personnel training and site implementation. Since Chooz A is located inside two caves, the project will involve waste transportation from the reactor cave through long galleries to the waste buffer area. The project will end after the entire dismantling work is completed, and the waste storage is outside the caves and ready to be shipped either to the ANDRA (French National Radioactive Waste Management Agency) waste disposal facilities - (for low-level waste [LLW] and very low-level waste [VLLW], which are considered short lived) - or to the EDF Interim Storage Facility planned to be built on another site - (for low- and intermediate-level waste [LILW], which is considered long lived). The project has started with a detailed conceptual study that determines the step-by-step approach for dismantling the reactor and eventually supplying the packed containers ready for final disposal. All technical reports must be verified and approved by EDF and the French Nuclear Safety Authority before receiving the authorization to start the site work. The detailed conceptual study has been completed to date and equipment design and manufacturing is ongoing. This paper will present the conceptual design of the reactor internals segmentation and packaging process that will be implemented at Chooz A, including the planning, methodology, equipment, waste management, and packaging strategy. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear reactor assemblies, nuclear reactor target assemblies, and nuclear reactor methods

Reactor target assemblies are provided that can include a housing defining a perimeter of at least one volume and Np or Am spheres within the one volume. Reactor assemblies are provided that can include a reactor vessel and a bundle of target assemblies within the reactor vessel, at least one of the target assemblies comprising a housing defining a volume with Np or Am spheres being within the volume. Irradiation methods are also provided that can include irradiating Np or Am spheres within a nuclear reactor, then removing the irradiated spheres from the reactor and treating the irradiated spheres.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Comparison of Reg. Guide 1.99 fluence attenuation methods

U.S. Regulatory Guide 1.99 Revision 2 (U.S. Nuclear Regulatory Commission, 1988, 'Radiation Embrittlement of Reactor Vessel Materials,' Regulatory Guide 1.99, Revision 2, Washington, D.C.) provides for the use of two substantially different methods for determining through-wall fluence in nuclear reactor pressure vessels. One method is a generic attenuation curve based on a simplistic exponential decay equation. Partly due to the simplicity of its application, the generic attenuation method is predominantly used for licensing calculations. However, it has a limitation in that at increasing distances away from the core belt-line, it becomes increasingly less accurate because it cannot account for neutron streaming effects in the cavity region surrounding the pressure vessel. The other attenuation method is based on a displacement per atom (dpa) calculation specific to the reactor vessel structure. The dpa method provides a more accurate representation of fluence attenuation through the reactor pressure vessel (RPV) wall at all elevations of the pressure vessel because it does account for neutron streaming in the cavity region. A requirement for using the dpa method, however, is an accurate flux solution through the RPV wall. This requirement has limited the use of traditional transport methods, such as discrete ordinates, that are limited by their treatment of cavity regions (i.e., air) outside the pressure vessel wall. TransWare Enterprises, under the sponsorship of EPRI and BWRVIR has developed an advanced three-dimensional transport methodology capable of producing fully converged flux solutions throughout the entire reactor system, including in the cavity region and primary shield structures. This methodology provides an accurate and reliable determination of through-wall fluence in boiling water reactor (BWR) and pressurized water reactor (PWR) pressure vessels, thus allowing the dpa method to be implemented with high reliability. Using this advanced 3-D methodology, this paper presents comparisons of the generic and dpa attenuation methods at critical locations in both BWR and PWR pressure vessel walls. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

HEAVY WATER COMPONENTS TEST REACTOR DECOMMISSIONING

The Heavy Water Components Test Reactor (HWCTR) Decommissioning Project was initiated in 2009 as a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Removal Action with funding from the American Recovery and Reinvestment Act (ARRA). This paper summarizes the history prior to 2009, the major D&D activities, and final end state of the facility at completion of decommissioning in June 2011. The HWCTR facility was built in 1961, operated from 1962 to 1964, and is located in the northwest quadrant of the Savannah River Site (SRS) approximately three miles from the site boundary. The HWCTR was a pressurized heavy water test reactor used to develop candidate fuel designs for heavy water power reactors. In December of 1964, operations were terminated and the facility was placed in a standby condition as a result of the decision by the U.S. Atomic Energy Commission to redirect research and development work on heavy water power reactors to reactors cooled with organic materials. For about one year, site personnel maintained the facility in a standby status, and then retired the reactor in place. In the early 1990s, DOE began planning to decommission HWCTR. Yet, in the face of new budget constraints, DOE deferred dismantlement and placed HWCTR in an extended surveillance and maintenance mode. The doors of the reactor facility were welded shut to protect workers and discourage intruders. In 2009 the $1.6 billion allocation from the ARRA to SRS for site footprint reduction at SRS reopened the doors to HWCTR - this time for final decommissioning. Alternative studies concluded that the most environmentally safe, cost effective option for final decommissioning was to remove the reactor vessel, both steam generators, and all equipment above grade including the dome. The transfer coffin, originally above grade, was to be placed in the cavity vacated by the reactor vessel and the remaining below grade spaces would be grouted. Once all above equipment including the dome was removed, a concrete cover was to be placed over the remaining footprint and the groundwater monitored for an indefinite period to ensure compliance with environmental regulations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Testing and Commissioning of a Multifunctional Tool for the Dismantling of the Activated Internals of the KNK Reactor Shaft - 13524

The Compact Sodium Cooled Reactor Facility Karlsruhe (KNK), a prototype reactor to demonstrate the Fast Breeder Reactor Technology in Germany, was in operation from 1971 to 1991. The dismantling activities started in 1991. The project aim is the green field in 2020. Most of the reactor internals as well as the primary and secondary cooling loops are already dismantled. The total contaminated sodium inventory has already been disposed of. Only the high activated reactor vessel shielding structures are remaining. Due to the high dose rates these structures must be dismantled remotely. For the dismantling of the primary shielding of the reactor vessel, 12 stacked cast iron blocks with a total mass of 90 Mg and single masses up to 15.5 Mg, a remote-controlled multifunctional dismantling device (HWZ) was designed, manufactured and tested in a mock-up. After successful approval of the test sequences by the authorities, the HWZ was implemented into the reactor building containment for final assembling of the auxiliary equipment and subsequent hot commissioning in 2012. Dismantling of the primary shielding blocks is scheduled for early 2013. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Dismantling of primary shielding with prototype machines in a compact sodium cooled reactor - 15463

The Compact Sodium Cooled Reactor Facility Karlsruhe (KNK), a prototype reactor to demonstrate the Fast Breeder Reactor Technology in Germany, was in operation from 1971 to 1991. The dismantling activities started in 1991. The project aim is the green field in 2020. Most of the reactor internals as well as the primary and secondary cooling loops have already been dismantled. The contaminated sodium inventory has already been disposed of completely. Only the highly activated reactor vessel shielding structures remain. Due to their high dose rates, these structures must be dismantled remotely. For the removal of the primary shielding of the reactor vessel, 12 stacked cast iron blocks with a total mass of 90 Mg and individual masses of up to 15.5 Mg, a remote-controlled multifunctional dismantling device (HWZ) was designed, manufactured and tested in a mock-up. Since it is not possible to remove the segments in one piece for offsite treatment, a special prototype band-saw (BWZ) had to be developed for sawing the segments both horizontally and vertically into smaller pieces. The resulting sub-segments are transferred directly into repository containers. After the successful approval of the test sequences by the authorities and intensive training of the operational staff, both prototype machines were installed inside the reactor building containment for final assembly. The dismantling started in 2013. The present paper covers the successful dismantling of the primary shielding as well as the experiences gained through the development, use and improvement of these prototype machines. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Neutron Irradiation of Nuclear Structural Materials Fabricated by Powder Metallurgy with Hot Isostatic Pressing

An irradiation campaign intended to produce data necessary to qualify various reactor structural materials fabricated by powder metallurgy with hot isostatic pressing (PM/HIP) is currently in progress. Manufacturing processes have considerable influence over the safety and integrity of nuclear reactor vessels and internal components. Established processes such as casting, plate rolling and welding, forging, drawing, and extrusion have been used to fabricate structural and pressure-retaining materials used in the nuclear power industry for the past 60 years. However, weldability and inspectability are ongoing issues in the manufacture of reactor vessels and internals. Furthermore, these components are subject to harsh service environments, which combine high radiation fluence, high temperature, and mechanical stress. These conditions can accelerate material degradation and failure, with the most extreme degradation often occurring at weldments and in poorly manufactured or inspected components. Advanced reactor designs and lifetime extensions to the existing fleet of light-water reactors (LWRs) will exacerbate materials degradation issues by increasing the duty on reactor internals. Thus, developing reliable manufacturing processes wherein high-quality weldments and inspections can be performed is of great importance to the continued safety and operation of nuclear power plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Design study and comparative evaluation of JSFR failed fuel detection system

A conceptual design study of an advanced sodium-cooled fast reactor JSFR has progressed in the 'Fast Reactor Cycle Technology Development (FaCT) 'project in Japan. JSFR has two failed fuel detection systems in the core. One is a failed fuel detection (FFD) system which continuously monitors a fission product from failed fuel subassembly. The other is a failed fuel detection and location (FFDL) system which locates when it receives signals from FFD. The FFD system consists of a FFD-DN which detects delayed neutron (DN) in sodium and a FFD-CG which detects fission products in the cover gas of the reactor vessel. In this study, requirements to the FFD-DN and the FFD-DN design to meet the requirements were investigated for the commercial and demonstration JSFR. In the commercial JSFR, a sampling type FFD which collects sodium from the reactor vessel by sampling lines for DN detectors was adopted. The performances have been investigated and confirmed by a fluid analysis in the reactor upper plenum. In the demonstration JSFR, the performance of DN detectors installed on the primary cold-leg piping has been confirmed. For the FFDL systems, experiences in the previous fast reactors and the R and D of FFDL system for JSFR were investigated. This study focuses on the Selector-Valve and the Tagging-Gas FFDL systems. Operation experiences of the Selector-valve FFDL system were accumulated in PFR and Phenix. Tagging-gas system experiences were accumulated in EBR-II and FFTF. The feasibility of both FFDL systems for JSFR was evaluated. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Gripper Test Assembly Status Report (FY2020)

Refueling systems for fast reactors are designed to handle fresh and used core assemblies (fuel, reflector, and shield core assemblies) within the reactor vessel in an opaque coolant environment without visual reference. These refueling machines are designed to work in a sodium (or other fast reactor coolant) and argon vapor space environment and are engineered with the rotatable plug system to allow for the movement of fresh and spent fuel into and out of the reactor core. The refueling machines are a critical component in any reactor and thus need to undergo extensive testing in a prototypic environment to ensure that they will meet all of the system functions and requirements. Argonne has developed an innovative compact refueling system design for the Advanced Fast Reactor-100 that is based upon some mechanisms used in previous reactor designs, such as the U.K.’s Prototype Fast Reactor (PFR) and some mechanisms that have not been used in sodium. This compact refueling machine supports the reduction in size of the AFR-100’s reactor vessel, and if fully developed, would support and inform the development of the in-vessel refueling machines for such commercial reactors as the GEH PRISM reactor plant, the ARC Clean Energy’s ARC-100 reactor, and the Natrium reactor, among others. This refueling system is a vital component of a fast reactor that supports reducing the cost of the reactor and increasing its reliability. During the development of the compact fuel handling machine conceptual design for the AFR-100, a lack of testing data for many mechanical components in sodium under typical in-reactor loads and conditions was discovered. The reduction in lifetime of the various mechanical components in the liquid sodium environment needs to be quantified versus the calculated component lifetimes under normal conditions in the testing while they are subjected to typical loading profiles experienced in the past. The Gripper Test Assembly discussed here includes a full-size gripper device with appropriate mechanical features that will be tested in sodium to provide this testing data. The Gripper Test Assembly is used to test various mechanical fuel handling components submerged in high temperature liquid sodium. These mechanisms are gears, bearings, gripper jaws and head, universal joints and shafts, ball screws, among others. These components will be tested under the typical sodium environmental conditions experienced during refueling operations with appropriate loading conditions that simulate the removal and insertion of core assemblies into a fast reactor grid plate structure. This Gripper Test Assembly is the second in a series of refueling system mechanisms developed for testing in sodium. The first test assembly is the Gear Test Assembly (GTA) which was used to test the performance of gears and bearings operating in sodium. Because of the successful testing conducted with the GTA, it was decided to continue with the development of the Gripper Test Assembly which uses the same gears and bearings tested in GTA. Using the data collected during operation of this gripper test assembly, lifetime reduction factors of the various mechanical components can be calculated for the material combinations selected. These lifetime reduction factors can be used in the design of future mechanical systems which operate in these environments to accurately predict component end of life. In addition, an understanding of the ability of these components and mechanisms to operate under-sodium with the chosen materials will be accomplished. Again, this Gripper Test Assembly is the follow-on test article to the Gear Test Assembly which was testing the ability of gears and bearings operating in a sodium environment. Once fabricated and qualified, it will be tested in the Mechanism Engineering Test Loop (METL) facility located in Building 308 at Argonne National Laboratory.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development and Experimental Validation of a Heat Transfer Model for Spilled Molten Salt Pools

A spill of radionuclide-bearing molten salt is one of the major postulated events that needs to be analyzed for liquid fluorine salt-cooled high-temperature reactor (FHR) or molten salt reactor licensing purposes. In this postulated event, radioactive source term materials (RSTMs) in the molten salt are discharged from the reactor vessel to the reactor building. The release of RSTMs from the spilled salt pool to the gas space in the reactor building is expected to be controlled by the cooling behavior of the spilled salt, including the growth and shrinkage of the solid crust on the surface of the spilled salt pool. This paper presents a simulation model for spilled salt pool heat transfer and validation efforts. The validation data come from two molten salt spill tests that were performed recently: the PELE2 test by the Rapid Experimental Laboratory of Kairos Power LLC (KP) and the Argonne salt cooling test conducted by Argonne National Laboratory. The former was a large-scale test involving kilograms of molten spilled FLiNaK salt, and the latter was a relatively smaller-scale test targeting various processes associated with a salt spill event. Both tests generated valuable data sets that can be used to assess salt cooling and validate evaluation models. This paper provides a new one-dimensional model that can simulate the cooling process of a spilled salt pool as well as the thermal responses of heat structures, such as the stainless steel liner and the concrete below the salt. The model has been implemented as part of KP-SAM code, which is a branch of the systems code SAM specific to KP FHR. In conclusion, the simulation results of the model are compared with the data of the PELE2 and Argonne tests, and reasonable agreements are observed between the model and test data.

heat transfer model↗

Application of the modified neutron source multiplication method to the prototype FBR Monju

The Modified Neutron Source Method (MNSM) is applied to the Monju reactor. This static method to estimate sub-criticality has already given good results on commercial Pressurized Water Reactors. The MNSM consists both in the extraction of the fundamental mode seen by a detector to avoid the effect of higher modes near sources, and the correction of flux distortion effects due to control rod movement. Among Monju's particularities that have a big influence on MNSM factors are: the presence of two californium sources and the position of the detector, which is located far from the core outside of the reactor vessel. The importance of spontaneous fission and ({alpha},n) reactions, which have increased during the shutdown period of 15 years, will also be discussed. In order to evaluate the detector count rate, an analytical propagation has been conducted from the reactor vessel. For two subcritical states, an estimation of the reactivity has been made and compared to experimental data obtained in the restart experiments at Monju (2010). Results indicate a good agreement between the MNSM reactivity and the reactivity measured with other methods. The reactivity dependence of the correction to apply to point kinetic equation is discussed. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Preliminary Investigation of Rapid Depressurization Phenomena Following a Sudden DLOFC in a VHTR

Air ingress has been identified as a potential threat for Very High Temperature gas-cooled Reactors (VHTR). Reactor components constructed of graphite will, at high temperatures, produce exothermic reactions in the presence of oxygen. The danger lies in the possibility of fuel element damage and core structural failure. Previous investigations of air ingress mechanisms have focused on thermal and molecular diffusion, density-driven stratified flow due to hydrodynamic instability, and natural convection. Here, we investigate the possibility of a rapid flow reversal of helium coolant due to a Taylor (rarefaction) wave expansion after a hypothetical sudden Depressurized Loss of Forced Cooling (DLOFC) scenario in a VHTR. Conceivably, flow reversal of the helium coolant could entrain significant quantities of air into the reactor vessel. Our analysis starts with a one-dimensional shock tube simulation to simply illustrate the development of a Taylor wave with resulting reentrant flow. Then, a simulation is performed of an idealized two-dimensional axisymmetric representation of the lower plenum of General Atomics GT-MHR subjected to a hypothetical catastrophic break of the hot duct. Analysis shows the potential for significant and rapid air ingress into the reactor vessel in the case of a large break in the cooling system.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Probabilistic methods in a study of trip setpoints

Most early vintage Boiling Water Reactors have a high head and high capacity High Pressure Coolant Injection (HPCI) pump to keep the core covered following a loss of coolant accident (LOCA). However, the protection afforded by the HPCI pump for mitigating a LOCA introduces the potential that a spurious start of the HPCI pump could oversupply the reactor vessel and lead to an automatic trip of the main turbine due to high water level. A turbine trip and associated increase in moderator density could challenge the bases of fuel integrity operating limits. To prevent turbine trip during spurious operation of the HPCI pump, the reactor protection system includes instrumentation and logic to sense high water level and automatically trip the HPCI pump prior to reaching the turbine trip setpoint. This paper describes an analysis that was performed to determine if existing reactor vessel water level trip instrumentation, logic and setpoints result in a high probability that the HPCI pump will trip prior to actuation of the turbine trip. Using nominal values for the initial water level and for the HPCI pump and turbine trip setpoints, and using the probability distribution functions for measurement uncertainty in these setpoints, a Monte Carlo simulation was employed to determine probabilities of successfully tripping the HPCI pump prior to tripping of the turbine. The results of the analysis established that the existing setpoints, instrumentation and logic would be expected to reliably prevent a trip of the main turbine. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Estimation of the sub-criticality of the sodium-cooled fast reactor Monju using the modified neutron source multiplication method

The Modified Neutron Source Method (MNSM) is applied to the Monju reactor. This static method to estimate sub-criticality has already given good results on commercial Pressurized Water Reactors. The MNSM consists both in the extraction of the fundamental mode seen by a detector to avoid the effect of higher modes near sources, and the correction of flux distortion effects due to control rod movement. Among Monju's particularities that have a big influence on MNSM factors are: the presence of two californium sources and the position of the detector which is located far from the core outside of the reactor vessel. The importance of spontaneous fission and ({alpha}, n) reactions which have increased during the shutdown period of 15 years will also be discussed. The relative position of detectors and sources deeply affect the correction factors in some regions. In order to evaluate the detector count rate, an analytical propagation has been conducted from the reactor vessel. For two subcritical states, an estimation of the reactivity has been made and compared to experimental data obtained in the restart experiments at Monju (2010). (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

On component isolation of conceptual advanced reactors

Implementation of component isolation in nuclear industry is challenging due to gaps in research and the lack of specific guidelines. In this study, parameters affecting component-level isolation of advanced reactor vessels are identified based on a representative numerical model with explicit consideration of nonlinear soil-structure interaction (SSI). The objective of this study is to evaluate the effectiveness of, and to identify potential limitations of using conventional friction pendulum and lead-rubber bearings to seismically isolate vessels. It is found that slender vessels or components are particularly vulnerable to rotational accelerations at the isolation interface, which are caused by rotation of the sub-structure and by excitation of higher modes in the horizontal direction of the seismically isolated system. Component isolation is found to be more effective for relatively stiffer vessels and at sites with stiff soil properties. Considering that conventional isolators are deficient in resisting axial tension, it is observed that the optimum location for supporting a component to achieve seismic isolation, is at a cross-sectional plane passing through the center of mass of the vessel. These findings are corroborated by numerous simulations of the response of seismically isolated reactor vessels at different nuclear sites subject to a variety of ground motions.

99 GENERAL AND MISCELLANEOUS↗

Contaminant Migration Modeling to Support the In Situ Decommissioning of Hardened Nuclear Facilities - 20215

The decommissioning of hardened nuclear facilities provides a unique challenge in balancing current worker dose with exposure to future receptors and media. In situ decommissioning (ISD) is a cost-effective and safe option for the closure of such facilities but requires a detailed understanding of the threat that radioactive and hazardous constituents remaining in the facilities pose to groundwater and surrounding surface water. The Savannah River Site (SRS) extensively employs contaminant migration models within the decommissioning process to develop site-specific removal, grouting, and monitoring strategies in support of safe and effective final end states of nuclear facilities. This work discusses the use of contaminant migration modeling in the ISD process at SRS, including specific examples from the closure of P-Reactor and R-Reactor, Building 235-F, F-Canyon and F/H Laboratory Complex. Migration models developed during the closure of P-Reactor and R-Reactor were divided into four source areas: the reactor vessel, the process area, the disassembly basin, and the purification wing. Each source area was assigned a specific inventory and migration pathway and was then subject to varying hypothetical removal, capping, and grouting schemes. Modeling indicated that groundwater Maximum Concentration Limits (MCLs) might be exceeded if no action was taken for eleven and ten constituents of concern (COCs) at P-Reactor and R-Reactor, respectively. These exceedances could occur in as few as 200 to 500 years. Alternatively, the migration modeling demonstrated that the selected ISD actions reduced contaminant mobility which allowed for significant radioactive decay and resulted in fewer predicted exceedances of groundwater MCLs (five COCs for P-Reactor; eight COCs for R-Reactor). In response to the modeling results for P-Reactor and R-Reactor, effectiveness monitoring programs were developed to target contaminants, specific to each reactor, that may migrate to groundwater. Contaminant migration modeling also revealed that roof collapse was a large factor in the release of COCs to the environment, giving rise to roof improvements, and an inspection and vegetation control program to ensure roof stability over time. Contaminant migration modeling is also aiding in the closure planning for hardened facilities in F Area. Building 235-F housed the Actinide Billet Line, which produced Np-237 billets for irradiation in SRS reactors, and the Plutonium Fuel Form (PuFF) facility that produced Pu-238 heat sources for the space program. As a result of these missions, areas within Building 235-F contain considerable residual amounts of both Pu-238 and Np-237. Contaminant migration modeling of Building 235-F was originally performed in 2012 to identify the feasibility of ISD and the amount of radioactive material removal required to prevent the exceedance of groundwater MCLs. The original model indicated that a 60% reduction in the PuFF facility Pu-238 inventory could keep groundwater concentrations below standards, while Np-237 did not pose a threat to groundwater. However, updates to the model with an emphasis on source impact pathways revealed that, due to the orientation of the source areas relative to groundwater flow, no amount of reasonable removal of Pu-238 would keep groundwater concentrations below MCLs and that Np-237 could be a large contributor to localized MCL exceedances. With this insight, the refined 2019 model is being used to assist in the development of grouting plans specific to each facility source area, where bentonite may be utilized to slow the migration of Pu-238 and its daughter products from the PuFF facility and a reducing grout may decrease Np-237 transport by ensuring the nuclide remains in the less mobile +IV oxidation state. The beginning phases of contaminant migration modeling are underway for F-Canyon and associated facilities using lessons learned from the Reactors and Building 235-F. A contaminant migration pathway, similar to the pathway used for the reactor vessels, is being developed for the hot and warm canyons. The F-Canyon inventories are being spatially refined to identify specific and localized source zones, comparable to Building 235-F, that may impact groundwater. Contaminant migration modeling provides vital input within the ISD process, from facility investigation to post closure effectiveness monitoring, making it a valuable tool in the development of safe and effective end states for hardened nuclear facilities at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗