Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RCRA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

ERM 593 Applied Project_Guidance for Reviewing and Approving a Waste Stream Profile in the Waste Compliance and Tracking System_Final_05-05-15

My ERM 593 applied project will provide guidance for the Los Alamos National Laboratory Waste Stream Profile reviewer (i.e. RCRA reviewer) in regards to Reviewing and Approving a Waste Stream Profile in the Waste Compliance and Tracking System. The Waste Compliance and Tracking system is called WCATS. WCATS is a web-based application that “supports the generation, characterization, processing and shipment of LANL radioactive, hazardous, and industrial waste.” The LANL generator must characterize their waste via electronically by filling out a waste stream profile (WSP) in WCATS. Once this process is completed, the designated waste management coordinator (WMC) will perform a review of the waste stream profile to ensure the generator has completed their waste stream characterization in accordance with applicable state, federal and LANL directives particularly P930-1, “LANL Waste Acceptance Criteria,” and the “Waste Compliance and Tracking System User's Manual, MAN-5004, R2,” as applicable. My guidance/applied project will describe the purpose, scope, acronyms, definitions, responsibilities, assumptions and guidance for the WSP reviewer as it pertains to each panel and subpanel of a waste stream profile.

54 ENVIRONMENTAL SCIENCES↗

Saltstone 4QCY14 TCLP Toxicity and UTS Results

A Saltstone Disposal Facility (SDF) waste form was prepared in the Savannah River National Laboratory (SRNL) from a Tank 50H sample and Z-Area premix material for the fourth quarter of calendar year 2014 (4QCY14). After a 47 day cure, a sample of the SDF waste form was collected, and shipped to a certified laboratory for Toxic Characteristic and Universal Treatment Standards (UTS) analysis. The metals analysis is performed using the Toxic Characteristic Leaching Procedure (TCLP) . The 4QCY14 saltstone sample results show that the saltstone is Resource Conservation Recovery Act (RCRA) nonhazardous, but is greater than the universal treatment standard for land disposal. The Saltstone Production Facility (SPF) and SDF were in a maintenance outage during the 4QCY14. Thus no processing or disposal of saltstone, as characterized by this 4QCY14 sample, occurred.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Saltstone 4QCY14 TCLP Toxicity and UTS Results

A Saltstone Disposal Facility (SDF) waste form was prepared in the Savannah River National Laboratory (SRNL) from a Tank 50H sample and Z-Area premix material for the fourth quarter of calendar year 2014 (4QCY14). After a 47 day cure, a sample of the SDF waste form was collected, and shipped to a certified laboratory for Toxic Characteristic and Universal Treatment Standards (UTS) analysis. The metals analysis is performed using the Toxic Characteristic Leaching Procedure (TCLP) 1 . The 4QCY14 saltstone sample results show that the saltstone is Resource Conservation Recovery Act (RCRA) nonhazardous, but is greater than the universal treatment standard for land disposal. The Saltstone Production Facility (SPF) and SDF were in a maintenance outage during the 4QCY14. Thus no processing or disposal of saltstone, as characterized by this 4QCY14 sample, occurred.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Saltstone 1QCY15 TCLP Toxicity and UTS Results

A Saltstone Disposal Facility (SDF) waste form was prepared in the Savannah River National Laboratory (SRNL) from a Tank 50H sample and Z-Area premix material for the first quarter of calendar year 2015 (1QCY15). After a 28 day cure, a sample of the SDF waste form was collected, and shipped to a certified laboratory for Toxic Characteristic and Universal Treatment Standards (UTS) analysis. The metals analysis is performed using the Toxic Characteristic Leaching Procedure (TCLP). The 1QCY15 saltstone sample results meet South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-79.261.24 and R.61-79.268.48(a) requirements for a nonhazardous waste form with respect to RCRA metals and underlying hazardous constituents (UHC).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Saltstone 2QCY15 TCLP Toxicity and UTS Results

A Saltstone Disposal Facility (SDF) waste form was prepared in the Savannah River National Laboratory (SRNL) from a Tank 50H sample and Z-Area premix material for the second quarter of calendar year 2015 (2QCY15). After a 28 day cure, a sample of the SDF waste form was collected, and shipped to a certified laboratory for Toxic Characteristic and Universal Treatment Standards (UTS) analysis. The metals analysis is performed using the Toxic Characteristic Leaching Procedure (TCLP) 1 . The 2QCY15 saltstone sample results meet South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-79.261.24 and R.61-79.268.48(a) requirements for a nonhazardous waste form with respect to RCRA metals and underlying hazardous constituents (UHC).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Verification of EPA's ''Preliminary Remediation Goals for radionuclides'' (PRG) electronic calculator

The U.S. Environmental Protection Agency (EPA) requested an external, independent verification study of their updated “Preliminary Remediation Goals for Radionuclides” (PRG) electronic calculator. The calculator provides PRGs for radionuclides that are used as a screening tool at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and Resource Conservation and Recovery Act (RCRA) sites. These risk-based PRGs establish concentration limits under specific exposure scenarios. The purpose of this verification study is to determine that the calculator has no inherit numerical problems with obtaining solutions as well as to ensure that the equations are programmed correctly. There are 167 equations used in the calculator. To verify the calculator, all equations for each of seven receptor types (resident, construction worker, outdoor and indoor worker, recreator, farmer, and composite worker) were hand calculated using the default parameters. The same four radionuclides (Am-241, Co-60, H-3, and Pu-238) were used for each calculation for consistency throughout.

54 ENVIRONMENTAL SCIENCES↗

Saltstone 2QCY15 TCLP Toxicity and UTS Results

A Saltstone Disposal Facility (SDF) waste form was prepared in the Savannah River National Laboratory (SRNL) from a Tank 50H sample and Z-Area premix material for the second quarter of calendar year 2015 (2QCY15). After a 28 day cure, a sample of the SDF waste form was collected, and shipped to a certified laboratory for Toxic Characteristic and Universal Treatment Standards (UTS) analysis. The metals analysis is performed using the Toxic Characteristic Leaching Procedure (TCLP). The 2QCY15 saltstone sample results meet South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-79.261.24 and R.61-79.268.48(a) requirements for a nonhazardous waste form with respect to RCRA metals and underlying hazardous constituents (UHC).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Saltstone 3QCY15 TCLP Toxicity and UTS Results

A Saltstone Disposal Facility (SDF) waste form was prepared in the Savannah River National Laboratory (SRNL) from a Tank 50H sample and Z-Area premix material for the third quarter of calendar year 2015 (3QCY15). After a 28 day cure, a sample of the SDF waste form was collected, and shipped to a certified laboratory for Toxic Characteristic and Universal Treatment Standards (UTS) analysis. The metals analysis is performed using the Toxic Characteristic Leaching Procedure (TCLP).1 The 3QCY15 saltstone sample results meet South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-79.261.24 and R.61-79.268.48(a) requirements for a nonhazardous waste form with respect to RCRA metals and underlying hazardous constituents (UHC).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY-15 Progress Report on Cleanup of irradiated SHINE Target Solutions Containing 140g-U/L Uranyl Sulfate

During FY 2012 and 2013, a process was developed to convert the SHINE Target Solution (STS) of irradiated uranyl sulfate (140 g U/L) to uranyl nitrate. This process is necessary so that the uranium solution can be processed by the UREX (Uranium Extraction) separation process, which will remove impurities from the uranium so that it can be recycled. The uranyl sulfate solution must contain <0.02 M SO 4 2- so that the uranium will be extractable into the UREXsolvent. In addition, it is desired that the barium content be below 0.0007 M, as this is the limit in the Resource Conservation and Recovery Act (RCRA).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the Fourth Quarter Calendar Year 2015 Tank 50H Salt Solution Sample

In this memorandum, the chemical and radionuclide contaminant results from the Fourth Quarter Calendar Year 2015 (CY15) sample of Tank 50H salt solution are presented in tabulated form. The Fourth Quarter CY15 Tank 50H samples were obtained on October 29, 2015 and received at Savannah River National Laboratory (SRNL) on October 30, 2015. The information from this characterization will be used by Defense Waste Processing Facility (DWPF) & Saltstone Facility Engineering for the transfer of aqueous waste from Tank 50H to the Salt Feed Tank in the Saltstone Production Facility, where the waste will be treated and disposed of in the Saltstone Disposal Facility. This memorandum compares results, where applicable, to Saltstone Waste Acceptance Criteria (WAC) limits and targets. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals will be documented at a later time per the Task Technical and Quality Assurance Plan (TTQAP) for the Tank 50H saltstone task. The chemical and radionuclide contaminant results from the characterization of the Fourth Quarter Calendar Year 2015 (CY15) sampling of Tank 50H were requested by SRR personnel and details of the testing are presented in the SRNL Task Technical and Quality Assurance Plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Treatment Study Plan for Nitrate Salt Waste Remediation Revision 1.0

The two stabilization treatment methods that are to be examined for their effectiveness in the treatment of both the unremediated and remediated nitrate salt wastes include (1) the addition of zeolite and (2) cementation. Zeolite addition is proposed based on the results of several studies and analyses that specifically examined the effectiveness of this process for deactivating nitrate salts. Cementation is also being assessed because of its prevalence as an immobilization method used for similar wastes at numerous facilities around the DOE complex, including at Los Alamos. The results of this Treatment Study Plan will be used to provide the basis for a Resource Conservation and Recovery Act (RCRA) permit modification request of the LANL Hazardous Waste Facility Permit for approval by the New Mexico Environment Department-Hazardous Waste Bureau (NMED-HWB) of the proposed treatment process and the associated facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results For The Third Quarter Calendar Year 2016 Tank 50H Salt Solution Sample

In this memorandum, the chemical and radionuclide contaminant results from the Third Quarter Calendar Year 2016 (CY16) sample of Tank 50H salt solution are presented in tabulated form. The Third Quarter CY16 Tank 50H samples (a 200 mL sample obtained 6” below the surface (HTF-5-16-63) and a 1 L sample obtained 66” from the tank bottom (HTF-50-16-64)) were obtained on July 14, 2016 and received at Savannah River National Laboratory (SRNL) on the same day. Prior to obtaining the samples from Tank 50H, a single pump was run at least 4.4 hours, and the samples were pulled immediately after pump shut down. The information from this characterization will be used by Defense Waste Processing Facility (DWPF) & Saltstone Facility Engineering for the transfer of aqueous waste from Tank 50H to the Saltstone Production Facility, where the waste will be treated and disposed of in the Saltstone Disposal Facility. This memorandum compares results, where applicable, to Saltstone Waste Acceptance Criteria (WAC) limits and targets. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals will be documented at a later time per the Task Technical and Quality Assurance Plan (TTQAP) for the Tank 50H saltstone task. The chemical and radionuclide contaminant results from the characterization of the Third Quarter CY16 sampling of Tank 50H were requested by Savannah River Remediation (SRR) personnel and details of the testing are presented in the SRNL TTQAP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Associate Directorate Environmental Management Infrastructure Plan for Area G and Area L Domes

Technical Area 54, at Los Alamos National Laboratory (LANL) is situated in the east-central portion of the Laboratory on the Mesita del Buey between Pajarito Canyon to the south and Cañada del Buey to the north. TA-54 includes four MDAs designated as G, H, J, and L; a waste characterization, container storage, and transfer facility; active TRU waste and MLLW waste storage and low-level waste (LLW) disposal operations at Area G; active hazardous and mixed low-level (MLLW) waste storage operations at Area L; and administrative and support areas. MDA J has previously under-gone closure. Area G is a waste management and disposal area, used for the disposal and storage of radioactive wastes since 1957. Since August 2015, Area G has been in warm standby and provides minimal operations to support safety, compliance, and nitrate salt remediation. Located within Area G, MDA G covers 63-acres. MDA G contains 334 active and inactive waste management units, which include 36 pits, 294 shafts, and 4 trenches. In 1971, Area G began use for the retrievable storage of TRU waste. There are two pits, four trenches and 60 shafts that contain retrievable TRU waste. Thirty-three of the shafts contain TRU waste that may present unique problems for retrieval. In 1986, segregation of MLLW was initiated at Area G for treatment and temporary storage or for off-site disposal. Area G is the only active LLW disposal facility at the Laboratory. Current operations at Area G include storage and characterization of TRU and mixed TRU waste destined for off-site disposal at the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico and the storage of MLLW destined for off-site treatment and/or disposal. Several above-ground container storage units (CSUs) are currently used for storage of containerized MLLW and/or mixed TRU wastes. These consist of asphalt pads and associated fabric domes or other structures. As defined by the Consent Order, MDA G contains 229 of the 334 subsurface waste management units at Area G. These MDA G disposal units include 32 pits, 193 shafts, and 4 trenches and contain LLW, MLLW and TRU waste. The remaining 105 solid waste management units (SWMUs) include RCRA-regulated landfill and storage units and DOE-regulated LLW disposal units. The TA-54 closure project must ensure that continuing waste operations at Area G and their transition to an interim or enduring facility are coordinated with closure activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the first quarter calendar year 2017 tank 50H salt solution sample

In this memorandum, the chemical and radionuclide contaminant results from the First Quarter Calendar Year 2017 (CY17) sample of Tank 50H salt solution are presented in tabulated form. The First Quarter CY17 Tank 50H samples [a 200 mL sample obtained 6” below the surface (HTF-50-17-7) and a 1 L sample obtained 66” from the tank bottom (HTF-50-17-8)] were obtained on January 15, 2017 and received at Savannah River National Laboratory (SRNL) on January 16, 2017. Prior to obtaining the samples from Tank 50H, a single pump was run at least 4.4 hours and the samples were pulled immediately after pump shut down. All volatile organic analysis (VOA) and semi-volatile organic analysis (SVOA) were performed on the surface sample and all other analyses were performed on the variable depth sample. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50H to the Saltstone Production Facility, where the waste will be treated and disposed of in the Saltstone Disposal Facility. This memorandum compares results, where applicable, to Saltstone Waste Acceptance Criteria (WAC) limits and targets. The chemical and radionuclide contaminant results from the characterization of the First Quarter CY17 sampling of Tank 50H were requested by SRR personnel and details of the testing are presented in the SRNL Task Technical and Quality Assurance Plan (TTQAP). This memorandum is part of Deliverable 2 from SRR request. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals will be documented at a later time per the TTQAP for the Tank 50H saltstone task.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Summary of the Integrated Disposal Facility Performance Assessment 2008

The U.S. Department of Energy (DOE) order on radioactive waste management (DOE 1 999a) as well as the Maintenance Plan for the Hanford Immobilized Low-Activity Tank Waste Performance Assessment (Mann 2004) require an annual summary on the adequacy of the Hanford Immobilized Low-Activity Tank Waste Performance Assessment (RLAW PA) in each year in which a performance assessment is not issued. The most recent approved PA is the Hanford Immobilized Low-Activity Waste Performance Assessment: 2001 Version (Mann et al 2001). The RLAW PA evaluated the adequacy of the ILAW disposal facility, now referred to as the Integrated Disposal Facility (IDF), to safely dispose vitrified Hanford Site tank waste. More recently, a preliminary evaluation for the disposal of offsite low-level and mixed low-level waste was considered in the Integrated Disposal Facility Risk Assessment (Mann et al. 2003a). The first phase of IDF construction was completed on April 28, 2006 and included the installation of the cell liners and leachate collection tanks. The IDF is now in a preoperational maintenance mode and will not receive treated tank waste for several years. In view of these circumstances, the RCRA Part B Permit for the Integrated Disposal Facility has been modified to recognize that the facility will not be receiving waste in the near future. A subsequent modification indicated transfer of the IiDF from the DOE Office of River Protection (DOE/ORP) operation to the DOE Richland Operations Field Office (DOE/RL). This summary is the latest in a succession of sumnmaries that have been published since 2000 (Mann, 2000b, 2002, 2003b, 2004, 2005, 2006 and 2007) and approved by the Field Manager, Office of River Protection (e.g., Schepens 2005c). This annual summary compares new data collected during Fiscal Year 2008 with the Hanford Immobilized Low-Activity Waste Performance Assessment: 2001 Version (Mann et al 2001), which has been approved by DOE (DOE 2003a). Most of the data collected during Fiscal Year 2008 pertained to long-term contaminant release from ILAW packages made at the Waste Treatment Plant. Results of data collection and additional analyses do not change the conclusions of the 2001 ILAW PA as they pertain to RLAW disposal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Economical and Environmentally Benign Extraction of Rare Earth Elements (REES) from Coal & Coal Byproducts

This final report provides a complete summary of the activities, results, analytical discussion, and overall evaluation of the project titled “Economical and Environmentally Benign Extraction of Rare Earth Elements (REES) from Coal & Coal Byproducts” under DOE Award Number DE-FE-0027155 that started in March 2016 and ended December 2017. Fly ash was selected as the coal-byproduct source material due to fact that it is readily available with no need for extensive methods to obtain the material, it is produced in large quantities (>50 million tons per year) and had REE concentrations similar to other coal-byproducts. The selected fly ash used throughout this project was from the Mill Creek power generating facility operated by Louisville Gas and Electric located in Louisville, KY and was subjected to a variety of physical and chemical characterization tests. Results from fusion extractions showed that the selected fly-ash had a TREE+Y concentration of 480 ppm with critical REEs concentration of 200 ppm. The fly ash had an outlook ratio of 1.25 and an estimated value of $16-$18 worth of salable REEs per 1-tonne of fly ash. Additional characterizations by optical evaluation, QEMSCAN, XRD, size fractionation, and SEM analysis showed the fly ash consisted of small glassy spherules with a size range between 1 to 110 µm (ave. diam. of 13 um), was heterogeneous in chemical composition (main crystalline phases: aluminum oxides and iron oxides) and was primarily an amorphous material (75 to 80%). A simple stepped approach was completed to estimate the total REE resource quantity. The approach included REE characterization of the representative samples, evaluation of fly-ash availability, and final determination estimated resource availability with regards to REE grade on a regional and national scale. This data represents the best available information and is based upon the assumptions that the power generating facility where the fly-ash was obtained will use the same coal sources (actual mines were identified), the coal materials will have relatively consistent REE concentrations, and the REE extraction process developed during this project can achieve 42% REE recovery (validated and confirmed). Calculations indicated that the estimated REE resource is approximately 175,000 tonnes with a current estimated value of $3,330MM. The proposed REE extraction and production process developed during this project used four fundamental steps; 1) fly-ash pretreatment to enhance REE extraction, 2) REE extraction by acid digestion, 3) REE separation/concentration by carbon adsorption and column chromatography, and 4) REE oxide production. Secondary processing steps to manage process residuals and additional processing techniques to produce value-added products were incorporated into the process during the project. These secondary steps were not only necessary to manage residuals, but also provided additional revenue streams that offset operational and capital expenditures. The process produces one value product stream (production of zeolite Na-P1), a solids waste stream, and one liquid stream that met RCRA discharge requirements. Based upon final design criteria and operational parameters, the proposed system could produce approximately 200 grams of REOs from 1-tonne of fly-ash, thereby representing a TREE+Y recovery of 42% (project target of > 25%). A detailed economic model was developed to evaluate both CAPEX and OPEX estimates for systems with varying capacities between 100 kg to 200 tonnes of fly ash processed per day. Using a standard system capacity of 10 tonne/day system, capital costs were estimated at $88/kg fly ash while operating costs were estimated at approximately $450/kg fly ash. This operating cost estimate includes a revenue of $495/tonne of fly ash processed from the value-added product produced from the system (zeolite Na-P1). Although operating cost savings due to zeolite production were significant, the capital + operating cost for a 10 tonne system was more expensive than the total dollar value of REEs present in the fly ash material. Specifically, the estimated cost per 1-tonne of fly ash treated is approximately $540 while the estimated value of REEs in the fly ash is $18-$20/tonne. This is an excessive difference showing that the proposed process is not economically feasible strictly on the basis of REE revenue compared to extraction costs. Although the current proposed system does not produce sufficient quantities of REEs or additional revenue sources to offset operational and capital costs, supplementary factors including US strategic concerns, commercial demands, and defense department requirements must be factored. At this time, the process developed during this project provides foundational information for future development of simple processes that require low capital investment and one that will extract a valuable quality and quantity of REE oxides from industrial waste.

01 COAL, LIGNITE, AND PEAT↗

Results for the First Quarter Calendar Year 2018 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the First Quarter Calendar Year 2018 (CY18) sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility, where the waste will be treated and disposed of in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to Saltstone Waste Acceptance Criteria (WAC) limits and targets. The chemical and radionuclide contaminant results from the characterization of the First Quarter CY18 sampling of Tank 50 were requested by SRR personnel via a Task Technical Request (TTR) 2 and details of the testing are presented in the Savannah River National Laboratory (SRNL)Task Technical and Quality Assurance Plan (TT QAP). This Technical Report is part of Deliverable 2 relating to Task 1 from the SRR request. 2 Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals will be documented at a later time per the TTQAP for the Tank 50 Saltstone task.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Saltstone First Quarter Calendar Year 2018 (1QCY18) Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from Tank 50 (salt solution) is sampled quarterly for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). A SDF waste form (saltstone) was prepared in the Savannah River National Laboratory (SRNL) from the Tank 50 Waste Acceptance Criteria (WAC) sample and Z-Area premix material for the first quarter of calendar year 2018 (1QCY18). Results from this memorandum support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR). After a 28 day cure, a sample of the SDF waste form was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The 1QCY18 saltstone sample met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79-268.48 requirements for a non-hazardous waste form with respect to Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and also met the Saltstone WAC.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗