Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Pilot performance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Gen 3 Particle Pilot Plant (G3P3) -- High-Temperature Particle System for Concentrating Solar Power (Phases 1 and 2)

The U.S. Department of Energy Solar Energy Technologies Office initiated the Generation 3 Concentrating Solar Power (CSP) program to achieve higher operating temperatures (>700 °C) to enable next-generation CSP high-temperature power cycles such as the supercritical CO 2 (sCO2) Brayton Cycle. Three teams were selected to pursue high-temperature gas, liquid, and solid pathways for the heat-transfer media. Phases 1 and 2, which lasted from 2018 – 2020, consisted of design, modeling, and testing activities to further de-risk each of the technologies and develop a design for construction, commissioning, and operation of a pilot-scale facility in Phase 3 (2021 – 2024). This report summarizes the activities in Phases 1 and 2 for the solid-particle pathway led by Sandia National Laboratories. In Phases 1 and 2, Sandia successfully de-risked key elements of the proposed Gen 3 Particle Pilot Plant (G3P3) by improving the design, operation, and performance of key particle component technologies including the receiver, storage bins, particle-to-sCO2 heat exchanger, particle lift, and data acquisition and controls. Modeling and testing of critical components have led to optimized designs that meet desired performance metrics. Detailed drawings, piping and instrumentation diagrams, and process flow diagrams were generated for the integrated system, and structural analyses of the assembled tower structure were performed to demonstrate compliance with relevant codes and standards. Instrumentation and control systems of key subsystems were also demonstrated. Together with Bridgers & Paxton, Bohannan Huston, and Sandia Facilities, we have completed a 100% G3P3 tower design package with stamped engineering drawings suitable for construction bid in Phase 3.

14 SOLAR ENERGY↗

Performance Testing of a Moving-Bed Gasifier Using Coal, Biomass, and Waste Plastic Blends to Generate White Hydrogen

The objective of this DOE-funded project by the Electric Power Research Institute, Inc. (EPRI), Hamilton Maurer International (HMI) and Sotacarbo S.p.A. (Sotacarbo), is to qualify coal, biomass, and plastic waste blends based on performance testing of selected pellet recipes in a pilot-scale updraft moving-bed gasifier. The testing provides relevant data to advance the commercial-scale design of the moving-bed gasifier to be able to successfully use these feedstocks to produce hydrogen. In particular, the effects of the waste plastics on feedstock development (i.e., blending and pelletizing) and the resulting products (i.e., syngas compositions, organic condensate production, and ash characteristics) are a focus. The gasifier is Hamilton Mauer International, Inc. (HMI)’s moving-bed gasifier, which has been proven capable of gasifying nearly all coal ranks. It has also shown the ability in prior testing work to gasify wood chips. However, mixtures of these fuels with plastic wastes had not yet been prepared and gasified together. The feedstocks were prepared by California Pellet Mill (CPM) under contract to HMI.

01 COAL, LIGNITE, AND PEAT↗

Hydrogen Production, Grid Integration, and Scaling for the Future

The project will explore near and long-term visions towards the commercialization of grid integrated electrolysis systems to inform deployment across the planning, procurement, and operation stages of hydrogen production on the grid. It will leverage NREL's state-of-the-art 1.25 MW polymer electrolyte membrane (PEM) electrolyzer system to characterize system performance in relevant scenarios, also creating a digital twin for emulation in the Advanced Research on Integrated Energy Systems (ARIES) virtual environment and performing hardware-in-the-loop (HIL) testing of pilot scale, decentralized, and centralized hydrogen systems.

electrolysis systems↗

Enabling Industrial Re-Use of Large-Format Additive Manufacturing Molding and Tooling

Large-format additive manufacturing (LFAM) is an enabling manufacturing technology capable of producing large parts with highly complex geometries for a wide variety of applications, including automotive, infrastructure/construction, and aerospace mold and tooling. In the past decade, the LFAM industry has seen widespread use of bio-based, glass, and/or carbon fiber reinforced thermoplastic composites which, when printed, serve as a lower-cost alternative to metallic parts. One of the highest-volume materials utilized by the industry is carbon fiber (CF)-filled polycarbonate (PC), which in out-of-autoclave applications can achieve comparable mechanical performance to metal at a significantly lower cost. Previous work has shown that if this material is recovered at various points throughout the manufacturing process for both the lab and pilot scale, it can be mechanically recycled with minimal impacts on the functional performance and printability of the material while significantly reducing the feedstock costs. End-of-life (EOL) CF-PC components were processed through industrial shredding, melt compounding, and LFAM equipment, followed by evaluation of the second-life material properties. Experimental assessments included quantitative analysis of fiber length attrition, polymer molecular weight degradation using gel permeation chromatography (GPC), density changes via pycnometry, thermal performance using dynamic mechanical analysis (DMA), and mechanical performance (tensile properties) in both the X- and Z-directions. Results demonstrated a 24.6% reduction in average fiber length compared to virgin prints, accompanied by a 21% decrease in X-direction tensile strength and a 39% reduction in tensile modulus. Despite these reductions, Z-direction tensile modulus improved by 4%, density increased by 6.8%, and heat deflection temperature (HDT) under high stress retained over 97% of its original value. These findings underscore the potential for integrating mechanically recycled CF-PC into industrial LFAM applications while highlighting the need for technological innovations to mitigate fiber degradation and enhance material performance for broader adoption. This critical step toward circular material practices in LFAM offers a pathway to reducing feedstock costs and environmental impact while maintaining functional performance in industrial applications.

additive manufacturing↗

Autoregressive distributed lag-based dynamic uniformity modeling and monitoring approaches for superconductor manufacturing

High-temperature superconductors (HTS), known for their high efficiency and low energy loss, have found profound applications across various fields, driving the demand for long, uniformly performing tapes. However, ensuring uniform performance over extended lengths of HTS tapes, often characterized by the consistency of critical current, remains challenging due to fluctuations in growth conditions during manufacturing. Here, to elucidate the mechanisms underlying variations in tape uniformity and enable real-time monitoring of associated parameters, we propose an Autoregressive Distributed Lag (ADL)-based Dynamic Uniformity Modeling and Monitoring (ADUM2) approach. This method integrates uniformity measurement, the identification of critical process parameters and real-time monitoring within the manufacturing process. The ADUM2 approach is applied to the advanced metal organic chemical vapor deposition (A-MOCVD) process, a pilot-scale method for superconductor manufacturing. Our model demonstrates superior performance compared to benchmark methods, accounting for over 80% of the total variance in the data and identifying 13 key process parameters influencing the uniformity of HTS tapes. This study offers significant insights into the high-temperature superconductor manufacturing process and holds the potential to facilitate the production of cost-effective, uniformly performing long superconducting tapes in the future.

autoregressive distributed lag analysis↗

Manufacture of Carbon Foam in Continuous Process at Atmospheric Pressure

CFOAM LLC has been manufacturing CFOAM® vitreous carbon foam from coal in panel form for several years. The process is currently set up in batch mode as two steps, where the first step is conducted at very high pressure. In order to reduce cost and increase capacity, a new process for making carbon foam is being developed that can be performed at atmospheric pressure. This advance in turn would enable the development of a continuous manufacturing process, which is also being pursued. Both carbon foam panels and light weight aggregates are being investigate. Progress on the evolution of the pilot scale manufacturing plant and initial results of processing, microstructure, properties and performance of carbon foam products made using this new process will be discussed. This project is being supported by a cooperative agreement with the Department of Energy – National Energy Technology Laboratory (DE-FOA-0002185, Area of Interest 4: Coal-Derived Carbon Foam Produced via a Continuous Process, award number DE-FE-0031992).

01 COAL, LIGNITE, AND PEAT↗

Manufacture of Carbon Foam in Continuous Process at Atmospheric Pressure

CFOAM LLC has been manufacturing vitreous carbon foam from coal in panel form for several years. The process is currently set up in batch mode as two steps, where the first step is conducted at very high pressure. In order to reduce cost and increase capacity, a new process for making carbon foam is being developed that can be performed at atmospheric pressure. This advance in turn would enable the development of a continuous manufacturing process, which is also being pursued. Both carbon foam panels and light weight aggregates are being investigate. Progress on the evolution of the pilot scale manufacturing plant and initial results of processing, microstructure, properties and performance of carbon foam products made using this new process will be discussed. This project is being supported by a cooperative agreement with the Department of Energy – National Energy Technology Laboratory (DE-FOA-0002185, Area of Interest 4: Coal-Derived Carbon Foam Produced via a Continuous Process, award number DE-FE-0031992).

01 COAL, LIGNITE, AND PEAT↗

Deep Neural Network Assisted Distributed Strain and Temperature Fiber Sensor System for Natural Gas Pipeline Monitoring

Natural gas pipeline integrity monitoring is crucial to detect potential leaks, find structural issues, and prevent environmental damage. This article presents a system of natural gas pipeline monitoring that uses a specialized double Brillouin peak sensing fiber along with the Brillouin optical time domain analysis (BOTDAs) technique. The calibrated sensing fiber coefficients for strain and temperature are 41.8 kHz/ με and 0.9 MHz/°C for peak 1; and 47.2 kHz/ με , and 1.11 MHz/°C for peak 2, respectively. Initially, lab tests were performed by installing a short section of double Brillouin peak fiber (DBPF) on a 1-in steel pipe under pressure up to 1000 per square inch (psi) at elevated temperatures. Simultaneous distributed measurements of temperature and pressure-induced hoop strain were successfully measured. Considering the long processing speed to extract Brillouin frequency shift (BFS), we employ a novel probabilistic deep neural network (PDNN) framework for rapid BFS prediction. Additionally, using the Finite Element Method, the effects of the pipeline pressure on hoop strain were modeled and compared to the experimental hoop strain under the same set of pipeline conditions. Finally, an actual 4-in outer diameter steel natural gas pipeline was used for pilot-scale tests, where hoop strain was measured at various pressure levels. Leaks were simulated to demonstrate accurate pipeline integrity monitoring. At an internal pipe pressure of 1000 psi, hoop strain of approximately 300 με was observed, and the sensitivity was calculated as 0.28 με /psi. The results of this pilot-scale study demonstrated that the system is capable of performing distributed monitoring sufficient to detect pipeline pressure and the presence of leaks to ensure the safe operation of gas pipelines in the field.

03 NATURAL GAS↗

AGR-5/6/7 Irradiation Disassembly and Metrology First Look

The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program was established to perform research and development on tristructural isotropic (TRISO)-coated particle fuel to support deployment of high-temperature gas-cooled reactors (HTGRs), which are graphite-moderated nuclear reactors cooled with helium. This work continues as part of the Advanced Reactor Technologies (ART) TRISO Fuel Program. The overarching program goal is to provide a baseline fuel qualification data set to support licensing, deployment, and operation of HTGRs in the United States. To achieve these goals, the program includes fuel fabrication, irradiations of TRISO fuels and high-temperature materials (e.g., graphite), safety testing and post-irradiation examination (PIE), fuel performance modeling, and fission product transport and source term determination. The ART AGR program has conducted four distinct fuel irradiation experiments in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL). The first of these irradiation tests, designated AGR-1, began in ATR in December of 2006 and ended in November 2009. This experiment was primarily to act as a shakedown test of the multi-capsule test train design and to provide early data on fuel performance that would be used in fuel fabrication process development. AGR-1 fuel kernels were produced on an engineering scale, but the TRISO coatings and cylindrical fuel compacts were fabricated on a laboratory scale. The AGR-1 PIE was completed and the final report was published in 2015. The second irradiation test, AGR-2, started in ATR in June 2010 and ended in October 2013. The AGR-2 irradiation test was designed to provide fuel performance data for coated particles fabricated on an engineering-scale pilot line using a coater with an internal chamber diameter of 150 mm (6 in.). The final PIE report was published in 2021. AGR-3/4, a single irradiation that combined what were originally conceived as the third and fourth tests, was to support the refinement of fission product transport models and to assess the effects of sweep gas impurities on fuel performance and fission product transport. PIE of the AGR-3/4 experiment is still in progress as of this writing. The subject of this report is AGR-5/6/7, the final qualification test of AGR TRISO fuel made entirely at the engineering scale.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Harnessing the power of supercomputers using the PanDA Pilot 2 in the ATLAS Experiment

The unprecedented computing resource needs of the ATLAS experiment at LHC have motivated the Collaboration to become a leader in exploiting High Performance Computers (HPCs). To meet the requirements of HPCs, the PanDA system has been equipped with two new components; Pilot 2 and Harvester, that were designed with HPCs in mind. While Harvester is a resource-facing service which provides resource provisioning and workload shaping, Pilot 2 is responsible for payload execution on the resource. The presentation focuses on Pilot 2, which is a complete rewrite of the original PanDA Pilot used by ATLAS and other experiments for well over a decade. Pilot 2 has a flexible and adaptive design that allows for plugins to be defined with streamlined workflows. In particular, it has plugins for specific hardware infrastructures (HPC/GPU clusters) as well as for dedicated workflows defined by the needs of an experiment. Examples of dedicated HPC workflows are discussed in which the Pilot either uses an MPI application for processing fine-grained event level service under the control of the Harvester service or acts like an MPI application itself and runs a set of job in an assemble. In addition to describing the technical details of these workflows, results are shown from its deployment on Titan (OLCF) and other HPCs in ATLAS.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hydrogen Production System Scaling Using a High-Fidelity Simulation-Optimization Framework

Proton exchange membrane (PEM) electrolyzers are widely used for hydrogen production, yet few validated, high-fidelity tools can reliably guide scale-up. Using measured performance from a 50-hour hardware-in-the-loop pilot test, a physics-based, plant-level model of a 1.25 MW PEM electrolyzer and its balance-of-plant (BoP) subsystems is developed and validated. The model couples electrochemistry and thermal/flow submodels and is calibrated against pilot test data via a genetic algorithm (GA) workflow. Validation yields a mean absolute percentage error (APE) of 0.43% for cell voltage and stack power. Two scale-out strategies are then benchmarked under a common 7-day wind-and-photovoltaic (PV) profile: (i) linear duplication of 1.25 MW blocks and (ii) shared-BoP architectures. Sharing BoP between stacks reduces BoP energy by 27% at 10 MW and 34% at 100 MW (vs. linear duplication) and improves system specific energy consumption (SEC) to 52.9 and 52.6 kWh/kg, respectively (from 54.0 kWh/kg with linear duplication). Partial-load studies (25-100% set-point) show that cumulative hydrogen production remains nearly constant down to 50% load because all cases use the same weekly renewable-energy input. Below 50%, the power cap limits how much energy can be used within 168 h, which reduces hydrogen output. The model further indicates that the practical operating optimum lies between 50% and 85% load, where efficiency gains begin to appear without significant loss in hydrogen output. Moreover, the efficiency gains at lower loads are offset by reduced production. The validated framework supports scenario-based engineering trade-off studies for large configurations (10-100 MW) and for operating policies under variable renewables.

08 HYDROGEN↗

The spherical tokamak advanced reactor (STAR) fusion power plant design

Scientific and technical advancements have been made that improve fusion’s prospects to provide a new energy source, showing enhanced plasma confinement conditions with plasma temperatures reaching or exceeding 100 million degrees. Overshadowing this progress is the challenge involved in developing an economically viable fusion power plant design. Many proposed next-step DEMO and pilot plant designs are extensions of existing physics-focused experimental devices defined to understand and control plasma operations to achieve and sustain a fusion reaction. Transitioning scientific and technical advancements into a functional power plant requires a dedicated focus on architectural designs that integrate diverse technologies, while optimizing physics conditions, with a focus on economic viability. This holistic approach is essential in turning the promise of fusion energy into a reality. The Spherical Tokamak Advanced Reactor (STAR) is a fusion power plant conceptual design with the architectural focus that strives to balance physics, engineering, and cost considerations. In conclusion, it has been set up to introduce relevant physics, engineering and concept features that an intermediate pilot plant might follow, with the goal of meeting system performances and economic requirements that lead to a commercially competitive fusion power plant.

Blanket segmentation↗

An end-to-end pipeline for succinic acid production at an industrially relevant scale using Issatchenkia orientalis

Abstract Microbial production of succinic acid (SA) at an industrially relevant scale has been hindered by high downstream processing costs arising from neutral pH fermentation for over three decades. Here, we metabolically engineer the acid-tolerant yeast Issatchenkia orientalis for SA production, attaining the highest titers in sugar-based media at low pH (pH 3) in fed-batch fermentations, i.e. 109.5 g/L in minimal medium and 104.6 g/L in sugarcane juice medium. We further perform batch fermentation using sugarcane juice medium in a pilot-scale fermenter (300×) and achieve 63.1 g/L of SA, which can be directly crystallized with a yield of 64.0%. Finally, we simulate an end-to-end low-pH SA production pipeline, and techno-economic analysis and life cycle assessment indicate our process is financially viable and can reduce greenhouse gas emissions by 34–90% relative to fossil-based production processes. We expect I. orientalis can serve as a general industrial platform for production of organic acids.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Operational Modes of a 2.0 MWth Chloride Molten-Salt Pilot-Scale System

The limit of traditional solar-salt thermal stability is around 600 °C with ambient air as the cover gas. Nitrate molten salt concentrating solar power (CSP) systems are currently deployed globally and are considered to be state-of the art heat transfer fluids (HTFs) for present day high-temperature operation. However, decomposition challenges occur with these salts for operation beyond 600 C. Although slightly higher limits may be possible with solar salt, to fully realize SunShot efficiency goals of $15/kWhth HTFs and an LCOE of 6¢/kWh, molten-salt technologies working at higher temperatures (e.g., 650 °C to 750 °C) will require an alternative salt chemistry composition, such as chlorides. In this investigation a 2.0MWth Pilot-scale CSP plant design is developed to assess thermodynamic performance potential for operation up to 720 C. Here, an Engineering Equation Solver (EES) model is developed with respect to 14 state-points from the base of a solar tower at the Sandia National Laboratories, National Solar Thermal Test Facility (NSTTF), to solar receiver mounted 120 ft. above the ground. The system design considers a ternary chloride ternary chloride (20%NaCl/40%MgCl/40%KCl by mol%) salt as the HTF, with 6 hrs. of storage and a 1 MWth primary salt to sCO2 heat exchanger. Preliminary system modelling results indicate a minimum non-dimensional Cv of 60 required for both cold and hot-side throttle recirculation valves for the operational pump operating between speeds of 1800 and 2400 RPM. Further receiver comparison study results suggest that the ternary salt requires an average 15.2% higher receiver flux with a slightly lower calculated receiver efficiency when compared to a binary carnelite salt to achieve a 2.0 MWth desired input power design.

associated liquids↗

Water quality data collected from the Muskegon River (MI, USA) using AquaBOT June-July 2024.

This dataset contains processed output from AquaBOT, which combines 30-second interval measurements of GPS location and YSI water quality parameters (temperature (degrees Celsius), dissolved oxygen (mg/l), specific conductance(microSiemens/cm at 25 degrees Celsius), and turbidity (NTU)), for 3 sections of the Muskegon River in Michigan, USA. The file aquabot2024_MuskegonRiver.csv has information on locations, dates and times, and observations. The data were processed by removing observations recorded before and after AquaBOT was in the water and observations where no data values were recorded. No other QA/QC was done. This research was performed as part of the DOE Research Development and Partnership Pilot award “Expanding Collaborative Capacity to Address Climate Resiliency in the Great Lakes Region”, which aims to expand collaborations between researchers at Central Michigan University and U.S. Department of Energy labs and projects focused on enhancing climate resilience in Great Lakes communities and ecosystems.

54 ENVIRONMENTAL SCIENCES↗

Front-End Engineering Design (FEED) Study for a Carbon Capture Plant Retrofit to a Natural Gas-Fired Gas Turbine Combined Cycle Power Plant

A comprehensive front-end engineering design (FEED) study has been undertaken for a post-combustion capture (PCC) unit located at Panda’s Sherman natural gas–combined cycle (NGCC) power plant in Sherman, Texas. This is described in a full and unredacted FEED study report with all supporting documents, numbering over 150, also publicly available.

20 FOSSIL-FUELED POWER PLANTS↗

Front-End Engineering Design (FEED) Study for a Carbon Capture Plant Retrofit to a Natural Gas-Fired Gas Turbine Combined Cycle Power Plant (2x2x1 Duct-Fired 758-MWe Facility with F Class Turbines)

A comprehensive front-end engineering design (FEED) study has been undertaken by Bechtel National Inc. (Bechtel) for locating a post-combustion capture and compression (PCC) unit at Panda’s Sherman natural gas–combined cycle (NGCC) power plant in Sherman, Texas. This is described in the unredacted FEED Study report (Attachment 1) with all supporting documents, numbering over 150. The Study Report is publicly available. Sizing of the PCC plant is based on treating an amount of flue gas equivalent to that produced when generating 420 MW, which is approximately 68% of the total flue gas emitted by the NGCC power plant operating at guarantee condition with duct burners off. A reduced power plant capacity factor was used for sizing the PCC plant because the gas turbines at the site often operate at reduced load due to the high penetration of renewable power in the ERCOT region. The cost of carbon capture is primarily driven by capital cost (and therefore is highly sensitive to capacity factor). Sizing the capture unit so that when used it is nearly always operating at full capacity is critical to the economic viability of the proposed investment.

03 NATURAL GAS↗