Recovery of Rare Earth Elements (REEs) from Coal Mine Drainage, Phase 2

Phase 1 research identified a two-step refining train, acid leaching of AMD precipitate feed followed by solvent extraction (SX), to produce a 2% TREE product. For the Phase 2 bench scale system, the objective was to get the acid leaching step to operate in batch-mode with sufficient storage capacity to feed an aqueous, enriched REE liquor to a pilot SX plant operating in continuous-mode at a feed rate capable of producing 3 g/hr 2% TREE. Important process variables included feed rate, extractant makeup, flowsheet configuration, and stripping conditions. Operating parameters were optimized through a feedback-capable SCADA system configured for the SX bench scale plant. These conditions were met and exceeded. TREE grades approaching 90% were produced while our Techno-Economic Assessment indicated highly favorable economic returns. The project led to the design of a pilot facility for producing roughly 500 kg/TREE/year. That plant is now in the procurement stage with constructed expected to begin in late 2020.

01 COAL, LIGNITE, AND PEAT↗

Recovery of Rare Earth Elements (REEs) from Coal Mine Drainage, Phase 2

Phase 1 research identified a two-step refining train, acid leaching of AMD precipitate feed followed by solvent extraction (SX), to produce a 2% TREE product. For the Phase 2 bench scale system, the objective was to get the acid leaching step to operate in batch-mode with sufficient storage capacity to feed an aqueous, enriched REE liquor to a pilot SX plant operating in continuous-mode at a feed rate capable of producing 3 g/hr 2% TREE. Important process variables included feed rate, extractant makeup, flowsheet configuration, and stripping conditions. Operating parameters were optimized through a feedback-capable SCADA system configured for the SX bench scale plant. These conditions were met and exceeded. TREE grades approaching 90% were produced while our Techno-Economic Assessment indicated highly favorable economic returns. The project led to the design of a pilot facility for producing roughly 500 kg/TREE/year. That plant is now in the procurement stage with constructed expected to begin in late 2020.

01 COAL, LIGNITE, AND PEAT↗

Search for Double Beta Decays of Xe134 with EXO-200 Phase II

EXO-200 was a leading double beta decay experiment consisting of a single-phase, enriched liquid xenon time projection chamber filled with an admixture of 80.672% ^{136}Xe and 19.098% ^{134}Xe. The detector operated at the Waste Isolation Pilot Plant between 2010 and 2018 and was designed to search for double beta decay of ^{136}Xe. Data were acquired in two phases separated by a period of detector upgrades. We report on the search for 0νββ and 2νββ decay of ^{134}Xe with Phase II EXO-200 data, with median 90% CL exclusion sensitivity to half-life T_{1/2}^{0ν}≥3.7×10^{23} yr and T_{1/2}^{2ν}≥2.6×10^{21} yr, respectively. No statistically significant signal is observed for either decay mode. We set a world-leading lower limit on the half-life of the neutrinoless decay mode of ^{134}Xe of T_{1/2}^{0ν}≥8.7×10^{23} (90% CL) and the second strongest constraint on the two-neutrino decay of T_{1/2}^{2ν}≥2.9×10^{21} (90% CL), a threefold improvement over the EXO-200 Phase I measurement. New constraints are also set for the 2νββ and 0νββ decays of ^{134}Xe to the lowest excited state of ^{134}Ba.

Al Kharusi, S↗

Overview of actinide chemistry in the WIPP

The year 2009 celebrates 10 years of safe operations at the Waste Isolation Pilot Plant (WIPP), the only nuclear waste repository designated to dispose defense-related transuranic (TRU) waste in the United States. Many elements contributed to the success of this one-of-the-kind facility. One of the most important of these is the chemistry of the actinides under WIPP repository conditions. A reliable understanding of the potential release of actinides from the site to the accessible environment is important to the WIPP performance assessment (PA). The environmental chemistry of the major actinides disposed at the WIPP continues to be investigated as part of the ongoing recertification efforts of the WIPP project. This presentation provides an overview of the actinide chemistry for the WIPP repository conditions. The WIPP is a salt-based repository; therefore, the inflow of brine into the repository is minimized, due to the natural tendency of excavated salt to re-seal. Reducing anoxic conditions are expected in WIPP because of microbial activity and metal corrosion processes that consume the oxygen initially present. Should brine be introduced through an intrusion scenario, these same processes will re-establish reducing conditions. In the case of an intrusion scenario involving brine, the solubilization of actinides in brine is considered as a potential source of release to the accessible environment. The following key factors establish the concentrations of dissolved actinides under subsurface conditions: (1) Redox chemistry - The solubility of reduced actinides (III and IV oxidation states) is known to be significantly lower than the oxidized forms (V and/or VI oxidation states). In this context, the reducing conditions in the WIPP and the strong coupling of the chemistry for reduced metals and microbiological processes with actinides are important. (2) Complexation - For the anoxic, reducing and mildly basic brine systems in the WIPP, the most important inorganic complexants are expected to be carbonate/bicarbonate and hydroxide. There are also organic complexants in TRU waste with the potential to strongly influence actinide solubility. (3) Intrinsic and pseudo-actinide colloid formation - Many actinide species in their expected oxidation states tend to form colloids or strongly associate with non actinide colloids present (e.g., microbial, humic and organic). In this context, the relative importance of actinides, based on the TRU waste inventory, with respect to the potential release of actinides from the WIPP, is greater for plutonium and americium, and to less extent for uranium and thorium. The most important oxidation states for WIPP-relevant conditions are III and IV. We will present an update of the literature on WIPP-specific data, and a summary of the ongoing research related to actinide chemistry in the WIPP performed by the Los Alamos National Laboratory (LANL) Actinide Chemistry and Repository Science (ACRSP) team located in Carlsbad, NM [Reed 2007, Lucchini 2007, and Reed 2006].

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Carbon Mineralization by Aqueous Precipitation for Beneficial Use of CO 2 from Flue Gas

The objective of this project was to demonstrate an innovative process to mineralize CO 2 from flue gas directly to reactive carbonates and maximize the value and versatility of its beneficial use products. The program scope includes the design, construction, and testing of a CO 2 Conversion to Material Products (CCMP) Pilot Demonstration Plant utilizing CO 2 from the flue gas of a power production facility in Moss Landing, CA as well as flue gas from coal combustion. This final report details all development, analysis, design and testing of the project. Also included in the final report are an updated Techno-Economic Analysis and CO 2 Lifecycle Analysis. The subsystems included in the pilot demonstration plant are the mineralization subsystem, the Alkalinity Based on Low Energy (ABLE) subsystem, the waste calcium oxide processing subsystem, and the fiber cement board production subsystem. The fully integrated plant was proven to be capable of capturing CO 2 from various sources (gas and coal) and mineralizing it into a reactive calcium carbonate binder and subsequently producing commercial size (4ftx8ft) fiber cement boards. The final report provides a description of the “as built” design of these subsystems and the results of the commissioning activities that have taken place to confirm operability. The report also discusses the results of the fully integrated operation of the facility. Fiber cement boards have been produced in this facility exclusively using reactive calcium carbonate from captured CO 2 from flue gas. These boards meet all US and China appropriate acceptance standards. Use demonstrations for these boards are now underway.

20 FOSSIL-FUELED POWER PLANTS↗

250 kWt Pilot Testing in Support of a 10 MWe Coal-Direct Chemical Looping Demonstration Feasibility Study

The Babcock & Wilcox Company and The Ohio State University have constructed a 250 kWt coal direct chemical looping pilot facility at the Babcock & Wilcox Research Center in Barberton, Ohio. Testing was conducted on the facility to support installation of a 10 MWe coal direct chemical looping large pilot facility at the Dover Light & Power Plant in Dover, Ohio. Results of the testing and their impact on the design of the large pilot facility are discussed.

20 FOSSIL-FUELED POWER PLANTS↗

Technology and development requirements for advanced coal conversion systems

A compendium of coal conversion process descriptions is presented. The SRS and MC data bases were utilized to provide information paticularly in the areas of existing process designs and process evaluations. Additional information requirements were established and arrangements were made to visit process developers, pilot plants, and process development units to obtain information that was not otherwise available. Plant designs, process descriptions and operating conditions, and performance characteristics were analyzed and requirements for further development identified and evaluated to determine the impact of these requirements on the process commercialization potential from the standpoint of economics and technical feasibility. A preliminary methodology was established for the comparative technical and economic assessment of advanced processes.

Source record↗

Cost Drivers for a Tokamak-Based Compact Pilot Plant

A comprehensive systems code that includes a range of physics and engineering considerations along with a simplified costing model has been utilized to evaluate the primary cost drivers for a compact tokamak pilot plant. The systems code has been benchmarked against several tokamak reactor designs and is utilized with sophisticated optimization algorithms to develop optimal solutions for a set of user-specified assumptions and design constraints. Here, in contrast to previous models that have focused on the cost of electricity as the key cost metric, this study uses the estimated capital cost of the facility. The analysis suggests that a pilot plant with the following features may offer potential for a cost-attractive pilot plant: A ~ 3, H 98y2 > 1.5, P net = 200 MW, 𝜏 𝑝⁢𝑢⁢𝑙⁢𝑠⁢𝑒 ~ 1 to 2 h utilizing rare-earth barium copper oxide (REBCO) magnet technology and a plug-bucked central solenoid/toroidal field (CS/TF) magnet support structure. While REBCO magnets offer some advantages relative to Nb 3 Sn magnets in all cases, the most gain is obtained when combined with the plug-bucked CS/TF bucking solution. Pulsed operation reduces capital cost requirements relative to steady-state operation, especially at low confinement. Cost sensitivity studies indicate that there are significant cost uncertainties associated with the achievable confinement quality, tritium breeding capability, attainable thermal efficiency, and achievable neutron wall loading, suggesting that these areas are the most critical areas in reducing the cost risk for a compact tokamak pilot plant. Further cost sensitivity studies indicate that the estimated cost is most sensitive to the underlying cost of the magnetic coils, providing further impetus to better establish cost-effective means for producing fusion magnets.

Compact pilot plant↗

Design and Assessments of Liquid Metal Systems for a Fusion Power Reactor

This three-year research program at UCLA builds on the Fusion Engineering System Study (FESS) and has the major goal of identifying and accessing the most critical MHD/Mass & Heat Transfer phenomena associated with LM MHD flows in fusion breeding/cooling applications. The computed results and their analyses provide a strong basis to overcome present design limitations and will eventually lead to feasible, more effective solutions for LM systems of a fusion power reactor, such as breeding blankets and LM plasma facing components (PFCs). The project focuses on three research thrusts: Identification and characterization of the most important generic issues common to LM breeders (hereinafter called “Blanket”: ~47% of the resources); Design, implementation and assessments of two LM breeding-blanket concepts, DCLL and HCLL, for particular fusion devices, such as the US Fusion Nuclear Science Facility (FNSF) or the Fusion Pilot Plant (FPP) (hereinafter called “System Studies”: ~40% of the resources); Design and analysis of LM (Li) divertor concepts for FNSF or FPP, including scoping and detailed 2D and 3D computations (hereinafter called “LM PFC”: ~13% of the resources).

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Advanced process engineering co-simulation using CFD-based reduced order models

The process and energy industries face the challenge of designing the next generation of plants to operate with unprecedented efficiency and near-zero emissions, while performing profitably amid fluctuations in costs for raw materials, finished products, and energy. To achieve these targets, the designers of future plants are increasingly relying upon modeling and simulation to create virtual plants that allow them to evaluate design concepts without the expense of pilot-scale and demonstration facilities. Two of the more commonly used simulation tools include process simulators for describing the entire plant as a network of simplified equipment models and computational fluid dynamic (CFD) packages for modeling an isolated equipment item in great detail by accounting for complex thermal and fluid flow phenomena. The Advanced Process Engineering Co-Simulator (APECS) sponsored by the U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) has been developed to combine process simulation software with CFD-based equipment simulation software so that design engineers can analyze and optimize the coupled fluid flow, heat and mass transfer, and chemical reactions that drive overall plant performance (Zitney et al., 2006). The process/CFD software integration was accomplished using the process-industry standard CAPE-OPEN interfaces.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Final Technical Report - Commercially Important Carbohydrate Diacids - Building Blocks from Renewable Carbohydrates

The primary objective of this project was to develop oxidation methods appropriate for the conversion of agriculturally derived simple sugars to their corresponding diacids (aldaric acids) for use as biobased chemical building blocks for new biodegradable polymers and other materials. Principal target diacids were D-glucaric, meso-xylaric, D-mannaric and L-arabinaric acid, each to be prepared by nitric acid oxidation of the naturally occurring precursor carbohydrates (monosaccharides) D-glucose, D-xylose, D-mannose and L-arabinose, respectively, all from hydrolysis of naturally abundant plant polysaccharides. These conversions were to be designed for scale up to a level suitable for transfer first to a pilot plant scale, and then to an industrial plant scale. The core of the project involved a comprehensive study of the title oxidation employing a computer controlled reactor. The plan of action involved defining experimental parameters to allow for control of the oxidations with considerable precision and reproducibility. The prototype oxidations were typically run using ca. 0.75 molar amounts of carbohydrate, with a goal of eventually doubling the reaction size when appropriate reaction parameters were established. During the course of the funding period for this grant, the fundamentals of reaction control were established for oxidation of D-glucose, a critical component of the project given the exothermic character of the reaction. The reactions were monitored using a reliable GC/MS protocol. The glucose to glucaric acid conversion represented the most important and potentially highest value conversion. During the grant period we were able to establish one workable system to carry out the glucose to glucaric acid conversion, but were not able to optimize the process or establish a protocol that was satisfactory for a scale up to a pilot plant scale. However, the work carried out showed the possibility that with appropriate innovation and continued effort, a prototype for a successful pilot plant scale operation might be possible. It was not possible to explore oxidations with the other simple sugars indicated during the time frame of this project. A graduate student, J. Brand, and an undergraduate student, B. O'Connor received partial support for research done on the project. A manuscript for publication entitled ANitric Acid Oxidation of D-Glucose to D-Glucaric Acid: Improved Process and Analytical Assessment@, is in preparation for submission to Industrial & Engineering Chemistry Research or Carbohydrate Research.

36 MATERIALS SCIENCE↗

MYRRHA a multi-purpose hybrid research reactor for high-tech applications

MYRRHA (Multi-purpose hYbrid Research Reactor for High-tech Applications) is the flexible experimental accelerator driven system (ADS) in development at SCK-CEN. MYRRHA is able to work both in subcritical (ADS) as in critical mode. In this way, MYRRHA will allow fuel developments for innovative reactor systems, material developments for generation IV (GEN IV) systems, material developments for fusion reactors, radioisotope production and industrial applications, such as Si-doping. MYRRHA will also demonstrate the ADS full concept by coupling the three components (accelerator, spallation target and subcritical reactor) at reasonable power level to allow operation feedback, scalable to an industrial demonstrator and allow the study of efficient transmutation of high-level nuclear waste. MYRRHA is based on the heavy liquid metal technology and so it will contribute to the development of lead fast reactor (LFR) technology and in critical mode, MYRRHA will play the role of European technology pilot plant in the roadmap for LFR. In this paper the historical evolution of MYRRHA and the rationale behind the design choices is presented and the latest configuration of the reactor core and primary system is described. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of Technologies and Capabilities for Coal Energy Resources

This is the final report for the Aerojet Rocketdyne (AR) Advanced Gasification Systems Development (AGSD) project that was initiated on October 1, 2004. The project’s primary objective is to demonstrate technologies that improve the availability and efficiency of gasification-based power plants and to reduce plant capital and operational costs. The objective will be accomplished by (1) development and testing of cooled refractory liners, (2) feed system development and demonstration, (3) pilot plant definition and planning, (4) transport gasifier feed analysis, (5) coal-biomass mixture feed analysis, and (6) coal-biomass mixture pilot scale tests. Task 1, development and testing of cooled refractory liners, was conducted at CANMET Energy Technology Centre in Ottawa, Canada. The test objectives were to screen high conductivity CMC materials with alternate manufacturing methods and a variety of surface treatments for cooled metal tubes in a slagging gasifier environment. During the CMC testing, it was found that a constantly cooled CMC will survive in good conditions and that high porosity CMC resulted in high material erosion and corrosion. During cooled tube testing, it was found that hard metal spray coat and bare Haynes 188 performed the best. Task 2, feed system development and demonstration, was conducted at at the Energy and Environmental Research Center (EERC) at the University of North Dakota (UND). For tasks 2.1-2.6, the test objective was to demonstrate 400-tons/day coal feed system operation (to 1,000 psia gasifier pressures) in ultra-dense phase flow without plugging and to achieve multi-element injector flow-split non-uniformities below 2 %RSD. Testing was successfully completed with no feed system plugging of the feed system. The majority of the other Task 2 activities were associated with the Dry Solids Pump design (Task 2.8 and 2.11), development (Task 2.10), fabrication (Task 2.12), amd testing (Task 2.13-2.15). A variety of tests were performed that verified the capability of the Dry Solids Pump to consolidate various pulverized feedstocks to a state capable of sealing and sustaining downstream outlet pressures during mechanical operation of the pump as well as during periods when the pump was turned off. However, the final operating goals were not achieved. Task 3, pilot plant definition and planning, was to define requirements for an advanced commercial gasifier with a cooled liner and to establish a preferred commercial gasifier system configuration to serve as the reference point for an advanced gasifier pilot plant concept definition. A pilot plant concept was successfully defined that is scalable and traceable to the commercial gasifier configuration. The schedule and cost for design, installation, and long-duration test operation of a pilot plant were estimated at 33 months and $\$$25.6M. Taks 4, transport gasifier feed analysis, was to determine the effects of larger sized transport gasifier low rank coals within the AR dry solids pump. It was found for the two low-rank +100 mesh size transport gasifier coals that the cohesion of these larger materials was significantly less than the coals ground to minus 200 mesh. Also, the gas permeability of the MSL transport coal was found to be significantly higher than the permeability of the PRB transport coal. Task 5, coal-biomass mixture feed analysis, was to determine the effects of coal biomass blends within the AR ultra-dense phase feed system and dry solids pump, and to determine the cost of electricity increase of an integrated gasification combined cycle (IGCC) operating on coal/biomass blends with the AR dry solids pump and ultra-dense phase feed system. In summary, it was found that 75/25 wt% coal/corn stover blends produce reasonable economic results for IGCC operation with minimal dry solids pump modifications – especially if the coal is a low rank coal and the corn stover biomass is pelletized. The increase in electricity cost was found to be 1.1 cents/kWh. Task 6, coal-biomass mixture pilot scale tests, was to determine which coal/biomass blends could be tested in the current dry solids pump without major modifications. As reported in detail in the reports by Sprouse (2010) and Sprouse and Darby (2013), the coal/biomass blend having the least impact on pump configuration and operation is the 90/10 wt% Illinois #6 to corn stover ratio blend. The AGSD program was initiated on October 1, 2004. The interim final report was submitted on October 21, 2010 and covered Task 1, Task 2.1-2.9, and Task 3, performed during budget period 1. This final report covers Task 2.10-2.16, 4, 5, and 6, performed during budget period 2. The interim final report is attached as part of the appendix to this report.

Darby, Alan K.↗

Development of a framework for sequential Bayesian design of experiments: Application to a pilot-scale solvent-based CO 2 capture process

In this paper, a methodology is developed for sequential design of experiments (SDoE) for process systems and applied to a solvent-based CO 2 capture system. In this approach, the prior knowledge of the system is used to prioritize process data collection at specific operating conditions. These data are then incorporated into a Bayesian inference methodology for updating a stochastic model by refining estimations of its underlying parameters, and the updated model is then used to generate the next set of test runs. Thus, the new knowledge obtained from the data is used to guide subsequent iterations of the experimental runs, ensuring that the overall data collection is maximally informative given that most experimental campaigns, especially at pilot or higher-scale plants, are costly, time-consuming, and resource-limited. The test run objective for this work was to minimize the maximum model prediction uncertainty for key output variables, but the methodology is generic and can be readily applied to other test run objectives. This methodology is applied to an aqueous monoethanolamine (MEA) pilot plant campaign at the National Carbon Capture Center (NCCC) in Wilsonville, Alabama, USA. The SDoE framework was utilized for two iterations, while collecting 18 sets of data representing different process conditions, and this resulted in an overall average reduction in uncertainty of approximately 50% in the prediction of CO 2 capture percentage. Moreover, 11 additional data sets were obtained with variation of absorber packing height for further model validation. This work shows the capability of the SDoE framework to maximize learning given limited resources, allowing for the reduction of model uncertainty, which is of great importance for many applications including reduction of technical risk associated with scale-up and economic analysis.

20 FOSSIL-FUELED POWER PLANTS↗

Coalbed-methane pilots - timing, design, and analysis

Four distinct sequential phases form a recommended process for coalbed-methane (CBM)-prospect assessment: initial screening reconnaissance, pilot testing, and final appraisal. Stepping through these four phases provides a program of progressively ramping work and cost, while creating a series of discrete decision points at which analysis of results and risks can be assessed. While discussing each of these phases in some degree, this paper focuses on the third, the critically important pilot-testing phase. This paper contains roughly 30 specific recommendations and the fundamental rationale behind each recommendation to help ensure that a CBM pilot will fulfill its primary objectives of (1) demonstrating whether the subject coal reservoir will desorb and produce consequential gas and (2) gathering the data critical to evaluate and risk the prospect at the next-often most critical-decision point.

01 COAL, LIGNITE, AND PEAT↗

Operation and Process Control Development for a Pilot-Scale Leaching and Solvent Extraction Circuit Recovering Rare Earth Elements From Coal-Based Sources

The US Department of Energy in 2010 has identified several rare earth elements as critical materials to enable clean technologies. As part of ongoing research in REEs (rare earth elements) recovery from coal sources, the University of Kentucky has designed, developed and is demonstrating a ¼ ton/hour pilot-scale processing plant to produce high-grade REEs from coal sources. Due to the need to control critical variables (e.g. pH, tank level, etc.), process control is required. To ensure adequate process control, a study was conducted on leaching and solvent extraction control to evaluate the potential of achieving low-cost REE recovery in addition to developing a process control PLC system. The overall operational design and utilization of Six Sigma methodologies is discussed. Further, the application of the controls design, both procedural and electronic for the control of process variables such as pH is discussed. Variations in output parameters were quantified as a function of time. Data trends show that the mean process variable was maintained within prescribed limits. Future work for the utilization of data analysis and integration for data-based decision-making will be discussed.

coal, rare earth elements, pilot plant, automation↗

FINAL TECHNICAL AND ECONOMIC FEASIBILITY STUDY ON THE APPLICATION OF A HEAT INTEGRATED POST-COMBUSTION CO2 CAPTURE SYSTEM WITH HITACHI ADVANCED SOLVENT INTO EXISTING COAL-FIRED POWER PLANT

This report contains the results of a techno-economic assessment (TEA) conducted of a heat integrated post-combustion CO2 capture process with Hitachi advanced solvent for retrofit into an existing coal-fired power plant (but treated as greenfield plant on cost analysis). The process has been developed by the University of Kentucky Center for Applied Energy (UK CAER). EPRI was chiefly responsible for this analysis, with significant input from WorleyParsons, Hitachi Power Systems America (Hitachi) and UK CAER. The project also involves the design, fabrication, installation, testing, and analyses of a slipstream facility located at L&GE-KU’s E.W. Brown Generating Station to demonstrate the UK CAER carbon capture system that could utilize heat integration with the main power plant. The design, start-up, and baseline of the pilot system was performed with a generic 30 wt% MEA solvent to obtain data for direct comparison with the DOE/NETL Reference Case followed by testing Hitachi’s proprietary solvent H3-1. In this techno-economic analysis, two cases utilizing the UK CAER process are compared, using different approach temperatures and solvent, against the DOE/NETL Reference Case (Case 10). The results are shown comparing the energy demand for post-combustion CO2 capture and the net higher heating value (HHV) efficiency of the power plant integrated with the post-combustion capture (PCC) plant. A levelized cost of electricity (LCOE) assessment was performed showing the costs of the options presented in the study. The key factors contributing to the reduction of LCOE were identified as CO2 partial pressure increase at the flue gas inlet, thermal integration of the process, and performance of the Hitachi H3-1 solvent. Recent UK CAER process pilot-scale testing data and process simualtion data showed that the packing heights of absorber and stripper columns were significantly oversized in the prelimanary TEA (Task 2 of this project) and thus updated in this final TEA for the H3-1 case only. In addition, the solvent make-up cost for H3-1 was updated based on lattest test results. Finally, a heat integration with the main power plant was applied in this final TEA to increase overall energy effciency for both the MEA and H3-1 cases. Additonal reductions in capital and operational costs are expected but not taken into account here. Shorter columns result in reduced pressure drops, smaller blower head and pump hydraulic head requirements. An increase in overall energy efficiency resuls in a decreased size of the power plant, the CCS and a reduced parasitic steam requirement to the CCS. The net efficiency of the UK CAER integrated PC power plant with CO2 capture changes from 26.2% for the Reference Case 10 plant in 2010 revised DOE/NETL baseline report to 27.6% for the MEA options considered, and 29.1% for the options utilizing the Hitachi advanced solvent. The UK CAER Process + Hitachi case also produces an extra 30.9 MW of generation compared to the UK CAER Process + MEA case and total 60.9 MW more than DOE Case 10. LCOE ($/MWh) values are $172.08/MWh for the MEA option and $157.65/MWh for the Hitachi H3-1 solvent cases considered in comparison to $189.59/MWh in January 2012 dollar for the Reference Case 10. The UK CAER CCS process with MEA case lowers energy consumption for CO2 capture to 1340 Btu/lb-CO2 captured as compared to 1540 Btu/lb-CO2 in the Reference Case 10. The UK CAER CCS process with H3-1 case further lowers energy consumption for CO2 capture to 973 Btu/lb-CO2 captured, for an advantage of 36.8% less energy consumption than Case 10. The study also shows 38.1% less heat rejection associated with the carbon capture system from 3398 MBtu/hr (Case 10) to 2104 MBtu/hr for the UK CAER + MEA system. Heat rejection is reduced to 2464 MBtu/hr in the UK CAER + H3-1 case, for a 27.5 % decrease compared to Case 10. Modeling outputs show that in the UK CAER process, the cooling water that is 2-5°C cooler than conventional cooling tower water can be achieved for ambient conditions common to the midwest and other regions. The results from the techno-economic assessment show that the proposed technology can be investigated further as a viable alternative to conventional CO2 capture technology. The evaluation also shows the effect of the critical parameters on the LCOE, with the main variables being the approach temperature and CO2 partial pressure increase at the flue gas inlet. A summary of the key advantages of the UK CAER Process + H3-1 case for LCOE and other economic factors compared to the DOE Case 10 is as follows: • A lower variable operating cost by $1.56/MWh ($1.08MWh less than the UK CAER Process + MEA Case), a 11.7% reduction compared to the DOE Case 10 • A lower COE by $25.32MWh ($13.94/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower LCOE by $31.94/MWh ($17.51/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower cost of CO2 captured by $18.65/tonne CO2 ($9.44/tonne CO2 lower than the UK CAER Process + MEA Case), a 30.4% reduction compared to the DOE Case 10 • A lower cost of CO2 avoided by $34.95/tonne CO2 ($18.53 tonne CO2 lower than the UK CAER Process + MEA Case), a 38.7% reduction compared to the DOE Case 10

Bhown, Abhoyjit S.↗

Hanford’s Supplemental Treatment Project: Full-Scale Integrated Testing of In-Container-Vitrification and a 10,000-Liter Dryer

The GeoMelt® In-Container Vitrification™ (ICV™) process was selected by the U.S. Department of Energy (DOE) in 2004 for further evaluation as the supplemental treatment technology for Hanford’s low-activity waste (LAW). Also referred to as “bulk vitrification,” this process combines glass forming minerals, LAW, and chemical amendments; dries the mixture; and then vitrifies the material in a refractory-lined steel container. AMEC Nuclear Ltd. (AMEC) is adapting its GeoMelt ICV™ technology for this application with technical and analytical support from Pacific Northwest National Laboratory (PNNL). The DVBS project is funded by the DOE Office of River Protection and administered by CH2M HILL Hanford Group, Inc. The Demonstration Bulk Vitrification Project (DBVS) was initiated to engineer, construct, and operate a full-scale bulk vitrification pilot-plant to treat up to 750,000 liters of LAW from Waste Tank 241-S-109 at the DOE Hanford Site. Since the beginning of the DBVS project in 2004, testing has used laboratory, crucible-scale, and engineering-scale equipment to help establish process limitations of selected glass formulations and identify operational issues. Full-scale testing has provided critical design verification of the ICV™ process before operating the Hanford pilot-plant. In 2007, the project’s fifth full-scale test, called FS-38D, (also known as the Integrated Dryer Melter Test, or IDMT,) was performed. This test had three primary objectives: 1) Demonstrate the simultaneous and integrated operation of the ICV™ melter with a 10,000-liter dryer, 2) Demonstrate the effectiveness of a new feed reformulation and change in process methodology towards reducing the production and migration of molten ionic salts (MIS), and, 3) Demonstrate that an acceptable glass product is produced under these conditions. Testing was performed from August 8 to 17, 2007. Process and analytical results demonstrated that the primary test objectives, along with a dozen supporting objectives, were successfully met. Glass performance exceeded all disposal performance criteria. A previous issue with MIS containment was successfully resolved in FS-38D, and the ICV™ melter was integrated with a full-scale, 10,000-liter dryer. This paper describes the rationale for performing the test, the purpose and outcome of scale-up tests preceding it, and the performance and outcome of FS-38D.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗