Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Performance Tools”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

PNNL-CompBio/perseq

Per sequence functional classification and Functional annotation in addition to linking those functions to taxonomic groups presents a challenge due to many established tools performing one task and not the other creating disparate downstream data. PerSeq aims to address these challenges by performing local alignments against a reference database annotated for both aspects, function and taxonomy, to annotate sequences individually. Downstream results are merged into count tables facilitating complex analyses based on observed function or functional potential in addition to being able to separate out function by taxonomic level to determine metabolic contributions by present organisms.

Brown, Joe↗

Zgoubi Users' Guide

The initial version of zgoubi, dedicated to ray-tracing in magnetic fields, was developed by D. Garreta and J.C. Faivre at CEN-Saclay in the early 1970’s. It was perfected for the purpose of studying the four spectrometers SPES I, II, III, IV at the Laboratoire National SATURNE (CEA-Saclay, France), and SPEG at GANIL (Caen, France). It is being used since long in several national and foreign laboratories. The first manual was in French. Accounting for many developments and improvements, and in or der to facilitate access to the program an English version of the manual was written at TRIUMF with the assistance of J. Doornbos. P. Stewart prepared the manuscript for publication. An updating of the latter was necessary for accompanying the third version of the code which included developments regarding spin tracking and ray-tracing in combined electric and magnetic fields; this was done with the help of D. Bunel (SATURNE Laboratory, Saclay) for the preparation of the document and lead to the third release. In the mid-1990s, the computation of synchrotron radiation electromagnetic impulse and spectra was introduced for the purpose of studying interference effects at the LEP synchrotron radiation based diagnostic mini-wiggler. In the mean time, several new optical elements were added, such as electro-magnetic and other electrostatic lenses. Used since several years for special studies in periodic machines (e.g., SATURNE at Saclay, COSY at Julich, LEP and LHC at CERN, Neutrino Factory rings), zgoubi has also undergone extensive developments regarding storage ring related features. These developments of zgoubi have strongly benefited of the environment of the Groupe Théorie, Laboratoire National SATURNE, CEA/DSM-Saclay, in the years 1985-1995. The graphic interface to zgoubi (addressed in Part D) has also undergone concomitant extensive devel opments, which make it a performing tool for the post-processing of zgoubi outputs. The Users’ Guide is intended to describe the contents of the most recent version of zgoubi, which is far from being a “finished product”. Françios Méot

43 PARTICLE ACCELERATORS↗

Energy Zones Study: A Comprehensive Web-Based Mapping Tool to Identify and Analyze Clean Energy Zones in the Eastern Interconnection

This report describes the work conducted in support of the Eastern Interconnection States’ Planning Council (EISPC) Energy Zones Study and the development of the Energy Zones Mapping Tool performed by a team of experts from three National Laboratories. The multi-laboratory effort was led by Argonne National Laboratory (Argonne), in collaboration with the National Renewable Energy Laboratory (NREL) and Oak Ridge National Laboratory (ORNL).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

PIPER: Performance Insight for Programmers and Exascale Runtimes (Final Technical Report)

This project concentrated on the development of novel performance tools and analysis techniques for large scale parallel systems and applications, eventually targeting exascale platforms. Activities conducted included work to novel root cause detection approaches and an auto-tuning framework for parallel systems. The work has led to several software solutions, which are available as open source.

97 MATHEMATICS AND COMPUTING↗

BISON Capabilities for LWR Fuel Behavior Analysis During Accident and High-burnup Conditions

The U.S. Department of Energy (DOE)'s Nuclear Energy Advanced Modeling and Simulation (NEAMS) program aims to develop predictive capabilities using computational methods for the analysis and design of advanced reactor and fuel cycle systems. This program has been supporting the development of BISON which is a high-fidelity and high-resolution fuel performance tool at the engineering scale. Increasing recent interest in applications at extended burnups motivated this study to incorporate more physically based models in BISON. This document details integration of newly implemented modeling capabilities into BISON, which includes (1) new thermal conductivity models that are valid up to 100 GWd/t, (2) models for the formation of the high-burnup structure (HBS), (3) two porosity correction methods beingapplied on the thermal conductivity due to the conducting pores during the HBS formation. BISON's results are verified and validated to test the new modeling capabilities

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Assessment and Improvement of Fission Product Transport Predictions of Particle Fuel in BISON

The U.S. Department of Energy’s Nuclear Energy Advanced Modeling and Simulation (NEAMS) program aims to develop predictive capabilities by applying computational methods to the analysis and design of advanced reactor and fuel cycle systems. This program has been providing engineering-scale support for the development of BISON, a high-fidelity and high-resolution fuel performance tool. This study was motivated by the need to incorporate more physics-based models in BISON in order to foster tri-structural isotropic (TRISO) applications. This document details the integration of new modeling capabilities in BISON, including (1) development of pyrolytic carbon (PyC) and silicon carbide (SiC) layer anisotropic thermal and mass transport capabilities, (2) verification of the mass diffusion solution in TRISO modeling, (3) calibration of fission product diffusivity using Advanced Gas Reactor (AGR) experiments, (4) improved fission product release modeling by developing compact diffusion modeling capabilities, and (5) documentation of accelerated failure analysis on the BISON website. Improvements made to the diffusion models and parameters were documented and validated against AGR-1 and -2 experiment data.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Develop and Connect TRISO Failure Analysis and Uncertainty Quantification to Fission Product Release Calculation Capability

The U.S. Department of Energy’s Nuclear Energy Advanced Modeling and Simulation (NEAMS) program aims to develop predictive capabilities by applying computational methods to the analysis and design of advanced reactor and fuel cycle systems. This program has been providing engineering-scale support for the development of BISON, a high-fidelity and high-resolution fuel performance tool. Stress-based failure probability has been developed and analyzed to assess the integrity of tri-structural isotropic (TRISO) fuel particles during fuel life cycles. While simple, stress-based approaches to failure probability leveraging the Weibull statistical distribution entails a number of drawbacks when stress concentration occurs near crack tips, including finite element mesh size dependency. In this report, we use an interaction integral approach to the computation of stress intensity factors in functionally graded materials (FGM) for axisymmetric models. The inner pyrolytic carbon (IPyC) cracking induced silicon carbide (SiC) failure is one of the dominated failure modes in TRISO failure analysis. In this study, we consider a crack in the IPyC layer perpendicular to the SiC layer. The interface between these two TRISO layers is considered to be porous, which we simulate considering a transition of mechanical properties over the porous length. These aspects are considered in the computation of stress intensity factor (SIF) from a fracture mechanics approach and compared with the known stress-based failure probability approach.

42 ENGINEERING↗

Keeping LAMMPS cutting edge

Since its inception 30 years ago, LAMMPS has grown to be a world-class molecular dynamics code and a cornerstone of computational materials science research. This project aimed to keep LAMMPS at the forefront of molecular dynamics simulations by adapting LAMMPS to the latest developments in machine learning technology and hardware. Initially, the project set out to provide a unified implementation of active learning for efficient training data generation in LAMMPS, but the research trajectory pivoted to address more immediate and impactful opportunities. On the hardware side, recent record-breaking molecular dynamics simulations were developed on the Cerebras wafer-scale AI chip, and this project has developed an interface between LAMMPS and the hardware-specific molecular dynamics code to accelerate and simplify development and user adoption. On the software side, PyTorch’s Ahead-of-Time (AOT) compilation features promised increased performance for state-of-the-art equivariant neural network potentials, and this project laid the groundwork for their adoption in LAMMPS, resulting in a nearly 20x acceleration in extreme cases. Combined with a comprehensive benchmark study of LAMMPS across all current exascale systems, this project has reinforced LAMMPS’s role as a versatile, high-performance tool for current and future materials science applications.

36 MATERIALS SCIENCE↗

Cle Elum Supplementation and Research Facility : Monthly Progress Report November 2008.

FISH PRODUCTION: Final shocking of eggs was finished in the incubation. Egg enumeration for the 2008 brood was completed and the eggs are being incubated in 38 degree Fahrenheit chilled water. Don Larsen of NOAA made a request of eggs for research purposes and was able to acquire supplemental line eggs 10,555. Estimated density at the time of ponding in Mid-March of 2009 is approximately 43,869 fry per raceway after calculating an average fry loss of 2%. The end of the month totals for the 2007 brood reports 773,807 juveniles on hand with an overall average of 31.4 fish per pound. Tagging continues on the 2007 brood and is on pace to wrap up in early December. FISH CULTURE: Ponds are cleaned as needed and due to the colder water temperatures, the feeding frequency has been changed to three days a week. All ponds are sampled at the end of the month. Growth for production fish are adjusted accordingly as temperature dictates feeding levels. Torrential rain on the 12th turned the Yakima River extremely turbid. Fish tagging operations were halted and the ensuing conditions at the facility intake screens became a concern. Water flow to the wet well became restricted so the decision was made to shut the surface water (river) pumps down and turn on well pumps No.1, No.4 and No.6 to run water to the facility head box. This operation continued for twenty-four hours at which point normal operations were optimal and fish tagging resumed, although the river didn't clear up enough to feed the fish until the 17th. WATER PRODUCTION: The current combined well and river water supply to the complex is 14,822 gallons/minute. Well No.2 is pumping water at a rate of 530 gallons per minute. All four river pumps are in operation and pumping 14,292 gallons/minute. ACCLIMATION SITES: Cle Elum staff has been working to prep the acclimation sites for the upcoming fish transfer before the snow falls. Thermographs at each site are changed weekly. AMB Tools performed routine maintenance on the compressor and Brown and Jackson pumped out the septic tank at the Jack Creek acclimation site. VEHICLE MAINTENANCE: Snow tires are now on all vehicles and snow blowers were installed on the John Deere tractor and lawn tractor. The snowplow was also installed on the Ford one ton. The four Snowmobiles were serviced by Yamaha Jacks of Ellensburg. MAINTENANCE BUILDING MAINTENANCE: Clean up occurs on Fridays of each week. HATCHERY BUILDING MAINTENANCE: Water has been turned on to vertical incubator islands one and two. After eggs were transferred to vertical stacks cleaning of troughs began. WDFW crew inventoried eggs from isolettes and then transferred them to the vertical incubators. RIVER PUMP STATION MAINTENANCE: All four pumps are in operation and supplying the facility with 14,292 gallons/minute of water to rearing ponds. WELL FIELD MAINTENANCE: Well pumps No.1, No.4 and No.6 were turned on to supplement water flow to the facility as mentioned previously. Well No.5 was powered up but a winterizing valve malfunction wouldn't allow operation, we are currently working on it at this time. Well No.2 is pumping 530 gallons per minute and supplies well water to incubation and chiller. The pumps meter is recorded weekly. Test holes are monitored weekly and results are faxed to CH2MHILL afterward. SAFETY AND TRAINING: Ice melt and sand bags are popular items at the facility this month as freezing temperatures cause ground to become slippery and hazardous. GROUNDS: Van Alden's Plumbing installed a new commode in resident house No.411 and also inspected a plumbing problem at resident No.1131. Cle Elum staff along with WDFW staff worked to locate the spawning channel building back to the position it was at to have Greg Wallace of Wallace Electric hook electricity back up to the spawning shed. MEETINGS AND TOURS: Charlie attended a policy meeting at Cle Elum on the 18th. The Internal projects annual review took place at Cle Elum on the 19th and 20th. Bill Bosch continues to visit monthly to incorporate data into the YKFP data base. PERSONNEL: IHS employees traveled to Cle Elum to administer flu shots to YN staffers and families as well as WDFW staffers.

13 HYDRO ENERGY↗

Cle Elum and Supplementation Research Facility : Monthly Progress Report October 2008.

FISH PRODUCTION: On October 7th the 2008 spawning season was completed. 823 adults were transferred to the facility for the 2008 season. The overall adult mortality was 6.9% (1.3% pre-spawning mortality and 5.6% encountered after sorting). Wild/natural salmon collected included 278 females, 173 males, and 29 jacks for a total 480 fish for the 2008 brood. Supplemented brood stock collected included 149 adults (85 females, 35 males and 29 jacks). Hatchery control brood collected for research included 194 adults (91 females, 68 males and 35 jacks). Eggs will be inventoried in November with an actual summary of eggs numbers to be submitted for the November report. The estimated egg takes (production) for the 2008 season was 1,375,146 eggs with 1,006,063 comprising of W x W crosses and 250,755 eggs of H x H crosses with 118,328 supplement crosses. Total fish on hand for the 2007 brood is 768,751 with an average fish per pound of 30.6 f/lb. FISH CULTURE: The marking and pit-tagging operation started on October 13th. The pit-tagging portion was completed on October 23rd. A total 40,000 juveniles were pit-tagged (2,000 from each of the production ponds and 4,000 each for the hatchery juvenile ponds 9 & 10). Cle Elum staff began shocking, sorting, counting and splitting eggs in incubation. Shocking eggs will separate live eggs from dead eggs. Eggs are treated with formalin three times a week to control fungus. The focus for the culturists during the month of October entail completing the final spawn (egg take) on the 7th, pond cleaning, keeping the marking trailers supplied with fish and end of month sampling. The adult holding ponds were power washed and winterized for the shut down period. Facility crew members Greg Strom and Mike Whitefoot assisted Joe Blodgett and his crew with fish brood collection on the 22nd of October. Fall Chinook and Coho salmon were seined up and put in tanker trucks from Chandler canal and transported to holding ponds for later spawning. Charlie, Simon and Vernon assisted with sorting and spawning Summer Chinook at the Wells hatchery for the Summer Chinook reintroduction program on the lower Yakima River. WATER PRODUCTION: The current combined well and river water supply to the complex is 12,909 gallons/min. Four river pumps (12,400gpm) and one well pump No.2 (509gpm) are supplying water to the facility main head box and the egg incubation building. ACCLIMATION SITES: Easton had much activity in October, the electrical power panel that's switches commercial power operation to generator power (transfer switch) malfunctioned. Charlie called Wallace Electric as well as ASCO Services to trouble shoot the problem which has yet to be determined. Heaters have been turned on in all service buildings at the acclimation sites. Pacific States Marine Fisheries Commission traveled to Easton to install a pole to mount a satellite and a new ups backup system with new monitors and computers for pit tag data recording and transmitting. Brown and Jackson pumped out the septic tanks at Easton and Clark Flat. AMB Tools performed maintenance on the compressors at the acclimation sites as well as Cle Elum (5 total). VEHICLE MAINTENANCE: Day Wireless performed maintenance on all handheld and vehicle radios. Day Wireless repaired radio communications (static noise) on the 6th also. All vehicles mileages and conditions are reported monthly to Toppenish. Cle Elum staff continues to clean and maintain all facility vehicles weekly. MAINTENANCE BUILDING MAINTENANCE: Kevin of Raincountry was called in response to repairs needed to the water chiller system. Cle Elum staff winterized all irrigation as well as shop grounds. Brown and Jackson pumped out the septic tank at the hatchery on the 22nd. HATCHERY BUILDING MAINTENANCE: The incubation room has been set up for transfer of eggs from isolation buckets to vertical stacks, temperature units are recorded daily. RESENTDENTIAL HOUSING: Residents irrigation has been winterized and fall fertilizer was applied to all grass on facility. Four Seasons performed maintenance on all heating systems and replaced a thermostat on resident house No.391. Alden Plumbing replaced a water faucet in a sink at resident house No.1001. Shaw's Furniture & Appliance replaced three faulty microwaves in residents No.391, 411 and 871. RIVER PUMP STATION MAINTENANCE: All river pumps are in operation and supply river water to the main facility. Approximately 12,400 gallons per minute are being pumped to eighteen raceways. Weekly cleaning and upkeep is performed by Cle Elum staff. WELL FIELD MAINTENANCE: Weekly test holes are measured, recorded and sent to CH2MHILL. Pump No.1 is in operation and the flow meter is recorded weekly. On the 3rd well pumps 5 and 6 were shut down and winterized for the season. Well pump No.2 had fence damage repaired on the 16th. SAFETY AND TRAINING: A safety meeting was held on the 21st. On the 15th ABC Fire Prevention did maintenance on all fire extinguishers.

13 HYDRO ENERGY↗

A physics-based ensemble machine-learning approach to identifying a relationship between lightning indices and binary lightning hazard

To convert lightning indices generated by numerical weather prediction experiments into binary lightning hazard, a machine-learning tool was developed. This tool, consisting of parallel multilayer perceptron classifiers, was trained on an ensemble of planetary boundary layer schemes and microphysics parameterizations that generated four different lightning indices over 1 week. In a subsequent week, the multi-physics ensemble was applied and the machine-learning tool was used to evaluate the accuracy. Unintuitively, the machine-learning tool performed better on the testing dataset than the training dataset. Much of the error may be attributed to mischaracterizing the convection. The combination of the machine learning model and simulations could not differentiate between cloud-to-cloud lightning and cloud-to-ground lightning, despite being trained on cloud-to-ground lightning. It was found that the simulation most representative of the local operational model was the most accurate simulation tested.

54 ENVIRONMENTAL SCIENCES↗

Phase Field Simulations of Microstructure Evolution in IN718 using a Surrogate Ni–Fe–Nb Alloy during Laser Powder Bed Fusion

The solidification microstructure in IN718 during additive manufacturing was modeled using phase field simulations. The novelty of the research includes the use of a surrogate Ni–Fe–Nb alloy that has the same equilibrium solidification range as IN718 as the model system for phase field simulations, the integration of the model alloy thermodynamics with the phase field simulations, and the use of high-performance computing tools to perform the simulations with a high enough spatial resolution for realistically capturing the dendrite morphology and the level of microsegregation seen under additive manufacturing conditions. Heat transfer and fluid flow models were used to compute the steady state temperature gradient and an average value of the solid-liquid (s-l) interface velocity that were used as input for the phase field simulations. The simulations show that the solidification morphology is sensitive to the spacing between the columnar structures. Spacing narrower than a critical value results in continued growth of a columnar microstructure, while above a critical value the columnar structure evolves into a columnar dendritic structure through the formation of secondary arms. These results are discussed in terms of the existing columnar to dendritic transition (CDT) theories. The measured interdendritic Nb concentration, the primary and secondary arm spacing is in reasonable agreement with experimental measurements performed on the nickel-base superalloy IN718.

36 MATERIALS SCIENCE↗

Computational Needs for the Next Generation Electric Grid Proceedings

The April 2011 DOE workshop, 'Computational Needs for the Next Generation Electric Grid', was the culmination of a year-long process to bring together some of the Nation's leading researchers and experts to identify computational challenges associated with the operation and planning of the electric power system. The attached papers provide a journey into these experts' insights, highlighting a class of mathematical and computational problems relevant for potential power systems research. While each paper defines a specific problem area, there were several recurrent themes. First, the breadth and depth of power system data has expanded tremendously over the past decade. This provides the potential for new control approaches and operator tools that can enhance system efficiencies and improve reliability. However, the large volume of data poses its own challenges, and could benefit from application of advances in computer networking and architecture, as well as data base structures. Second, the computational complexity of the underlying system problems is growing. Transmitting electricity from clean, domestic energy resources in remote regions to urban consumers, for example, requires broader, regional planning over multi-decade time horizons. Yet, it may also mean operational focus on local solutions and shorter timescales, as reactive power and system dynamics (including fast switching and controls) play an increasingly critical role in achieving stability and ultimately reliability. The expected growth in reliance on variable renewable sources of electricity generation places an exclamation point on both of these observations, and highlights the need for new focus in areas such as stochastic optimization to accommodate the increased uncertainty that is occurring in both planning and operations. Application of research advances in algorithms (especially related to optimization techniques and uncertainty quantification) could accelerate power system software tool performance, i.e. speed to solution, and enhance applicability for new and existing real-time operation and control approaches, as well as large-scale planning analysis. Finally, models are becoming increasingly essential for improved decision-making across the electric system, from resource forecasting to adaptive real-time controls to online dynamics analysis. The importance of data is thus reinforced by their inescapable role in validating, high-fidelity models that lead to deeper system understanding. Traditional boundaries (reflecting geographic, institutional, and market differences) are becoming blurred, and thus, it is increasingly important to address these seams in model formulation and utilization to ensure accuracy in the results and achieve predictability necessary for reliable operations. Each paper also embodies the philosophy that our energy challenges require interdisciplinary solutions - drawing on the latest developments in fields such as mathematics, computation, economics, as well as power systems. In this vein, the workshop should be viewed not as the end product, but the beginning of what DOE seeks to establish as a vibrant, on-going dialogue among these various communities. Bridging communication gaps among these communities will yield opportunities for innovation and advancement. The papers and workshop discussion provide the opportunity to learn from experts on the current state-of-the-art on computational approaches for electric power systems, and where one may focus to accelerate progress. It has been extremely valuable to me as I better understand this space, and consider future programmatic activities. I am confident that you too will enjoy the discussion, and certainly learn from the many experts. I would like to thank the authors of the papers for sharing their perspectives, as well as the paper discussants, session recorders, and participants. The meeting would not have been as successful without your commitment and engagement. I also would like to thank Joe Eto and Bob Thomas for their vision and leadership in bringing together such a well-structured and productive forum.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Supporting the Development of Resilient Message Passing Applications using Simulation

An emerging aspect of high-performance computing (HPC) hardware/software co-design is investigating performance under failure. The work in this paper extends the Extreme-scale Simulator (xSim), which was designed for evaluating the performance of message passing interface (MPI) applications on future HPC architectures, with fault-tolerant MPI extensions proposed by the MPI Fault Tolerance Working Group. xSim permits running MPI applications with millions of concurrent MPI ranks, while observing application performance in a simulated extreme-scale system using a lightweight parallel discrete event simulation. The newly added features offer user-level failure mitigation (ULFM) extensions at the simulated MPI layer to support algorithm-based fault tolerance (ABFT). The presented solution permits investigating performance under failure and failure handling of ABFT solutions. The newly enhanced xSim is the very first performance tool that supports ULFM and ABFT.

Engelmann, Christian↗

BISON High Burnup Structure Modeling Capabilities Validated with a Selection of the Halden IFA-650 Rods

The U.S. Department of Energy (DOE)’s Nuclear Energy Advanced Modeling and Simulation (NEAMS)program aims to develop predictive capabilities using computational methods for the analysis and design of advanced reactor and fuel cycle systems. This program has been supporting the development of BISON, a high-fidelity and high-resolution fuel performance tool at the engineering scale. This document continues analysis and refinement of capabilities added to BISON early this calendar year in regards to the incorporation of capabilities applicable to extended burnups in response to industry interest. Details are provided on high burnup thermal conductivity models, a refitting of the high-burnup structure (HBS) porosity formation model to include additional data, the coupling of the HBS volume fraction model to thermal conductivity and fine fragmentation models, and validation activities. The IFA-650.4 and IFA-650.9 loss of coolant accident (LOCA) analyses are revisited with the latest developments in this report. A new validation case, IFA-650.14 has also been added to the BISON test suite.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Direction on characterization of fuel debris for defueling process in Fukushima Daiichi Nuclear Power Station

For the decommissioning of Fukushima Daiichi Nuclear Power Station (1F), defueling of the fuel debris in the reactor core of Units 1-3 is planned to start within 10 years. Preferential items in the characterization of the fuel debris were identified for this work, in which the procedure and handling tools were assumed on the basis of information on 1F and experience after the Three Mile Island Unit 2 (TMI-2) accident. The candidates for defueling tools for 1F were selected from among the TMI- 2 defueling tools. It was found that they could be categorized into six groups according to their operating principles. The important properties of the fuel debris for defueling were selected considering the effect of the target materials on the tool performance. The selected properties are shape, size, density, thermal conductivity, heat capacity, melting point, hardness, elastic modulus, and fracture toughness. Of these properties, the mechanical properties (hardness, elastic modulus, fracture toughness) were identified as preferential items, because too few data on these characteristics of fuel debris are available in past severe accident studies. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Establishing a Cyber Security Culture for the Nuclear Industry

This paper explores the development of a Cyber Security Culture that deploys the appropriate technological and Human Performance tools using the key tenets of INPO's Nuclear Safety Culture program as a basis. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Eddy current NDE performance demonstrations using simulation tools

To carry out performance demonstrations of the Eddy-Current NDE processes applied on French nuclear power plants, EDF studies the possibility of using simulation tools as an alternative to measurements on steam generator tube mocks-up. This paper focuses on the strategy led by EDF to assess and use code{sub C}armel3D and Civa, on the case of Eddy-Current NDE on wears problem which may appear in the U-shape region of steam generator tubes due to the rubbing of anti-vibration bars.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗