Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Parts Assurance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Fracture Control for Additive Manufactured Spacecraft Structures

This paper describes how the intent of current NASA fracture control requirements may be applied to “fracture critical” additively manufactured spacecraft hardware. Fracture control is a multi-discipline design and certification methodology that is applied in order to mitigate catastrophic failure of structures resulting from growth of an undetected crack-like defect. The methodology is defined in existing NASA standards and is required on all human-rated space structures. As legacy spacecraft structures have been built using primarily metallic and composite materials manufactured using well established methods, guidance for application of fracture control to parts composed of these material types has been established and is documented in several NASA requirements. Additive manufactured structures offer advantages in design flexibility and manufacturing efficiency and as a result are expected to continue to be used more and more in the future. Recently, relevant guidance has been published by NASA to define materials and processes requirements for certain additive manufactured hardware, but procedures for fracture control are not addressed yet in any requirements or guidance document. While use of additive manufactured parts in non-critical scenarios may be of relatively low concern in current structural certification processes, there is a need for new fracture control guidance in order to use and certify additively manufacture hardware that is “fracture critical” where failure of the part may result in loss of life or loss of vehicle. Assurance of damage tolerance, i.e., that as-built flaws in a given part either do not exist or will not grow to become catastrophic, is of particular interest to the fracture control community. This poses a challenge due to the fact that damage tolerance behavior is not well understood in additive manufactured parts compared to legacy material types and manufacturing techniques. The discussion contained herein is necessary at this time as new guidance in this area should be founded collaboratively by the technical community at large. Different hardware types (e.g., pressure vessel, structural member) are described to highlight specific challenges and solutions for each. The discussion concludes with considering specific disciplines within fracture control (non-destructive evaluation, materials & processes, fracture mechanics, and structural certification) in a proposed extension of existing fracture control requirements to additive manufactured parts.

McElroy, Mark↗

Goal Structuring Notation in a Radiation Hardening Assurance Case for COTS-Based Spacecraft

A systematic approach is presented to constructing a radiation assurance case using Goal Structuring Notation (GSN) for spacecraft containing COTS parts. The GSN paradigm is applied to an SRAM single-event upset experiment board designed to fly on a CubeSat in January 2017. A custom software language for development of a GSN assurance case is under development at Vanderbilt. Construction of a radiation assurance case without use of hardened parts or extensive radiation testing is discussed.

Radiation Effects Modeling (REM)↗

Heat pipe with hot gas reservoir

Heat pipe can reverse itself with gas reservoir acting as evaporator, leading to rapid recovery from liquid in reservoir. Single layer of fine-mesh screen is included inside reservoir to assure uniform liquid distribution over hottest parts of internal surface until liquid is completely removed.

Marcus, B. D.↗

The software product assurance metrics study: JPL's software systems quality and productivity

The findings are reported of the Jet Propulsion Laboratory (JPL)/Software Product Assurance (SPA) Metrics Study, conducted as part of a larger JPL effort to improve software quality and productivity. Until recently, no comprehensive data had been assembled on how JPL manages and develops software-intensive systems. The first objective was to collect data on software development from as many projects and for as many years as possible. Results from five projects are discussed. These results reflect 15 years of JPL software development, representing over 100 data points (systems and subsystems), over a third of a billion dollars, over four million lines of code and 28,000 person months. Analysis of this data provides a benchmark for gauging the effectiveness of past, present and future software development work. In addition, the study is meant to encourage projects to record existing metrics data and to gather future data. The SPA long term goal is to integrate the collection of historical data and ongoing project data with future project estimations.

Bush, Marilyn W.↗

The present state and future directions of PDF methods

The objectives of the workshop are presented in viewgraph format, as is this entire article. The objectives are to discuss the present status and the future direction of various levels of engineering turbulence modeling related to Computational Fluid Dynamics (CFD) computations for propulsion; to assure that combustion is an essential part of propulsion; and to discuss Probability Density Function (PDF) methods for turbulent combustion. Essential to the integration of turbulent combustion models is the development of turbulent model, chemical kinetics, and numerical method. Some turbulent combustion models typically used in industry are the k-epsilon turbulent model, the equilibrium/mixing limited combustion, and the finite volume codes.

Pope, S. B.↗

Managing systems faults on the commercial flight deck: Analysis of pilots' organization and prioritization of fault management information

In rare instances, flight crews of commercial aircraft must manage complex systems faults in addition to all their normal flight tasks. Pilot errors in fault management have been attributed, at least in part, to an incomplete or inaccurate awareness of the fault situation. The current study is part of a program aimed at assuring that the types of information potentially available from an intelligent fault management aiding concept developed at NASA Langley called 'Faultfinde' (see Abbott, Schutte, Palmer, and Ricks, 1987) are an asset rather than a liability: additional information should improve pilot performance and aircraft safety, but it should not confuse, distract, overload, mislead, or generally exacerbate already difficult circumstances.

Rogers, William H.↗

Continuous Risk Management: An Overview

Software risk management is important because it helps avoid disasters, rework, and overkill, but more importantly because it stimulates win-win situations. The objectives of software risk management are to identify, address, and eliminate software risk items before they become threats to success or major sources of rework. In general, good project managers are also good managers of risk. It makes good business sense for all software development projects to incorporate risk management as part of project management. The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to implement risk management. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This is an introductory tutorial to continuous risk management based on this course. The rational for continuous risk management and how it is incorporated into project management are discussed. The risk management structure of six functions is discussed in sufficient depth for managers to understand what is involved in risk management and how it is implemented. These functions include: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

Rosenberg, Linda↗

Mars Pathfinder

The Mars Pathfinder Mission Assurance program was the first.

concurrent engineering early↗

Asset Analysis and Operational Concepts for Separation Assurance Flight Testing at Dryden Flight Research Center

A preliminary survey of existing separation assurance and collision avoidance advancements, technologies, and efforts has been conducted in order to develop a concept of operations for flight testing autonomous separation assurance at Dryden Flight Research Center. This effort was part of the Unmanned Aerial Systems in the National Airspace System project. The survey focused primarily on separation assurance projects validated through flight testing (including lessons learned), however current forays into the field were also examined. Comparisons between current Dryden flight and range assets were conducted using House of Quality matrices in order to allow project management to make determinations regarding asset utilization for future flight tests. This was conducted in order to establish a body of knowledge of the current collision avoidance landscape, and thus focus Dryden s efforts more effectively towards the providing of assets and test ranges for future flight testing within this research field.

Costa, Guillermo J.↗

International Space Station as a Base Camp for Exploration Beyond Low Earth Orbit

The idea for using the International Space Station (ISS) as platform for exploration has matured in the past year and the concept continues to gain momentum. ISS provides a robust infrastructure which can be used to test systems and capabilities needed for missions to the Moon, Mars, asteroids and other potential destinations. International cooperation is a critical enabler and ISS has already demonstrated successful management of a large multi-national technical endeavor. Systems and resources needed for expeditions can be aggregated and thoroughly tested at ISS before departure thus providing wide operational flexibility and the best assurance of mission success. A small part of ISS called an Exploration Platform (ISS-EP) can be placed at Earth-Moon Libration point 1 (EML1) providing immediate benefits and flexibility for future exploration missions. We will show how ISS and the ISS-EP can be used to reduce risk and improve the operational flexibility for missions beyond low earth orbit. Life support systems and other technology developed for ISS can be evolved and adapted to the ISS-EP and other exploration spacecraft. New technology, such as electric propulsion and advanced life support systems can be tested and proven at ISS as part of an incremental development program. Commercial companies who are introducing transportation and other services will benefit with opportunities to contribute to the mission since ISS will serve as a focal point for the commercialization of low earth orbit services. Finally, we will show how use of ISS provides immediate benefits to the scientific community because its capabilities are available today and certain critical aspects of exploration missions can be simulated.

Raftery, Michael↗

Practical Application of PRA as an Integrated Design Tool for Space Systems

This paper presents the application of the first comprehensive Probabilistic Risk Assessment (PRA) during the design phase of a joint NASA/NOAA weather satellite program, Geostationary Operational Environmental Satellite Series R (GOES-R). GOES-R is the next generation weather satellite primarily to help understand the weather and help save human lives. PRA has been used at NASA for Human Space Flight for many years. PRA was initially adopted and implemented in the operational phase of manned space flight programs and more recently for the next generation human space systems. Since its first use at NASA, PRA has become recognized throughout the Agency as a method of assessing complex mission risks as part of an overall approach to assuring safety and mission success throughout project lifecycles. PRA is now included as a requirement during the design phase of both NASA next generation manned space vehicles as well as for high priority robotic missions. The influence of PRA on GOES-R design and operation concepts are discussed in detail. The GOES-R PRA is unique at NASA for its early implementation. It also represents a pioneering effort to integrate risks from both Spacecraft (SC) and Ground Segment (GS) to fully assess the probability of achieving mission objectives. PRA analysts were actively involved in system engineering and design engineering to ensure that a comprehensive set of technical risks were correctly identified and properly understood from a design and operations perspective. The analysis included an assessment of SC hardware and software, SC fault management system, GS hardware and software, common cause failures, human error, natural hazards, solar weather and infrastructure (such as network and telecommunications failures, fire). PRA findings directly resulted in design changes to reduce SC risk from micro-meteoroids. PRA results also led to design changes in several SC subsystems, e.g. propulsion, guidance, navigation and control (GNC), communications, mechanisms, and command and data handling (C&DH). The fault tree approach assisted in the development of the fault management system design. Human error analysis, which examined human response to failure, indicated areas where automation could reduce the overall probability of gaps in operation by half. In addition, the PRA brought to light many potential root causes of system disruptions, including earthquakes, inclement weather, solar storms, blackouts and other extreme conditions not considered in the typical reliability and availability analyses. Ultimately the PRA served to identify potential failures that, when mitigated, resulted in a more robust design, as well as to influence the program's concept of operations. The early and active integration of PRA with system and design engineering provided a well-managed approach for risk assessment that increased reliability and availability, optimized lifecyc1e costs, and unified the SC and GS developments.

Kalia, Prince↗

Advanced Ground Systems Maintenance Prognostics Project

The project implements prognostics capabilities to predict when a component system or subsystem will no longer meet desired functional or performance criteria, called the end of life. The capability also provides an assessment of the remaining useful life of a hardware component. The project enables the delivery of system health advisories to ground system operators. This project will use modeling techniques and algorithms to assess components' health andpredict remaining life for such components. The prognostics capability being developed will beused:during the design phase and during pre/post operations to conduct planning and analysis ofsystem design, maintenance & logistics plans, and system/mission operations plansduring real-time operations to monitor changes to components' health and assess their impacton operations.This capability will be interfaced to Ground Operations' command and control system as a part ofthe AGSM project to help assure system availability and mission success. The initial modelingeffort for this capability will be developed for Liquid Oxygen ground loading applications.

Prognostics↗

Conceive, Believe and Achieve; A Path to Miniaturization, COTS Infusion, and Size Weight and Power Realization for Flight

JPL along with other aerospace agencies such as the US Air Force Space Pro-grams and a packaging technology innovator, i3 Electronics, Inc., are evaluating the use of state-of-the-art (SOA) commercial off-the-shelf (COTS) and alternative packaging technologies for future high performance and high reliability space applications. Utilization of SOA COTS technologies have resulted in large scale reduction in electronics volume, weight, power, cost and schedule with outstanding electrical performance and high reliability. We will share JPL’s joint design, architectural approach, alternative substrate materials selection, associated processes, and mission assurance role in identifying reliability and qualification risks, as part of the three year Heterogeneous Packaging/Device Integration effort under the guidance and leadership of JPL’s Mission Assurance Directorate.

Hunter, Don J.↗

SMA for Highly Constrained Projects

This is a collection of presentation elements into a consolidated presentation on overall safety and mission assurance practices for highly constrained projects, such as Class D, 7120.8, or Do No Harm.

safety and mission assurance↗

Assurance of Reasoning Enabled Systems (ARES)

ARES was in part motivated by the determination of President’s Council of Advisors on Science and Technology (PCAST) on May 13th, 2023 that published a set of inquiries: In an era in which convincing images, audio, and text can be generated with ease on a massive scale, how can we ensure reliable access to verifiable, trustworthy information? How can we be certain that a particular piece of media is genuinely from the claimed source? What technologies, policies, and infrastructure can be developed to detect and counter AI-generated disinformation? In an effort to automatically analyze and patch/optimize code the work in this report describes various neural Machine Learning (ML) analysis engine implementations to assist in situations where source code is deficient or completely lacking to decompile (lift) binary code to ’C’. The goal is to gradually reduce human intervention. To this end, two Large Language Model (LLM) variants (Code LLama 2, LLama 3.1 and Starcoder1, Starcoder 2) where finetuned with ’before/after’ code pairs on the OpenBLAS library. LLama trained on the lowering process, Starcoder trained on the lifting process with National Security Agency’s (NSA) open-source Ghidra decompiler assist. The inferencing test results indicate correctness for only very short sequences for Starcoder 2. Moving forward, the experiments conclude with a set of recommendations of required resources and technologies

97 MATHEMATICS AND COMPUTING↗

Explicit Finite Element Modeling of Multilayer Composite Fabric for Gas Turbine Engine Containment Systems: Ballistic Impact Testing - Part 2

Under the Federal Aviation Administration's Airworthiness Assurance Center of Excellence and the Aircraft Catastrophic Failure Prevention Program, National Aeronautics and Space Administration Glenn Research Center collaborated with Arizona State University, Honeywell Engines, Systems and Services, and SRI International to develop improved computational models for designing fabric-based engine containment systems. In the study described in this report, ballistic impact tests were conducted on layered dry fabric rings to provide impact response data for calibrating and verifying the improved numerical models. This report provides data on projectile velocity, impact and residual energy, and fabric deformation for a number of different test conditions.

ZYLON↗

Management of government quality assurance functions for NASA contracts

This handbook sets forth requirements for NASA direction and management of government quality assurance functions performed for NASA contracts and is applicable to all NASA installations. These requirements will standardize management to provide the minimum oversight and effective use of resources. This handbook implements Federal Acquisition Regulation (FAR) Part 46, NASA FAR Supplement 18-46, Quality Assurance, and NMI 7410.1. Achievement of established quality and reliability goals at all levels is essential to the success of NASA programs. Active participation by NASA and other agency quality assurance personnel in all phases of contract operations, including precontract activity, will assist in the economic and timely achievement of program results. This involves broad participation in design, development, procurement, inspection, testing, and preventive and corrective actions. Consequently, government, as well as industry, must place strong emphasis on the accomplishment of all functions having a significant bearing on quality and reliability from program initiation through end-use of supplies and services produced. For purposes of implementing NASA and other agency agreements, and to provide for uniformity and consistency, the terminology and definitions prescribed herein and in a future handbook shall be utilized for all NASA quality assurance delegations and subsequent redelegations.

Source record↗

Earth Observatory Satellite system definition study. Report no. 5: System design and specifications. Part 1: Observatory system element specifications

The performance, design, and quality assurance requirements for the Earth Observatory Satellite (EOS) Observatory and Ground System program elements required to perform the Land Resources Management (LRM) A-type mission are presented. The requirements for the Observatory element with the exception of the instruments specifications are contained in the first part.

Source record↗