Exploration of High-Dimensional Scalar Function for Nuclear Reactor Safety Analysis and Visualization

The next generation of methodologies for nuclear reactor Probabilistic Risk Assessment (PRA) explicitly accounts for the time element in modeling the probabilistic system evolution and uses numerical simulation tools to account for possible dependencies between failure events. The Monte-Carlo (MC) and the Dynamic Event Tree (DET) approaches belong to this new class of dynamic PRA methodologies. A challenge of dynamic PRA algorithms is the large amount of data they produce which may be difficult to visualize and analyze in order to extract useful information. We present a software tool that is designed to address these goals. We model a large-scale nuclear simulation dataset as a high-dimensional scalar function defined over a discrete sample of the domain. First, we provide structural analysis of such a function at multiple scales and provide insight into the relationship between the input parameters and the output. Second, we enable exploratory analysis for users, where we help the users to differentiate features from noise through multi-scale analysis on an interactive platform, based on domain knowledge and data characterization. Our analysis is performed by exploiting the topological and geometric properties of the domain, building statistical models based on its topological segmentations and providing interactive visual interfaces to facilitate such explorations. We provide a user’s guide to our software tool by highlighting its analysis and visualization capabilities, along with a use case involving dataset from a nuclear reactor safety simulation.

97 MATHEMATICS AND COMPUTING↗

Exploration of high-dimensional scalar function for nuclear reactor safety analysis and visualization

The next generation of methodologies for nuclear reactor Probabilistic Risk Assessment (PRA) explicitly accounts for the time element in modeling the probabilistic system evolution and uses numerical simulation tools to account for possible dependencies between failure events. The Monte-Carlo (MC) and the Dynamic Event Tree (DET) approaches belong to this new class of dynamic PRA methodologies. A challenge of dynamic PRA algorithms is the large amount of data they produce which may be difficult to visualize and analyze in order to extract useful information. We present a software tool that is designed to address these goals. We model a large-scale nuclear simulation dataset as a high-dimensional scalar function defined over a discrete sample of the domain. First, we provide structural analysis of such a function at multiple scales and provide insight into the relationship between the input parameters and the output. Second, we enable exploratory analysis for users, where we help the users to differentiate features from noise through multi-scale analysis on an interactive platform, based on domain knowledge and data characterization. Our analysis is performed by exploiting the topological and geometric properties of the domain, building statistical models based on its topological segmentations and providing interactive visual interfaces to facilitate such explorations. We provide a user's guide to our software tool by highlighting its analysis and visualization capabilities, along with a use case involving data from a nuclear reactor safety simulation. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Expectation vs. Reality: The Sunrise Problem Applied to Probabilistic Risk Assessment

The Sunrise Problem is succinctly stated as a question: “what is the probability that the sun will rise tomorrow?” Attempts to answer this seemingly simple question reveal unexpected incongruities between statistical/probabilistic estimates and “real-world” expectations. Rather than being a purely philosophical problem, similar incongruities can be found in reliability and probabilistic risk assessment (PRA) analyses. These differences between statistical predictions and demonstrated reliability can result in analysis shortcomings that should be addressed and resolved. This presentation will begin by discussing the nature of the Sunrise Problem and how it applies to PRA and reliability. Examples of the Sunrise Problem in a PRA estimate will also be included, along with tips to identify and resolve the shortcomings that result from these anomalous situations.

Sunrise Problem↗

Risk-Informed ATF and FLEX Analysis for an Enhanced Resilient BWR Under Design-Basis and Beyond-Design-Basis Accidents

This report documents the activities performed by the Idaho National Laboratory (INL) during fiscal year (FY) 2020 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk-Informed System Analysis (RISA) Pathway, Enhanced Resilient Plant (ERP) Systems research. The purpose of the RISA Pathway research and development is to support plant owner-operator decisions with the aim to improve the economics, reliability, and maintain the high levels of safety of current nuclear power plants over periods of extended plant operations. The concept of ERP refers to the combinations of accident-tolerant fuel (ATF), optimal use of diverse and flexible coping strategy (FLEX), enhancements to plant components and systems, and the incorporation of augmented or new passive cooling systems, as well as improved fuel cycle efficiency. The objective of the ERP research effort is to use the RISA methods and toolkit in industry applications, including methods development and early demonstration of technologies, in order to enhance existing reactors’ safety features (both active and passive) and to substantially reduce operating costs through risk-informed approaches to plant design modifications to the plant and their characterization. One main focus of the FY 2020 efforts documented in this report was to extend the analyses conducted in FYs 2018 and 2019 for a pressurized water reactor (PWR) to a boiling water reactor (BWR). The same analysis process, risk analysis approaches, and analysis tools as in the previous work for PWR were used for a generic BWR with near-term ATF cladding (i.e., Iron-Chromium-Aluminum [FeCrAl] cladding and Chromium [Cr]-coated cladding) designs under the postulated station blackout (SBO) and medium loss-of-coolant (MLOCA) accident scenarios. In addition, a FLEX model was developed and incorporated into a generic BWR probabilistic risk assessment (PRA) model using the INL-developed software tool, Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE), to assess the risk impact from FLEX. The other main focus of the FY 2020 efforts was to advance analysis methods, including developing dynamic approach for FLEX human reliability analysis (HRA) using the INL-developed software tool, Event Modeling Risk Assessment using Linked Diagrams (EMRALD), as well as developing a multicriterion benefit evaluation (MCBE) method for evaluating costs and benefits of safety enhancements in nuclear power plants (NPPs). As a case study, the MCBE method was applied to evaluate the costs and benefits brought by FLEX implementation.

99 GENERAL AND MISCELLANEOUS↗

SAPHIRE 8 Volume 1 - Overview and Summary

The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment (PRA) using a personal computer (PC) running the Microsoft Windows operating system. SAPHIRE Version 8 is funded by the U.S. Nuclear Regulatory Commission (NRC) and developed by the Idaho National Laboratory (INL). INL's primary role in this project is that of software developer and tester. However, INL also plays an important role in technology transfer by interfacing and supporting SAPHIRE users, who constitute a wide range of PRA practitioners from the NRC, national laboratories, the private sector, and foreign countries. SAPHIRE can be used to model a complex system’s response to initiating events and quantify associated consequential outcome frequencies. Specifically, for nuclear power plant applications, SAPHIRE 8 can identify important contributors to core damage (Level 1 PRA) and containment failure during a severe accident which leads to releases (Level 2 PRA). It can be used for a PRA where the reactor is at full power, low power, or at shutdown conditions. Furthermore, it can be used to analyze both internal and external initiating events and has special features for managing models such as flooding and fire. It can also be used in a limited manner to quantify risk in terms of release consequences to the public and environment (Level 3 PRA). In SAPHIRE 8, the act of creating a model has been separated from the analysis of that model in order to improve the quality of both the model (e.g., by avoiding inadvertent changes) and the analysis. Consequently, in SAPHIRE 8, the analysis of models is performed by using what are called Workspaces. Currently, there are Workspaces for three types of analyses: (1) the NRC’s Accident Sequence Precursor program, where the workspace is called “Events and Condition Assessment (ECA);” (2) the NRC’s Significance Determination Process (SDP); and (3) the General Analysis (GA) workspace. Workspaces are independent of each other and modifications or calculations made within one workspace will not affect another. In addition, each workspace has a user interface and reports tailored for their intended uses. This report provides an overview of the functions and features available in SAPHIRE 8 and presents general instructions for using the software. Since SAPHIRE 8 expands upon Version 7, new and improved features will be discussed.

99 GENERAL AND MISCELLANEOUS↗

Incorporating FLEX Strategies in Multi-Unit Probabilistic Risk Assessment

The catastrophic Fukushima nuclear accident reminded nuclear community about the possibilities of extreme accident scenarios, including those involving multiple reactor units on the same site. As the responses to the Fukushima accident, the nuclear power industry developed and implemented a series of strategies, including the Diverse and Flexible Coping Strategies (FLEX), to enhance the coping capacities of nuclear power plants (NPPs) under extreme accidents. This study intends to examine the impact of FLEX strategies on the risk from all the reactor units on the same NPP site, including risks from accidents involving a single unit and from accidents involving multiple units. The fundamental, methodological element of this study is Multi-Unit Probabilistic Risk Assessment (MUPRA), which requires a shift in Probabilistic Risk Assessment (PRA) from a “one-reactor-at-a-time” mindset to a “considering all reactors sharing a site as a unity” one. An integrated modeling approach for multi-unit event sequence development will be leveraged to develop MUPRA model and address the intra-unit and inter-unit dependencies. Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE), a PRA software developed and maintained by Idaho National Laboratory (INL) for the U.S. Nuclear Regulatory Commission (NRC), will serve as the platform for MUPRA modeling. This study selects Loss Of Offsite Power (LOOP) as a representative initiating event, which may occur on a generic two-unit NPP site and impacts both reactor units on the site. First, an MUPRA model, including multi-unit event trees, will be developed to obtain single-unit and multi-unit accident scenarios. Next, different FLEX strategies will be assumed, including FLEX equipment for a unit cannot be used for another unit, FLEX equipment for multiple units can be used in a cross-connected manner, etc. Lastly, the effectiveness of each postulated FLEX strategy will be evaluated by incorporating the corresponding FLEX equipment and deployment logic in the MUPRA model.

99 GENERAL AND MISCELLANEOUS↗

MACCS Theory Manual

This report describes the models of the MACCS computer code as presented in MACCS Version 3.10.0. The purpose of MACCS is to simulate the impact of severe accidents at nuclear power plants on the surrounding environment. MACCS has been developed by Sandia National Laboratories for the U.S. Nuclear Regulatory Commission. From a given release of radioactive material into the atmosphere, MACCS estimates the extent and magnitude of radiological contamination, offsite doses, protective actions, socioeconomic impacts and costs, and health effects. Since the weather at the time of an accident is not predictable, MACCS supports various sampling options to run a representative set of simulations to evaluate weather variability. MACCS simulates atmospheric transport with a straight-line Gaussian plume segment model. From the estimated air and ground concentrations, MACCS models dose projections through several dose exposure pathways. These exposures can be offset by protective actions during the emergency response and long-term recovery of the accident. MACCS users directly specify the evacuation and sheltering area, while other protective actions (e.g., relocation, farmland restrictions, decontamination) are based on user-specified dose or concentration limits. While protective actions help reduce dose accumulation, they also cause social and economic impacts. MACCS models the extent of displaced individuals and land contamination, and the cost of offsite property damage, economic disruptions, and various accident expenditures caused by protective actions. Finally, from the dose accumulation, MACCS estimates early and stochastic health effects according to dose-response models. The purpose of consequence analyses is to be able to understand and estimate the impact of nuclear accidents. Consequence analysis is an essential tool to inform determinations of adequate protection of the public, to understand nuclear power hazards, to measure the value of regulations, and to help us appreciate the importance of nuclear safety. As such, MACCS has a variety of regulatory uses including environmental analyses (10 CFR 51.53, 52.47), regulatory cost-benefit analyses, backfit analyses (10 CFR 50.109), consequence analysis studies such as SOARCA (NUREG-1935), Level 3 PRA studies, and risk-informing of emergency planning (10 CFR 50 App. E and 50.47). This report updates the previous MACCS theory manual (NUREG/CR-4691 Vol. 2; Chanin, Sprung, Ritchie, & Jow, 1990) and accompanies the MACCS User's Guide (SAND-2021-1588) that describes the use and input requirements of the graphical user interface of MACCS known as WinMACCS. The MACCS User's Guide is also a reference guide that describes data input file formats, describes various software components in the MACCS code suite, and provides a set of example tutorials for running WinMACCS. Also, soon to be published is a MACCS input parameter guidance report (NUREG/CR-7270) that provides technical bases for commonly used MACCS input values. This page left blank

97 MATHEMATICS AND COMPUTING↗

Development of Probabilistic Risk Assessment Model for BWR Shutdown Modes 4 and 5 Integrated in SPAR Model

Nuclear plant operating experience and several studies show that the risk from shutdown operation during modes 4, 5, and 6 can be significant This paper describes development of the standard template risk evaluation models for shutdown modes 4, and 5 for commercial boiling water nuclear power plants (BWR). The shutdown probabilistic risk assessment model uses full power Nuclear Regulatory Commission’s (NRC’s) Standardized Plant Analysis Risk (SPAR) model as the starting point for development. The shutdown PRA models are integrated with their respective internal events at-power SPAR model. This is accomplished by combining the modified system fault trees from SPAR full power model with shutdown event tree logic. For human reliability analysis (HRA), the SPAR HRA (SPAR-H) method is used which requires the analysts to complete relatively straight forward worksheet, including the performance shaping factors (PSFs). The results are then used to estimate HEP of interest. The preliminary results indicate the risk is dominated by the operator’s ability to diagnose the events and provide long term cooling.

99 GENERAL AND MISCELLANEOUS↗

Use of limited data to construct Bayesian networks for probabilistic risk assessment.

Probabilistic Risk Assessment (PRA) is a fundamental part of safety/quality assurance for nuclear power and nuclear weapons. Traditional PRA very effectively models complex hardware system risks using binary probabilistic models. However, traditional PRA models are not flexible enough to accommodate non-binary soft-causal factors, such as digital instrumentation&control, passive components, aging, common cause failure, and human errors. Bayesian Networks offer the opportunity to incorporate these risks into the PRA framework. This report describes the results of an early career LDRD project titled %E2%80%9CUse of Limited Data to Construct Bayesian Networks for Probabilistic Risk Assessment%E2%80%9D. The goal of the work was to establish the capability to develop Bayesian Networks from sparse data, and to demonstrate this capability by producing a data-informed Bayesian Network for use in Human Reliability Analysis (HRA) as part of nuclear power plant Probabilistic Risk Assessment (PRA). This report summarizes the research goal and major products of the research.

Groth, Katrina M.↗

A computational risk assessment approach to the integration of seismic and flooding hazards with internal hazards

Probabilistic risk assessment (PRA) of nuclear power plants historically focuses on internal events at the plant, rather than external hazards. Although the importance of external hazards risk analysis is now well recognized, the methods for assessing the risk associated with low probability external hazards rely heavily on subjective judgment of specialists, often using conservative elements in the analysis, as is the case with the Conservative Deterministic Failure Margin approach commonly used for seismic PRA. The U.S. Department of Energy Light Water Reactor Sustainability program has been investigating the use of first principles analyses to provide a more realistic assessment of the risk of external hazards, in a process called computational risk assessment (CRA). Efforts undertaken are described in the development of CRA methods to integrate the risk associated with seismic and flooding events into traditional PRA. Further, the results of four case studies are presented.

99 GENERAL AND MISCELLANEOUS↗

Science-Based Simulation Model of Human Performance for Human Reliability Analysis

Human reliability analysis (HRA), a component of an integrated probabilistic risk assessment (PRA), is the means by which the human contribution to risk is assessed, both qualitatively and quantitatively. However, among the literally dozens of HRA methods that have been developed, most cannot fully model and quantify the types of errors that occurred at Three Mile Island. Furthermore, all of the methods lack a solid empirical basis, relying heavily on expert judgment or empirical results derived in non-reactor domains. Finally, all of the methods are essentially static, and are thus unable to capture the dynamics of an accident in progress. The objective of this work is to begin exploring a dynamic simulation approach to HRA, one whose models have a basis in psychological theories of human performance, and whose quantitative estimates have an empirical basis. This paper highlights a plan to formalize collaboration among the Idaho National Laboratory (INL), the University of Maryland, and The Ohio State University (OSU) to continue development of a simulation model initially formulated at the University of Maryland. Initial work will focus on enhancing the underlying human performance models with the most recent psychological research, and on planning follow-on studies to establish an empirical basis for the model, based on simulator experiments to be carried out at the INL and at the OSU.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

RAVEN User Manual

RAVEN is a generic software framework to perform parametric and probabilistic analysis based on the response of complex system codes. The initial development was aimed to provide dynamic risk analysis capabilities to the Thermo-Hydraulic code RELAP-7, currently under development at the Idaho National Laboratory (INL). Although the initial goal has been fully accomplished, RAVEN is now a multi-purpose probabilistic and uncertainty quantification platform, capable to agnostically communicate with any system code. This agnosticism includes providing Application Programming Interfaces (APIs). These APIs are used to allow RAVEN to interact with any code as long as all the parameters that need to be perturbed are accessible by inputs files or via python interfaces. RAVEN is capable of investigating the system response, and investigating the input space using Monte Carlo, Grid, or Latin Hyper Cube sampling schemes, but its strength is focused to- ward system feature discovery, such as limit surfaces, separating regions of the input space leading to system failure, using dynamic supervised learning techniques. The development of RAVEN has started in 2012, when, within the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program, the need to provide a modern risk evaluation framework became stronger. RAVEN principal assignment is to provide the necessary software and algorithms in order to employ the concept developed by the Risk Informed Safety Margin Characterization (RISMC) program. RISMC is one of the pathways defined within the Light Water Reactor Sustainability (LWRS) program. In the RISMC approach, the goal is not just the individuation of the frequency of an event potentially leading to a system failure, but the closeness (or not) to key safety-related events. Hence, the approach is interested in identifying and increasing the safety margins related to those events. A safety margin is a numerical value quantifying the probability that a safety metric (e.g. for an important process such as peak pressure in a pipe) is exceeded under certain conditions. The initial development of RAVEN has been focused on providing dynamic risk assessment capability to RELAP-7, currently under development at the INL and, likely, future replacement of the RELAP5-3D code. Most the capabilities that have been implemented having RELAP-7 as principal focus are easily deployable for other system codes. For this reason, several side activates are currently ongoing for coupling RAVEN with soft- ware such as RELAP5-3D, etc. The aim of this document is the explanation of the input requirements, focalizing on the input structure.

97 MATHEMATICS AND COMPUTING↗

RAVEN regression tests' description

Regression tests for the Python RAVEN framework are found in raven/tests/framework. There is a hierarchy of folders with tests collected by similar testing. Every test is described in a special XML node (< TestInfo >) within the < Simulation > block.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Hazards and Probabilistic Risk Assessments of a Light-Water Reactor Coupled with Industrial Facilities

This report provides a roadmap and toolkit for site-specific risk assessments across a broad range of industrial customers co-located with nuclear power plants (NPPs). This report builds upon the body of work sponsored by the Department of Energy (DOE) Light-Water Reactor Sustainability (LWRS) Flexible Plant Operation and Generation Pathway that presented hazards assessment and generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to light-water reactors co-located with hydrogen production facilities. The report expands the hazards assessments to include other industrial facilities: an oil refinery, a methanol plant, a synthetic fuel (synfuel) plant, the production of synthetic gas (syngas) as part of the methanol and synfuel plants, and wood pulp and paper mills. All these facilities are specified through industrial process and requirements research performed by national laboratories, universities, and interaction with industry. Many of the processes used in this report are pre-conceptual designs to use for decarbonization of the current technology facilities. A process of failure modes and effects analysis (what can go wrong) and accidentology (what has historically gone wrong) was used to determine the hazards presented to the NPP by the addition of the HES and the industrial customer. Chemical properties of feedstocks and products are summarized as part of the hazards assessment. Example analysis procedures are provided for each of the hazard types identified. These deterministic analyses can be used to assess adherence to licensing criteria. They can also be used to meet other safety goals like protection of the public, workers, or industrial facility equipment. The probabilistic analysis consisted of three sizes of HESs modeled in a PRA to assess the impact on the initiating events (IE) and results of the PRA. The PRA results conclude that the resulting increases in IE frequencies are below the limits required for small changes to existing NPPs under 10 CFR 50.59.

08 HYDROGEN↗

Impact Outputs for A Representative Extended Duration Artemis Mission

BACKGROUND: As NASA and private industry begin preparation for long-duration spaceflight, quantifying the impact that potential human health and performance capabilities have on crew health outcomes is imperative for medical risk mitigation. NASA’s Informing Mission Planning via Analysis of Complex Tradespaces tool (IMPACT) applies Probabilistic Risk Assessment (PRA) methodology to estimate these outcomes. OVERVIEW: As NASA prepares to return to the Moon, medical system planning has already begun for extended Artemis missions, which will see humans spending months at a time in cis-lunar space and on the surface of the Moon. The Long Duration Lunar Orbital and Lunar Surface (LDLOLS) design reference mission (DRM) lasts 9 months, including 3 months on the lunar surface, and involves 2 male and 2 female crewmembers. LDLOLS assumes no extravehicular activities (EVAs) in orbit, but, while on the lunar surface, involves 2-4 EVAs/month in a pressurized rover and 2-4 EVAs/month in an unpressurized rover or on foot. This DRM assumes a physician level Crew Medical Officer with commensurate knowledge, skills, and abilities. The IMPACT tool was utilized to estimate in-flight medical risk for this mission. More specifically, 100,000 simulations of this DRM were modeled, and overall estimates for loss of crew life (LOCL), need for evacuation (RTDC; return to definitive care), and crew task time lost (TTL; a measure of disability) were calculated. A recommended medical capability set, with appropriate mass and volume constraints, was also generated. DISCUSSION: This abstract reviews the IMPACT-derived risk for these mission outcomes with and without treatment, a macroscopic look at the total mass and volume necessary for full diagnostic and treatment capability, and how these change with input mission parameters.

J G Steller↗

Derivation of the Most Influential Medical Conditions for An Extended Duration Artemis Mission

BACKGROUND: The risk of loss of mission due to medical conditions may be influenced by loss of crew life (LOCL), need for evacuation (RTDC; return to definitive care), and crew task time lost. Predicting what medical conditions are most likely to lead to crew morbidity and mortality may influence medical system design, clinical capability prioritization, and research strategies. NASA’s Informing Mission Planning via Analysis of Complex Tradespaces tool (IMPACT) applies Probabilistic Risk Assessment (PRA) methodology to assess these risks. OVERVIEW: A team of subject matter experts (SME) from a variety of medical disciplines developed a consensus-based process to determine 120 of the most clinically relevant medical conditions for long-duration exploration missions (LDEMs) . This IMPACT Condition List (ICL) expanded upon previous work done for Integrated Medical Model (IMM). For each condition a best-case and worst-case definition were derived. These definitions were used to identify probability of occurrence, proportion of cases that are best case vs. worst case, clinical phase duration, and risk of outcomes (task time loss [TTL], RTDC, and LOCL) for both treated and untreated states. These data were sources from existing spaceflight databases (e.g. Longitudinal Survey of Astronaut Health), relevant models (e.g. the ISS fire model), and/or terrestrial literature. Each condition was then tied to diagnostic and therapeutic resources and capabilities. IMPACT was then run for the LDLOLS DRM (see Abstract #2 for this panel). DISCUSSION: This abstract will present the process for generating the IMPACT condition list, the relevant data for each clinical condition, and present results for the ten most influential conditions impacting LOCL, RTDC, and TTL for a representative extended duration Artemis mission.

A Nelson↗

Improving the Fidelity of Capability & Resource Weighting in A Probalistic Risk Assessment Model for Spaceflight

INTRODUCTION NASA’s Informing Mission Planning via Analysis of Complex Tradespaces (IMPACT) tool uses Probabilistic Risk Assessment (PRA) to provide an evidence-based, data-driven estimate of how medical system capabilities affect mission outcomes. IMPACT maps condition incidence to available resources thereby facilitating the calculation of outcome metrics that allow the estimation of mission medical risk. Conditions can be nominally categorized as either treated or untreated depending on the availability of necessary diagnostic and therapeutic capabilities. This categorization enables IMPACT to estimate the effect of various medical system configurations on mission outcomes such as crew mortality, disability, crew member down-time, return to duty/recovery, and need for evacuation. IMPACT currently employs an equal weighting, “partial credit” approach to define treatment in which each of the capabilities associated with a given condition contributes an equal amount to management of the condition. This feature enables IMPACT to report values in between “fully untreated” and “fully treated” based on the proportion of capabilities available within the model. However, as is normal in medical/clinical practice, not all individual capabilities contribute equally to medical care. For example, the ability to provide intramuscular epinephrine during an anaphylactic episode contributes more likelihood of overall management success than does the administration of oral diphenhydramine. We hypothesize that weighting the relative contribution of each capability to each specific condition will improve outcome prediction and therefore will better provide mission planners with more nuanced and accurate options when designing space medical systems. METHODS Using a five-point Fibonacci scaling sequence (1, 2, 3, 5, 8) subject matter experts from NASA’s Exploration Medical Capabilities (ExMC) element assigned relative contribution weighting values to each identified capability within IMPACT. Since the relative importance of each capability varies depending on the specific condition, the resulting “partial” weighting was completed for more than 1,600 individual weighting assignments for 666 capabilities across 121 conditions. Each assignment required three-physician concurrence based on the overall importance of the capability to the diagnosis and management of the condition being considered and the difficulty with which it could be improvised by the crew. Once complete, 100,000 IMPACT simulations were run for a 6-month Lunar mission with a 30-day surface stay to evaluate the effect of this modification of the model. RESULTS Partial weighting significantly decreased predicted task time loss (TTL), evacuation, and loss of crew life without causing significant changes to the recommended medical system design. CONCLUSIONS The paucity of real-world referent data to support long-duration space missions of this type limits the ability to judge one predictive analytics method as superior to another. However, since the proposed method significantly reduces and optimizes outcome risks—without changing the medical system design—incorporating a partial weighting methodology is likely to provide a more accurate and operationally-relevant representation of medical risk without compromising IMPACTs ability to inform overarching medical system requirements.

Steller JG↗

Risk-Informed External Hazards Analysis for Seismic and Flooding Phenomena for a Generic PWR

This report describes the activities performed during the FY2017 for the US-DOE Light Water Reactor Sustainability Risk-Informed Safety Margin Characterization (LWRS-RISMC), Industry Application #2. The scope of Industry Application #2 is to deliver a risk-informed external hazards safety analysis for a representative nuclear power plant. Following the advancements occurred during the previous FYs (toolkits identification, models development), FY2017 focused on: increasing the level of realism of the analysis; improving the tools and the coupling methodologies. In particular the following objectives were achieved: calculation of buildings pounding and their effects on components seismic fragility; development of a SAPHIRE code PRA models for 3-loops Westinghouse PWR; set-up of a methodology for performing static-dynamic PRA coupling between SAPHIRE and EMRALD codes; coupling RELAP5-3D/RAVEN for performing Best-Estimate Plus Uncertainty analysis and automatic limit surface search; and execute sample calculations for demonstrating the capabilities of the toolkit in performing a risk-informed external hazards safety analyses.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗