Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PLUTONIUM 240”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

149 records · Page 9

Analysis of an irradiated uranium sample for source attribution without chemical separation using microplasma ionization and ultrahigh resolution mass spectrometry

The use of element isotope ratios has great potential in not only determining the reactor type used to produce plutonium (Pu) but also in determining the burnup and the time since irradiation. While a powerful nuclear forensic technique, determining element isotope ratios is complicated by severe isobaric interferences when performed on typical inductively coupled plasma mass spectrometers. Such analyses require extensive chemical separations prior to analysis to alleviate the inter-elemental isobars. Ultrahigh mass resolution spectrometry provides a potential alternative, greatly reducing the complexity of sample preparation and turnaround times for these critical measurements. To demonstrate the power of the approach, a sample of irradiated, depleted uranium was analyzed with the liquid sampling—atmospheric pressure glow discharge ion source coupled to an Orbitrap mass spectrometer. The Orbitrap is augmented with an external data acquisition system, Spectroswiss’s FTMS-Booster X2T, allowing collection of extended ion transients, providing higher mass resolution. In using this approach, the 150 Sm/ 149 Sm and 152 Sm/ 149 Sm isotope ratios were found to be within 20% of predicted values without any chemical separations and without mass bias corrections. In addition, the 240 Pu/ 239 Pu isotope ratio was determined, free from the 238 UH + interferences common to the ICP-MS platforms, while at the same time allowing for the determination of U isotopic signatures. While these demonstrative results are from a single sample, the advantages of the microplasma/ultrahigh mass resolution approach to intra-element isotope ratio determinations are clear.

Fuel burnup↗

Conservation Habitat Assessment and Mitigation Prioritization for the Hanford Site: Proposed Methodology

The central Hanford Site extends over 312 mi 2 in south-central Washington State, with State Route 240 providing the main boundary to the south and west and the Columbia River bounding it on the north and east. The Hanford Site is within the largest remaining area of contiguous native shrub-steppe and grasslands in Washington State. It also contains some of the most extensive dune systems in the region and is home to hundreds of plant and wildlife species. The natural resources on the Hanford Site are of notable value, both locally and regionally. This area has been home to several Native American Tribes. Remnants, artifacts, and burial sites associated with historical Tribal activity are found throughout the Hanford Site, highlighting that this area is also culturally significant and important to the Tribes today. The U.S. Department of Energy (DOE) currently manages the Hanford Site. In 1989 DOE entered into the Tri-Party Agreement with the U.S. Environmental Protection Agency and the Washington State Department of Ecology. Since then DOE has invested in cleanup of the Hanford Site to address the nuclear waste and pollution remaining from the nuclear reactors constructed to produce plutonium during World War II as part of the Manhattan Project and the Cold War Era. As described on DOE’s website (https://www.energy.gov/em/hanford-site), “after more than two decades of cleanup, considerable progress has been made at Hanford, reducing the risk the site poses to the health and safety of workers, the public, and the environment.”

54 ENVIRONMENTAL SCIENCES↗

Investigating rapid alpha-decay induced aging of 238 PuO 2 by Raman Spectroscopy

Investigating alpha-decay induced aging in PuO 2 is useful in nuclear forensics; helping to determine the time since last calcination. This was previously investigate by monitoring the damage to 240 PuO 2 over the course of a few years. The rate of alpha-decay induced aging has long been assumed to scale only with the decay rate of other isotopes without direct verification. This article reports the first alpha-decay aging study of 238 PuO 2 by Raman spectroscopy. Contrary to the expected 10 days for 238 PuO 2 to reach steady state based on 240 PuO 2 studies, the alpha aging curve reached an approximate steady state ∼24–30 h after laser annealing. While the cause of the order of magnitude decrease is unknown, it is speculated that dynamic annealing could contribute to the differences in rate of induced aging. The Raman spectra of annealed and aged 238 PuO 2 matched the expected features in 239 PuO 2 and 240 PuO 2 spectra; showing no formation of new stable chemical species in the material such as secondary Pu oxide phases (e.g., Pu 4 O 9 ). In conclusion, results indicate that 238 Pu could be leveraged for rapid alpha-decay aging studies to characterize alpha-decay induced features and better understand matrix temperatures and the annealing of Frankel pair defects.

Actinide↗

U.S. Commercial Spent Nuclear Fuel Assembly Characteristics - 1968-2013

Activities related to management of spent nuclear fuel (SNF) are increasing in the US and many other countries. Over 240,000 SNF assemblies have been discharged from US commercial reactors since the late 1960s. The enrichment and burnup of SNF have changed significantly over the past 40 years, and fuel assembly designs have also evolved. Understanding the general characteristics of SNF helps regulators and other stakeholders form overall strategies towards the final disposal of US SNF. This report documents a survey of all US commercial SNF assemblies in the GC-859 database and provides reference SNF source terms (e.g., nuclide inventories, decay heat, and neutron/photon emission) at various cooling times up to 200 years after fuel discharge. This study reviews the distribution and evolution of fuel parameters of all SNF assemblies discharged over the past 40 years. Assemblies were categorized into three groups based on discharge year, and the median burnups and enrichments of each group were used to establish representative cases. An extended burnup case was created for boiling water reactor (BWR) fuels, and another was created for the pressurized water reactor (PWR) fuels. Two additional cases were developed to represent the eight mixed oxide (MOX) fuel assemblies in the database. Burnup calculations were performed for each representative case. Realistic parameters for fuel design and operations were used to model the SNF and to provide reference fuel characteristics representative of the current inventory. Burnup calculations were performed using the ORIGEN code, which is part of the SCALE nuclear modeling and simulation code system. Results include total activity, decay heat, photon emission, neutron flux, gamma heat, and plutonium content, as well as concentrations for 115 significant nuclides. These quantities are important in the design, regulation, and operations of SNF storage, transportation, and disposal systems.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Small to Full Height Scale Comparisons of Cesium Ion Exchange Performance with Crystalline Silicotitanate

The U.S. Department of Energy’s (DOE) Hanford Site houses 56 million gallons of high-level radioactive waste generated from plutonium production from 1944 to 1988. The supernatant waste, currently stored in underground tanks, is intended to be vitrified following filtration and 137 Cs removal at the Hanford Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Vitrification Facility. The WTP Pretreatment Facility will not be operational for several years. The Tank Side Cesium Removal (TSCR) system is a technology demonstration that will remove cesium from tank waste supernate to support directly feeding LAW to the vitrification facility. The 137 Cs removal is important to meet the WTP LAW contract specification and ultimately for creating a contact-handled waste form. The waste acceptance criteria (WAC) limit for the WTP LAW Facility is <3.18E-5 Ci 137 Cs per mole Na. The TSCR system is skid mounted and employs two key technologies: dead end filtration for solids removal and ion exchange (IX) for cesium removal. Filtration is necessary to protect the functionality of the IX columns. The IX process utilizes sodium form crystalline silicotitanate (CST) IX media produced by UOP Honeywell, LLC (Des Plaines, IL) under the product name IONSIV R9140-B, 18 x 50 mesh, in a lead-lag-polish column configuration. Each column contains a CST bed height of 92 inches and a volume of approximately 157 gallons of CST IX media. The full-scale TSCR operation will run at a residence time of 1.9 bed volumes (BV)/h, which results in a superficial velocity of 7.3 cm/min and a flowrate of ~5 gal/min. Column testing at small (2.5% of the full bed height), medium (12% of the full bed height), and full-height scales has been previously conducted to evaluate process variables and scale up performance of Cs exchange onto the CST. Cesium load performances from various sieve cuts at the small scale indicated that a 30-mesh sieve cut be tested to determine if it better reflects the 12% and full-height column performances at the small scale. Two process flowrates were tested in the small-column configuration with <30-mesh CST and simulant solutions. These tests were compared to full-height column tests at the same residence times to assess CST particle size effect on column scaling. Table S.1 summarizes the observed column performance determined for the two flowrates juxtaposed to the previous work with 5.6 M Na simulant at higher scales (used as benchmarks). The WAC breakthroughs between the small and full-height tests at 1.3 BV/h differed by ~59 BVs. The WAC breakthroughs for small, medium, and full-height tests at 1.8 BV/h were consistent at 240 BVs. The 50% Cs breakthroughs were nominally equivalent for all column tests. The common transition zones and onsets of Cs breakthrough at the 1.8 BV/h tests indicated that the Cs mass transfers were equivalent and thus the <30-mesh CST Cs load performance at the small scale successfully modeled that of the full-height system. It is recommended that the <30-mesh CST be used in subsequent 10-mL CST bed tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗