At least 163 records · Page 9

Gen 3 Particle Pilot Plant (G3P3) Life Cycle Management Plan (SAND report)

The National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories New Mexico (SNL/NM) developed this Life Cycle Management Plan (LCMP) to document its process for executing, monitoring, controlling and closing-out Phase 3 of the Gen 3 Particle Pilot Plant (G3P3). This plan serves as a resource for stakeholders who wish to be knowledgeable of project objectives and how they will be accomplished.

14 SOLAR ENERGY↗

LACSD BNR Pilot Plant Metagenomes

In this study, we aimed to evaluate Biological Nutrient Removal (BNR) and investigate microbial community changes when the DO is reduced in the aerated portions of wastewater treatment trains. We present a dataset of metagenomes obtained from activated sludge collected from the Los Angeles Sanitary District BNR pilot plant at the beginning of operation, when the DO was high, and at the end of operation, when the DO was low.

metagenome↗

Underground test coordination at the waste isolation pilot plant - 15229

Underground test coordination is a critical component of safe and efficient conduct of testing operations in a working underground research laboratory (URL). This is particularly important when planning and implementing large, multi-organizational field-scale test programs, when the URL is co-located with an operating repository, or when the host facility, such as the Waste Isolation Pilot Plant (WIPP), is recovering from off-normal events. As such, the Department of Energy Carlsbad Field Office developed an Integrated Project Team (IPT) charter in late 2013 establishing the WIPP underground Test Coordination Office (TCO). The IPT was established to ensure that underground science activities are coordinated, implemented, and managed in an integrated, consistent, efficient, cost-effective, safe, and environmentally compliant manner that maintains quality assurance standards. This is done while ensuring testing operations do not interfere with the WIPP's primary mission, the disposal of transuranic (TRU) waste, and at present, the recovery of WIPP operations. This paper reports the current status of the WIPP underground science and testing programs within the framework of the WIPP stabilization and recovery activities and describes the role of the TCO for current activities as well as for the long-term success of an underground research laboratory. As a result of the underground fire and radiological incident of early February 2014, during this recent period of WIPP recovery, the TCO is ensuring the requirements of the scientific programs are met and that work activities are planned and implemented in compliance with enhanced work control processes and corrective actions imposed at WIPP. This paper addresses the impacts of the accidents at WIPP on the many science experiments that were in process when the events occurred. It presents the plans for their recovery in concert with WIPP's recovery plans, and summarizes the impacts of new underground processes and procedures that will be imposed on the science work as a result. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Maintaining Continuity of Knowledge on Nuclear Waste Destined for Geological Repositories. A Case Study of Plutonium Shipments to the Waste Isolation Pilot Plant (WIPP)

This study examines methods that can help maximize confidence in maintaining Continuity of Knowledge (CoK) on plutonium-bearing wastes, from a final safeguards-verification measurement through emplacement underground. The study identifies Containment and Surveillance (C/S) measures that can be applied during packaging of plutonium wastes at the Savannah River Site (SRS) in South Carolina, USA, through shipment to, and receipt and disposal at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, USA. Results of this study could apply to countries with a Comprehensive Safeguards Agreement (CSA) that plan to dispose in a geological repository plutonium or other non-fuel nuclear materials that are under international safeguards.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrosion of stainless steels in the riser during co-processing of bio-oils in a fluid catalytic cracking pilot plant

Co-processing of bio-oils with conventional petroleum-based feedstocks is an attractive initial option to make use of renewable biomass as a fuel source while leveraging existing refinery infrastructures. But, bio-oils and their processing intermediates have high concentrations of organic oxygenates, which, among their other negative qualities, can result in increased corrosion issues. A range of stainless steel alloys (409, 410, 304L, 316L, 317L, and 201) was exposed at the base of the riser in a fluid catalytic cracking pilot plant while co-processing vacuum gas oil with pine-derived pyrolysis bio-oils that had been catalytically hydrodeoxygenated to ~ 2 to 28% oxygen. We studied the processing using a catalyst temperature of 704 °C, a reaction exit temperature of 520 °C, and total co-processing run times of 57–75 h. External oxide scaling 5–30 μm thick and internal attack 1–5 μm deep were observed in these short-duration exposures. The greatest extent of internal attack was observed for co-processing with the least stabilized bio-oil, and more so for types 409, 410, 304L, 316L, 317L stainless steel than for type 201. Finally, the internal attack involved porous Cr-rich oxide formation, associated with local Ni-metal enrichment and S-rich nanoparticles, primarily containing Cr or Mn. Implications for alloy selection and corrosion are discussed.

09 BIOMASS FUELS↗

An integrated data management and informatics framework for continuous drug product manufacturing processes: A case study on two pilot plants

The pharmaceutical industry continuously looks for ways to improve its development and manufacturing efficiency. In recent years, such efforts have been driven by the transition from batch to continuous manufacturing and digitalization in process development. To facilitate this transition, integrated data management and informatics tools need to be developed and implemented within the framework of Industry 4.0 technology. Here, in this regard, the work aims to guide the data integration development of continuous pharmaceutical manufacturing processes under the Industry 4.0 framework, improving digital maturity and enabling the development of digital twins. This paper demonstrates two instances where a data integration framework has been successfully employed in academic continuous pharmaceutical manufacturing pilot plants. Details of the integration structure and information flows are comprehensively showcased. Approaches to mitigate concerns in incorporating complex data streams, including integrating multiple process analytical technology tools and legacy equipment, connecting cloud data and simulation models, and safeguarding cyber-physical security, are discussed. Critical challenges and opportunities for practical considerations are highlighted.

59 BASIC BIOLOGICAL SCIENCES↗

A solution for 40 K interference from K internal to the human body, in an underground high sensitivity whole body counter at the Waste Isolation Pilot Plant, Carlsbad, NM, USA

The objective of the present work is to find a solution for the interference arising from 1461 keV photons emitted by 40 K in natural K internal to the human body in the detection of 241 Am and 210 Pb activities at the level of 37 mBq (1 pCi). The response of a broad energy Ge (BEGe) reference crystal to 1461 keV photons was simulated using GEANT4 code. Simulations were performed for a point source without and with shielding, as well as for a Bottle Manikin Absorption (BOMAB) phantom in the shielded whole-body counting chamber (WBC). The WBC facility is located underground at the Waste Isolation Pilot Plant, Carlsbad, NM, USA. The simulation results were discussed with regards to the interference in detecting the 241 Am and 210 Pb at the level of 37 mBq (1 pCi). The specific conclusion is that the interference counts from 40 K activity at the natural levels present in the human body in typical clinical settings were found to be greater than the 210 Pb and 241 Am signal counts from 37 mBq (1 pCi), when a 38.1 mm diameter, 25.4 mm thick BEGe reference crystal was used. Our solution for minimizing the interference to the desired precision at the specified levels was found by sacrificing the broad energy response of the counting system.

40K gamma-ray interference↗

Establishment of uncertainty ranges and probability distributions of actinide solubilities for performance assessment in the Waste Isolation Pilot Plant (WIPP).

The Fracture-Matrix Transport (FMT) code developed at Sandia National Laboratories solves chemical equilibrium problems using the Pitzer activity coefficient model with a database containing actinide species. The code is capable of predicting actinide solubilities at 25 C in various ionic-strength solutions from dilute groundwaters to high-ionic-strength brines. The code uses oxidation state analogies, i.e., Am(III) is used to predict solubilities of actinides in the +III oxidation state; Th(IV) is used to predict solubilities of actinides in the +IV state; Np(V) is utilized to predict solubilities of actinides in the +V state. This code has been qualified for predicting actinide solubilities for the Waste Isolation Pilot Plant (WIPP) Compliance Certification Application in 1996, and Compliance Re-Certification Applications in 2004 and 2009. We have established revised actinide-solubility uncertainty ranges and probability distributions for Performance Assessment (PA) by comparing actinide solubilities predicted by the FMT code with solubility data in various solutions from the open literature. The literature data used in this study include solubilities in simple solutions (NaCl, NaHCO{sub 3}, Na{sub 2}CO{sub 3}, NaClO{sub 4}, KCl, K{sub 2}CO{sub 3}, etc.), binary mixing solutions (NaCl+NaHCO{sub 3}, NaCl+Na{sub 2}CO{sub 3}, KCl+K{sub 2}CO{sub 3}, etc.), ternary mixing solutions (NaCl+Na{sub 2}CO{sub 3}+KCl, NaHCO{sub 3}+Na{sub 2}CO{sub 3}+NaClO{sub 4}, etc.), and multi-component synthetic brines relevant to the WIPP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Gen 3 Particle Pilot Plant (G3P3) -- High-Temperature Particle System for Concentrating Solar Power (Phases 1 and 2)

The U.S. Department of Energy Solar Energy Technologies Office initiated the Generation 3 Concentrating Solar Power (CSP) program to achieve higher operating temperatures (>700 °C) to enable next-generation CSP high-temperature power cycles such as the supercritical CO 2 (sCO2) Brayton Cycle. Three teams were selected to pursue high-temperature gas, liquid, and solid pathways for the heat-transfer media. Phases 1 and 2, which lasted from 2018 – 2020, consisted of design, modeling, and testing activities to further de-risk each of the technologies and develop a design for construction, commissioning, and operation of a pilot-scale facility in Phase 3 (2021 – 2024). This report summarizes the activities in Phases 1 and 2 for the solid-particle pathway led by Sandia National Laboratories. In Phases 1 and 2, Sandia successfully de-risked key elements of the proposed Gen 3 Particle Pilot Plant (G3P3) by improving the design, operation, and performance of key particle component technologies including the receiver, storage bins, particle-to-sCO2 heat exchanger, particle lift, and data acquisition and controls. Modeling and testing of critical components have led to optimized designs that meet desired performance metrics. Detailed drawings, piping and instrumentation diagrams, and process flow diagrams were generated for the integrated system, and structural analyses of the assembled tower structure were performed to demonstrate compliance with relevant codes and standards. Instrumentation and control systems of key subsystems were also demonstrated. Together with Bridgers & Paxton, Bohannan Huston, and Sandia Facilities, we have completed a 100% G3P3 tower design package with stamped engineering drawings suitable for construction bid in Phase 3.

14 SOLAR ENERGY↗

The Waste Isolation Pilot Plant Deep Geological Repository: A Domestic and Global Blueprint for Safe Disposal of High-Level Radioactive Waste - 12081

At the end of 2011, the world's first used/spent nuclear fuel and other long-lived high-level radioactive waste (HLW) repository is projected to open in 2020, followed by two more in 2025. The related pre-opening periods will be at least 40 years, as it also would be if USA's candidate HLW-repository is resurrected by 2013. If abandoned, a new HLW-repository site would be needed. On 26 March 1999, USA began disposing long-lived radioactive waste in a deep geological repository in salt at the Waste Isolation Pilot Plant (WIPP) site. The related pre-opening period was less than 30 years. WIPP has since been re-certified twice. It thus stands to reason the WIPP repository is the global proof of principle for safe deep geological disposal of long-lived radioactive waste. It also stands to reason that the lessons learned since 1971 at the WIPP site provide a unique, continually-updated, blueprint for how the pre-opening period for a new HLW repository could be shortened both in the USA and abroad. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Computer vision-based rock bolt detection in orthomosaic imagery obtained in the Waste Isolation Pilot Plant underground facility

Assessing structural integrity of large underground tunnel facilities is often a time consuming and human-labor intensive task. Thus, research using various modes of sensing and automated detection of key structural components in mines is posed to aid in safety assessments and establishing overall structural health. We propose an approach utilizing off-the-shelf camera and lidar technology fixed to a custom sensing platform, image stitching techniques, fine-tuned object detection models, and specialized model-inference methods to automatically detect, count, and map roof bolts for assessment of structural safety in man-made underground tunnels. Results show a novel workflow for effective object counting in orthomosaic tunnel ceiling images generated from collections in GPS-denied mining environments. Additionally, we demonstrate effective fine-tuning of EfficientDet object detectors utilizing state-of-the-art image augmentation techniques known as the mosaic and mixup transformations. Our work is demonstrated on sensed data and imagery collected from the Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) where miles of tunnel ceiling must be assessed for structural integrity.

42 ENGINEERING↗

Arsenic pilot plant operation and results : Anthony, New Mexico.

Sandia National Laboratories (SNL) is conducting pilot scale evaluations of the performance and cost of innovative water treatment technologies aimed at meeting the recently revised arsenic maximum contaminant level (MCL) for drinking water. The standard of 10 {micro}g/L (10 ppb) is effective as of January 2006. The pilot tests have been conducted in New Mexico where over 90 sites that exceed the new MCL have been identified by the New Mexico Environment Department. The pilot test described in this report was conducted in Anthony, New Mexico between August 2005 and December 2006 at Desert Sands Mutual Domestic Water Consumers Association (MDWCA) (Desert Sands) Well No.3. The pilot demonstrations are a part of the Arsenic Water Technology Partnership program, a partnership between the American Water Works Association Research Foundation (AwwaRF), SNL and WERC (A Consortium for Environmental Education and Technology Development). The Sandia National Laboratories pilot demonstration at the Desert Sands site obtained arsenic removal performance data for fourteen different adsorptive media under intermittent flow conditions. Well water at Desert Sands has approximately 20 ppb arsenic in the unoxidized (arsenite-As(III)) redox state with moderately high total dissolved solids (TDS), mainly due to high sulfate, chloride, and varying concentrations of iron. The water is slightly alkaline with a pH near 8. The study provides estimates of the capacity (bed volumes until breakthrough at 10 ppb arsenic) of adsorptive media in the same chlorinated water. Adsorptive media were compared side-by-side in ambient pH water with intermittent flow operation. This pilot is broken down into four phases, which occurred sequentially, however the phases overlapped in most cases.

54 ENVIRONMENTAL SCIENCES↗

Pilot plant testing of elemental mercury reemission from a wet scrubber

This paper is to discuss the recent observations of elemental mercury (Hg{sup 0}) remission from a pilot-scale limestone wet scrubber. Simulated flue gas was generated by burning natural gas in a down-fired furnace and doped with 2000 ppm of sulfur dioxide (SO{sub 2}). Mercuric chloride (HgCl{sub 2}) solution was delivered to the scrubber at a controlled rate to simulate the absorption of ionized mercury (Hg{sup 2+}). Testing results have shown that, after Hg{sup 2+} was injected, elevated Hg{sup 0} concentrations were soon detected both in the scrubber effluent flue gas and the hold tank air, which reflected the occurrence of Hg{sup 0} reemission in both places. When the HgCl{sub 2} feed was stopped, the Hg{sup 0} reemission continued for more than 2 h. In addition, a significant Hg{sup 0} reemission was also detected outside the scrubber loop. In an attempt to understand the Hg{sup 0} reemission increase across the wet scrubber system under transient and steady states and to understand the underlying relationship with the mercury complexes retained in the wet scrubber system, a mercury reemission model was developed. With this model, it was found that the Hg{sup 0} reemission rate under the current testing conditions can be simulated by a first-order reaction, and only a portion of HgS(IV) complexes retained in the slurry were participating in the reemission reaction. 5 refs., 6 figs., 1 gab.

01 COAL, LIGNITE, AND PEAT↗

Virtual Power Plants: Pilots, Challenges, and Innovations Shaping Future Development

Virtual Power Plants (VPPs) aggregate distributed energy resources (DERs) to provide grid services traditionally delivered by centralized power plants. This article reviews the current state of VPP deployment, highlighting business models, compensation mechanisms, and global pilot projects. While VPPs offer benefits such as grid flexibility, resilience, and cost savings, challenges remain in communication infrastructure, regulatory frameworks, market access, and customer engagement. To address these, we propose a scalable, privacy-preserving hierarchical VPP architecture that coordinates with distribution utilities and preserves customer data. We also present the Integrated T&D Control Room of the Future as a key test bed for validating and accelerating VPP adoption. These innovations can help transition VPPs from pilot programs to integral components of a modern, reliable power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Reply to Comment on ‘The advanced tokamak path to a compact net electric fusion pilot plant’

Abstract The Comment by Manheimer (submitted to Nucl. Fusion with this response) on our recent paper Buttery et al (2021 Nucl. Fusion 61 046028), has mischaracterized our paper with a series of misleading statements about its content, which it then seeks to refute. It also offers a series of assertions that are unsupported by refereed publication or scientific data—and sometimes in contradiction to the published record and well-established points in the scientific community. In this response we address the main thrusts and themes of the comment, while providing a point-by-point response in the appendix.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Voidage and pressure profile characteristics of sand-iron ore-coal-FCC single-particle systems in the riser of a pilot plant circulating fluidized bed

Hydrodynamic behaviors of single system of particles were investigated in a circulating fluidized bed (CFB) unit. Particles belonging to Geldart groups A and B like sand of various sizes (90, 300, 417, 522, 599, and 622 mu m), FCC catalyst (120 mu m), iron ore (166 and 140 {mu} m), and coal (335 and 168 {mu} m) were used to study the hydrodynamic characteristics. Superficial air velocity used in the present study ranged between 2.01 and 4.681 m/s and corresponding mass fluxes were 12.5-50 kg/(m{sup 2} s). A CFB needs the creation of some special hydrodynamic conditions, namely a certain combination of superficial gas velocity, solids circulation rate, particle diameter, density of particle, etc. which can give rise to a state wherein the solid particles are subjected to an upward velocity greater than the terminal or free fall velocity of the majority of the individual particles. The hydrodynamics of the bed was investigated in depth and theoretical analysis is presented to support the findings. Based on gas-solid momentum balance in the riser, a distinction between apparent and real voidage has been made. The effects of acceleration and friction on the real voidage have been estimated. Results indicated a 0.995 voidage for higher superficial gas velocity of 4.681. m/s.

01 COAL, LIGNITE, AND PEAT↗