SEARCH · Engineering Papers
Results for “PEER Review”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Energy Storage for Social Equity (ES4SE) - 2022 DOE Peer Review.
Abstract not provided.
SULI Peer Review
Daniel Xing is a SULI intern whose project was titled: “An Improved Boosted Decision Tree Framework for Event Classification MicroBooNE” This is a physical subject that helps us understand how we can better model neutrinos. I do not study neutrinos, so listening to this talk was very formal.
DOE Peer Review Solar Heating of an Endothermic Ethylene Reactor (SHEER) Project Poster
Explore the source record for details and available documents.
DOE Peer Review Operations and Maintenance Project Poster
Explore the source record for details and available documents.
2024 SETO Peer Review: Sandia Project Posters
Explore the source record for details and available documents.
SETO 2024 Peer Review Poster: Characterizing falling particle curtain receivers at commercially relevant scales
Explore the source record for details and available documents.
Poster for 2024 SETO peer review: "Develop experimentally validated numerical models that can predict accumulated creep and fatigue damage and predict service lifetimes for diffusion bonded microchannel heat exchangers."
Explore the source record for details and available documents.
2024 SETO Peer Review: PVPMC Blind Modeling Comparison lightning talk
Explore the source record for details and available documents.
Design Basis Document / Owner’s Technical Specification for Nitrate Salt Systems in CSP Projects - Peer Review Poster [Poster]
As a follow-on to the NREL Best Practices report, a technical Design Basis Document has been developed for salt systems. The report includes prescriptive specifications for tanks, steam generators, valves, heat tracing, materials, and process engineering, with a goal of achieving a plant availability of 92+ percent.
SULI Peer Review
Explore the source record for details and available documents.
An independent evaluation by the plenary peer review team
There are no author-identified significant results in this report.
Validation Methods Research for Fault-Tolerant Avionics and Control Systems Sub-Working Group Meeting. CARE 3 peer review
A computer aided reliability estimation procedure (CARE 3), developed to model the behavior of ultrareliable systems required by flight-critical avionics and control systems, is evaluated. The mathematical models, numerical method, and fault-tolerant architecture modeling requirements are examined, and the testing and characterization procedures are discussed. Recommendations aimed at enhancing CARE 3 are presented; in particular, the need for a better exposition of the method and the user interface is emphasized.
Peer Review of a Formal Verification/Design Proof Methodology
The role of formal verification techniques in system validation was examined. The value and the state of the art of performance proving for fault-tolerant compuers were assessed. The investigation, development, and evaluation of performance proving tools were reviewed. The technical issues related to proof methodologies are examined. The technical issues discussed are summarized.
NESC Peer-Review of the Flight Rationale for Expected Debris Report
Since the loss of Columbia on February 1, 2003, the Space Shuttle Program (SSP) has significantly improved the understanding of launch and ascent debris, implemented hardware modifications to reduce debris, and conducted tests and analyses to understand the risks associated with expected debris. The STS-114 flight rationale for expected debris relies on a combination of all three of these factors. A number of design improvements have been implemented to reduce debris at the source. The External Tank (ET) thermal protection system (TPS) foam has been redesigned and/or process improvements have been implemented in the following locations: the bipod closeout, the first ten feet of the liquid hydrogen (LH2) tank protuberance air load (PAL) ramp, and the LH2 tank-to-intertank flange closeout. In addition, the forward bipod ramp has been eliminated and heaters have been installed on the bipod fittings and the liquid oxygen (LO2) feedline forward bellows to prevent ice formation. The Solid Rocket Booster (SRB) bolt catcher has been redesigned. The Orbiter reaction control system (RCS) thruster cover "butcher paper" has been replaced with a material that sheds at a low velocity. Finally, the pad area has been cleaned to reduce debris during lift-off.
Cryocooler and front-end integration peer review
Explore the source record for details and available documents.
DSN array microwave subsystem technical peer review
Explore the source record for details and available documents.