Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “NEPA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Exploring communication techniques across a wide spectrum of groups - 15105

Communication about radionuclide and nuclear waste is one factor in facilitating decisions regarding environmental issues and energy solutions. However, the decision process involves many people with a variety of perceptions that have been formed throughout many years. This paper describes various communication techniques across a spectrum of stakeholders from the general public, students, first responders, analysts, and decisions makers. Techniques include dose assessment tools, assessment training, preparing first responders to confront potential radiological/nuclear situations, web multimedia information, ongoing Department of Energy (DOE) education projects, public talks and presentations, and National Environmental Policy Act (NEPA) participation. Issues are identified concerning perception including units, background radiation, effects of environmental levels of radiation, potential approaches to energy literacy, and risk comparison. These various communication techniques across a spectrum of stakeholders are evaluated with feedback and use statistics concerning aspects of strategies, challenges, and common perceptions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned From Public Outreach: Effective Incorporation of the Stakeholder Voice - 18447

The licensing process for any facility associated with nuclear power or aspects of the nuclear fuel cycle can be expected to encounter intense stakeholder interest, and often significant challenges. Over the last decade, staff of the Center for Nuclear Waste Regulatory Analyses (CNWRA{sup R}) at Southwest Research Institute{sup R} (SwRI{sup R}) provided comprehensive support to the U.S. Nuclear Regulatory Commission (NRC) for public outreach efforts across a wide variety of nuclear activities. Many of these projects included public involvement and consultation activities for compliance with the National Environmental Policy Act (NEPA), including scoping, public meetings, responding to public comments on draft documents, and holding small meetings with affected local, state, and tribal governments. In addition, we have supported NRC public outreach related to nuclear facility licensing activities (including the proposed repository at Yucca Mountain), rulemaking, and regulatory guidance development. This experience has offered us a broad view of the challenges faced by industry, regulators, and stakeholders. In the process, we have observed some best practices that lead to effective stakeholder communication. Communication about complex technical issues is challenging, particularly for societally controversial topics, such as civilian use of nuclear power and management of radioactive waste. Most commonly, we have observed a lack of mutual trust and respect among industry, regulators, and stakeholders that creates an atmosphere ripe for suspicion and misunderstanding. Stakeholders have, in public comments, criticized the lack of appropriate venues to raise concerns in which they feel they can get meaningful responses from the nuclear industry and regulators. Conversely, industry faces difficulty in reaching compromise with stakeholders, who sometimes misinterpret or misrepresent factual information. Within this contentious environment, regulators are constrained by their statutory framework, even as they are challenged to be more responsive, transparent, and fair to both stakeholders and industry. In spite of these obstacles, there are examples where feedback from stakeholders was heard and utilized. Because of successful collection of appropriate feedback, regulators became more adept at understanding the full range of perspectives from both industry and stakeholders, and subsequently did a better job at effectively incorporating feedback and communicating their decisions and findings in a clear and understandable way. Ultimately, the success of these examples was based on a measure of mutual respect, which was reached through effective communication and implementation of some best practices. These best practices include (i) outreach planning that is abundantly mindful of the various stakeholder points of view, site history, regional characteristics, and probable future and related actions, combined with advance identification of key stakeholders; (ii) development and distribution of information that facilitates public participation; and (iii) use of avenues by which stakeholders can provide meaningful and effective comments. Illustrative examples include (i) how concerns raised by stakeholders were heard by an applicant and resulted in a revised project proposal; (ii) use of a variety of interaction formats that incorporated input across a broad spectrum of stakeholders; (iii) utilizing stakeholder feedback received during scoping; and (iv) how a facility underestimated the impact of 'outsider' stakeholder voices that were in contrast to the known local community. By moving past the viewpoint that public outreach is a 'necessary evil' and engaging only to check a procedural box, each participant can benefit from mutually satisfactory and improved outcomes. (author)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

ECAR-5363 Rev 0 MARVEL Environmental Assessment Inhalation Dose Consequence Calculations

The following dose consequence analysis is performed to support the Microreactor Applications Research Validation and Evaluation Project (MARVEL) environmental assessment. The purpose of the MARVEL project is to develop a nuclear microreactor applications test bed at Idaho National Laboratory (INL) to perform research and development on various operational features of microreactors to ultimately improve integration of microreactors to end-user applications. The MARVEL concept is a 100-kilowatt thermal (kWth) and approximately 20-kilowatt electric (kWe) generating microreactor. The MARVEL system will be located in the INL TREAT facility in the north high bay equipment pit. This ECAR analyzes a maximum reasonably foreseeable accident for MARVEL as required by “Recommendations for Analyzing Accidents under NEPA.” Consistent with the recommendations from this guidance, this ECAR considers the median air dispersion parameters for INL in evaluation accident releases from the MARVEL reactor concept and documents the dose from the maximum reasonably foreseeable accident.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

COR-0011 Rev 6 MARVEL Project Code of Record

This Code of Record identifies the codes, standards, and procedures necessary to design, develop, construct, and startup the Microreactor Applications Research Validation and Evaluation (MARVEL) Project at the Materials and Fuel Complex (MFC) Transient Reactor Test (TREAT) Facility and the Idaho National Laboratory (INL). The MARVEL Project is an INL test microreactor funded by the United States Department of Energy (DOE) via the Microreactor Program (MRP). The goal of the project is to establish an operational nuclear applications test bed that can generate combined heat and power to enable integration and R&D with end-user technologies, as well as allow microreactor technologists to test next-generation control systems. The microreactor is a thermal reactor utilizing Uranium Zirconium Hydride (UZrH) fuel with review and authorization by the Department of Energy Idaho Operations Office (DOE-ID) for National Environmental Policy Act (NEPA) compliance, safety review, and supplemental readiness assessments for startup and operation. To enable rapid deployment, the MARVEL reactor will reside in the Transient Reactor Test (TREAT) Facility and utilize the existing operating Category B reactor facility, approved facility safety basis, operating crews, and recent re-start experience.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Chefornak Mini-grid Business Case

A business case analysis was performed for the Village of Chefornak. The business case analysis evaluated the optimal case from the technical analysis performed by the National Renewable Energy using HOMER. The optimal case adds an 800 kW wind plant with 650 kW of electric thermal stoves and a 300 kW battery. The project cost 5.8 million. The direct cost of electricity would likely decline from 0.41/kWh to 0.30/kWh. The direct costs don’t include administrative and distribution costs. The addition of the renewable resources and thermal electric stoves reduced total fuel consumption by more almost 80% or approximately 103,000 gallons. The reduction in cost provides an opportunity for Chefornak’s utility, the Naterkaq Light Plant, to obtain financing through grants and loans to install renewable energy and reduce overall fuel consumption to the community.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Ionic‐Liquid Free and Flexible Transistors Made of 2D Material Inks

The development of thin-film transistors (TFTs) using 2D materials is crucial for enabling scalable, low-cost, and flexible electronics. Currently, 2D TFTs with the highest performance have been achieved by using ionic-liquid gating (ILG), a technique suited for proof-of-concept studies. However, ILG suffers from slow switching speeds, temperature sensitivity, poor long-term stability, and integration challenges, making it unsuitable for practical use. Moreover, typical fabrication methods for 2D TFTs involve harsh conditions such as strong acids or high temperatures (>300 °C), limiting integration with flexible substrates. This work provides the first demonstration of an ILG-free, all-2D-material TFT fabricated onto a flexible substrate. Water-based graphene and hexagonal boron nitride (h-BN) inks are printed to deposit the electrodes and dielectric layers, respectively. The MoS 2 channel is produced via supramolecular interfacial self-assembly, yielding uniform, monolayer-rich films transferable to rigid and flexible substrates. The resulting TFTs operate below 3 V, exhibit negligible leakage current, and achieve field-effect mobilities up to 0.46 cm 2 V −1 s −1 (rising to 2.47 cm 2 V −1 s −1 with silver electrodes) measured under ambient conditions, while maintaining excellent mechanical flexibility. This work establishes a low-cost and scalable solution-processable platform for flexible electronics based on 2D materials that match requirements for practical applications.

2D materials↗

Life Cycle Water Consumption and Water Resource Assessment for Utility-Scale Geothermal Systems: An In-Depth Analysis of Historical and Forthcoming EGS Projects

This report is the third in a series of reports sponsored by the U.S. Department of Energy Geothermal Technologies Program in which a range of water-related issues surrounding geothermal power production are evaluated. The first report made an initial attempt at quantifying the life cycle fresh water requirements of geothermal power-generating systems and explored operational and environmental concerns related to the geochemical composition of geothermal fluids. The initial analysis of life cycle fresh water consumption of geothermal power-generating systems identified that operational water requirements consumed the vast majority of water across the life cycle. However, it relied upon limited operational water consumption data and did not account for belowground operational losses for enhanced geothermal systems (EGSs). A second report presented an initial assessment of fresh water demand for future growth in utility-scale geothermal power generation. The current analysis builds upon this work to improve life cycle fresh water consumption estimates and incorporates regional water availability into the resource assessment to improve the identification of areas where future growth in geothermal electricity generation may encounter water challenges.

15 GEOTHERMAL ENERGY↗

GeoVision - Barriers Taskforce

This submission includes papers, presentations, and data developed during the multi-year GeoVision Barriers Taskforce effort. Developers have identified many non-technical barriers to geothermal power development, including land access, permitting, and market barriers. Included in this submission are three papers submitted to the Geothermal Resources Council (GRC) which detail how land access, permitting, and market barriers delay geothermal project development. Also included is the GeoVision Barriers Analysis Summary report, which projects and quantifies the future electric and nonelectric deployment potentials of geothermal technologies within a range of scenarios in addition to their impacts on U.S. jobs, the economy, and environment.

15 GEOTHERMAL ENERGY↗

Economic Impact of Permitting Timelines on Produced Geothermal Power

Despite having a large geothermal power potential in the United States, only a small fraction has been developed for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to lower contribution of geothermal energy in the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. This study shows that the geothermal permitting timelines can vary from six months to several years, depending on the presence or absence of biological resources, cultural resources, and sensitive environmental issues at the project site. The potential impacts of these permit barriers can range from investors abandoning geothermal development to making the product (i.e., electricity) more expensive and uncompetitive.

15 GEOTHERMAL ENERGY↗

Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2012

The PNNL Annual Site Environmental Report for Calendar Year 2012 was prepared pursuant to the requirements of Department of Energy (DOE) Order 231.1B, "Environment, Safety and Health Reporting" to provide a synopsis of calendar year 2012 information related to environmental management performance and compliance efforts. It summarizes site compliance with federal, state, and local environmental laws, regulations, policies, directives, permits, and orders and environmental management performance.

air quality↗

National Environmental Policy Act Hazards Assessment for the TREAT Alternative

This document provides an assessment of hazards as required by the National Environmental Policy Act for the alternative of restarting the reactor at the Transient Reactor Test (TREAT) facility by the Resumption of Transient Testing Program. Potential hazards have been identified and screening level calculations have been conducted to provide estimates of unmitigated dose consequences that could be incurred through this alternative. Consequences considered include those related to use of the TREAT Reactor, experiment assembly handling, and combined events involving both the reactor and experiments. In addition, potential safety structures, systems, and components for processes associated with operating TREAT and onsite handling of nuclear fuels and experiments are listed. If this alternative is selected, a safety basis will be prepared in accordance with 10 CFR 830, “Nuclear Safety Management,” Subpart B, “Safety Basis Requirements.”

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

National Environmental Policy Act Hazards Assessment for the TREAT Alternative

This document provides an assessment of hazards as required by the National Environmental Policy Act for the alternative of restarting the reactor at the Transient Reactor Test (TREAT) facility by the Resumption of Transient Testing Program. Potential hazards have been identified and screening level calculations have been conducted to provide estimates of unmitigated dose consequences that could be incurred through this alternative. Consequences considered include those related to use of the TREAT Reactor, experiment assembly handling, and combined events involving both the reactor and experiments. In addition, potential safety structures, systems, and components for processes associated with operating TREAT and onsite handling of nuclear fuels and experiments are listed. If this alternative is selected, a safety basis will be prepared in accordance with 10 CFR 830, “Nuclear Safety Management,” Subpart B, “Safety Basis Requirements.”

99 GENERAL AND MISCELLANEOUS↗

Impacts Analyses Supporting the National Environmental Policy Act Environmental Assessment for the Resumption of Transient Testing Program

This document contains the analysis details and summary of analyses conducted to evaluate the environmental impacts for the Resumption of Transient Fuel and Materials Testing Program. It provides an assessment of the impacts for the two action alternatives being evaluated in the environmental assessment. These alternatives are (1) resumption of transient testing using the Transient Reactor Test Facility (TREAT) at Idaho National Laboratory (INL) and (2) conducting transient testing using the Annular Core Research Reactor (ACRR) at Sandia National Laboratory in New Mexico (SNL/NM). Analyses are provided for radiologic emissions, other air emissions, soil contamination, and groundwater contamination that could occur (1) during normal operations, (2) as a result of accidents in one of the facilities, and (3) during transport. It does not include an assessment of the biotic, cultural resources, waste generation, or other impacts that could result from the resumption of transient testing. Analyses were conducted by technical professionals at INL and SNL/NM as noted throughout this report. The analyses are based on bounding radionuclide inventories, with the same inventories used for test materials by both alternatives and different inventories for the TREAT Reactor and ACRR. An upper value on the number of tests was assumed, with a test frequency determined by the realistic turn-around times required between experiments. The estimates provided for impacts during normal operations are based on historical emission rates and projected usage rates; therefore, they are bounding. Estimated doses for members of the public, collocated workers, and facility workers that could be incurred as a result of an accident are very conservative. They do not credit safety systems or administrative procedures (such as evacuation plans or use of personal protective equipment) that could be used to limit worker doses. Doses estimated for transportation are conservative and are based on transport of the bounding radiologic inventory that will be contained in any given test. The transportation analysis assumes all transports will contain the bounding inventory.

99 GENERAL AND MISCELLANEOUS↗

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2013

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2013. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2013. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2013 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2014

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2014. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2014. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2014 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Performance Report 2014. NREL (National Renewable Energy Laboratory)

The purpose of this report is to ensure that the U.S. Department of Energy (DOE) and the public receive timely, accurate information about events that have affected or could adversely affect the health, safety, and security of the public or workers, the environment, or the operations of DOE facilities. This report meets the DOE requirements of the Annual Site Environmental Report and has been prepared in accordance with the DOE Order 231.1B Chg 1, Environment, Safety and Health Reporting.

54 ENVIRONMENTAL SCIENCES↗