Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Lean Mission Operations Systems Design - Using Agile and Lean Development Principles for Mission Operations Design and Development

The Resource Prospector Mission seeks to rove the lunar surface with an in-situ resource utilization payload in search of volatiles at a polar region. The mission operations system (MOS) will need to perform the short-duration mission while taking advantage of the near real time control that the short one-way light time to the Moon provides. To maximize our use of limited resources for the design and development of the MOS we are utilizing agile and lean methods derived from our previous experience with applying these methods to software. By using methods such as "say it then sim it" we will spend less time in meetings and more time focused on the one outcome that counts - the effective utilization of our assets on the Moon to meet mission objectives.

Operations↗

The F1 Multi-Mission Radioisotope Thermoelectric Generator (MMRTG) : a Power Subsystem Enabler for the Mars Science Laboratory (MSL) Mission

The Mars Science Laboratory (MSL) spacecraft carrying the Curiosity rover launched from Cape Canaveral Air Force Station (CCAFS) on November 26, 2011. Following an 8.5-month cruise and after a successful Entry, Descent and Landing (EDL) phase, the Curiosity rover arrived at the surface of Mars on August 6, 2012 UTC. At the core of the Curiosity rover power subsystem is the F1 Multi-Mission Radioisotope Thermoelectric Generator (MMRTG) supplied by the Department of Energy. Integration of the F1 MMRTG into the MSL spacecraft has provided the first opportunity to architect a power subsystem that also included a Solar Array (during the cruise phase of the mission and up to the initial stage of the EDL phase) and secondary Li-ion batteries for operation during the planned one Martian year surface phase of the mission. This paper describes the F1 MMRTG functional features as an enabler of the MSL mission and as a novel component of the MSL power subsystem architecture.

Curiosity rover↗

Applicability of STEM-RTG and High-Power SRG Power Systems to the Discovery and Scout Mission Capabilities Expansion (DSMCE) Study of ASRG-Based Missions

This study looks at the applicability of utilizing the Segmented Thermoelectric Modular Radioisotope Thermoelectric Generator (STEM-RTG) or a high-power radioisotope generator to replace the Advanced Stirling Radioisotope Generator (ASRG), which had been identified as the baseline power system for a number of planetary exploration mission studies. Nine different Discovery-Class missions were examined to determine the applicability of either the STEM-RTG or the high-power SRG power systems in replacing the ASRG. The nine missions covered exploration across the solar system and included orbiting spacecraft, landers and rovers. Based on the evaluation a ranking of the applicability of each alternate power system to the proposed missions was made.

Stirling Engines↗

Usage of Multi-Mission Radioisotope Thermoelectric Generators (MMRTGs) for Future Potential Missions

The goal of NASAs Radioisotope Power Systems (RPS) Program is to make RPS ready and available to support the exploration of the solar system in environments where the use of conventional solar or chemical power generation is impractical or impossible to meet the needs of the missions. To meet this goal, the RPS Program, working closely with the Department of Energy, performs mission and system studies (such as the recently released Nuclear Power Assessment Study), evaluates the readiness of promising technologies to infuse in future generators, assesses the sustainment of key RPS capabilities and knowledge, forecasts and tracks the Programs budgetary needs, and disseminates current information about RPS to the community of potential users. This presentation focuses on the needs of the mission community and provides users a better understanding of how to integrate the MMRTG (Multi-Mission Radioisotope Thermoelectric Generator).

Radioisotope↗

Defining a Space Mission Architectural Framework: Guiding Robotic Space Mission Design and Development at NASA Goddard Spaceflight Center

Modern Systems Engineering activities for robotic science missions face increased complexity due to evolving measurement requirements, increased collaboration amongst stakeholders and increased collaboration between human and robotic systems. While NASA has employed standard process frameworks for project management and systems engineering for years, it has not yet established an architecture framework (AF) by which its mission systems are described. While an architecture framework is not a necessary component of an organization's operations, the value of a specified AF greatly enhances an organization's ability to define systems consistently and aid in communication across project and organizational boundaries. The current effort identifies an approach to establishing a Space Mission Architecture Framework (SMAF), an AF with roots in ISO 42010 (Systems and Software Engineering-Architecture Description), NASA Procedural Requirements (NPR) 7120.5 (NASA Space Flight Program and Project Management Requirements) and 7123.1B (NASA Systems Engineering Processes and Requirements). The heart of the AF lies in its viewpoints and work products, artifacts that represent a set of information from the viewpoint of a particular stakeholder. This effort articulates the needs, goals and objectives that the SMAF addresses, as well as the approach to creating the framework and establishing the various work products. A full set of work products, sufficient to satisfy the Mission System reporting requirements of NPR 7120/7123 at Key Decision Point (KDP) A is identified in this paper.

Architecture↗

The Aeolus Mission Concept, an Innovative Mission to Study the Winds and Climate of Mars

Aeolus is a mission to provide the first set of global, seasonal, and diurnal data to characterize winds and study the climate of Mars. Aeolus measures surface and atmospheric temperatures, aerosol abundances, and Doppler shifts in atmospheric spectral lines. The payload includes a system of four of a new type of miniaturized Spatial Heterodyne Spectrometer (SHS) paired to two orthogonal viewing telescopes that can measure CO2 (daytime absorption) and O2 (day and night emission) lines in the Martian atmosphere. The Thermal Limb Sounder (TLS) instrument measures atmospheric temperature profiles and aerosol (H2O ice clouds, dust) profiles, and the Surface Radiometric Sensor Package (SuRSeP) measures the total reflected solar radiance, and surface temperatures down to 140K. These combined spectral and thermal measurements will provide a new understanding of the global energy balance, dust transport processes, and climate cycles in the Martian atmosphere. The mission concept for Aeolus consists of a single sub-100 kg secondary spacecraft in a highly inclined orbit, allowing it to pass over all local times. Aeolus attains global coverage of the surface for a mission duration of one Martian year, to capture climate patterns during each Martian season. This paper gives an overview of the Aeolus payload, spacecraft, and the methodology used to mature the Aeolus mission concept.

Mauro, David↗

DSENDS: multi-mission flight dynamics simulator for NASA missions

Increasingly complex space missions require powerful and flexible simulation environments in order to design, analyze, and operate the missions. NASA’s Jet Propulsion Laboratory has created the DSENDS simulation environment that addresses these needs for a wide range of space missions. In this paper, we describe the DSENDS simulation environment and the key architectural components that make DSENDS a useful simulation and analysis framework. We also overview a variety of NASA missions and flight experiments that are using DSENDS.

Sklyanskiy, Evgeniy↗

Planetary Protection, Parts, and Perception: The Ranger Missions as the Origin Story of the Myth of Planetary Protection-Related Mission Failures

There has been a long-standing perspective in the planetary engineering community that the use of planetary protection sterilization techniques such as dry heat microbial reduction (DHMR) have led to significant mission failures in the past. This perception has led to a hesitation to craft mission designs that incorporate sterilization beyond the component-level. Via interviews with long-standing members of the planetary engineering community across the Agency, we have identified the root historical missions that have driven this perspective. The source, or Origin Story, which has been passed down to subsequent generations of engineers, is the failures tied to the early series of the Ranger missions. In this presentation, we examine the details behind the Ranger failures, the majority of which are non-planetary protection sterilization-related, and bring to light the myth of this perception.

planetary protection↗

A Technical Overview of the Mission Engagement Onboarding Process Managed by the Mission Engagement Working Group (MEWG)

NASA's intricate network, encompassing the Near Space Network (NSN) and Deep Space Network (DSN), plays a pivotal role in supporting an array of space missions. These range from those in Low Earth Orbit (LEO) and Geosynchronous Orbit (GEO), to the more distant Cislunar and Deep Space endeavors. To manage the vast communications needs, we utilize multiple ground stations globally, coupled with the Tracking and Data Relay Satellite System (TDRSS). The Mission Engagement Working Group (MEWG), within the Commercialization, Innovation, and Synergies (CIS) division, stands as the primary gateway for all Space Communications and Network (SCaN) communication and navigation requests. This includes not only NASA's internal missions but also extends to other governmental agencies and commercial sector endeavors. How does the MEWG Process Work? - Initial Contact : Clients initiate their interaction with the NSN by submitting their service requirements through a dedicated online portal. - Preliminary Assessment by MEWG: Upon submission, MEWG embarks on a primary screening of the request. This involves evaluating the client's identity and the foundational concept of their mission. - Detailed Analysis by the NSN Team: Parallelly, the NSN team conducts a comprehensive review of the service request. This often necessitates additional clarification from the requester, ensuring that the final assessment is both thorough and accurate. - Coordination & Streamlining: MEWG's overarching objective is to effectively log, classify, orchestrate, and guarantee that pertinent actions are delegated based on initial client interactions. Acting as the central hub for these primary contacts, MEWG ensures that each request is sufficiently detailed for an in-depth evaluation. - Feedback & Remediation: If a request is deemed unsuitable or lacking, MEWG doesn't merely reject it. Instead, the team discerns the reasons for the inadequacy and suggests potential rectification strategies. This approach ensures that feedback delivered to clients is precise, prompt, constructive, and actionable. Conclusion: This plenary presentation will detail the efforts of the MEWG resulting in a greatly streamlined and refined onboarding process for space communication Direct-To-Earth (DTE) and Space Relay (SR) support requests. By centralizing the preliminary interactions and assessments, we've reduced the complexity for clients, ensuring they engage with a singular, efficient, and responsive point of contact. This initiative, we believe, fortifies NASA's commitment to fostering effective and synergistic collaborations with its partners.

Devin L Bitner↗

A Technical Overview of the Mission Engagement Onboarding Process Managed by the Mission Engagement Working Group (MEWG)

NASA's intricate network, encompassing the Near Space Network (NSN) and Deep Space Network (DSN), plays a pivotal role in supporting an array of space missions. These range from those in Low Earth Orbit (LEO) and Geosynchronous Orbit (GEO), to the more distant Cislunar and Deep Space endeavors. To manage the vast communications needs, we utilize multiple ground stations globally, coupled with the Tracking and Data Relay Satellite System (TDRSS). The Mission Engagement Working Group (MEWG), within the Commercialization, Innovation, and Synergies (CIS) division, stands as the primary gateway for all Space Communications and Network (SCaN) communication and navigation requests. This includes not only NASA's internal missions but also extends to other governmental agencies and commercial sector endeavors. How does the MEWG Process Work? - Initial Contact : Clients initiate their interaction with the NSN by submitting their service requirements through a dedicated online portal. - Preliminary Assessment by MEWG: Upon submission, MEWG embarks on a primary screening of the request. This involves evaluating the client's identity and the foundational concept of their mission. - Detailed Analysis by the NSN Team: Parallelly, the NSN team conducts a comprehensive review of the service request. This often necessitates additional clarification from the requester, ensuring that the final assessment is both thorough and accurate. - Coordination & Streamlining: MEWG's overarching objective is to effectively log, classify, orchestrate, and guarantee that pertinent actions are delegated based on initial client interactions. Acting as the central hub for these primary contacts, MEWG ensures that each request is sufficiently detailed for an in-depth evaluation. - Feedback & Remediation: If a request is deemed unsuitable or lacking, MEWG doesn't merely reject it. Instead, the team discerns the reasons for the inadequacy and suggests potential rectification strategies. This approach ensures that feedback delivered to clients is precise, prompt, constructive, and actionable. Conclusion: This plenary presentation will detail the efforts of the MEWG resulting in a greatly streamlined and refined onboarding process for space communication Direct-To-Earth (DTE) and Space Relay (SR) support requests. By centralizing the preliminary interactions and assessments, we've reduced the complexity for clients, ensuring they engage with a singular, efficient, and responsive point of contact. This initiative, we believe, fortifies NASA's commitment to fostering effective and synergistic collaborations with its partners.

Devin Bitner↗

Mission Architecture for the Green Propulsion Dual Mode Mission

Current spacecraft propulsion technologies are broadly divided into chemical and electric propulsion modes, each of which has unique advantages. It is common for both systems to have a place in interplanetary spacecraft, but the size, weight, and power required to carry two separate propulsion systems is extremely limiting for small spacecraft such as CubeSats. The upcoming NASA STMD-funded Green Propulsion Dual Mode (GPDM) mission will demonstrate on-orbit a novel dual-mode propulsion system known as the GPDM Propulsion System that uses the AF-M315E/ASCENT green monopropellant to feed both a chemical 100 mN monopropellant thruster and four electrospray thrusters. GPDM will fly a 6U CubeSat in low Earth orbit and perform orbit-raising and lowering maneuvers to characterize the performance of this dual-mode propulsion technology, enabling a new generation of future interplanetary small satellite explorers. The Georgia Institute of Technology Space Systems Design Laboratory (SSDL) is conducting the design, assembly, integration, testing, and mission operations of the GPDM host spacecraft, as well as the integration of the GPDM Propulsion System payload, designed by NASA’s Marshall Spaceflight Center (MSFC). The NASA Marshall Space Flight Center is overseeing the overall GPDM project as well as specific technology development activities of the GPDM Propulsion System, while electrospray thrusters are supplied by the MIT Space Propulsion Lab, with additional components supplied by MMA Design, Blue Canyon Technologies, Quasonix, Xiphos, and Rubicon Space Systems. The GPDM spacecraft will carry the GPDM Propulsion System into orbit and use a high-power S-band radio to enable real-time operations in low Earth orbit (LEO) via the NASA Tracking and Data Relay Satellite System (TDRSS). The mission is working towards a tentative launch readiness date of August 2025, in support of launch and operations commencing in January 2026. This paper describes GPDM’s overall mission concept of operations, spacecraft overview, and subsystem breakdown.

Green Propulsion Dual Mode↗

Identification of Mission Sensitivities with Mission Modeling from the One System Organization at Hanford - 13292

The Hanford site in southeast Washington contains approximately 207 million liters of radioactive and hazardous waste stored in 177 underground tanks. The U.S. Department of Energy's Office of River Protection is currently managing the Hanford waste treatment mission, which includes the storage, retrieval, treatment and disposal of the tank waste. Two recent studies, employing the modeling tools managed by the One System organization, have highlighted waste cleanup mission sensitivities. The Hanford Tank Waste Operations Simulator Sensitivity Study evaluated the impact that varying 21 different parameters had on the Hanford Tank Waste Operations Simulator model. It concluded that inaccuracies in the predicted phase partitioning of a few key components can result in significant changes in the waste treatment duration and in the amount of immobilized high-level waste that is produced. In addition, reducing the efficiency with which tank waste is retrieved and staged can increase mission duration. The 2012 WTP Tank Utilization Assessment concluded that flowsheet models need to include the latest low-activity waste glass algorithms or the waste treatment mission duration and the amount of low activity waste that is produced could be significantly underestimated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mission Design Overview for the Phoenix Mars Scout Mission

The Phoenix mission "follows the water" by landing in a region where NASA's Mars Odyssey orbiter has discovered evidence of ice-rich soil very near the Martian surface. For three months after landing, the fixed Lander will perform in-situ and remote sensing investigations that will characterize the chemistry of the materials at the local surface, sub-surface, and atmosphere, and will identify potential provenance of key indicator elements of significance to the biological potential of Mars, including potential organics and any accessible water ice. The Lander will employ a robotic arm to dig to the ice layer, and will analyze the acquired samples using a suite of deck-mounted, science instruments. The development of the baseline strategy to achieve the objectives of this mission involves the integration of a variety of elements into a coherent mission plan.

Phoenix↗

Navigation and Mission Analysis Software for the Next Generation of JPL Missions

MONTE (Mission analysis, Operations, and Navigation Toolkit Environment) is a new software system being developed to replace the navigation and trajectory analysis software currently in use at the Jet Propulsion Laboratory (JPL). MONTE will reproduce the existing functionality of the legacy systems and add significant new capabilities for the MONTE users - the mission and navigation analysts in the Navigation and Mission Design Section (Section 312). MONTE will be developed as a single tightly integrated system, in contrast to the multiple disparate software suites currently in use. MONTE is being designed to facilitate a variety of navigation and trajectory tasks in a broad range of contexts, including research and development, analysis and design, and operations.

MONTE (Mission analysis, Operations, and Navigatio↗

Mission and Navigation Design for the 2009 Mars Science Laboratory Mission

NASA s Mars Science Laboratory mission will launch the next mobile science laboratory to Mars in the fall of 2009 with arrival at Mars occurring in the summer of 2010. A heat shield, parachute, and rocket-powered descent stage, including a sky crane, will be used to land the rover safely on the surface of Mars. The direction of the atmospheric entry vehicle lift vector will be controlled by a hypersonic entry guidance algorithm to compensate for entry trajectory errors and counteract atmospheric and aerodynamic dispersions. The key challenges for mission design are (1) develop a launch/arrival strategy that provides communications coverage during the Entry, Descent, and Landing phase either from an X-band direct-to-Earth link or from a Ultra High Frequency link to the Mars Reconnaissance Orbiter for landing latitudes between 30 deg North and 30 deg South, while satisfying mission constraints on Earth departure energy and Mars atmospheric entry speed, and (2) generate Earth-departure targets for the Atlas V-541 launch vehicle for the specified launch/arrival strategy. The launch/arrival strategy employs a 30-day baseline launch period and a 27-day extended launch period with varying arrival dates at Mars. The key challenges for navigation design are (1) deliver the spacecraft to the atmospheric entry interface point (Mars radius of 3522.2 km) with an inertial entry flight path angle error of +/- 0.20 deg (3 sigma), (2) provide knowledge of the entry state vector accurate to +/- 2.8 km (3 sigma) in position and +/- 2.0 m/s (3 sigma) in velocity for initializing the entry guidance algorithm, and (3) ensure a 99% probability of successful delivery at Mars with respect to available cruise stage propellant. Orbit determination is accomplished via ground processing of multiple complimentary radiometric data types: Doppler, range, and Delta-Differential One-way Ranging (a Very Long Baseline Interferometry measurement). The navigation strategy makes use of up to five interplanetary trajectory correction maneuvers to achieve entry targeting requirements. The requirements for cruise propellant usage and atmospheric entry targeting and knowledge are met with ample margins.

Mission design↗

EOS Aqua Mission Status at the Earth Science Constellation (ECS) Mission Operations Working Group (MOWG) Meeting in Toulouse, France

This presentation provides mission operations status for the Earth Observing System (EOS) Aqua satellite for the past six-months (December 2018 through May 2019). It only contains information that is of interest to the International Earth Science Constellation (ESC) Mission Operations Working Group (MOWG) member missions. It will be presented at the bi-annual MOWG Meeting in Toulouse, France on Wednesday, June 5, 2019. These meetings have been occurring twice a year since the MOWG was formed in 2003.

EOS Aqua↗

THE NUCLEAR SPECTROSCOPIC TELESCOPE ARRAY (NuSTAR) HIGH-ENERGY X-RAY MISSION

The Nuclear Spectroscopic Telescope Array (NuSTAR) mission, launched on 2012 June 13, is the first focusing high-energy X-ray telescope in orbit. NuSTAR operates in the band from 3 to 79 keV, extending the sensitivity of focusing far beyond the {approx}10 keV high-energy cutoff achieved by all previous X-ray satellites. The inherently low background associated with concentrating the X-ray light enables NuSTAR to probe the hard X-ray sky with a more than 100-fold improvement in sensitivity over the collimated or coded mask instruments that have operated in this bandpass. Using its unprecedented combination of sensitivity and spatial and spectral resolution, NuSTAR will pursue five primary scientific objectives: (1) probe obscured active galactic nucleus (AGN) activity out to the peak epoch of galaxy assembly in the universe (at z {approx}< 2) by surveying selected regions of the sky; (2) study the population of hard X-ray-emitting compact objects in the Galaxy by mapping the central regions of the Milky Way; (3) study the non-thermal radiation in young supernova remnants, both the hard X-ray continuum and the emission from the radioactive element {sup 44}Ti; (4) observe blazars contemporaneously with ground-based radio, optical, and TeV telescopes, as well as with Fermi and Swift, to constrain the structure of AGN jets; and (5) observe line and continuum emission from core-collapse supernovae in the Local Group, and from nearby Type Ia events, to constrain explosion models. During its baseline two-year mission, NuSTAR will also undertake a broad program of targeted observations. The observatory consists of two co-aligned grazing-incidence X-ray telescopes pointed at celestial targets by a three-axis stabilized spacecraft. Deployed into a 600 km, near-circular, 6 Degree-Sign inclination orbit, the observatory has now completed commissioning, and is performing consistent with pre-launch expectations. NuSTAR is now executing its primary science mission, and with an expected orbit lifetime of 10 yr, we anticipate proposing a guest investigator program, to begin in late 2014.

79 ASTRONOMY AND ASTROPHYSICS↗