Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Autonomous In-space Construction, Maintenance, and Reconfiguration Using Programmable Meta-Material

NASA ARC's Coded Structures Laboratory (CSL) is developing autonomous construction, maintenance, and reconfiguration technologies to meet long-duration and deep space infrastructure needs, in accordance with long-term NASA goals of "in-space reliance" and "mass-less exploration." We seek to achieve these capabilities by utilizing a "programmable meta-material" approach that integrates emerging advances in materials (mechanical meta-materials), manufacturing (cooperative mobile robotics), and autonomy (multi-agent planning algorithms). Through the ARMADAS project, we have shown assembly of high-performance engineered cellular materials using multiple cooperating mobile robotic assemblers. In this paper, we describe how such a programmable meta-material architecture may shift the paradigm of how we design, build, manufacture, and operate future space infrastructure and assets. The core of a programmable meta-material architecture consists of 3 main technology sub-areas: the structure, the assembly agents, and the assembly algorithms. We co-design these systems to ensure an adaptable system that can create and reconfigure structures from a base set of building block components. From this core technology, we can branch out and expand the capability of the system through additional secondary component types and robotic agents to perform activities such as inspections, maintenance, repair, payload installation, or perform power and communications interconnect. As these technologies mature, future designers will be able to utilize the system to rapidly integrate and operate assets in space or on planetary surfaces from a set of well-tested part library, or create their own modules to integrate into the system. A core trait to the development of this system is the automation approach. Because of the modular and functional discrete (pixel-like) nature of the structural system, a diverse set of powerful algorithms for analysis, planning, and simulation can be adapted and leveraged to optimize construction, maintenance, and dynamic reorganization (as hardware with programmable form and function). With an ability to free the design space from launch vehicle constraints and fundamentally shift how a mission is designed and conducted, we discuss the influence of a programmable meta-material architecture on mission design, build, and operations. For the "design phase", we discuss project lifecycle effects, costs, time, and performance. For the "build phase", we discuss reusability, ISRU, manufacturing, material logistics, and scalability. And for "operations", we discuss autonomy, maintenance and upgrades, reliability, and reconfiguration. Autonomy and modularity are the primary enabling traits of this system. Engineering systems that utilize a modular and reconfiguration building block approach such as digital communication and computation systems, currently lead all other areas of technology in size and complexity scalability. NASA is extending the benefits and flexibility of digital systems to hardware systems, to optimize materials lifecycle management and expand our space exploration mission capabilities.

in space assembly↗

Method and computer program product for maintenance and modernization backlogging

According to one embodiment, a computer program product for determining future facility conditions includes a computer readable medium having computer readable program code stored therein. The computer readable program code includes computer readable program code for calculating a time period specific maintenance cost, for calculating a time period specific modernization factor, and for calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. In another embodiment, a computer-implemented method for calculating future facility conditions includes calculating a time period specific maintenance cost, calculating a time period specific modernization factor, and calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. Other embodiments are also presented.

97 MATHEMATICS AND COMPUTING↗

Assessment of Cloud-based Applications for Enabling a Scalable Riskinformed Predictive Maintenance Strategy

The current light-water reactor fleet uses time-based maintenance strategies to achieve high-capacity factors. But to make nuclear more competitive in the energy market, these reactors could utilize emerging artificial intelligence (AI) and cloud computing technologies to achieve a cost-effective, predictive-maintenance strategy. This paper presents discussion and results on the application of cloud computing in the nuclear industry. The technical viability of cloud computing was analyzed using data from a boiling-water reactor’s safety relief valve. The models were hosted on three different systems: a local personal computer, Idaho National Laboratory’s high-performance computer system, and Microsoft Azure. The data were loaded and processed, and two types of models were trained in an A/B fashion. Based on the speed at which these actions were completed, it was determined that cloud computing affords adequate computing resources. Additionally, the computing power can scale with the demanded load. To enable cloud computing in the existing fleet, additional sensors, networks, and other requirements must be implemented to ensure a smooth transition from current maintenance strategies. However, the benefit is that the plants no longer need to manage their own servers, software, cybersecurity, and information technology support staff for in-house data analytics purpose. Many of these features can be offloaded to the cloud provider for a potential cost savings. Demonstrating how AI can improve the maintenance and operation of non-safety-related systems seems the likely path forward for implementing AI and cloud computing resources inside nuclear power plants.

azure↗

NASA Critical Facilities Maintenance Assessment

Critical Facilities Maintenance Assessment (CFMA) was first implemented by NASA following the March 2000 overtest of the High Energy Solar Spectroscopic Imager (HESSI) spacecraft. A sine burst dynamic test using a 40 year old shaker failed. Mechanical binding/slippage of the slip table imparted 10 times the planned force to the test article. There was major structural damage to HESSI. The mechanical "health" of the shaker had not been assessed and tracked to assure the test equipment was in good working order. Similar incidents have occurred at NASA facilities due to inadequate maintenance (e.g., rainwater from a leaky roof contaminated an assembly facility that housed a spacecraft). The HESSI incident alerted NASA to the urgent need to identify inadequacies in ground facility readiness and maintenance practices. The consequences of failures of ground facilities that service these NASA systems are severe due to the high unit value of NASA products.

maintenance↗

Autocrine Semaphorin3A signaling is essential for the maintenance of stem-like cells in lung cancer

Cancer stem-like cells (CSCs) exist in tumor tissues composed of heterogeneous cell population and are characterized by their self-renewal capacity and tumorigenicity. Many studies demonstrate that eradication of CSCs prevents development and recurrences of tumor; yet, molecules critical for the maintenance of CSCs have not been completely understood. We previously reported that Semaphorin3A (Sema3a) knockdown suppressed the tumorigenicity and proliferative capacity of Lewis lung carcinoma (LLC) cells. Therefore, we identified Sema3a as an essential factor for the establishment or maintenance of CSCs derived from LLC (LLC-stem cell). shRNA against Sema3a was introduced into LLC cells to establish a LLC-stem cell line and its effects on tumorigenesis, sphere formation, and mTORC1 activity were tested. Sema3a knockdown completely abolished tumorigenicity and the sphere-formation and self-renewal ability of LLC-stem cells. The Sema3a knockdown was also associated with decreased expression of mRNA for stem cell markers. The self-renewal ability abolished by Sema3a knockdown could not be recovered by exogenous addition of recombinant SEMA3A. In addition, the activity of mammalian target of rapamycin complex 1 (mTORC1) and the expression of its substrate p70S6K1 were also decreased. These results demonstrate that Sema3a is a potential therapeutic target in eradication of CSCs. - Highlights: • Sema3a enhances tumorigenic capacity of cancer stem-like cells. • Sema3a is essential for the maintenance of cancer stem-like cells. • Sema3a can be a therapeutic target to eradicate cancer stem-like cells.

60 APPLIED LIFE SCIENCES↗

Cross-domain digital twin architecture for predictive maintenance via machine learning and Large Language Models

This research introduces a comprehensive framework for creating and deploying a digital twin platform for continuous monitoring and predictive maintenance within industrial settings. Through utilizing advanced technologies, including Unreal Engine 5, Unity 3D, the Message Queue Telemetry Transport protocol, Random Forest machine learning algorithms, and Large Language Models (LLMs), we establish a platform that digitally reproduces physical equipment and translates digital controls into real-world actions. This facilitates preventive maintenance approaches and improves operational effectiveness. The digital twin platform gathers sensor data from operational equipment, analyzes it using machine learning, and delivers practical insights to prevent potential malfunctions and enhance equipment performance. Furthermore, the incorporation of a web portal enables efficient monitoring and access to historical data, educational materials, and equipment status information. Preliminary findings indicate that digital twins can transform industrial equipment management and maintenance methodologies.

97 MATHEMATICS AND COMPUTING↗

Software solutions manage the definition, operation, maintenance and configuration control of the National Ignition Facility

The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of the shot experiment data and the safe operation of the facility. The NIF business application suite of software provides the means to effectively manage the definition, build, operation, maintenance and configuration control of all components of the National Ignition Facility. State of the art Computer Aided Design software applications are used to generate a virtual model and assemblies. Engineering bills of material are controlled through the Enterprise Configuration Management System. This data structure is passed to the Enterprise Resource Planning system to create a manufacturing bill of material. Specific parts are serialized then tracked along their entire lifecycle providing visibility to the location and status of optical, target and diagnostic components that are key to assessing pre-shot machine readiness. Nearly forty thousand items requiring preventive, reactive and calibration maintenance are tracked through the System Maintenance & Reliability Tracking application to ensure proper operation. Radiological tracking applications ensure proper stewardship of radiological and hazardous materials and help provide a safe working environment for NIF personnel.

42 ENGINEERING↗

Toward the application of the Risk-Based Maintenance approach to a hydrogen-fueled manufacturing plant

Safety, reliability, and maintenance of hydrogen-based equipment, including Risk-Based Maintenance (RBM), have recently gained increasing attention, as hydrogen, while key to decarbonizing hard-to-abate sectors, raises safety concerns. However, two literature gaps limit the development of risk-based strategies for hydrogen technologies. First, existing RBM methodologies do not account for hydrogen-specific components, such as electrolyzers, which differ from conventional equipment. Second, available studies on electrolyzer reliability remain largely qualitative or laboratory-scale. This study addresses these gaps by proposing an adapted RBM methodology tailored to hydrogen-fueled manufacturing facilities. Integrating qualitative tools (e.g., FMEA) with probabilistic models (e.g., Bayesian Networks) enables comprehensive hazardous scenarios identification and likelihood estimation. A conceptual layout of a glass furnace supplied by a 3 MW PEM electrolyzer is considered as a case study to demonstrate the feasibility of the adapted RBM framework in identifying high-risk components and enabling maintenance prioritization, potentially improving plant safety.

08 HYDROGEN↗

Operations & Maintenance Best Practices - A Guide to Achieving Operational Efficiency (Release 3)

This guide highlights operations and maintenance programs targeting energy and water efficiency that are estimated to save 5% to 20% on energy bills without a significant capital investment. The purpose of this guide is to provide you, the Operations and Maintenance (O&M)/Energy manager and practitioner, with useful information about O&M management, technologies, energy and water efficiency, and cost-reduction approaches. To make this guide useful and to reflect your needs and concerns, the authors met with O&M and Energy managers via Federal Energy Management Program (FEMP) workshops. In addition, the authors conducted extensive literature searches and contacted numerous vendors and industry experts. The information and case studies that appear in this guide resulted from these activities. It needs to be stated at the outset that this guide is designed to provide information on effective O&M as it applies to systems and equipment typically found at Federal facilities. This guide is not designed to provide the reader with step-by-step procedures for performing O&M on any specific piece of equipment. Rather, this guide first directs the user to the manufacturer's specifications and recommendations. In no way should the recommendations in this guide be used in place of manufacturer's recommendations. The recommendations in this guide are designed to supplement those of the manufacturer, or, as is all too often the case, provide guidance for systems and equipment for which all technical documentation has been lost. As a rule, this guide will first defer to the manufacturer's recommendations on equipment operation and maintenance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Wind Energy Computerized Maintenance Management System (CMMS): Data Collection Recommendations for Reliability Analysis

This report addresses the general data requirements for reliability analysis of fielded wind turbines and other wind plant equipment. The report provides a rationale for why this data should be collected, a list of the data needed to support reliability and availability analysis, and specific data recommendations for a Computerized Maintenance Management System (CMMS) to support automated analysis. This data collection recommendations report was written by Sandia National Laboratories to address the general data requirements for reliability analysis of operating wind turbines. This report is intended to help develop a basic understanding of the data needed for reliability analysis from a Computerized Maintenance Management System (CMMS) and other data systems. The report provides a rationale for why this data should be collected, a list of the data needed to support reliability and availability analysis, and specific recommendations for a CMMS to support automated analysis. Though written for reliability analysis of wind turbines, much of the information is applicable to a wider variety of equipment and analysis and reporting needs. The 'Motivation' section of this report provides a rationale for collecting and analyzing field data for reliability analysis. The benefits of this type of effort can include increased energy delivered, decreased operating costs, enhanced preventive maintenance schedules, solutions to issues with the largest payback, and identification of early failure indicators.

17 WIND ENERGY↗

Maintenance Engineering Basics & Best Practices

The purpose of this document is to concisely describe the basics of maintenance engineering, summarize maintenance policies at Los Alamos National Laboratory, and also review current industry best-practices through the use of case studies. Maintenance engineering incorporates the study of failure, reliability, policies, and procedures in order to optimize cost and equipment availability. Each of these topics will be covered within this report.

42 ENGINEERING↗

Windfarm Operations and Maintenance cost-Benefit Analysis Tool (WOMBAT)

This report provides technical documentation and background on the newly-developed Wind Operations and Maintenance cost-Benefit Analysis Tool (WOMBAT) software. WOMBAT is an open-source model that can be used to obtain cost estimates for operations and maintenance of land-based or offshore wind power plants. The software was designed to be flexible and modular to allow for implementation of new strategies and technological innovations for wind plant maintenance. WOMBAT uses a process-based simulation approach to model day-to-day operations, repairs, and weather conditions. High-level outputs from WOMBAT, including time-based availability and annual operating costs, are found to agree with published results from other models.

17 WIND ENERGY↗

Explainable Artificial Intelligence Technology for Predictive Maintenance

The domestic nuclear power plant fleet has relied on labor-intensive and time-consuming preventive maintenance programs, thus driving up operation and maintenance costs to achieve high-capacity factors. Artificial intelligence and machine learning can help simplify complex problems, such as diagnosing equipment degradation, to enable more effective decision-making. Benefits will be felt not only within existing analog and digital instrumentation and control, but also work processes, the integration of people with technology, and most importantly, the business case. Together, these hold promise to make nuclear power more efficient and reduce costs associated with operation and maintenance. While the artificial intelligence and machine learning technologies hold significant promise in the nuclear industry, there are challenges or barriers to their adoption. This report outlines the those different machine learning adoption barriers (categorized as historical, technical, economic, regulatory, and user) that the industry must overcome to realize the full benefits of artificial intelligence and machine learning capabilities for long-term economic sustainability. This report also provides solutions for some of these barriers by focusing on improving the explainability of machine learning to encourage trust from the end-user. Trust and explainability are essential to machine learning adoption. This report focuses on research-developed solutions to some of these barriers while analyzing a non-safety-related system, namely the circulating water system. This system frequently experiences waterbox fouling which our models preemptively diagnoses then explains to the operator how those conclusions were reached. This report presents and discusses the inherent trade-off between machine learning performance (in terms of accuracy) and explainability, where highly accurate machine learning methods (such as deep-learning) are the least explainable, and the most explainable methods (such as decision trees) are the least accurate. In addition, explainability of artificial intelligence techniques in terms of transparency and post-hoc metrics are discussed. This report outlines the importance of data novelty and value of new information in evaluating both the explainability and trustworthiness. Novelty detection helps to establish consistency or inconsistency of the new data with respect to the training data. On the other hand, value of information could be a part of the user-centric visualization recommendation system that request additional information to be collected, thereby strengthening the machine learning outcomes. During this project, a copyrighted user-centric visualization that aligns with a human-in-the-loop approach was developed. The user-centric visualization presents different levels of information and can be tailored as per user credentials to gain user confidence. One of the salient features of the user-centric visualization is it presents machine learning methods with explainability metrics. A simplified version of the user-centric visualization was presented to 32 users with varying levels of machine learning expertise. Feedback was solicited to test the hypothesis that the app contained sufficient explainability and that the users would trust the algorithm. Overall, the app was positively received, and the hypothesis was supported. This report discusses the trust-but-verify framework – a potential approach to build user trust artificial intelligence. The framework discusses trust from the human level to artificial intelligence level. The fundamental premise of the trust but verify framework is derived from an observation of nuclear safety culture (i.e., nuclear power plant personnel do not rely on a singular source of data to make a decision). This also ties back to the user-centric visualization that presents different levels of information to achieve both explainability and trustworthiness of artificial intelligence. Even so, the adoption of artificial intelligence and machine learning in the nuclear industry faces additional barriers, namely regulatory and stakeholder readiness. To overcome these challenges, new solutions must gain regulatory approval and cater to stakeholder needs. The Nuclear Regulatory Committee has a 5-year strategic plan which prepares them for reviewing artificial intelligence technologies in licensee submissions. Early and frequent engagement with the regulator is encouraged. Additionally, artificial intelligence solutions should incorporate human-in-the-loop considerations and offer explainability. Stakeholders must prepare by hiring or training staff to adapt to advancing technology in everyday plant tasks.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Demonstration and Evaluation of Explainable and Trustworthy Predictive Technology for Condition-based Maintenance

The domestic nuclear power plant (NPP) fleet has historically relied on labor-intensive and time-consuming predictive maintenance (PdM) programs, thus driving up operation and maintenance (O&M) costs to achieve high-capacity factors. Artificial intelligence (AI) and machine-learning (ML) can help simplify complex problems such as diagnosing equipment degradation to enable more effective decision-making efforts. The benefits of AI will be felt through more efficient plant O&M, improved work processes, and better integration of people and technology. Together, these benefits hold the promise to make nuclear power more sustainable by reducing O&M costs while improving employee engagement. While AI and ML technologies hold significant promise for the nuclear industry, there are challenges or barriers to their adoption. Explainability and trustworthiness of AI are two salient challenges that need to be addressed for wider deployment of these technologies in NPPs. This research focuses specifically on addressing the explainability and trustworthiness of AI technologies to advance the human, technical, and organization (HTO) readiness levels in adopting a risk-informed PdM strategy at commercial NPPs. In addition, this approach can be adapted to enhance the acceptability of AI in other nuclear applications with a few application-specific modifications. The technical approach ensuring wider adoption of AI technologies was developed by Idaho National Laboratory (INL)—in collaboration with Public Service Enterprise Group (PSEG), Nuclear, LLC—by utilizing the circulating water system (CWS) at two PSEG-owned plant sites for demonstration. Focused user studies were performed in collaboration with subject matter experts (SMEs) from PSEG and other nuclear domains to enhance human and organization readiness by building trust in AI-informed technologies. VIsualization for PrEdictive maintenance Recommendation (VIPER)—a Battelle Energy Alliance, LLC, copyrighted software—was developed and expanded to provide a user-centric visualization by incorporating inputs from the collaborating utility, human factors engineering guidelines, and data analysts. The VIPER software enables users, who may be unfamiliar with ML in general, to be interactively engaged by asking technical questions about PdM, work orders, diagnosis results and their confidence levels, the kind of data being used, and the types of ML algorithms employed. This interactive engagement enhances explainability and builds trust. One of the enabling accomplishments was the integration of large language models (LLMs), both text-based and vision-based, in the VIPER software.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2005-2006 Annual Progress Report.

The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program designed to enhance both subsistence fishing, educational opportunities for Tribal members of the Shoshone-Paiute Tribes, and recreational fishing facilities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program also intends to afford and maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was the least productive as a result of high turbidity levels and constraining water quality parameters. Lake Billy Shaw trout were in poorer condition than in previous years potentially as a result of water quality or other factors. Mountain View Reservoir trout exhibit the best health of the three reservoirs and was the only reservoir to receive constant flows of water.

13 HYDRO ENERGY↗

Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2006-2007 Annual Progress Report.

The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program that serves to partially mitigate the loss of anadromous fish that resulted from downstream construction of the hydropower system. The project's goals are to enhance subsistence fishing and educational opportunities for Tribal members of the Shoshone-Paiute Tribes and provide resident fishing opportunities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program is also designed to maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was very unproductive this year as a fishery. Fish morphometric and water quality data indicate that the turbidity is severely impacting trout survival. Lake Billy Shaw was very productive as a fishery and received good ratings from anglers. Mountain View was also productive and anglers reported a high number of quality sized fish. Water quality (specifically dissolved oxygen and temperature) is the main limiting factor in our fisheries.

13 HYDRO ENERGY↗

Staffing Strategies for Maintenance of Critical Software Systems at the Jet Propulsion Laboratory

The Mission Design and Navigation Software Group at the Jet Propulsion Laboratory (JPL) maintains mission critical software systems. We have good empirical data and models for maintenance demand—when defects will occur, how many and how severe they will be, and how much effort is needed to address them. However, determining the level of staffing needed to address maintenance issues is an ongoing challenge and is often done ad-hoc. There are two common strategies are (1) reactive – add/remove staff as needed to respond to maintenance issues, and (2) capacitive – retain a given staff size to address issues as they occur, proactively address issues and prevent defects.

software maintenance↗

Online Monitoring to Enable Improved Diagnostics, Prognostics and Maintenance

For both existing and new plant designs there are increasing opportunities and needs for the application of advanced online surveillance, diagnostic and prognostic techniques. These methods can continuously monitor and assess the health of nuclear power plant systems and components. The added effectiveness of such programs has the potential to enable holistic plant management, and minimize exposure to future and unknown risks. The 'NDE & On-line Monitoring' activities within the Advanced Instrumentation, Information and Control Systems (II&CS) Pathway are developing R&D to establish advanced condition monitoring and prognostics technologies to understand and predict future phenomena, derived from plant aging in systems, structures, and components (SSC). This research includes utilization of the enhanced functionality and system condition awareness that becomes available through the application of digital technologies at existing nuclear power plants for online monitoring and prognostics. The current state-of-the-art for on-line monitoring applied to active components (eg pumps, valves, motors) and passive structure (eg core internals, primary piping, pressure vessel, concrete, cables, buried pipes) is being reviewed. This includes looking at the current deployment of systems that monitor reactor noise, acoustic signals and vibration in various forms, leak monitoring, and now increasingly condition-based maintenance (CBM) for active components. The NDE and on-line monitoring projects are designed to look beyond locally monitored CBM. Current trends include centralized plant monitoring of SSC, potential fleet-based CBM and technology that will enable operation and maintenance to be performed with limited on-site staff. Attention is also moving to systems that use online monitoring to permit longer term operation (LTO), including a prognostic or predictive element that estimates a remaining useful life (RUL). Many, if not all, active components (pumps, valves, motors etc.) can be well managed, routinely diagnosed, analyzed and upgraded as needed using a combination of periodic and online CBM. The ability to successfully manage passive systems and structures is seen as the key to LTO, particularly in the USA. New approaches will be demonstrated, including prognostics for passive structures, which is critical to maintaining safety and availability and to reducing operations and maintenance costs for NPP's. To provide proactive on-line monitoring that includes estimates for RUL new projects will include advanced sensors, better understanding of stressors and challenges faced in quantification of uncertainty associated with RUL. This program area will leverage insights from past experience in other industries and seek to demonstrate the feasibility of on-line monitoring and prognostics to support NPP LTO.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗